This attachment to a federal contract opportunity outlines provisioning requirements for the STARLite ER SAR/GMTI radar system. Key requirements include sustainment services, engineering and technical support, repairs, and obsolescence monitoring. Special tools and test equipment as well as repair kits and sets will be listed in the provisioning parts list. The contractor must attend a guidance conference and have sample components available for review. Provisioning documentation will be provided in both hardcopy and digital format on a performance schedule. The related federal contract opportunity is a planned sole source award to Northrop Grumman Systems Corporation, the original equipment manufacturer, for sustainment of the STARLite ER radar sensor. The five-year contract from the Army Contracting Command at Aberdeen Proving Ground includes fixed price, cost plus, and cost reimbursement contract types.
Attachment 0005, STARLite ER Provisioning Requirement
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0005 – STARLite ER Provisioning Requirements Statement (Provisioning Screening required)
Provisioning Requirements Statement
| Provisioning Requirements Statement |
| ARP No. |
Title of ARP
Provisioning Activity (address and zip code)
USA C-E LCMC, ABERDEEN PROVING GROUNDS, MD 21005
ATTN: safari.s.king.civ@mail.mil
This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with Performance Work Statement (PWS). Deliverable Provisioning Technical Documentation (PTD) and Engineering Data for Provisioning (EDFP) Requirements will be specified on Contract Data Requirements List (CDRL).
Provisioning Requirements
| 1 |
| Guidance Conference |
| Required |
| X |
| Not Required |
| Place |
| Aberdeen Proving Grounds, Maryland |
| Date |
| DD MONTH YEAR |
| Time |
| TBD |
| Estimated number of days |
| 3 |
If required, fill out Place, Date, Time and number of days. See Block 14, Note 1
| 2 |
| IPR/Provisioning Conference |
| Required |
| X |
| Not Required |
| Place |
| Contractor Facility |
| F |
| Date |
| DD MONTH YEAR |
| Time |
| TBD |
| Estimated number of days |
Contractor is
| Required |
| X |
| Not Required |
To have a sample of the component or End Item at the conference
Sample Article
| Will be viewed at the conference |
| X |
| Will be disassembled at the conference |
If required, fill out Place, Date, Time and number of days. See Block 14, Note 2
| 3 |
| Manufacturers or Commercial Manuals |
| Required |
| X |
| Not Required |
| 4 |
| Incremental Submission of Provisioning Technical Data |
| X |
| Authorized |
Not Authorized
| 5 |
| Provisioning Screening |
| X |
| Required |
Not Required
If required, results must be incorporated into the Provisioning Parts List (PPL)
| 6 |
| Resident Provisioning Team (RPT) |
| Will be established |
| X |
| Will not be established |
| 7 |
| Interim Release |
| Authorized |
| X |
| Not Authorized |
| 8 |
| Engineering Data For Provisioning (EDFP) |
| Hardcopy |
| X |
| Digital Format |
| 9 |
| EDFP will be sequenced by: |
| X |
| PLISN |
| X |
| Reference Number |
Reference Designation
Other
If Other, explain
| 10 |
| Tools And Equipment |
| X |
| Will Be |
Will Not Be
Included in the PPL. See Block 14, Note 3
| 11 |
| Provisioning Performance Schedule (PPS)/milestone chart |
| X |
| Required |
Not Required
See Block 14, Note 4
| 12 |
| Repair Kits and Repair Sets |
| X |
| Will Be |
Will Not Be
Included in the PPL.
| 13 |
| Bulk Item List |
| See Block 14, Note 5 |
| 14 |
| NOTES: |
1. IPR/Provisioning Conference already occurred.
1. SPECIAL TOOLS and TEST EQUIPMENT will be listed in the PPL as “B” indentured items with the NHA being the End Item.
These items will be shown in the RPSTL in section three. Source code must be “PE”. Must also include Basis Of Issue.
Provisioning Category Code coded as “D”.
1. Items with Source Code of “M” (Make) must have associated “P” coded item on the Bulk List. Bulk List is shown as the last figure of section two in the RPSTL. Bulk Items will be listed in the PPL as “B” indentured items with the NHA being the End Item. Must include Provisioning Category Code coded as “E”.
DICTIONARY OF ABBREVIATIONS
| CONF | CONFERENCE PIO...............PROVISIONED ITEM ORDER |
| CNTR | CONTRACTOR PL.................PARTS LIST |
| DRF | DATA REQUIREMENT FORM PPL..............PROVISIONING PARTS LIST |
| GUID | GUIDANCE PPS..............PROVISIONING PERFORMANCE SCHEDULE |
| IPR | IN-PROCESS REVIEW PROV...........PROVISIONING |
| NR | NUMBER REQ'D..........REQUIRED |
| PAR | PARAGRAPH PRS..............PROVISIONING REQUIREMENT STATEMENT |
| PCL | POST CONFERENCE LIST |
1.
File details come from the government source that posted it. Updated .