This document is an Amendment of Solicitation/Modification of Contract (SF 30) for a roofing systems contract at Aberdeen Proving Ground, Maryland. The amendment (Number 0004) extends the Request for Proposal (RFP) due date to 13 May 2025 at 11:00am and includes several key updates: adding wage determinations for residential buildings in Harford, Prince George's, and Baltimore Counties; incorporating Maryland prevailing wages; removing Blossom Point as an APG service facility; and establishing the point of contact as Debora Cardoso Thelen. The contract is a competitive 8(a) set-aside for maintenance, repair, reconstruction, demolition, replacement, and installation of roofing systems, with a five-year base period and a six-month extension option. The estimated contract value is up to $130 million, with approximately $22 million of work expected to be awarded per year, and the previous contract was held by Cypress SBS JV (contract W56ZTN19D0007).

View the file

Other files

File Type Posted
W56ZTN25R0003_0008.pdf PDF
W56ZTN25R0003_0007 Final.pdf PDF
W56ZTN25R0003_0006.pdf PDF
W56ZTN25R0003_0005.pdf PDF
Roofing Bid Sheet 5 year base and 6 month extension_Rev 2.0.xlsx XLSX spreadsheet
W56ZTN25R0003_0003.pdf PDF
W56ZTN-25-R-0003 Attendance list roofing site visit.docx DOCX document
W56ZTN25R0003_0002.pdf PDF
W56ZTN25R0003_0002.pdf PDF
Roofing Bid Sheet 5 year base and 6 month extension_Rev 1.0.xlsx XLSX spreadsheet
ROOFING CLIN BID SHEET FY25 Contract_03.17.2025.xls XLS spreadsheet
W56ZTN25R00030001.pdf PDF
W56ZTN25R0003_Final.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Amendment 0004 is hereby provided as noted throughout this document.

See SF30 - block 14 Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 74

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-May-2025

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W56ZTN25R0003

X 9B. DATED (SEE ITEM 11)

05-Mar-2025

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-May-2025

CODE

ACC-APG INSTALLATION AND TECHNOLOGY DIV

6472 INTEGRITY COURT

BUILDING 4401

ABERDEEN PROVING GROUND MD 21005-3013

W56ZTN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0004

The Purpose of this modification is to:

1. Add Wage Determinations MD20250063, MD20250066 and MD20250070 for residential buildings in Harford County, Prince George County and Baltimore.

2. Add the MD Prevailing Wages for Harford County and Prince George County to reflect the adopted State of Maryland Prevailing wages as mentioned in the RFI 1 – item 112. Please note: DBA wages are subject to change after award and during the performance of the contract. Ensure any escalation fees applied in the proposal for each year of the contract is accurate and reflective of your business practice.

3. Revise RFI 01 to reflect the removal of Blossom Point as an APG service facility, effective with amendment W56ZTN25R0003003.

4. Extend the RFP due date to 13 May 2025 no later than 11:00am. All others terms and conditions remain unchanged. Please read the entire solicitation to include the responses to the RFI's prior to submitting the proposal.

5. The point of contact for this action is Debora Cardoso Thelen, debora.c.cardosothelen.civ@army.mil

The following have been deleted:

AMENDMENT 0003

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 09-May-2025 10:00 AM to 13-May-2025 11:00 AM.

SECTION 00 21 13 - INSTRUCTIONS TO BIDDERS

The following have been modified:

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS TO OFFERORS

1. INTRODUCTION

a. Offerors shall submit proposals Not Later Than 11:00 AM on 13 May 2025. The offerors' proposals shall remain valid for a period of 90 calendar days from date of receipt of proposal. Proposals offering a shorter period than 90 calendar days will be rejected as non-responsive. The Government is not longer opening a period to accept questions. No questions submitted after this date and time shall be accepted. All questions must be submitted in writing via email to the point of contacts listed in the Proposal Submission section.

b. The offeror’s proposal shall consist of four (4) distinct volumes and each volume shall clearly identify the contents. The Volumes are as follows: Volume I – Technical; Volume II – Past Performance; Volume III – Price; and Volume IV - Solicitation, Offer, Award Documents with Certifications.

c. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked in each proposal.

2. PROPOSAL SUBMISSION

PROPOSAL SUBMISSION REQUIREMENTS

a. Each volume shall be submitted electronically via the DOD SAFE site: https://safe.apps.mil. If offerors require a passcode to submit files, please contact Mrs. Debora Cardoso Thelen and Mrs. Erin Hynes at the email addresses given below. The Government only requires one copy of the proposal to be submitted. Please note that the drop-off request is only valid for 14 calendar days. No hard copies of an Offeror’s proposal will be accepted.

b. Proposals may be submitted via email to Mrs. Debora Cristina Cardoso Thelen at the email debora.c.cardosothelen.civ@army.mil and Mrs. Erin Hynes at erin.l.hynes.civ@army.mil electronic formatted files submitted by the Offeror that are found to contain viruses, malware, or other malicious types of code will be set aside and the contents of those files will not be considered by the Government. No classified information shall be submitted by the Offeror in response to this solicitation. NOTE: Please avoid waiting until the last minute to submit proposals. To avoid late submissions, it is recommended that proposals are submitted at least 24 hours prior to the proposal due date.

