A07- Solicitation W56JSR-18-R-0008_02.pdf
PDF 147 KB Posted
- Attached to
- STARLite ER SAR/GMTI
- Solicitation number
- W56JSR-18-R-0008
About this file
This solicitation requests proposals for sustainment services for the STARLite ER SAR/GMTI system. Requirements include engineering, technical, and logistics support services; repairs; lay-in materials; and obsolescence monitoring and mitigation. The performance period is five years using contract types including firm fixed price, cost plus fixed fee, and cost reimbursement. The Army Contracting Command at Aberdeen Proving Ground intends to award this sole source contract to Northrop Grumman Systems Corporation as the original equipment manufacturer and sole provider of the necessary capabilities. The place of performance is the contractor's facility.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. Contract ID Code Page Of
2. Amendment/Modification No.
3. Effective Date
4. Requisition/Purchase Req No.
5. Project No. (If applicable)
6. Issued By Code 7. Administered By (If other than Item 6) Code
8. Name And Address Of Contractor (No., Street, City, County, State and Zip Code)
9A. Amendment Of Solicitation No.
9B. Dated (See Item 11)
10A. Modification Of Contract/Order No.
10B. Dated (See Item 13) Code Facility Code
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing items 8 and 15, and returning ____________ copies of the amendments: (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. Accounting And Appropriation Data (If required)
13. THIS ITEM ONLY APPLIES TO MODIFICATIONS OF CONTRACTS/ORDERS
It Modifies The Contract/Order No. As Described In Item 14.
A. This Change Order is Issued Pursuant To: The Changes Set Forth In Item 14 Are Made In
The Contract/Order No. In Item 10A.
B. The Above Numbered Contract/Order Is Modified To Reflect The Administrative Changes (such as changes in paying office, appropriation data, etc.) Set
Forth In Item 14, Pursuant To The Authority of FAR 43.103(b).
C. This Supplemental Agreement Is Entered Into Pursuant To Authority Of:
D. Other (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return _______________ copies to the Issuing Office.
14. Description Of Amendment/Modification (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. Name And Title Of Signer (Type or print)
16A. Name And Title Of Contracting Officer (Type or print)
15B. Contractor/Offeror 15C. Date Signed 16B. United States Of America 16C. Date Signed
By (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITIONS UNUSABLE
30-105-02 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
SEE SCHEDULE
X
Cost Plus Fixed Fee
W56JSR
ACC-APG Division E (W56JSR)
6565 SURVEILLANCE LOOP
APG, MD 21005-1846
MATTHEW W. CASEY
EMAIL: MATTHEW.W.CASEY2.CIV@MAIL.MIL
W56JSR-18-R-0008
2019JUL22
X
X
2 signed
SEE SECOND PAGE FOR DESCRIPTION
1 113
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
Buyer Name: MATTHEW W. CASEY
Buyer Office Symbol/Telephone Number: CCAP CCE/(443)861-0390
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
1. The information below is a continuation of Block 14 - Description of Amendment.
2. The purpose of this Amendment 0002 to Solicitation W56JSR-18-R-0008 is to:
a) Set forth the various revisions that have been made to the solicitation, to include Section B - Supplies or Services and
Prices/Costs (Contract Line Item Numbers (CLINs) and Electronic Line Item Numbers (ELINs)), Section C -
Description/Specifications/Statement of Work (Performance Work Statement (PWS)), Section D - Packaging and Marking, Section E -
Inspection and Acceptance, Section H - Special Contract Requirements, Section I - Contract Clauses, Section J - List of Attachments, Section L - Instructions, Conditions, and Notices to Offerors or Respondents, and Section M - Evaluation Factors for Award.
b) Set forth the appropriate solicitation provisions and contract clauses to exercise an Undefinitized Contract Action (UCA) Task
Order (TO) for the STARLite ER sustainment effort.
c) Establish an award for the base contract for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract vehicle, under which the UCA TO will be definitized.
d) Set forth instructions for the definitization of the UCA TO effort.
