This file is an Amendment (0006) to a federal solicitation (W56ZTN25R0003) for maintenance, repair, reconstruction, demolition, replacement, and installation of various roofing systems at Aberdeen Proving Ground, Maryland. The competitive 8(a) set-aside contract is for a five-year base period with a six-month extension, using NAICS code 238160 and a size standard of $19M. The solicitation is for a single-award, firm-fixed-price, indefinite-delivery requirements-type construction contract.
Key amendment details include responses to Request for Information (RFI) 03, which clarified requirements such as the contractor needing an office within 60 miles of both Aberdeen Proving Grounds and Adelphi Laboratories Center, updating Davis-Bacon wage determination MD20250117 to include roofer/waterproof wages, and addressing subcontracting and bonding questions. The proposal submission deadline is 11:00 AM on 28 July 2025, to be submitted through DOD Safe. The contract will be administered by the Installation and Technology Division at Aberdeen Proving Ground, with the point of contact being Debora Cardoso Thelen.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W56ZTN25R0003_0008.pdf | ||
| W56ZTN25R0003_0007 Final.pdf | ||
| W56ZTN25R0003_0005.pdf | ||
| W56ZTN25R0003_0004.pdf | ||
| Roofing Bid Sheet 5 year base and 6 month extension_Rev 2.0.xlsx | XLSX spreadsheet | |
| W56ZTN25R0003_0003.pdf | ||
| W56ZTN-25-R-0003 Attendance list roofing site visit.docx | DOCX document | |
| W56ZTN25R0003_0002.pdf | ||
| W56ZTN25R0003_0002.pdf | ||
| Roofing Bid Sheet 5 year base and 6 month extension_Rev 1.0.xlsx | XLSX spreadsheet | |
| ROOFING CLIN BID SHEET FY25 Contract_03.17.2025.xls | XLS spreadsheet | |
| W56ZTN25R00030001.pdf | ||
| W56ZTN25R0003_Final.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56ZTN25R0003
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0006 is hereby provided as noted throughout this document.
See SF30 - block 14 Continuation Page
1. CONTRACT ID CODE PAGE OF PAGES
J 1 362
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2025
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W56ZTN25R0003
X 9B. DATED (SEE ITEM 11)
05-Mar-2025
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2025
CODE
ACC-APG INSTALLATION AND TECHNOLOGY DIV
6472 INTEGRITY COURT
BUILDING 4401
ABERDEEN PROVING GROUND MD 21005-3013
W56ZTN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0006
The Purpose of this modification is to:
1. Include RFI 03 answers.
2. Revised section SECTION 01010 – SW 1.6 – Location in the PWS to read: Prime contractor must have an office within sixy (60) miles of both Aberdeen Proving Grounds (APG) and Adelphi Laboratories Center
(ACL).
3. Update Davis Bacon Wage Determination MD20250117 published on 06/27/2025 to include roofer/waterproof wage. All others terms and conditions remain unchanged. Please read the entire solicitation to include the responses to the RFI's prior to submitting the proposal.
4. The point of contact for this action is Debora Cardoso Thelen, debora.c.cardosothelen.civ@army.mil
SECTION 00 30 00 - AVAILABLE INFORMATION
The following have been added by full text:
RFI ANSWER 3
RFI 03 - QUESTIONS AND ANSWERS
01 - After reviewing the solicitation, we see a requirement stating we must have an office within 50 miles of both APG and Adelphi Labs, our office is within the 50-mile radius of APG, but 53.4 miles away from Adelphi Labs.
We would like to kindly request the government to extend this radius as we are very interested and capable of doing this work.
Revised SOW to read 60 miles in lieu of fifty.
02 - "The Davis-Bacon wage scale for Building in Harford County, MD (MD20250117) was just updated on 6/27/25 and a Roofer wage was added (It is now $52.21 base plus $14.91 fringe for a total of $67.12/hr). Please confirm the 6/27/25 mod to MD20250117 shall be incorporated into the Contract."
Yes, updates for the Davis-Bacon MD20250117 will be incorporated in the contract.
03 - Will 8(a) prime contractors be allowed to subcontract 100% of the physical labor, provided they retain management and oversight roles?
A major subcontractor is defined as a subcontractor which is expected to perform 15% or more of the total work on the contract. An 8a prime may subcontract the physical labor portions provided the subcontractors qualifications meet or exceed the requirements outlined in the SOW and the labor force meets the security requirements for access to the installation and to the security areas on post. For the evaluation of the subcontractor performance, the following documents are requested: a letter of intent/sub-contracting agreement between subcontractor and prime contractor, EMR for the subcontractors, sub-contractor’s field superintendent qualification(s), Safety program, QA/QC program.
04 - Are subcontractor bonding and performance qualifications evaluated at the task order level or at the base IDIQ level?
Bonding and performance shall be provided for the awarded offeror, no for the subcontractor. The instructions for offerors, item 3.c.(i) subfactor A states:
Offerors shall provide a signed letter from its Surety company stating that the offeror qualifies and can obtain $22 million of performance and payment bonds.
Bonding will be required at the task order level when required by the FAR or as deemed necessary by the Contracting Officer.
Bonding is not included in the contractor’s coefficient.