NOTE: Please avoid waiting until the last minute to submit proposals. To avoid late submissions, it is recommended that proposals are submitted at least 24 hours prior to the proposal due date.

3. PROPOSAL FILES

a. Format.

The text of the proposal shall be single-spaced and in Times New Roman or Arial, 12-point font size. Each section shall be clearly identified with the name of the section and provided an index as appropriate to the section. All pages of each section shall be appropriately numbered and identified by the complete company name, date, and Request for Proposal (RFP) number in the header of each page. Tables and illustrations may use a reduced font size no less than 10-point and may be in landscape format. Proposal shall be in Microsoft Word 2021 or higher, or Adobe PDF.

NOTE: The Government is establishing a total of 125 pages limit on the proposal, limiting 25 pages for each volume including subfactors is acceptable (exclusion applies for Volume II – see down below). Pages exceeding the maximum page limitation will not be evaluated. Additional pages over the maximum allowed limit will be removed or not read and will not be evaluated by the Government.

The following additional restrictions apply:

b. File Packaging. Zip files are not permitted. Files shall be in Adobe PDF or MS Word 2021 or higher. Any price breakdown information submitted to aide in the price evaluation shall be submitted in unlocked Microsoft Office Excel Read/Write format.

c. Content Requirement. All information shall be confined to the appropriate file. The offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Offerors are cautioned that “parroting” of the Statement of Work (SOW) with a statement of intent to perform does not reflect an understanding of the requirement or indicate the ability to perform any task in the SOW and will be rated as “Unacceptable”. Proprietary information shall be clearly marked.

The following shall be included in the Volumes:

(i) VOLUME I – Factor 1 - Technical. Offerors shall clearly articulate the technical approach (including risks and contingencies) for performing the work, an understanding of the requirement and the capacity to perform the work.

The volume shall be organized into the following sections:

Subfactor a: Bonding Capacity. This subfactor evaluates the offeror’s bonding capacity. The Offeror will provide information to substantiate the following:

Offerors shall provide a signed letter from its Surety company stating that the offeror qualifies and can obtain $22 million of performance and payment bonds. Bonding will be required at the task order level when required by the FAR or as deemed necessary by the Contracting Officer. Bonding is not included in the contractor’s coefficient.

Offeror shall also provide contact information for the surety so that the Government can at its discretion verify the information provided. When obtaining performance and payment bonds at the task order level, contractors shall submit their paid invoice from the surety to the Contracting Officer via email within five (5) days after task order award and prior to the pre- construction meeting with the Directorate of Public Works (DPW). The contractor will only be paid up to the bonding amount proposed in each task order proposal. NOTE: Surety companies utilized for the proposal and contract must be listed on the U.S. Department of the Treasury website. Reference https://www.fiscal.treasury.gov/surety-bonds/list-certified-companies.html.

Subfactor b. This subfactor evaluates the offeror’s Quality Control and Safety. The offeror will provide information to substantiate the following:

Offeror shall provide a discussion of planned Quality Control (QC) activities to meet the requirements of the contract. This discussion should be broad enough to address all aspects of QC including as a minimum, responsibility for surveillance of work, acceptance, rejection, documentation and resolution of deficiencies, trends analysis, corrective actions, QC processes and interface with Government inspector and contract closeout procedures.

The offeror shall provide the Experience Modification Rate (EMR) for itself and all major subcontractors for the previous five (5) year operating period. A major subcontractor is defined as a subcontractor which is expected to perform 15% or more of the total work on the contract.

The offeror shall provide OSHA recordable injuries/illnesses reports for itself and all major subcontractors for the previous five (5) years. A major subcontractor is defined as a subcontractor which is expected to perform 15% or more of the total work on the contract.

Subfactor c. This sub-factor evaluates the offeror’s Key Personnel. The offer will provide information to substantiate the following:

Project Manager (PM):

Offeror shall provide resume(s), including training certificates for at least one prime contractor employee that will perform the Project Manager duties. PM must be a prime contractor employee. The documentation submitted shall demonstrate the following for the PM:

• The PM possesses a minimum of seven (7) years’ experience in the construction/roofing field with a minimum of five (5) years’ experience in roofing management.

• Has managed, at a minimum, five roofing projects with a combined total value of five million U.S. Dollars.

• Has completed the OSHA 30 Hour construction safety course or the 40 hour USACE Construction safety course.

• The PM is a certified Project Management Professional (PMP) as issued by the Project Management Institute (PMI) with a minimum of two years as a PMP.