3. Solicitation W56JSR-18-R-0008, along with its Amendment 01, has been cleaned up to eliminate typographical errors, inconsistencies, ambiguities, unnecessary repetitions, format and lay-out issues, and to include negotiated positions. In addition, the Government fill-in requirements in various full text regulatory clauses were completed. While all attempts have been made to accurately reflect all of the changes, those that were minor or did not affect the overall intent of the solicitation language have not been specifically identified below.
4. In Section B - Supplies or Services and Prices/Costs (Contract Line Item Numbers (CLINs) and Electronic Line Item Numbers (ELINs)), the use of an X preceding a 3-digit number identifies the CLIN as set forth for the entire 5-year period. Year One (1) would have a 1 in place of the X; a 2 would replace the X for Year Two (2); a 3 would represent Year Three (3) in place of the X; Year Four (4) would replace the X with a 4, and Year Five (5) would replace the X with a 5. The following changes have been incorporated into Section B:
a) CLINs for the entire 5-year performance period have been included. CLINs X001 through X023 are Cost Plus Fixed Fee (CPFF). CLINs
X101 through X123 are Firm Fixed Price (FFP) and will begin in Year Three (3). At that time, data provided via the Contract Data
Requirements List (CDRL) submissions, the contractors proposing, and any other pertinent data available will be evaluated to determine requirements that may be negotiated on a FFP basis, as applicable.
b) Although CLINs for all five (5) years have been incorporated, only Years 1-2 will be negotiated and set forth for pre-pricing at this time. The initial TO proposal will include costs for negotiation and award which shall then be set forth as pre-priced CLINs for
Years 1-2.
c) All Test and Inspect (T&I) CLINs, Shop Replaceable Unit (SRU) Repair CLINs, Technical Support Services CLINs, Lay-In Material
CLINs, and Diminishing Manufacturing Sources and Material Shortages (DMSMS) Material CLINs have been established for Inspection and
Acceptance (I/A) on an Origin/Origin basis.
d) All Line Replaceable Unit (LRU) Repair CLINs have been established for I/A on a Destination/Destination basis, with Freight On
Board (FOB) also designated Destination.
e) All SRU repairs are to be shipped in place. Section B language specifying shipment to Defense Logistics Agency (DLA) at
Tobyhanna Army Depot (TYAD) are incorrect.
f) Part Numbers (P/Ns)and National Stock Numbers (NSNs) have been corrected as follows:
i) CLINs X002, X012, X102, and X112 have corrected the NSN to 5841-01-603-3428.
ii) CLINs X003, X013, X103, and X113 have been corrected to P/N 146K162G03.
2 113
W56JSR-18-R-0008
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
iii) CLINs X007, X017, X107, and X117 have been corrected to P/N 219K255G03.
5. Section C - Description/Specifications/Statement of Work has incorporated a revised PWS, included as an Attachment in Section J. The following represent the revisions that have been incorporated:
a) Contract Type: Cost Plus Incentive Fee (CPIF) and Cost Reimbursable (CR) No Fee language was removed. Years 1-2 will be CPFF for all facets of the requirement, with provisions for negotiating Years 3-5 as FFP based upon data collected in the first 2-year period.
b) Windfall Profit language was removed, as was the original PWS 1.2.2. which addressed establishing all rates at contract award.
c) Language associated with Engineering Change Proposal (ECP) Class 2 was revised to clarify the allowance of costs when concurred in by the Government.
d) Schedule: Provisions for a negotiated induction schedule for T&I and Repairs was incorporated.
e) Turnaround Time (TAT):
i) The TAT for T&Is has been established at 90 days, with the provision for an induction schedule to accommodate the contractors single test set.
