Industry Question 19-NOV-2020.pdf

PDF 70 KB Posted

Attached to
REQUEST FOR PROPOSAL (RFP) A-KITS
Solicitation number
W58RGZ-20-R-0063
Issued by

About this file

This document provides details of a Request for Proposal for Airframe Modification Kit manufacture. The Department of the Army Materiel Command Contracting Command Redstone Arsenal is seeking proposals from small businesses located in the Huntsville-Decatur-Albertville Combined Statistical Area to provide the manufacture of airframe modification kits, or A-kits, for installation of Air Soldier System components onto rotary wing aircraft over the next five years. Proposals must be submitted no later than November 16, 2020 at 1600 hours Central Time to the listed email addresses and meet the instructions provided in Section L of the RFP. The A-kits will provide wiring harnesses, mechanical brackets, fasteners, and connectors for three types of Air Soldier System line replaceable units. Respondents must demonstrate capabilities to meet quality standards and fabrication requirements for electrical/electronic assemblies and cable/wire harness assemblies.

View the file

Other files

File Type Posted
Industry Question 17-NOV-2020.pdf PDF
W58RGZ-20-R-0063-0002.pdf PDF
INDUSTRY QUESTIONS 13-NOV-2020.pdf PDF
W58RGZ-20-R-0063-0001.pdf PDF
Industry Question 111020.pdf PDF
Extension 11-09-20.pdf PDF
Industry Question 110920.pdf PDF
Industry Question 6 NOV 20.pdf PDF
Industry Questions (MOLEX PNs) USG RESPONSE 5 (11052020).pdf PDF
1051734X16 110320.pdf PDF
1051710_X00 WIRING DIAGRAM ASDC UH-60AL 110320.pdf PDF
INDUSTRY QUESTIONS 03NOV20.pdf PDF
INDUSTRY QUESTIONS (PERIOD of PERFORMANCE-SOW UPDATE)10212020.pdf PDF
INDUSTRY QUESTIONS 10222020.pdf PDF
W58RGZ-20-R-0063r2.pdf PDF
Attachment 1 W58RGZ-20-R-0063 A-kit TDP Index 21 Oct 2020 Update.xlsx XLSX spreadsheet
INDUSTRY QUESTIONS (TDP Drawings) USG RESPONSE (10192020).pdf PDF
1Attachment 1 W58RGZ-20-R-0063 A-kit TDP Index 27 Aug 2020.xlsx XLSX spreadsheet
1051893D_X10.pdf PDF
Attachment 0011 Price Input Workbook _ 27 Aug 2020.xlsx XLSX spreadsheet
Attachment 0012 GFP AKIT IDIQ.xlsx XLSX spreadsheet
W58RGZ-20-R-0063r1.pdf PDF
CONTRACTING FORMAL RESPONSE POSTING W58RGZ-20-R-0063 REV1.pdf PDF
Exhibit B W58RGZ-20-R-0063 A-Kit Document Summary List 3 Aug 2020.pdf PDF
Exhibit A CDRLs W58RGZ-20-R-0063 A-Kits 3 Aug 2020.pdf PDF
W58RGZ-20-R-0063 .pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Industry Question:

Section L states that "The offeror shall cross-reference the proposal to all solicitation criteria."

Will the Government please confirm that the required Cross-Reference Matrix does not count against page count? Additionally, we would like to include an Acronym list with the Table of Contents and List of Figures. Will the Government please confirm that an Acronym List will not be counted against page count?

USG Response:

The USG confirms the cross reference matrix does not count against proposal page count. An Acronym List will not count against proposal page count.

File details come from the government source that posted it. Updated .