• The PM is a certified Project Management Professional (PMP) as issued by the Project Management Institute (PMI) with a minimum of two years as a PMP.

Superintendents:

Offeror shall provide resume(s), including training certificates for at least two prime contractor employees that will perform site Superintendent duties. The submitted documentation shall demonstrate the following:

• The superintendents both possess a minimum of seven (7) years journeyman level experience in the roofing field, with minimum of three (3) years’ experience in supervisory positions in the industry.

• Has completed the International Institute of Building Enclosure Consultants (IIBEC) roof top Quality control course within the past three years.

Quality Control Manager (QCM):

Offeror shall provide resume(s), including training certificates for at least one prime contractor employee that will perform the QCM duties. The submitted documentation shall demonstrate the following:

• Minimum of seven (7) years’ experience in construction quality control, five (5) of which shall be directly related to quality control of roofing projects.

• Is a Registered Roof Observer (RRO) currently certified by the International Institute of Building Enclosure Consultants (IIBEC) and in good standing, with a minimum of three years as an RRO.

Corporate Safety Manager:

Offeror shall provide resume(s), including training certificates for at least one prime contractor employee that will perform the Corporate Safety Manager duties. The submitted documentation shall demonstrate the following:

• A minimum of seven years construction related experience, five of which must be solely dedicated to roofing projects.

• Is a certified site safety and health officer.

• Possesses the 30 hour OSHA safety course or the 40 hour USACE Construction safety course.

Subfactor d. This sub-factor evaluates the offeror’s Contract Management Plan (CMP).

The offer will provide information to substantiate the following:

• Describe the overall company structure related to the performance and SOW.

• Provide general overview of planned contract execution.

• Demonstrate Organization and ability to manage multiple projects through adequate and qualified on-site staffing to support at least 10 ongoing projects.

• Equipment: supply a detailed list of existing equipment to be used in this contract. List age of the vehicles, pictures, and personnel to use this equipment. Clearly identify current equipment owned and any plans to purchase/lease additional equipment after award during the one month transition-in/phase-in period. For planned purchases/leases, describe the purchasing plans and suppliers. Contractors should assume that approximately $22M of work will be awarded per year or will be ongoing at any time. Currently owned and planned purchases/lease Equipment list must be adequate for handling this magnitude of workload.

• Scheduling methodology: describe the scheduling techniques and project planning methodology. Describe the criteria for selecting and qualifying subcontractors.

• Describe the offeror’s plan to ensure Quality control of the contract and projects.

• Discuss method for managing multiple projects simultaneously. (List all reports, programs scheduling software, databases etc. that will be employed for this purpose).

• Discuss method to meet peak workload demands, identify resources, availability and time frames. Describe how multiple projects in the security areas will be staffed to ensure timely completion.

• Provide plan for providing additional resources, manpower and technical expertise for support of the field office to cover peak workloads, special projects and urgently required projects. Response time shall be not more than one hour from notification of emergency projects.

• Describe how multiple projects in the security areas will be staffed to ensure timely completion.

• Provide discussion and documentation/evidence of how the offeror has the ability to provide a sufficient quantity of qualified personnel, i.e. U.S. Citizens, who can obtain mobility access badges for the security areas of Aberdeen Proving Ground.

(ii) VOLUME II – Past Performance. This volume shall contain past performance information which are recent considered relevant and similar to this requirement. This volume shall not exceed 20 pages plus five (5) pages for each major subcontractor, excluding Past Performance Questionnaire Forms. The Government will use information submitted by the offeror and any other sources of information available to include sam.gov, to assess past performance. Offerors shall submit no more than five (5) contracts performed by the prime and no more than five (5) contracts for each major subcontractor (if any) in performance during any portion of the past five (5) years from the date of this solicitation. Relevant efforts are defined as services that are the same as or similar services as compared to the North American Industry Classification System (NAICS) code 238160 Roofing Contractors. Major subcontractors are defined members of an offeror’s overall team who are expected to perform fifteen (15) percent or more of the proposed effort. This volume shall be organized into the following sections:

Section 1 – Contract Descriptions. This section shall include the following information in the following format.

a. Contractor/subcontractor place of performance, CAGE code and Unique Entity Identifier number. If the work was performed as a subcontractor, also provide the name of the prime contractor, and point of contact (POC) within the prime contractor organization (name, and current address, Procuring Contracting Officer’s name, email address, and telephone number).

b. Provide the percentage of work performed by the company with the CAGE code in the CPARS report (as opposed to work provided by other vendors or subcontractors).

c. Offerors shall submit past performance examples from the CAGE code of the prime offeror or major subcontractors. If proposing examples from other CAGE codes then the offeror is required to provide a narrative in its proposal explaining why the work under another CAGE code should be considered relevant.