ii) The Repair TAT (RTAT) was established at 120 days, with 150 days for the Antenna Assemblies. Again, the induction schedule will be negotiated to allow for the use of the single test set, required for both T&I and repairs.
iii) For the repair of LRUs, the contractor will pull and replace the units from LRUs in the Government Furnished Property (GFP) inventory at the contractors facility. This action shall end the RTAT associated with the repair. The contractor shall then repair the pulled LRU and return the units to inventory. The cost associated with the repair of the pulled LRU shall be included in the T&I Repair
Report as a part of the repair cost.
iv) In the event of a secondary fault or failure, a new RTAT will be established. All costs associated with the testing and repair of the secondary fault or failure shall be included in the repair cost for the unserviceable unit.
vi) The contractor will ensure the Government is not charged the material cost for the use of the GFP inventory.
vii) The Government clarified the process for T&I and repairs within the PWS, and specified the starting triggers and stopping requirements associated with all TATs/RTATs.
vii) Excusable delay language was incorporated which considers 1) material availability, 2) secondary failures, and 3) test set availability.
viii) The initial TO will provide for the T&I of 52 STARLite ER unserviceable units, allowing the contractor to move forward with the less complicated repairs prior to those requiring long lead items or those of a more complex nature.
ix) Dependent upon the data received from the contractor, a tiered repair approach may be negotiated for Years 3-5.
f) The traditional use of the Government Furnished Property clause, Federal Acquisition Regulation (FAR) 52.245-1, was established. The
Government will not hold the contractor responsible or accountable for GFP for anything other than the requirements set forth in the FAR
52.245-1 clause.
g) Government inventory from Contract Number W15P7T-13-D-C118 will be transferred to the contractor for exclusive use under this IDIQ contract vehicle.
h) All existing GFP will not be subject to the Counterfeit Parts and Specialty Metals Defense FAR Supplement (DFARS) clauses. The clauses will apply to all new GFP obtained under this contract; only existing GFP is exempted.
j) Warranty language was clarified. The Government will take advantage of supplier-provided standard warranties, but will not pay additional funds for extended warranties. In addition, FAR 52.246-17 - Warranty of Supplies of a Non-Complex Nature, was removed from the solicitation.
k) The Government removed the requirement for submission of the DA Form 2410, Component Removal and Repair - Overhaul Record, from the solicitation.
m) Beyond Economical Repair (BER) language was clarified.
n) All language associated with the repair of shipping containers was remmoved.
3 113
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
p) A semi-annual requirement for conducting an Obsolescence Working Group (OWG) meeting at the contractors facility was removed.
6. Section D - Packaging and Marking, was established. DFARS clause 252.211-7004 Alternate Preservation, Packaging, and Packing was moved from Section M to Section D.
7. Section E - Inspection and Acceptance (I/A) was modified to include regulatory clauses associated with I/A Origin/Origin, as well as
I/A Destination/Destination.
8. Section H Special Contract Requirements: Negotiated DMSMS language was included.
9. Section I Contract Clauses:
a) The following clauses were added to the solicitation:
i) FAR 52.216-23 Commencement of Work
ii) FAR 52.246-11, Higher-Level Contract Quality Requirement
iii) DFARS 252.217-7027 Contract Definitization
iv) DFARS 252.227-7027, Deferred Ordering
b) The following clauses were deleted from the solicitation:
i) DFARS 252.225-7008 Restriction on Acquisition of Specialty Metals
ii) DFARS 252.225-7009 Contractor Counterfeit Electronic Part Detection and Avoidance System
10. Section J List of Attachments: This section was updated and corrected as follows:
a) Exhibit A, Contract Data Requirements List (CDRL) was added.
b) Attachment 0008 - Technical Proposal Northrop Grumman Mission Systems, and Attachment 0009 - Cost/Price Proposal Northrop
Grumman Mission Systems, were deleted. These attachments were replaced by:
i) Attachment 0008 STARLite ER Contract Security Classification Specification Form DD 254
ii) Attachment 0009 CDRL A012 Performance and Cost Report Worksheet
c) Attachment 0011 STARLite ER DD Form 2410 - Component Removal and Repair - Overhaul Record, was deleted.