Offeror shall also provide contact information for the surety so that the Government can at its discretion verify the information provided. When obtaining performance and payment bonds at the task order level, contractors shall submit their paid invoice from the surety to the Contracting Officer via email within five (5) days after task order award and prior to the pre- construction meeting with the Directorate of Public Works (DPW). The contractor will only be paid up to the bonding amount proposed in each task order proposal. NOTE: Surety companies utilized for the proposal and contract must be listed on the U.S.
Department of the Treasury website. Reference https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html.
05 - What financial or performance history is expected of subcontractors supporting 8(a) primes for this opportunity?
Only the successful bidder (i.e. prime contractor) will be under contractual obligation with the government.
With a sub-contractor, no such obligation is present as a sub-contractor is under contractual agreement with the prime, not the government. However, in the case of teaming agreements, where a contractual document establishing the teaming agreement/partnership is in place, these requirements may be shared among the W56ZTN25R0003 teaming partners, provided the Project Manager position is filled by an employee of the prime contractor of said teaming agreement.
For the evaluation of the subcontractor performance, is requested: a letter of intent/sub-contracting agreement between subcontractor and prime contractor, EMR for the subcontractors, sub-contractor’s field superintendent qualification(s), Safety program, QA/QC program.
06 - Can a subcontractor submit its capability statement directly, or must it be included under the prime’s proposal only?
Past Performance Information shall be sent by the offeror. This volume shall not exceed 20 pages plus five
(5) pages for each major subcontractor, excluding Questionnaire Forms. Offerors shall submit no more than five (5) contracts performed by the prime and no more than five (5) contracts for each major subcontractor (if any) in performance during any portion of the past five (5) years from the date of this solicitation. Unless the subcontractor is part of a Bonafide teaming agreement with the prime, then the answer is no, the subcontractors may not submit their capability statements directly to the government. Any subcontractor capability statement submitted outside of a Bonafide teaming agreement will not be reviewed or considered as a technically acceptable submittal for evaluation.
07 - Will non-8(a) subcontractors be notified of award developments if included on a prime’s team?
No, only the prime contractors will be notified of any Government notification.
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
STATEMENT OF WORK
Roofing Requirement Contract Specification Work Request: IE-0002G-4J
SECTION 01010
STATEMENT OF WORK (SOW) and
SPECIAL CONDITIONS(SC)
STATEMENT OF WORK
SW-1 DESCRIPTION OF WORK
SW-1.1 This work consists of furnishing all plant, labor, materials, equipment, tools, services, insurance and bonding necessary and performing all work necessary for the MAINTENANCE, REPAIR, RECONSTRUCTION, DEMOLITION, REPLACEMENT AND/OR INSTALLATION OF A VARIETY
OF ROOFING SYSTEMS. These systems include but are not limited to: Single ply systems (EPDM, TPO and or PVC), Built up systems (Multiple ply Modified Bitumen (APP and SBS), Four ply asphalt systems), Metal roof systems, Shingle systems (Asphalt shingle and Asbestos Cement Shingle), Corrugated Asbestos panel roof systems, Cedar Shake, Slate, Polymethylmethacrylate (PMMA) liquid applied systems, protected membrane roof assemblies/Inverted Roof membrane Assemblies (IRMA) and vegetative roof systems.
SW-1.2 All coordination with the Government shall be through the Contracting Officer (KO) or the Contracting Officers Representative (COR) and the Project Manager (PM Roofing)
SW-1.3 This includes all work related to providing complete and watertight roofing systems on diverse building types.
SW-1.4 This work includes inspections, sampling, and analysis. The Job Superintendent and the Quality Control specialist are required to have seven years of roofing construction experience.
The Quality Control Specialist is also required to be a Register Roof Observer (RRO) in good standing with the IIBEC (Formerly RCI) for a minimum of three years. The Corporate Safety Manager is required to have a minimum of seven years construction related experience, five of which must be solely dedicated to roofing projects. The prime contractor is required to have a full-time safety specialist on site.
SW-1.5 The Contractor will submit full version of the Quality Control Plan and the Safety and Health Plan to the Government within one week after contract award. These are post-award submittals:
SW-1.5.1 Quality Control Plan:
a. Quality Control procedures
b. Quality Control Manager’s responsibilities
c. Quality Control procedures for non-compliance of preventing problems
d. Inspection process for identifying, documenting, and timely correction of punch-lists/deficiencies
e. Plan for managing warranty inspections
f. Quality Control mission statement including commitment from corporate officers to that mission statement
SW-1.5.2 On/Off site Management Plan
a. Number of years’ experience for the Job Superintendent, Quality Control Manager, Quality Control Specialist, and Safety Specialist.
b. Plan for management of multiple projects simultaneously
c. Personnel plan reflecting functions, responsibilities and reporting
d. Resumes of key personnel who will be directly involved in the day-to-day operations
e. Personnel plan to meet peak workload demands
f. Technical support plan to provide technical expertise to field personnel
g. Management plan for improving customer service
h. Corporate philosophy and background of Firm (inclusive of both Prime and major sub-contractors)
SW-1.5.3 Safety and Health Plan
a. Position description and qualifications for Safety Specialist
b. Written health and safety plan
c. Control procedures for non-compliance for Safety and Health procedures
d. Behavior and attitudes of personnel
e. Condition of equipment
f. Experience Modification rate for worker’s Compensation insurance
g. OSHA reportable incidence rates for recordable injuries and illness
h. COVID -19 Compliance procedures.
i. General Liability completed operations insurance claims history printed on insurance provider letterhead
j. Safety Education/toolbox meeting schedules and topics
k. Provide a history for the previous five-year period of violations of Federal, State, Local safety regulations or environmental regulations.
l. Provide the firms Drug and Alcohol policies.
SW-1.5.4 Environmental Plan:
a. Plan of maintaining current MSDS sheets
b. Control procedures for compliance with environmental requirements
c. Environmental response plans/actions as they relate to liquids spills
d. Environmental Compliance Officer Resume and experience
e. Identification and reporting procedures for non-complaint activities along with corrective actions.
SW-1.6 Location: The work is to be performing in the geographical locations of the Aberdeen and Edgewood areas of Aberdeen Proving Ground (APG), to include but not limited to the North and South Cantonment areas, Churchville Automotive Testing Facility, Grace’s Quarters, and Carrol Island. Prime Contractor must have an office within sixty (60) miles of both Aberdeen Proving Ground (APG) and Adelphi Laboratories Center (ACL).
SW-2 PRINCIPAL FEATURES
SW-2.1 The work is to be performed under individual task orders, which can include the maintenance, repair, reconstruction, demolition, replacement, and the installation of the following principal features:
a. Existing variety of roofing materials and insulation
b. Roof decking
c. Trusses and rafters
d. Sheet metal, flashings, drip edges, gravel stops etc.
e. Cants, nailers, soffit, cornice, rake and fascia
f. Gutters and scuppers, downspouts, leaders and conductor heads
g. Vents and ventilators
h. Roof drains piping interior to building
i. Walkways, pitch pockets, expansion joints, caulking and backer rods
j. Painting various surfaces
k. Recoating roof systems
l. Raising roof mounted equipment
m. Relocation and reinstallation of electrical conduit/security sensors
n. Asbestos and Lead inspections, sampling testing and analyses
o. Roofing related materials containing asbestos and lead as necessary to accomplish the task at hand.
p. Associated tasks and details necessary to complete these projects and provide a weather tight roof
q. Associated tasks and details necessary to address the weather tight integrity of the building envelope.
r. Roof hatches, access ladders and safety rails
s. lightening protection systems
t. Removal and disposal of abandoned equipment from roof.
SW-2.2 Provide all equipment and labor to perform a variety of repairs and maintenance on an assortment of roof types. This includes emergency response during other than normal duty hours.
SW-2.3 Prior to the start of work, all roof drains, scuppers, gutters and downspouts shall be cleaned of all debris and tested to ensure proper operation. Precautions shall be taken to avoid damage to existing items during the cleaning and testing operation. Cleaning and testing of roof drains shall be incidental to the work items under this contract. The government reserves the right to issue task orders specifically form cleaning gutters and downspouts, such as during the late fall period to prepare for the winter months. The Contract Line Items provided are for that purpose.
SW-2.4 All Government property damaged by the contractor during the performance of this contract shall be repaired or replaced by the contractor at no additional costs to the Government.
This includes damaged to lawns and green spaces caused by vehicular traffic and foot traffic, damage to interior/exterior surfaces due to spillage of asphalt, adhesives, overspray, damage caused by falling materials, equipment. The contractor shall walk the proposed project site with the PM and COR to document the existing conditions to include operability of roof mounted fans and HVAC equipment prior to the start of work and shall return said project site to the conditions previously noted during this inspection.
SW-3 CONTRACT MANAGEMENT AND EXECUTION
SW-3.1 PROJECT MANAGER – The Project Manager shall have the following minimum level of qualification for the execution of work on this contract. The PM shall be fluent in English and possess good oral and written communication skills This individual shall be a full-time employee of the prime contractor with a minimum of seven years’ experience in the construction/roofing field with a minimum of five years’ experience in managing roofing project. The project manager shall have managed at minimum, five roofing projects with a total value of five million dollars ($5,000,000.00 USD). They shall also have completed an OSHA 30-hour construction safety course or the 40 hour USACE Construction safety course.
SW-3.2 SUPERINTENDENTS: The Government will evaluate the offeror’s ability to provide at least two prime contractor site superintendents shall possess the following experience/qualifications: A minimum of five
(5) years journeyman level experience in the roofing field, with minimum of three (3) years’ experience in supervisory positions in the industry.
SW-3.3 QUALITY CONTROL MANAGER – The Quality Control Manager shall be a separate but integral part of the contractor’s Quality Assurance/Quality Control Staff. This person shall be a full-time employee of the prime contractor with a minimum of seven (7) years’ experience in construction quality control, five (5) of which shall be directly related to quality control of roofing projects. The QCM Shall also be a Registered Roof Observer (RRO) certified by the International Institute for Building Envelope Consultants (IIBEC). This person shall have been certified as an RRO for a minimum of three years. In addition, the RRO shall be certified in Quality Control for Roofing as issued by the IIBEC. The QCM’s experience and qualifications are outlined in greater detail in Section 01-45-00.10-20 (Quality Control) of the Specification.
SW-3.4 CORPORATE SAFETY MANAGER – The Corporate Safety Manager (CSM) (officer) shall be an integral part of the contractor’s management team. This person and the site safety officers assigned to specific projects, shall have no other duties and responsibilities except for the implementation, supervision and safety oversight of the task orders issued under this contract. The CSM (O) shall be fluent in English and possess good oral and written communication skills. The CSM Shall have the following minimum level of training/experience: A minimum of seven years documented construction safety related experience, five of which shall be solely dedicated to roofing projects, be a certified Site Safety and Health Officer, 30-hour OSHA safety course or a 40 hour USACE Construction Safety Course.
SPECIAL CONDITIONS:
SC-1 BUY AMERICAN ACT:
Show evidence that all products to be used on this contract comply with the Buy American Act.
SC-2 AVAILABILITY OF THE WORK SITE:
The Contractor shall provide the Contracting Officers Representative (COR) two weeks advanced notice prior to beginning work on each project. The Contractor will not be allowed to begin work without prior approval of the COR.
SC-3 GENERAL SAFETY:
On each job prior to the start of work, the Contractor shall coordinate through the COR with the Safety Office and verify that all safety related issues are reviewed and addressed. MSD sheets are required for all products to be used on a given task order. The offeror’s proposed products shall not contain chromates, molybdate, chlorine or zinc or any other heavy metals chemical compounds, which are considered potential pollutants. Products that have no reportable quantity, no Permissible Exposure Limit (PEL) and reduce waste byproducts or render wastes neutral to the environment are desirable.
SC-3.1 The performance of all work associated with his contract shall include the requirements of 29 Code of Federal Regulations (CFR) Part 1910 General Industry Standards, and 29 CFR 1926, Construction Industry Standards, with the latest revisions to include the 1926 Subpart M Fall Protection Standard.
SC-3.2 The performance of all work associated with this contract also included the provisions of The United States Army Corps of Engineers (USACE) Safety and Health Requirements Manual, EM-385-1-1, the latest revision/edition.
SC-3.3 The contractor shall provide a foreman or on-site supervisor at each work site. This person shall have a current Red Cross Certification in First Aid, and Adult CPR (with AED certification), and a First Aid Kit appropriate for the work and number of people on hand. Current Red Cross certifications shall be in their possession at all times.
In the event current certifications are not in their possession, all work will be stopped until someone with current certifications in their possession is present on site. The job superintendent, quality control manager and corporate safety manager shall have seven
(7) years of roofing experience.
SC-3.4 The contractor shall have a Worker’s Compensation Insurance Experience Modification Ratio (EMR) of less than 1.0 over the previous five years, and this must be verifiable through the company’s worker’s compensation insurance agent/company. The contractor shall have no major insurance claims (combined liability, vehicle and equipment insurance) over the amount of five hundred thousand ($500,000.00 USD) dollars over the past five years and this must be certified on insurance carrier letterhead.
SC-4 STRUCTURAL INSPECTION:
The contractor and the government PM shall inspect the supporting structures of each building’s roofing system and verify load capacities, condition, and the roof’s ability to support workers, materials, and equipment to be used.
SC-5 SECURITY REQUIREMENTS:
In addition to the security requirements listed elsewhere in the specification, additional security requirements may be required by specific tenant commands during the execution of this project.
These requirements include but are not limited to the exclusive use of American citizens only, additional escort requirements, additional criminal background checks and badging requirements.
SC-6 ASBESTOS TESTING:
a. Existing materials: Prior to performing work on each task order under this contract, the government will sample and test suspected roofing materials for the presence of asbestos. The inspection and sampling will be inclusive of the roofing material that may contain asbestos. The Government, at their discretion, may require the roofing contractor to perform the sampling and testing of suspect roofing materials for the presence of asbestos. An Accredited Building Inspector (BI) who has been trained and certified in accordance with the USEPA’s Model Accreditation Plan (MAP) as outlined in 40 CFR Part 763 shall perform this work. This work will be paid for under the contract line item for asbestos sample analyses. When the results of such testing are complete, the contractor shall notify the COR who will distribute them to the PM. Installation Safety Office and the Environmental Division, Asbestos Coordinator.
b. New Materials: The Government, at their discretion, may require the contractor to provide asbestos analytical results for new materials installed as part of this contract.
These materials include but are not limited to gypsum drywall, gypsum roof board, exterior grade gypsum products, roofing felts, asphalt shingles, and roofing cements. The analytical method shall consist of either Polarized Light Microscopy with Dispersion Staining or Transmission Electron Microscopy for bulk samples utilizing the EPA protocols for analysis.
SC-7 CORE SAMPLES:
Upon request the contractor shall core sample the existing roofing materials down to the structural deck and repair the sample area. Where core samples are directed, the contractor shall patch the cored location to ensure it is weather tight and not a source of leakage into the building.
In addition, the government may, at their discretion, request a petrographic analysis of the core sample to determine the composition of the various layers within said sample.