The Government will consider explanations and may determine that the work is not relevant, in which case the work will not be favorably considered during the Government's evaluation.

d. Commercial and Government contracting activity current address, Procuring Officer’s name, email address and telephone number.

e. Commercial and Government’s technical representative/COR, and current e-mail address and telephone numbers.

f. Commercial and Government contract administration activity and the Administrative Contracting Officer's name, and current e-mail address, and telephone numbers.

g. Commercial and Government contract administration activity's Pre-Award Monitor's name, and current e-mail address and telephone numbers.

h. Contract Number and, in the case of Indefinite Delivery type contracts, GSA contracts, and Blanket

Purchase Agreements, include Delivery Order Numbers.

i. Contract Type (specific type such as Fixed Price (FP), Cost Reimbursement (CR), Time & Material (T&M), etc.). In the case of Indefinite Delivery contracts, indicate specific type (Requirements, Definite Quantity, and Indefinite Quantity) and secondary contract type (FP, CR, T&M, etc.)

j. Awarded price/cost.

k. Final or projected final price/cost.

l. Original delivery schedule, including dates of start and completion dates or overall period of performance.

Section 2 – Performance. Offerors shall provide a specific narrative explanation of each contract listed in Section 1, Contract Description, describing the objectives achieved and detailing how the effort is relevant to the requirement of this RFP.

a. Offerors shall submit past performance examples from the CAGE code of the prime offeror or major subcontractors. If proposing examples from other CAGE codes then the offeror is required to provide a narrative in its proposal explaining why the work under another CAGE code should be considered relevant. The Government will consider explanations and may determine that the work is not relevant, in which case the work will not be favorably considered during the Government's evaluation.

b. For any contracts that did not/do not meet original schedule or technical performance requirements, provide a brief explanation of the reason(s) for the shortcomings and any corrective action(s) taken to avoid recurrence. The Offerors shall list each time the delivery schedule was revised and provide an explanation of why the revision was necessary. All Requests for Deviation and Requests for Waiver shall be addressed with respect to causes and corrective actions. The Offerors shall also provide a copy of any Cure Notices or Show Cause Letters received on each contract listed and a description of any corrective action implemented by the Offeror or proposed subcontractor. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

c. Past Performance Questionnaire. For all contracts identified in Section 1, Contract Descriptions, Offerors must make a reasonable attempt to have a Past Performance Questionnaire (Solicitation Attachment 1) completed and submitted by the client. The offeror shall complete Part I of the Past Performance Questionnaire and email the questionnaire to both the Army contracting activity and technical representative responsible for the past/current contract. The POC's shall be instructed to electronically complete Part II of the questionnaire and directly email the entire questionnaire to the Contracting Officer no later than the proposal due date, to Erin Hynes at erin.l.hynes.civ@army.mil. The offeror shall also include a list of all the POC’s who were sent a questionnaire in the proposal. The POC List shall be include the following information: Solicitation Number; Company Name; Contract Number; Army Agency; POC Last Name, First Name; POC Title; POC Telephone Number; POC E-Mail Address; Date E-mailed to POC (month/day).

d. Subcontractors: If offeror is submitting a subcontractor, the offeror shall provide a descriptive narrative explaining how the work of this requirement will be assigned among the subcontractor and the offeror’s company employees.

The offeror shall provide the subcontractor’s company name, company address, CAGE Code, UEI, and the type of work, in accordance with the PWS of this requirement, the subcontractor will perform. When citing the PWS, the offeror shall provide the PWS paragraph number/section. This includes all subcontractors who will be providing critical hardware/services or whose subcontract is for more than 15 % of the total proposed price. This section will further include written consent of major subcontractors to allow the disclosure of their subcontractor’s past performance information to the Offeror. In addition, letters of commitment shall be included for all major subcontractors.

e. The Government will focus its evaluation on the Offeror’s record of performance as it relates to all solicitation requirements, including cost, schedule, and performance, management of subcontractors and compliance with FAR 52.219-8, Utilization of Small Business Concerns. Absent any recent and relevant past performance history or for whom information on past performance is not available, the offeror will be assigned a “neutral confidence rating” as indicated in Table 3 and its proposal will not be evaluated favorably or unfavorably on past performance.

(iii) VOLUME III – Factor 3 - Price. The volume shall be organized into the following sections:

The offeror shall complete all requested pricing line items in this solicitation including the excel pricing list, for each Line Item number and in section B.5 of the Instructions Section – Summary of Proposals, including the six (6) months, “Option to Extend Services.” Unit Pricing for each line item shall be inserted under the “Unit Price” then multiplied by the quantity and total entered under the “Amount”. This total shall be placed on the blank line in each line item.

The Government will add all line items for each year, to include the 6-month option, to determine the total evaluated price. Failure to comply with the RFP requirements for Cost information may result in an adverse assessment of an offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes.

(IV) VOLUME IV – SOLICITATIONS, OFFER AND AWARD DOCUMENTS AND

CERTIFICATIONS/REPRESENTATIONS

Certifications and Representations – Each offeror shall complete (fill-in and signatures) the solicitation sections indicated below using the file (without modification to the file) provided with the RFP. An authorized official of the firm shall sign the SF 1442 and all certifications requiring original signature.