d) Attachment 0010 STARLite ER Solicitation Section L has been provided.
e) Attachment 0011 STARLite ER Task Order 0001 PWS has been included to facilitate the prompt development of a Rough Order of
Magnitude (ROM) for submission to the Procuring Contracting Officer in no more than five (5) weeks from the effective date of this IDIQ base contract.
11. Section L - Instructions, Conditions, and Notices to Offerors or Respondents. Attachment 0010 augments the original cost / price proposal instructions set forth in the original solicitation.
12. Section M - Evaluation Factors for Award. Moved DFARS clause 252.211-7004 Alternate Preservation, Packaging, and Packing from
Section M to Section D Packaging and Marking.
13. Undefinitized Contractual Action (UCA): In conjunction with the award of this IDIQ basic contract, the initial TO requirement will be issued as a UCA. The contractor will then have 30 calendar days from the date of UCA execution to provide a formal proposal. Upon the
Governments receipt of a complete and accurate proposal from the contractor with certified cost and pricing data, the Government will definitize the TO UCA within 180 calendar days. At that time, negotiated costs associated with Years 1-2 will be incorporated into the base IDIQ contract.
14. Except as described herein, all other terms, conditions, provisions, and clauses remain unchanged.
*** END OF NARRATIVE A0004 ***
4 113
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
5 113
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
1001 ANTENNA ASSEMBLY P/N 225K946G02 $ _______________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-603-3398
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1002 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ASSEMBLYP/N _________________________________________________
247K760G01 $ __________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Radar Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-603-3428
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1003 POWER SUPPLY P/N 146K162G03 $ ___________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
6 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 6120-01-603-3385
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1004 CONTROL UNIT NAVIGATION SET P/N 231K935G01 $ __________________________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Control Unit Navigation Set Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 6605-01-578-4629
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1005 BLOWER ASSEMBLY P/N 215K772G01 $ ______________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Blower Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
7 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NSN: 4140-01-582-1363
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1006 RECEIVER/EXCITER PROGRAMMED ASSEMBLY P/N ________________________________________
219K256G02 $ __________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver/Exciter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2364
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1007 RF DOWNCONVERTER PROGRAMMED ASSEMBLY P/N ________________________________________
219K255G03 $ __________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
RF Downconverter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-646-2368
(End of narrative B001)
8 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1008 POWER SUPPLY CASE P/N 309K116G01 $ ________________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Case Test & Inspection In Accordance
With (IAW) Performance Work Statement (PWS) Sections
3.1, 3.2, 3.3.