SC-8 STORAGE:
Materials stored on the roof shall not exceed one’s day supply and shall be distributed so as not to exceed the load limit of the roofing system and structure. Where laydown areas are limited, the contractor may request to store materials on the roof in excess of one days’ supply, provided that those materials are distributed in such a manner as to not exceed the live load limit of the roof and roof structure. At no time will any flammable/combustible material be stored on the roof in excess of the amount needed for the days production. Flammable/combustible materials shall be stored in a segregated storage container or enclosure. The use of Flammable Materials Storage cabinets is recommended but not required unless the jurisdiction having authority requires their use.
SC-9 COMPATIBILITY:
All materials furnished shall be compatible with each other. In the event the use of dissimilar materials is unavoidable, they shall be completely insulated from each other by means of gaskets, insulating compounds, etc.
SC-10 SHELF LIFE:
At least half the shelf life, of any time-limited materials, shall remain at the time of application.
SC-11 REFERENCES AND STANDRARDS:
All publications, standards and other references incorporated into this specification include the most recent editions, supplements, revisions and amendments, etc.
SC-12 COMPLETION PACKAGE:
The completion package shall consist of the applicable warranties and submittal required by the contract documents. The contractor shall also fill out the applicable sections and submit the Real Property Close- Out package to the COR as part of the final completion package. This document shall be provided by the government in electronic format and returned electronically to the COR via DODSAFE. Contractor shall be required to maintain access to the DODSAFE Application for the life of the contract. As-Built drawings may be deemed necessary and shall be required on a case-by-case basis. Those projects requiring as built drawings will be identified during the site visit and the scope of the drawings identified and agreed to at that time. The as-built drawings, if required, shall be produced in the format described in the General Conditions.
SC-13 ASBESTOS CONTAINING MATERIALS
The use of products that contain asbestos is expressly forbidden during the execution of task orders assigned by this contract. Appliances, equipment, components and coatings as well as other items which normally utilize gaskets, seals, insulation and filler reinforcement, etc., whether factory fabricated or field fabricated shall be accompanied by formal literature or a specific statement from the manufacturer/supplier that no asbestos was incorporated into this product.
The requirements for testing suspected products are incorporated in SC-6 above.
END OF SECTION 01010
SECTION 01011
GENERAL CONDITIONS
PART 1 GENERAL
INDEX
GC-1 Access to Job Sites in Security Areas GC-2 As-Built Data GC-3 Department of Agriculture Quarantine GC-4 Disposal of Waste Materials GC-5 Excavation Clearance GC-6 Fire Protection and Protection GC-7 Fuel Burning Equipment GC-8 Hazardous Area Work Permits GC-9 Lyme Disease Warning GC-10 Maryland Department of the Environment (MDE) Permits GC-11 Range Briefings GC-12 Refrigerant Management GC-13 Safety GC-14 Submittal Registry and Progress Schedules GC-15 Unabsorbed Overhead Delay Damages GC-16 Utility Outages GC-17 Warranties GC-18 Water Supply GC-19 Working Hours GC-20 Worksite Appearance and Security
GC-1 ACCESS TO JOB-SITES IN SECURE AREAS:
a. For jobsites at Aberdeen Proving Ground in the security areas, contractor/contractor employees entering these areas must, at minimum, have a photographic security badge or be escorted by a person have such a badge. One person with a security badge may escort up to four (five) persons without a photographic security badge, provided all personnel remain together and within sight of the escort. The contractor shall submit applications for their employees after award of contract. Forms may be obtained from the Administrative Office in Building 4304. Badge applications require approximately six (6) weeks for processing after receipt of applications.
b. Certain areas are more restrictive than outlined above. Access to these areas shall be as detailed in other sections of the specifications.
c. Access to the roof tops of the building in the C5ISR Complex (6000 block buildings) will require submission of a Visitor Request (VR) form to the appropriate security officer within the C5 complex. VR’s can take up to four weeks to process.
d. Access to buildings behind the fence (ATC): in order for any U.S. citizen or naturalized U.S.
citizen to receive unescorted access to the Restricted Area they need to have at the minimum a favorable Tier 1 investigation. Those individuals will need to be fingerprinted then have the Tier 1 initiated in PSIP. Non-resident aliens are not authorized to be processed for a Tier 1.
For individuals without a clearance/Tier 1 they will receive an escort required badge from our Visitor Control, B324. They will be escorted by an ATC employee; civilian, military or mission-support contractor. All Foreign Nationals are to be escorted at all times.
e. All personnel and equipment entering these areas shall be subject to applicable local and federal regulations.
f. Additional restrictions on the possession, carrying and use of Personal Electronic devices (PED’s) may be initiated based upon the individual tenant activities security requirements.
Compliance with these additional requirements shall be mandatory and shall not be construed as an additional burden subject to compensation.
GC-2 AS-BUILT DATA
a. Exterior work – Specific to Roofing Projects
1. Where available, the government shall provide a copy of the original as-built roof drawings to the contractor in both digital and hard copy format. The contractor shall update and return the drawings in digital format as specified in the contract specifications.
2. Specific information required for roof drawing updates shall include the demolition of abandoned roof mounted equipment; the locations of new curbs and other pertinent details relative to roof mounted equipment; the insulation thickness, the membrane type along with method of attachment to the substrate; the taper profile to include fill (if applicable); the locations of safety rails, walk paths, etc. installed on the roof and the locations of the lightening protection system components to include ground loop and down lead locations (For new LPS installations). The locations of ladders, hatches and safety rails shall be shown on the as-builts as well.
b. Exterior Work – New Buildings, Utilities, Roads.
1. The limits of the As-built Plans shall be from the point in which the new work ties into existing features and infrastructure to and including the building or structure footprint.
2. The information that is depicted on the as-built drawings shall have UTM coordinate values associated with the features respective location. UTM values are required at the following points:
a. Corners of buildings
b. Points of Tangent (PT)
c. Points on Curve (POC)
d. Points of Curve (PC)
e. Points of Reverse Curve (PRC)
f. Points of Compound Curve (PCC) on linear features
g. Poles, transformer, manholes, valves, Tees, hydrants and other appurtenances associated with utilities.
c. Interior Work
1. The contractor will be given one hard copy set of full-sized prints of the contract drawings (in addition to those mentioned elsewhere) and if available, the drawings in electronic format on Compact Disk
(CD).
2. During the life of the contract, the on-site job superintendent shall maintain an as-built record of the contract, including any modifications performed, on that copy.
3. After the final inspection, the changes noted on the hard copy shall be incorporated into the digital data. Both the hard copies and CDs shall be turned over to the Contracting Officers Representative
(COR).
4. Equipment Warranty Identification Tag: The Contractor shall provide and install on each piece of equipment a self-adhesive warranty identification tag. The tag shall contain the following information: Installer’ name, Installers phone number, Manufacturer, Model Number, Serial Number, Contract Number, Government Project Manager and the Contracting Officer’s Representative (COR)with telephone numbers, Warranty expiration dates for the contractor and manufacturer, and the MAXIMO Identification Number. The contractor shall obtain the MAXIMO Identification number from the COR. The contractor shall also submit a written report to the COR of the above information.
GC-3 DEPARTMENT OF AGRICULTURE QUARANTINE:
See Section 01561, Environmental Protection for more details
GC-4 DISPOSAL OF WASTE MATERIAL:
See Section 01561, Environmental Protection for more details
GC-5 EXCAVATION CLEARANCES:
a. Contractor must obtain an approved Excavation Permit (EP), SSB Form 1247-R from the Directorate of Public Works prior to starting any intrusive excavation work. The Point of Contact at DPW is the Chief, Construction Inspection Branch at 410-306-1161 (voice), 410- 306-1187 (fax) or at ECO@usag.apg.army.mil (E-mail). The contractor shall initiate the permit process by filling out the “EXCAVATOR SECTION” of the EP and submitting the form electronically through the COR. Processing will normally require ten (10) workdays.
b. All damage to identified utilizes shall be the fiscal responsibility of the contractor, to include peripheral loss imposed on the organizations/tenants of Aberdeen Proving Ground (e.g., Damage to facilities, equipment, loss of productivity due to loss of any utility. The authorized representatives for DPW Construction Branch, the DPW Environmental Office and the Garrison Installation Safety Office have authority to stop any excavation that is deemed to be either unsafe or unauthorized.
c. Should the contractor encounter unidentified utility lines, all excavation work shall stop, and the COR shall be notified immediately. Excavation work shall not be permitted until the utilities are properly identified and the COR issues a notice to proceed.
d. Permits will be good for a period of thirty (30) calendar days from issuance. Contractor shall be responsible for obtaining renewals to maintain permit status.
GC-6 FIRE PREVENTION AND PROTECTION:
The contractor shall comply with all fire prevention measures prescribed in the installation fire regulations, a copy of which is on file with the Chief, Construction Inspection Branch and the project COR. A written fire permit shall be obtained by the contractor for use of open flame devices, such as blow torches, roofer’s torches, portable furnaces, asphalt kettles, hot air welders, gas and electric welding and cutting equipment from the from the Fire Department, Fire Prevention and Inspection Branch, of the Directorate of Emergency Services (DES). The contractor shall be liable for any fire damage to Government property attributable to negligence on the part of the contractor, including failure to comply with fire prevention measures prescribed by terms of this contract. Contractors may call the Fire Department at (410) 306-0572/0573 for on-site inspection, or report to Building 2200, Aberdeen Boulevard, to receive specific fire instructions if in the Aberdeen Area. Edgewood Area contractors should call (410) 436-4451 or 436-4452, or visit Building E-5180.
GC-7. FUEL BURNING EQUIPMENT:
Fuel burning equipment under this contract such as boilers, furnaces, water heaters, generators, etc.
will be supplied with Reasonably Available Control Technology (RACT), which reduces emission of nitrogen oxides (NOx). Manufacturers offer low NOx burners as optional items on their equipment. These low NOx burners shall be selected, and their price included in the contractor's bid.
GC-8. HAZARDOUS AREA WORK PERMITS:
a. Where a work site is included in an area known, or suspected, to contain hazardous materials, a Hazardous Area Work Permit (HAWP) will be included in the specification after the section "Statement of Work". The contractor shall post a copy of the permit in full view at the work site. The contractor shall be responsible to inform all his personnel and assure they conform to the special requirements directed by the permit. This conformance shall be monitored by the Installation Safety Office. Non-conformance shall result in a work stoppage until the situation is corrected, at no expense to the Government.
Continued instances of non-conformance may result in contract termination.
b. Hazardous materials include, but are not limited to, National Priority List (Comprehensive Environmental Response Compensation and Liability Act (CERCLA)), chemical surety materials, hazardous chemicals, carcinogens, asbestos, explosives, radioactive materials, etc. These hazardous materials may be encountered at work sites at Aberdeen Proving Ground.
c. When a HAWP is not included with the specification, the work site is in an area not known or suspected to contain hazardous materials. However, during operations such as excavation or demolition, materials may be uncovered which could be hazardous (e.g. asbestos). If contractor personnel should encounter materials, either known hazardous materials or unrecognized materials, they should stop work in that area immediately, and notify the Installation Safety Office at 410 306-1095/1096/1097 for work in the Aberdeen Area, or 410 436-4839 for work in the Edgewood Area, and the COR. Work may be resumed after identification of the material, and notification of work constraints, if any, caused by the materials.
GC-9. LYME DISEASE WARNING:
The contractor is responsible for ensuring that his or her personnel take all reasonable precautions to avoid contracting Lyme Disease, to include using repellents, wearing personal protective clothing and avoiding the wear of abbreviated clothing such as shorts, cutoffs, short sleeve shirts, tee shirts and sandals in areas where tick borne diseases are endemic. Particular attention must be given to ticks and Lyme disease prevention when working in grassy and wooded areas on Aberdeen Proving Ground.
GC-10. MARYLAND DEPARTMENT OF ENVIRONMENT (MDE) PERMITS:
Articles or processes requiring MDE permits to construct and/or operate, and that require shop drawings or manufacturer's data to obtain the permit, such as boilers, and incinerators, the following shall apply:
a. The contractor shall initiate the permit application.
After completion of those portions pertaining to the equipment to be furnished under contract, the application shall be forwarded, through the COR, to DPW for completion and submission to the MDE. The permit application shall be submitted within ten workdays of approval of the submittal for the equipment.
b. It is the contractor's responsibility to provide equipment or systems capable of construction and operation under MDE permit. The Government will not accept a system that does not meet the state of Maryland law.
c. If required, the Government will make available the following by the time the "Notice to Proceed" is issued:
1. MDE approved soil erosion and sediment control plans and, if necessary, storm water management plan.
2. A permit from the State Historic Preservation Office
(SHPO).
d. The contractor is responsible to comply with all provisions of the permit(s). Non-compliance shall result in the issuance of a stop-work order from the Contracting Officer, and work shall not be allowed to resume until corrective actions have been taken.
e. For further information, see Section 01561, ENVIRONMENTAL PROTECTION, the applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "ENVIRONMENTAL PERMITS" respectively.
GC-11. RANGE BRIEFINGS:
If the work site is designated as one in a range area or in close proximity to a range area, the contractor will be briefed and provided with written instructions on range procedures prior to start of work (see Aberdeen Proving Ground Regulation (APGR) 385-1). This information will include safety requirements such as range clearance/control procedures, emergency procedures, communication requirements, etc. The contractor shall be responsible to disseminate these procedures to all contract and sub-contract personnel. Work shall be scheduled and coordinated with the applicable organization.
GC-12. REFRIGERANT MANAGEMENT:
In line with federal environmental laws and regulations regarding the handling of chlorofluorocarbon (CFC) and hydrochlorofluorocarbon (HCFC) refrigerants, the following shall apply:
a. The contractor shall not intentionally vent any refrigerants to the atmosphere.
b. When performing work requiring the opening of existing air conditioning or refrigeration systems, the refrigerants shall be recovered using EPA-approved recovery or recovery/recycle equipment and storage vessels.
c. On systems to be reused after completion of work, the contractor shall install new or reclaimed refrigerant.
All current systems using CFC refrigerants should, unless otherwise specified, be considered for modification to allow use of an alternative HCFC.
d. New or replacement air conditioning/refrigeration equipment shall be installed with specified HCFC refrigerants. No refrigerant shall be used having an Ozone Depletion Potential (ODP) equal to or greater than
0.05 (based on R-11 = 1.0).
e. Refrigerant recovered and not to be reused shall be properly labeled as "Recovered Refrigerant", with the type (R-11, R-12, etc.) indicated, and turned over to the
COR.
f. See also Section 01561, ENVIRONMENTAL PROTECTION, applicable portions of paragraphs entitled "POLLUTION PREVENTION" and "SPECIFIC DISPOSAL METHODS" respectively.
GC-13. SAFETY:
All operations performed must be in accordance with OSHA 29 CFR 1910 and 1926, and the Code of Maryland (COMAR), including the High Voltage Act. In those instances where Army regulations are more stringent, the Army regulations shall apply. Applicable Army Safety Regulations include, but are not limited to:
(1) AR 385-10, The Army Safety Program;
(2) AMCR 385-100, Safety Manual;
(3) APGR 385-4, The APG Safety and Occupational Health
Program; and
(4) EM 385-1-1, U.S. Army Corps of Engineers Safety and
Health Requirements Manual.
Regulations are maintained in the Garrison Installation Safety Office (ISO) library, Building 305 (Aberdeen Area) are available for review upon request.
In accordance with contractual requirements, each contractor must appoint a safety representative/competent person to ensure compliance with safety regulations and to act as liaison between the contractor and ISO. ISO personnel will be available for regulatory compliance advice on any particular safety problem that may arise during normal course of operation.