Offerors are required to acknowledge all amendments (SF 30) in accordance with (IAW) FAR 52.215-1. Offerors also must complete Online Representations and Certifications Application (ORCA) registration IAW FAR 52.212- 3(b). An Acrobat PDF file shall be created to capture the signatures for submission.

SECTION 00 30 00 - AVAILABLE INFORMATION

The following have been added by full text:

RFI ANSWER 1

Q&A 1

1. Does the Registered Roof Observer have to be present on site at all times for every task order? How does the govt see the requirement of onsite presence?

A: The RRO is not required to be physically present on the roof top at all times during the execution of said project.

They are required to be in a location that would facilitate, at a minimum, a daily inspection and documentation of the project progress as part of their responsibilities.

2. The past performance requirement states project performed in the last 3 years, however the evaluation for award says projects performed over the past 5 years will be reviewed. Which should we follow?

A: The correct is the past five (5) years. It has been corrected in the amended RFP.

3. The RFP requires the superintendent to have a min. of 7 years journeyman level experience in the roofing field, with minimum of 3 years of experience in a supervisor position along with completion of IIBEC roof top quality control course within the past 3 years. This is a very specific and stringent requirement as a journeyman level experience would mean the individual was or is part of a roofer’s local union. The IIBEC course is meant for roofing material manufacturers, quality assurance observers, architectural and engineering field technicians etc. It would be very difficult to have qualified personnel who have all 3. Would the government accept proposed personnel who have 10+ years of supervisory experience, experience working in the roofing industry (non union), and completion of the IIBEC roof top quality control course. can govt clarify why journeyman experience with union is required for this MATOC?

A: This is a single award contract. The government believe union journeymen have a consistently high level of training and adherence to established standards.

4. Will Project Manager who has received a PMP under 2 years be considered, if they have over 10 years of experience?

A: No, a minimum of 2 years as a PMP is necessary.

5. Is this contract intended to be awarded to a single contractor or to multiple contractors?

A: Single contractor.

6. What is the estimated ROM for this project? It appears to be listed as 19 Million for the base year.

A: The Government will establish the contract total ("ceiling") based on the total evaluated price from the successful offeror's proposal, or in an amount up to $130M, whichever is deemed appropriate by the Contracting Officer at time of award.

7. Is there a legacy contract that is being replaced we can reference?

A: W56ZTN19D0007.

8. Please clarify, bond costs are not to be included in any of our line item pricing and not to be included in our coefficient?

A: As stated under the Evaluation Factors, item 1 – Technical Evaluation Subfactor a: Offerors shall provide a signed letter from its Surety company stating that the offeror qualifies and can obtain $22 million of performance and payment bonds.

Bonding will be required at the task order level when required by the FAR or as deemed necessary by the Contracting Officer. Bonding is not included in the contractor’s coefficient.

9. Is the security access All US Citizens Only for all locations/task orders?

A: In order for any U.S. citizen or naturalized U.S. citizen to receive unescorted access to the Restricted Area they need to have at the minimum a favorable Tier 1 investigation. Those individuals will need to be fingerprinted then have the Tier 1 initiated in PSIP. Non-resident aliens are not authorized to be processed for a Tier 1. For individuals without a clearance/Tier 1 they will receive an escort required badge from our Visitor Control, B324.

They will be escorted by an ATC employee; civilian, military or mission-support contractor. All Foreign Nationals are to be escorted at all times.

These requirements include but are not limited to the exclusive use of American citizens only.

10. Please clarify what the limit is for the Offeror’s past performance, excluding the PPQ’s,

a. What is the total page limitation to this section? It states 20 pages plus 5 for each major subcontractor. If we have 3 major subcontractors does this mean that the page limitation is then 20 plus 3x5 (15) =45?

A. Yes. The requirement is twenty pages plus five per major subcontractor

b. The past performance states, Offerors shall submit more than five contracts. Is this suppose to be “no more than 5”?

A. It was corrected to read NO more than five contracts.

c. Are letters of commitment from our subcontractors excluded from the page limitations?

A. No

11. Will completed CPARS evaluation reports be equally acceptable to be submitted for the Past Performance requirement in lieu of the PPQ/Past Performance Questionnaire? Is providing a copy of a competed CPAR evaluation report for each of the Experience/Project’s acceptable?

A: Offerors shall supply a complete list of ALL projects/contracts that contain a relevant roofing component with a value of $500,000.00 dollars or greater and the type of work specified in the scope of work must be ongoing or must have been performed during the last five (5) years from the date of issuance of this solicitation.

12. Is it equally acceptable to submit a previously completed Past Performance Questionnaire from a previous/different RFP directly in our proposal submission?

A. Past performance Questionnaires submitted in a different format than the one provided in the solicitation will not be accepted. It was added in the Appendix A.

13. Please provide the PPQ file/form template A: The PPQ template has been included in the amended solicitation.

14. Please provide the line item pricing file/form to complete and submit.

A: An updated price list has been uploaded in SAM. Please follow the instructions.

15. Please provide the incumbent award data from the past 2 incumbents.

A. The previous two incumbents were Cypress SBS JV (W56ZTN19D0007) and Service-Disabled Contracting Group (SDCG) (W56ZTN15D0003)

16. Please provide the most recent asset roof inventory reports/surveys.

A. The garrison contains over two thousand facilities under roof, compiling approximately eight million square feet of roof surface. At present there are no records of surveys/assessments that are available.

17. If the offeror is a JV, please clarify how to calculate the EMR. Is the EMR the average of the 2 member entities of the JV.

A. If the respondent is a JV, then the EMR for entity performing the actual roofing component is to be provided.

18. There are references made to attachments and appendices in the solicitation, but we do not see these files/sections, please provide/clarify.

A. Please respond with another RFI if you still cannot see it.

19. Is an USACE QAQC Certificate in the past 5 years equivalently acceptable in lieu of the International Institute of Building Enclosure Consultants (IIBEC) roof top Quality control course within the past three years for the Superintendent requirement?

A. NO, Garrison does not consider the USACE QA/QC certificate to be equivalent the IIBEC course.

20. Can the government provide more details on the expected volume or frequency of task orders under this contract?

A. Currently, fiscal constraints are the determining factor as to the number of projects to be awarded in a given fiscal year. As the projected workload within the annual work plan of the garrison is driven solely by availability of funding, it is impossible to predict the volume of work that could be awarded in a given fiscal year. Historically, the number of projects has ranged from a low of eight projects to as high as twenty-seven roof projects in a given fiscal year.

20. Please provide historical information on who is the incumbent contractor, and task order size & volume over the life of the contract. Can the government provide information on the incumbent's performance?

A. The incumbent contractor, CYPRESS SBS JV, has been awarded on average twenty projects per year over the course of their contract. The total value of their efforts is in excess of $68M.

21. Will there be any minimum guaranteed amount of work under this contract?

A. The minimum guarantee on this solicitation and contract is $10,000..00

22. Please include the wage scale for St. Mary’s County (location of Blossum Point Research Facilities).

A. Blossom Point has been removed from the list of APG service facilities, effective with amendment

W56ZTN25R0003003.

23. Can we assume that North & South Cantonment, Churchville Automotive Testing Facility & Grace’s Quarters are all located on APG?

A. The North and South Cantonment areas and Churchville Test Track are situated within the physical boundaries of Harford County MD while Graces Quarters is situated within the confines of Baltimore County. The Adelphi Lab Complex is situated along the boundaries of Montgomery County and Prince George’s County, Maryland

24. There is no wage rate for Hazardous Material Handlers (Asbestos Abatement professionals) in any of the wage scales attached, please include.

A: The Government has changed to show the most up-to-date wage determination.

25. Please provide a copy of the site visit sign in sheet.

A. Please see attached in Sam.gov

26. Is the Army Corp of Engineers responsible for managing this contract?

A. The USACE is in NO way responsible for ANY aspect of management of this contract.

27. Can you provide more details on the process for issuing task orders under this contract?

A. The Government PM will develop a draft statement of work (SOW) based upon the requirement and needs of the government. The PM will then request a site visit with the KTR to verify existing conditions and constraints, and agree upon the SOW. The revised SOW and RFP letter would then be issued to the KTR for their response. KTR will submit their proposal using the applicable line items, providing their proposed quantities and total cost for the SOW requirements, Government evaluates their proposal and if proposal is determined to be fair and reasonable, a task order would be issued, dependent upon availability of funds.

28. What specific documentation or approvals are required for subcontractors, particularly those performing more than 15% of the work

A. A letter of intent/sub-contracting agreement between subcontractor and prime contractor, EMR for the sub-contractors, sub-contractor’s field superintendent qualification(s), Safety program, QA/QC program.

29. Does the government have any specific roofing system preferences or requirements for different types of buildings at Aberdeen Proving Ground?

A. The type of roof systems presently employed by the garrison include but are not limited to architectural asphalt shingles systems, metal roof systems, natural slate, Modified Bitumen (APP and SBS) and single ply weldable systems (Thermopolyolifen).

30. Are there any special security clearance requirements for contractor personnel working on this contract?

A. Please refer to the response to question 9 above.

31. Will the government provide storage space for materials and equipment on-site, or is the contractor expected to arrange for off-site storage?

A. The government will not provide space for storage of bulk materials anticipated to be utilized during the course of this contract. Neither will the government provide temporary office space for contractor personnel. Limited on-site material storage for specific individual task orders will be available on a case by case basis after coordination with the government COR and facility POC.

32. How will price adjustments be managed over the 5-year base period of the contract?

A. If necessary, such adjustments would be processed under the existing FAR regulations. The Government recommends to include your average pricing to include a 2 or 3% 5 year escalation, see price list to incluse the escalation, if needed.

33. For the 6-month option period, will the same pricing structure apply as in the base period?

A. The same Contract Line Items Numbers (CLINs) with reduced quantities will apply to both the base and six-month extension periods.

34. Are there any government-furnished materials or equipment that will be provided for this contract?

A. No, the KTR is responsible for supplying all required materials, equipment, etc. for execution of work under this solicitation.

35. Please provide the missing quantity sheets/bid schedule for pricing.

A. An updated unit pricing/CLIN spreadsheet has been uploaded to SAM’s

36. Given the 125-page limit for the entire proposal, can the government clarify if any specific sections or attachments are excluded from this page count?

A. None of the sections are exempt from the total page limit for this solicitation

37. For Volume II - Past Performance, the instructions mention an exclusion applies. Can the government provide more details on what this exclusion entails? Can you please provide the PPQ document for completion?

A. Please see response to Question 13

38. How will the government evaluate and compare the coefficients proposed by different offerors?

A. The Government had changed the price list. . Price reasonableness will be utilized in the evaluation of the

Firm-Fixed Price effort. For a price to be fair and reasonable, it must represent a price to the Government that a prudent person would pay in the conduct of competitive business. Examples of methods that may be used include a comparison to the other competitive pricing received in response to the solicitation, comparison to previous prices paid, and a comparison to the IGCE pricing.

39. Questions Regarding Subfactor (c)- Key Personnel in accordance with FAR 11.002(a)(1), FAR 11.002(b). FAR 37.104, FAR 10.001, FAR 10.001(a)(2):

Are the personnel qualification requirements (e.g., years of experience, certifications) necessary to meet the Government’s actual needs, or do they exceed industry standards?

A. YES, the qualifications are necessary to meet Government requirements.

Was market research conducted to determine that the specified qualifications (e.g., PMP certification, RRO certification, OSHA training) are essential for performance success?

A. Yes, market research was conducted, and the specified qualifications are essential to the successful performance of work associated with this solicitation.

Does the requirement for prime contractor employees (rather than subcontractors/teaming partners) enhance performance or ensure contract success?

A. Not sure what is being requested here Does requiring key personnel to be employees of the prime contractor (instead of allowing subcontractors) unduly limit competition?

A. No

Has the Government considered alternative qualifications or equivalent certifications that could fulfill the same requirements?

A. Yes, alternative qualifications were considered and were found to be inadequate to meet the garrisons needs and or requirements.

Is the requirement for IIBEC certification (e.g., RRO certification) essential, or could equivalent industry certifications be accepted to broaden competition?

A. The government’s requirements are specific for a reason. Equivalent certifications will not be considered as meeting the requirements of this solicitation

IIBEC does not have a Roof Top Quality Control course, please clarify the training you are referring to.

A. The IIBEC offers a Roof Top Quality Assurance course in its library of courses available.

Could a broader range of OSHA and USACE safety courses be accepted to ensure more qualified personnel are available?

A. The OSHA and or USACE Construction Safety Courses would be considered acceptable.

Does the requirement for extensive prior experience in roofing project management limit competition unnecessarily?

A. No

Do the personnel experience and certification requirements unnecessarily restrict competition by favoring certain firms over others?

A. No Can justification be provided for the requirements in subfactor (c)- Key Personnel?

A. Given the critical nature of ensuring the weather tight integrity of the various facilities at APG, the stringent requirements are necessary for ensuring the integrity and life cycle of the roof systems being installed and/or replaced within the garrison.

43. Can you please detail how the requirement for handling multiple projects (e.g., ten ongoing projects) aligns with actual workload demands and industry capabilities?

A. The requirement for handling multiple projects simultaneously align with the current workloads issued to the existing KTR. The number ten was selected as an arbitrary benchmark to ensure continuity in the bidder’s response.

44. Can you share what factors were considered in determining the required level of equipment ownership and leasing plans, and is this requirement reasonable for all potential offerors?

A. The government considers this to be reasonable requirement for all respondents to this solicitation.

45. Has the Government evaluated whether the response time requirement of one hour for emergency projects is feasible for most capable contractors?

A. The one-hour emergency response has not been a problem in the past. It is up to the respondents to ensure that they can meet this requirement

46. Does the requirement for a $22M annual workload capability create an unfair barrier to small or mid-sized businesses that could otherwise perform successfully?

A. The government does not consider annual workload to be a barrier to small and or mid-sized corporations

47. Are the requirements for specific scheduling software, reports, and databases justified by mission needs, or could they be more flexible to allow broader participation?

A. Other than the requirement for As-built drawings to be in a specific format, there are no additional software, database or other requirements that would require anything other than commercially available software/programs.

48. Does the restriction to U.S. citizens for security clearance and mobility access badges apply to the entire project, or is that only for certain restricted areas of the various facilities? And, does that align with legal and mission-critical requirements, or does it unnecessarily limit the contractor pool? Will the government allow legal Resident Aliens and legal work permit holders to work on the project?

A. Please see the response to question 9 above. IN addition, there is a requirement to maintain qualifications for mobility badges for the duration of the contract. Specific facilities may require additional vetting for access to the interior of their facilities. These are mission critical requirements set forth by higher authority within the Department of the Army and the Department of Defense. They are not intended to, nor do they limit the availability of personnel who can work at APG. Non-Resident Aliens (NRAs) can be provided access to the base as long as they are vetted through the COR. NRA’s can also be escorted into the security areas with an escort who has satisfactorily met the requirement outlined in Questions 9 and possess a valid, government issued phot identification badge for the area(s) in which they will be working.

49. Can you please confirm that the offeror is required to submit more than five (5) contracts for past performance.

If so, what is the maximum number of contracts that can be submitted? Is that maximum number for the prime contractor and subcontractor/teaming partner combined? How many need to be submitted specifically by the prime contractor?

A: An amendment is being done to correct to read NO MORE THAN 5 contracts for the past performance. The subcontractor can complete 15% of the work or more.

50. At the site visit it was stated that the offeror needs to be withing fifty (50) miles of APG. We didn’t see that requirement in the solicitation. Can you please clarify the requirement? Within fifty (50) miles of the APG, within fifty (50) miles of one of the locations, within fifty (50) miles of all of the locations?

A. Within fifty miles of both APG and Adelphi labs.

51. In Section (iii) VOLUME III - Factor 3 - Price, could you please clarify which "line item numbers" you are referring to or are these identified for each task order as issued?

A. The Contract Line Item list have been uploaded to SAMs and should be available to all prospective bidders.

The offeror shall complete all requested pricing line items in this solicitation, for each Line Item number and in section B.5 of the Instructions Section – Summary of Proposals, including the six (6) months, “Option to Extend Services.” Unit Pricing for each line item shall be inserted under the “Unit Price” then multiplied by the quantity and total entered under the “Amount”. This total shall be placed on the blank line in each line item.

The Government will add all line items for each year, to include the 6-month option, to determine the total evaluated price. Failure to comply with the RFP requirements for Cost information may result in an adverse assessment of an offeror’s proposal and reduce or eliminate its chance of being selected for award. Offerors shall ensure that the information presented in this volume is consistent and correlates with the information contained in the other proposal volumes.

A. The CLIN spreadsheet was uploaded after the solicitation was issued. An updated CLIN spreadsheet is on the SAM’s website

52. Could you elaborate on the following statement and we do not see the Excel files attached for the Bid Response:

“Any price breakdown information submitted to aid in the price evaluation shall be submitted in unlocked Microsoft Office Excel Read/Write format”? Specifically, what type of breakdown information are you expecting from the Offerors? Again, will this be known on a task order by task order basis? Will the Excel files be provided prior to the Submission deadline?

A. If the prospective Bidder feels it is necessary to provide a breakdown of how they determined their unit costs for the line items associated with this solicitation, then that breakdown needs to be submitted in the format requested. The information which could be provided would include calculations for direct and indirect labor costs, material cost, overhead and profit. The unit pricing provided by the successful bidder will be the unit costs utilized by both contractor and Government in determining their respective proposal and estimated project costs for the five-year period of this contract. As this is a Firm Fixed Price contract, the only variable would be the quantities of the various CLIN’s utilized for that specific task order, plus the bond costs (Above the threshold for requiring bonding). The Excel file shave been uploaded to the SAM’s website.

53. How will the pricing portion of the proposal be evaluated if it is a Total Firm Fixed Price for the 5 Year IDIQ and the additional 6 mos Extension?

A. The total value of the five year pricing and the six month extension will be totaled to determine the total proposed price for the purpose of evaluating cost proposals.

54. In Section 00 72 00 - C.(iii) under Quality Assessment, it states the following. Could you please clarify whether “ALL” refers to every project we have completed that meets this criteria, or only the projects we include in the Past Performance (PP) section of our submission?

i. “Offerors shall supply a complete list of ALL projects/contracts that contain a relevant roofing component with a value of $500,000.00 dollars or greater and the type of work specified in the scope of work must be ongoing or must have been performed during the last five (5) years from the date of issuance of this solicitation.”

A. Only include those projects that were submitted with the offerors Past Performance portion of their proposal

55. Can the Site Safety Manager duties be performed by the Quality Control Manager? Can Key Personnel handle multiple duties if they meet the qualifications?

A. The Site Safety Manger and QC Manager are two distinct skill sets that are NOT authorized by this solicitation to be combined. Personnel associated with the subsequent contract award from this solicitation SHALL NOT be “dual hatted,” that is one person filling more than…