NSN: 6130-01-664-8370
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1009 RECEIVER SUBASSEMBLY WIRED CHASSIS P/N 146K167G03 $ _________________________________________________ __________________
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Wired Chassis Test & Inspection
In Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2367
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1010 SENSOR PROCESSOR PROGRAMMED ASSEMBLY P/N ________________________________________
247K759G04 $ __________ __________________
9 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: YR 1 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Sensor Processor Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-649-9033
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1011 ANTENNA ASSEMBLY P/N 225K946G02 $ $ _______________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN 5895-01-603-3398
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
1012 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ______________________________________
P/N247K760G01 $ $ _____________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
10 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Receiver Subassembly Radar Electronic Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-603-3428
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
1013 POWER SUPPLY P/N 146K162G03 $ $ ___________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6120-01-603-3385
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
1014 CONTROL UNIT NAVIGATION SET P/N 231K935G01 $ $ __________________________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Control Unit Navigation Set Repair In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6605-01-578-4629
11 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
1015 BLOWER ASSEMBLY P/N 215K772G01 $ $ ______________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Blower Assembly Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN 4140-01-582-1363
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
1016 RECEIVER/EXCITER PROGRAMMED ASSEMBLY P/N ________________________________________
219K256G02 $ $ __________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver/Exciter Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-646-2364
(End of narrative B002)
Packaging and Marking _____________________
12 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1017 RF DOWNCONVERTER PROGRAMMED ASSEMBLY P/N ________________________________________
219K255G03 $ $ __________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
RF Downconverter Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-646-2368
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1018 POWER SUPPLY CASE P/N 309K116G01 $ $ _________________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Case Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6130-01-664-8370
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
13 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
1019 RECEIVER SUBASSEMBLY WIRED CHASSIS P/N 146K167G03 $ $ _________________________________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Wired Chassis Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-646-2367
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1020 SENSOR PROCESSOR ASSEMBLY P/N 247K759G04 $ $ _________________________________________ ______________ __________________
SERVICE REQUESTED: YR 1 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Sensor Processor Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-649-9033
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1021 YR 1 TECHNICAL SERVICES $ $ _______________________ ______________ __________________
14 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: PWS PARAGRAPH 3.9
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Technical Services In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.9, These sevices will be provided and reported IAW
Contract Data Requirements List (CDRL) located in section J as an attachment.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1022 LAY-IN MATERIAL $ $ _______________ ______________ __________________
SERVICE REQUESTED: YR 1 LAY IN MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Lay-In Material In Accordance With (IAW) Performance
Work Statement (PWS) Section 3.8.1.
Outlined in Contract Data Requirements List (CDRL)
A007 located in Section J of this contract.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1023 DMSMS MATERIAL $ $ ______________ ______________ __________________
SERVICE REQUESTED: YR 1 DMSMS MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
15 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DMSMS Material In Accordance With (IAW) Performance
Work Statement (PWS) Section 3.8.2.
Outlined in Contract Data Requirements List (CDRL)
A006 located in Section J of this contract.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
1028 CONTRACT DATA REQUIREMENT LIST (CDRL) _____________________________________
A001 ENGINEERING CHANGE PROPOSAL (ECP) 1 LO $ ** NSP ** _________________________________ __________________
SERVICE REQUESTED: DI-SESS-80639D
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A002 LMI DATA PRODUCTS DESIGN CHANGE NOTICE (DCN) 1 LO $ ** NSP ** ____________________________________________ __________________
SERVICE REQUESTED: DI-SESS-81759A
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A003 REQUEST FOR VARIANCE (RFV) 1 LO $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: DI-SESS-80640D
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
16 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
INSPECTION: Destination ACCEPTANCE: Destination
A004 OPERATIONS SECURITY (OPSEC) PLAN 1 LO $ ** NSP ** ________________________________ __________________
SERVICE REQUESTED: DI-MGMT-80934C/T
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A005 CONTRACT STATUS REPORT 1 LO $ ** NSP ** ______________________ __________________
SERVICE REQUESTED: DI-MGMT-80227/T
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A006 DMSMS REPORT 1 LO $ ** NSP ** ____________ __________________
SERVICE REQUESTED: DI-SESS-81656
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A007 INVENTORY REPORT (GFP & CFP) 1 LO $ ** NSP ** ____________________________ __________________
SERVICE REQUESTED: DI-ILSS-80834
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A008 TEST/INSPECTION REPORT WITH COST ESTIMATE 1 LO $ ** NSP ** _________________________________________ __________________
17 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: DI-NDTI-80809B
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A009 SCIENTIFIC AND TECHNICAL REPORTS STUDIES AND ____________________________________________
ANALYSIS REPORT 1 LO $ ** NSP ** _______________ __________________
SERVICE REQUESTED: DI-MISC-80711A