Before work under the contract is started, the contractor's safety representative shall report to the ISD located on the First Floor of Building 305 for familiarization with safety requirements. The safety representative shall maintain an accurate record of all injuries and illnesses that occur in the execution of task orders under this contract and shall report to the ISO the exposure data and accidents resulting in death, traumatic injury, occupational disease and/or damage to property, materials, supplies and equipment incident to work performed under the contract.
The Contracting Officer shall notify the contractor of any noncompliance with the foregoing provisions and action to be taken. The contractor shall, after receipt of such notices, immediately correct the conditions. Such notice, when delivered to the contractor or his representative at the site of work, shall be deemed to be sufficient for this purpose. If the contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The contractor shall make any part of the time lost due to any such stop order subject of claim for excess costs or damages.
Confined space work shall not be performed without appropriate monitoring and approval of an entry permit under provisions of 29 CFR 1910.146 and APG Regulation 385-4.
Work requiring control of hazardous energy shall be performed IAW 29 CFR 1910.147 and APG Regulation 385-4.
GC-14. SUBMITTAL REGISTER AND PROGRESS SCHEDULES:
The Contractor shall prepare a submittal register of all items required under the contract. The contractor shall prepare a schedule in accordance with Contract Clause entitled "Schedule For Construction Contracts" (FAR 52.236-15) which shows milestones and intervals for contract completion. The register and schedule shall be delivered to the Contracting Officer within ten calendar days after the contractor's receipt of "Notice to Proceed".
GC-15. UNABSORBED OVERHEAD DELAY DAMAGES:
a. Compensation for unabsorbed overhead incurred in a delay during which the contractor is forced to stand by, whether calculated by the Eichleay Formula or any other method, is not automatic.
During any such delay, it is the duty of the contractor to seek out new contracts or additional work opportunities to mitigate delay damages. To substantiate entitlement to unabsorbed overhead damages, the contractor must first demonstrate the nature of the delay that made it impractical to mitigate delay damages by undertaking new work.
b. In submitting any claim for delay damages for unabsorbed overhead, regardless of length of delay, the contractor must list all work performed during the delay period. This list shall include date of each contract or agreement, the period of performance and any other information required by the Contracting Officer.
c. In submitting any claim for delay damages for unabsorbed overhead, the contractor must prove all opportunities, prime or sub-contract, bonded or unbonded, it could have undertaken but for the delay. The parties to this contract agree that if no additional work opportunities arise during any delay period in excess of 14 days, under absorption of overhead would be caused by lack of opportunity and not the delay under this contract. In the absence of opportunity to take on additional work, the contractor will be entitled to no additional unabsorbed overhead costs under this contract.
d. In the event new work opportunities do arise during a compensable delay, the contractor will provide notice to the Contracting Officer of such new contracts or other additional work opportunities as they become available during the delay period. The Government will be liable for no unabsorbed overhead costs that arise during the delay period in the absence of an opportunity to adjust the performance schedule to enable avoidance of such costs.
GC-16. UTILITY OUTAGES:
a. General: All utility service outages shall be at the convenience of the Government and will normally be scheduled during off-duty hours or weekends. Outages shall be requested in writing to the Contracting Officer no less than three weeks (21 days) in advance.
b. Electrical: Work on high voltage primary lines shall be accomplished while lines are de-energized, and grounds are in place. If, due to extenuating circumstances, this is not practical, permission may be requested through the COR, in writing, to allow work while energized or hot. If permitted, contractor shall be subject to all OSHA requirements for equipment and worker protection.
GC-17. WARRANTIES:
Before final acceptance, the contractor shall provide to the COR a list showing all products and installed equipment that are covered by warranties, and the length of time the warranty is in effect.
GC-18. WATER SUPPLY:
A vacuum breaker or appropriate backflow prevention device shall separate any temporary or permanent connection to the potable water supply. The vacuum breaker shall be in accordance with the National Plumbing Code and the American Water Works Association. See Section 01561, ENVIRONMENTAL PROTECTION, Water and/or Sewer Lines, for additional information.
GC-19. WORKING HOURS:
Unless otherwise specified, work under the contract shall be performed during the hours from 7:30 a.m. to 5:00 p.m., local time, Mondays through Fridays, except federal holidays. Every other Friday is a scheduled Regular Day Off (RDO). On workday Fridays the hours are from 7:30 a.m.
to 4:00 p.m. Prior to performing work during hours other than those specified, the contractor shall obtain the permission of the Contracting Officer or his authorized representative. Normally, requests for permission to work during hours other than those specified should be submitted no less than 24 hours prior to the time the contractor desires to perform such work.
GC-20. WORKSITE APPEARANCE AND SECURITY:
Contractor shall maintain worksite in a reasonably neat appearance. This shall be done by daily cleanups of the worksite. Contractor is responsible to secure all tools and materials at the close of business. The Contractor shall protect all construction materials from exposure to the elements.
The Contractor shall ensure that, at the end of the work shift, the building exterior doors/windows are secure to prevent access to the building interior. This requirement applies to all jobsites, including those within restricted areas of APG.
PART 2 PRODUCTS
Not…