Amend_0001_W56JSR_18_R_0008.pdf

PDF 17 KB Posted

Attached to
STARLite ER SAR/GMTI Federal contract opportunity
Solicitation number
W56JSR-18-R-0008
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document consists of an amendment to a solicitation and related federal contract opportunity. The amendment provides clarification on key elements of the solicitation for sustainment services of the STARLite ER SAR/GMTI radar system, including engineering, technical, and logistics support as well as lay-in materials, repairs, and obsolescence monitoring and mitigation. Changes include revising response dates, clarifying the two-phase award process for the indefinite delivery/indefinite quantity contract, restructuring performance work statement sections, updating contract data requirements, and modifying proposal instructions. The opportunity is a sole-source award to Northrop Grumman Systems as the original equipment manufacturer, developer, and sole provider/owner of proprietary technical data for the STARLite ER radar utilized on Gray Eagle and Persistent Surveillance System Tethered platforms.

Amendment 0001 to Solicitation W56JSR-18-R-0008

View the file

Other files for this federal contract opportunity

Other files attached to STARLite ER SAR/GMTI, newest first.
File Type Posted
Section L STARLite_08Oct2019_FINAL.DOCX DOCX document
A01-Attachment 0006 STARLite Data Rqmts Form_01302019.pdf PDF
A01-Attachment 0007 STARLite Data Elements Defs_01302019.pdf PDF
A07- Solicitation W56JSR-18-R-0008_02.pdf PDF
A01-Attachment 0001 - STARLite ER PWS Amd 02.pdf PDF
Attrachment 0009-CDRL A012 Performance and Cost Report Worksheet Jan 202....xlsx XLSX spreadsheet
Exh A_STARLite_Base_CDRL_8 JAN 2020.docx DOCX document
A01-Attachment 0005 STARLite Prov Rqmt_01302019.pdf PDF
A01-Attachment 0002 STARLite Acronyms_01302019.pdf PDF
A01-Attachment 0003 STARLite QASP 20190124.pdf PDF
A01-Attachment 0004 STARLite Parts List_01302019.pdf PDF
A01-Attachment 0008 STARLite DD254_SIGNED.PDF PDF
A01-STARLite_Base_CDRL_(A001-A014)_24_July_2019_Amend_0001.docx DOCX document
A01-Base_PWS_STARLite_NMC_FINAL_7__24_2019_(updated).docx DOCX document
A01-STARLite_Base_CDRL_(A001-A014)_19_July_2019.docx DOCX document
A01-Attachment_0010__STARLite_ER_DD254_SIGNED.pdf PDF
A01-Base_PWS_STARLite_NMC_FINAL_7_19_2019.docx DOCX document
STARLite_ER_Parts_List.docx DOCX document
A01_STARLite_ER_Appendix_C_-_Intel_Access.doc DOC document
A01-Attachment_0005__STARLite_ER_Prov_Rqmt.docx DOCX document
A01-Attachment_0002__STARLite_ER_Acronyms.docx DOCX document
W56JSR_18_R_0008_Final_Solicitation.pdf PDF
STARLite_ER_QASP_FINAL.docx DOCX document
A01-DA_FORM_2410.pdf PDF
A01_STARLite_ER_FOUO_Appendix_D.doc DOC document
A01_STARLite_ER_Appendix_A-_COMSEC.doc DOC document
A01-Attachment_0007__STARLite_ER_Data_Elements_Defs.docx DOCX document
A01-Attachment_0006_STARLite_ER_Data_Rqmts_Form.docx DOCX document
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of

2. Amendment/Modification No.

3. Effective Date

4. Requisition/Purchase Req No.

5. Project No. (If applicable)

6. Issued By Code 7. Administered By (If other than Item 6) Code

8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)

9A. Amendment Of Solicitation No.

9B. Dated (See Item 11)

10A. Modification Of Contract/Order No.

10B. Dated (See Item 13) Code Facility Code

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting And Appropriation Data (If required)

13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS

It Modifies The Contract/Order No. As Described In Item 14.

A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In

The Contract/Order No. In Item 10A.

B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set

Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).

C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:

D. Other (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.

14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. Name And Title Of Signer (Type or print)

16A. Name And Title Of Contracting Officer (Type or print)

15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed

By (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITIONS UNUSABLE

30-105-02 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

SEE SCHEDULE

X

Firm Fixed Price

W56JSR

ACC-APG Division E (W56JSR)

6565 SURVEILLANCE LOOP

APG, MD 21005-1846

MATTHEW W. CASEY

EMAIL: MATTHEW.W.CASEY2.CIV@MAIL.MIL

W56JSR-18-R-0008

2019JUL22

X

X

2 signed

SEE SECOND PAGE FOR DESCRIPTION

1 4

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

Buyer Name: MATTHEW W. CASEY

Buyer Office Symbol/Telephone Number: CCAP CCE/(443)861-0390

Type of Contract 1: Firm Fixed Price

Type of Contract 2: Cost Plus Fixed Fee

Kind of Contract: Maintenance Contracts

*** End of Narrative A0000 ***

1. The purpose of this Amendment 0001 to Solicitation W56JSR-18-R-0008 is to clarify elements of the initial solicitation.

2. The following changes have been made to Section A, paragraph 21:

a) FROM:

Friday, July 16, 2019

TO:

Friday August 16, 2019

b) Clarification to the initial language as follows:

FROM:

The Phase 2 award will be conducted as a modification to the original base contract award, establishing negotiated prices and estimated costs for all requested elements to be incorporated into the base IDIQ contract award.

TO:

The Phase 2 award will be conducted as a modification to the original base IDIQ contract award. All contract terms and conditions will be subject to negotiation for incorporation into the base IDIQ contract award, also establishing negotiation prices and estimated costs for all requested elements that were not included in Phase 1.

3. Section B has incorporated CLIN A014, Performance and Cost Report.

4. Section C, Performance Work Statement (PWS), has been revised and restructured to better clarify elements.

a) Various relocations/changes were made to Section 3 of the PWS:

i) Moved paragraph 3.4.4, ECP, to paragraph 3.14;

ii) Current paragraph 3.4.4 was intentionally left blank;

iii) Moved paragraph 3.4.5, DCN, to paragraph 3.9.1;

iv) Moved paragraph 3.5.2, Configuration Control Document

Numbering, to paragraph 3.14.3; and

v) Moved Paragraph 3.8.2, DMSMS, to paragraph 3.9.2.

b) Paragraph 3.9, Technical Services, clarified related subcategories.

c) FACAR language was inserted at PWS paragraph 3.15.

d) Existing PWS paragraph 3.5, Configuration Management, was revised.

i) Updated paragraph 3.5, Configuration Management; and

ii) Deleted paragraph 3.5.1, Baseline Changes.

2 4

W56JSR-18-R-0008

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

e) Made minor corrections to 3.8.1, Lay-In Materials, and paragraph

3.8.2, DMSMS.

5. Section J. Changes have been made to block 5, Contract Reference, for the following CDRLs:

a) A001, ECP;

b) A002, LMI Data Products;

c) A006, DMSMS;

d) A007, Inventory Report;

e) A009, Technical Services;

f) A010, Scientific and Technical Reports;

g) A012, Contractor Manpower Report; and

f) A013, FACAR.

6. The following revisions were made to Section L:

a) Volume 1, Technical Proposal, Item 2: Corrected 3.11, Technical

Support Personnel Qualification, to 3.9, Technical Services; and

b) Volume 3, Solicitation Documentation: Added a paragraph to the end of the volume, as follows:

PHASE 1 and 2: As this is a phased contract award, Phase 1 shall consist of Technical Services and Lay-In Materials. Phase 2 will incorporate all negotiated terms and conditions and will establish the final contract document.

*** END OF NARRATIVE A0002 ***

3 4

PIIN/SIIN

Page of

Name of Offeror or Contractor:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Reference No. of Document Being Continued

MOD/AMD

SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS

1028 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________

A014 PERFORMANCE AND COST REPORT 1 LO $ ** NSP ** ___________________________ __________________

SERVICE REQUESTED: DI-FNCL-80912/T

CLIN CONTRACT TYPE:

Firm Fixed Price

Inspection and Acceptance _________________________

INSPECTION: Destination ACCEPTANCE: Destination

DLVR SCH PERF COMPL

REL CD QUANTITY DATE ________ ______________ __________

001 1 AS REQUIRED

4 4

SECTION A
SECTION B

File details come from the government source that posted it. Updated .