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A010 CONTRACTOR MANPOWER REPORT 1 LO $ ** NSP ** __________________________ __________________
SERVICE REQUESTED: PWS PARAGRAPH 3.12
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A011 FAILURE REPORTING AND CORRECTIVE ACTION (FRACA) _______________________________________________
REPORT 1 LO $ ** NSP ** ______ __________________
SERVICE REQUESTED: DI-SESS-81315B/T
CLIN CONTRACT TYPE:
Firm Fixed Price
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A012 PERFORMANCE AND COST REPORT 1 LO $ ** NSP ** ___________________________ __________________
SERVICE REQUESTED: DI-FNCL-80912/T
CLIN CONTRACT TYPE:
Firm Fixed Price
18 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
A013 DELETED _______
A014 DELETED _______
2001 ANTENNA ASSEMBLY P/N 225K946G02 $ _______________________________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-603-3398
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2002 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ASSEMBLYP/N _________________________________________________
247K760G01 $ __________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Radar Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-603-3428
(End of narrative B001)
19 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2003 POWER SUPPLY P/N 146K162G03 $ ___________________________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 6120-01-603-3385
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2004 CONTROL UNIT NAVIGATION SET P/N 231K935G01 $ __________________________________________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Control Unit Navigation Set Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 6605-01-578-4629
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2005 BLOWER ASSEMBLY P/N 215K772G01 $ ______________________________ __________________
20 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Blower Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 4140-01-582-1363
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2006 RECEIVER/EXCITER PROGRAMMED ASSEMBLY P/N ________________________________________
219K256G02 $ __________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver/Exciter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2364
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2007 RF DOWNCONVERTER PROGRAMMED ASSEMBLY P/N ________________________________________
219K255G03 $ __________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
21 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
RF Downconverter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-646-2368
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2008 POWER SUPPLY CASE P/N 309K116G01 $ ________________________________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Case Test & Inspection In Accordance
With (IAW) Performance Work Statement (PWS) Sections
3.1, 3.2, 3.3.
NSN: 6130-01-664-8370
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2009 RECEIVER SUBASSEMBLY WIRED CHASSIS P/N 146K167G03 $ _________________________________________________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Wired Chassis Test & Inspection
In Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2367
22 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2010 SENSOR PROCESSOR PROGRAMMED ASSEMBLY P/N ________________________________________
247K759G04 $ __________ __________________
SERVICE REQUESTED: YR 2 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Sensor Processor Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-649-9033
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2011 ANTENNA ASSEMBLY P/N 225K946G02 $ $ _______________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-603-3398
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
23 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
2012 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ______________________________________
P/N247K760G01 $ $ _____________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Radar Electronic Assembly Repair
In Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-603-3428
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
2013 POWER SUPPLY P/N 146K162G03 $ $ ___________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6120-01-603-3385
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
2014 CONTROL UNIT NAVIGATION SET P/N 231K935G01 $ $ __________________________________________ ______________ __________________
24 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Control Unit Navigation Set Repair In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6605-01-578-4629
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
2015 BLOWER ASSEMBLY P/N 215K772G01 $ $ ______________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Blower Asembly Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 4140-01-582-1363
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
2016 RECEIVER/EXCITER PROGRAMMED ASSEMBLY P/N ________________________________________
219K256G02 $ $ __________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
25 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver/Exciter Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-646-2364
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2017 RF DOWNCONVERTER PROGRAMMED ASSEMBLY P/N ________________________________________
219K255G03 $ $ __________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
RF Downconverter Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-646-2368
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2018 POWER SUPPLY CASE P/N 309K116G01 $ $ _________________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
26 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Power Supply Case Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 6130-01-664-8370
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2019 RECEIVER SUBASSEMBLY WIRED CHASSIS P/N 146K167G03 $ $ _________________________________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Wired Chassis Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5841-01-646-2367
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2020 SENSOR PROCESSOR ASSEMBLY P/N 247K759G04 $ $ _________________________________________ ______________ __________________
SERVICE REQUESTED: YR 2 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
27 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Sensor Processor Programmed Assembly Repair In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-649-9033
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2021 YR 2 TECHNICAL SERVICES $ $ _______________________ ______________ __________________
SERVICE REQUESTED: PWS PARAGRAPH 3.9
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Technical Services In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.9.
