Attachment_0017_-_Sample_Order_3.pdf
PDF 434 KB Posted
- Solicitation number
- W58RGZ-16-R-0070
About this file
This statement of work defines the requirements for a firm fixed price contract to fabricate and deliver 300 laser detection set A-kits for installation on UH-60A/L helicopters. Key requirements include fabrication of the kits per the technical data package by March 2019, packaging to Mil-Std-129 level B preservation, sequential numbering, inspection and acceptance at contractor's facility, and shipping to Logistics Support Facility Management Activity at Redstone Arsenal. The government will provide 300 power filters as furnished property. The contractor must notify the procuring contracting officer within 30 days if any parts in the technical data package become obsolete or superseded.
Attachment 0015 - Sample Order 1
View the file
Other files
Show 40 more
Latest 50 of 72 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 0017
STATEMENT OF WORK (SOW)
FOR
FABRICATION OF THE UH-60A/L AN/AVR-2B A-KIT
FOR THE INSTALLATION OF THE LASER DETECTING
SET
SAMPLE ORDER 3
REV 1
APRIL 5, 2018
LOGISTIC SUPPORT FACILITY MANAGEMENT ACTIVITY
FFP
STATEMENT OF WORK
FOR FABRICATION OF THE UH-60A/L AN/AVR-2B A-KIT
FOR THE INSTALLATION OF THE LASER DETECTING SET
1.0 Scope
This Statement of Work (SOW) defines the effort required to deliver the quantity of 300 each
AN/AVR-2B LDS A-Kits, required to install the LDS on the UH-60A/L helicopters. This SOW also defines the requirements for packaging, labeling, and shipping for the AN/AVR-2B LDS A-
Kits.
1.1 Background
PM-UH and PM-ASE have a shared requirement for the rapid fabrication of 300 each A-Kits to support the airframe modification of the U.S. Army UH-60A/L fleet with the AN/AVR-2B Laser
Detecting Set (LDS). The AN/AVR-2B LDS A-kit is necessary for the installation of the
AN/AVR-2B LDS (B-Kit) onto UH-60A/L helicopter airframes.
1.2 Management and Administrative
The Contractor shall identify a single program management Point of Contact (POC) at the Post
Award Conference (PAC). This POC shall be responsible for ensuring successful delivery of this effort within the contracted schedule, by actively managing acquisition elements, subcontract elements, manufacturing elements, and kitting elements.
2.0 Applicable Documents
Applicable drawings are listed in the Contract Document Summary List (DSL), found at the end of this SOW.
3.0 Requirements
The contractor shall fabricate, package and ship a quantity of 300 each AN/AVR-2B LDS A-kits in accordance with (IAW) the requirements defined in this SOW. The contractor shall propose to support this work IAW the CLIN schedule defined in Attachment-1. *Note: No components of the
AN/AVR-2B LDS (B-Kit) will be procured via this requirement.
3.1 Fabrication
The contractor shall fabricate 300 each AN/AVR-2B LDS A-kits IAW the TDP defined in this
SOW. The contractor shall use the latest TDP drawing revisions when fabricating the AN/AVR-
2B LDS A-kits defined in this SOW.
3.2 Packaging
The contractor shall package 300 each AN/AVR-2B LDS A-kits IAW MIL-STD-129. The contractor shall insure a level of preservation of “B”, IAW preservation requirements and packaging requirements defined in MIL-STD-2073-1.
3.3 Labeling
The contractor shall label the first AN/AVR-2B LDS A-kit as kit number 1000, label the second kit as number 1001, label the third kit as number 1002 and continue this incremental numbering sequence for all 300 each AN/AVR-2B LDS A-kits.
3.4 Inspection and Acceptance
Government Inspection and Acceptance of end item deliverables defined in this SOW, will be made by DCMA at any of the contractor facilities (Origin/Origin) using DD Form 250 and/or an electronic equivalent in Wide Area Work Flow (WAWF).
3.5 Shipping
The contractor shall MARK FOR and SHIP TO all above items to:
LSFMA
ATTN: LSMA Cage Manager
Building Number 1234
Redstone Arsenal, AL 35898
3.6 Post Award Conference
The Contractor shall host a PAC to establish the framework of the Contractor and Government interaction during the delivery of this effort. The PAC shall be held no later than (NLT) 30 calendar days after contract award. The Contractor shall submit PAC meeting minutes and PAC briefing material in contractor format and shall submit to the awarding Procuring Contracting
Officer (PCO), NLT Five calendar days after PAC conclusion.
3.7 Travel
The contractor is NOT expected to travel during the delivery of end items defined in this SOW.
4.0 Delivery Schedule
The Contractor shall deliver AN/AVR-2B LDS A-kit IAW the delivery schedule defined in
Attachment-2. The Contractor is authorized to deliver early. **Note: For proposal purposes only, the contractor shall assume an estimated contract award date of March 2019.
5.0 Non-Availability
The contractor shall notify the PCO of any occurrence of a part number defined in the AN/AVR-
2B LDS A-Kits Technical Data Package (TDP) that is: 1) no longer available from the Original
Equipment Manufacturer (OEM) or 2) OEM has rolled to a new part number. Contractor notification to the PCO must provide: 1) a path forward to replacing the old part number with its equivalent counterpart and 2) requesting Government review and direction to allow for alternate part substitution. The contractor shall notify the PCO NLT 30 calendar days after the evidence of the above is known.
6.0 Government Furnished Property
The Government will provide Government Furnished Property (GFP), as defined in Attachment-
3. The Government will supply a quantity of 300 each 28 VDC Power Filters to be included with the AN/AVR-2B LDS A-kits defined in this SOW. This GFP will be provided to the contractor
NLT 60 calendar days after contract award.
Document Summary List (DSL)
TDP AN/AVR-2B Technical Data Package
File details come from the government source that posted it. Updated .