These sevices will be provided and reported IAW
Contract Data Requirements List (CDRL) located in section J of this contract.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2022 LAY-IN MATERIAL $ $ _______________ ______________ __________________
SERVICE REQUESTED: YR 2 LAY-IN MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Lay-In Material In Accordance With (IAW) Performance
Work Statement (PWS) Section 3.8.1.
28 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Outlined in Contract Data Requirements List (CDRL)
A007 located in Section J of this Contract.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
2023 DMSMS MATERIAL $ $ ______________ ______________ __________________
SERVICE REQUESTED: YR 2 DMSMS MATERIAL
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
DMSMS Material In Accordance With (IAW) Performance
Work Statement (PWS) Section 3.8.2.
Outlined in Contract Data Requirements List (CDRL)
A006 located in Section J of this contract.
(End of narrative B002)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3001 ANTENNA ASSEMBLY P/N 225K946G02 $ _______________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-603-3398
29 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3002 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ASSEMBLYP/N _________________________________________________
247K760G01 $ __________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Radar Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-603-3428
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3003 POWER SUPPLY P/N 146K162G03 $ ___________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 6120-01-603-3385
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
30 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
3004 CONTROL UNIT NAVIGATION SET P/N 231K935G01 $ __________________________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Control Unit Navigation Set Test & Inspection In
Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 6605-01-578-4629
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3005 BLOWER ASSEMBLY P/N 215K772G01 $ ______________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Blower Assembly Test & Inspection In Accordance With
(IAW) Performance Work Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 4140-01-582-1363
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3006 RECEIVER/EXCITER PROGRAMMED ASSEMBLY P/N ________________________________________
219K256G02 $ __________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
31 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Cost Plus Fixed Fee
Receiver/Exciter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2364
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3007 RF DOWNCONVERTER PROGRAMMED ASSEMBLY P/N ________________________________________
219K255G03 $ __________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
RF Downconverter Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-646-2368
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3008 POWER SUPPLY CASE P/N 309K116G01 $ ________________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Power Supply Case Test & Inspection In Accordance
With (IAW) Performance Work Statement (PWS) Sections
3.1, 3.2, 3.3.
32 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
NSN: 6130-01-664-8370
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3009 RECEIVER SUBASSEMBLY WIRED CHASSIS P/N 146K167G03 $ _________________________________________________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Wired Chassis Test & Inspection
In Accordance With (IAW) Performance Work Statement
(PWS) Sections 3.1, 3.2, 3.3.
NSN: 5841-01-646-2367
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3010 SENSOR PROCESSOR PROGRAMMED ASSEMBLY P/N ________________________________________
247K759G04 $ __________ __________________
SERVICE REQUESTED: YR 3 STARLITE TEST & INSPECT
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Sensor Processor Programmed Assembly Test &
Inspection In Accordance With (IAW) Performance Work
Statement (PWS) Sections 3.1, 3.2, 3.3.
NSN: 5895-01-649-9033
(End of narrative B001)
33 113
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Origin
3011 ANTENNA ASSEMBLY P/N 225K946G02 $ $ _______________________________ ______________ __________________
SERVICE REQUESTED: YR 3 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Antenna Assembly Repair In Accordance With (IAW)
Performance Work Statement (PWS) Sections 3.4, 3.6, 3.7, 3.8.
NSN: 5895-01-603-3398
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
3012 RECEIVER SUBASSEMBLY RADAR ELECTRONIC ______________________________________
P/N247K760G01 $ $ _____________ ______________ __________________
SERVICE REQUESTED: YR 3 STARLITE REPAIR SERVICES
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Receiver Subassembly Radar Electronic Assembly Repair
In…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .