A01-Attachment 0005 STARLite Prov Rqmt_01302019.pdf
PDF 235 KB Posted
- Attached to
- STARLite ER SAR/GMTI
- Solicitation number
- W56JSR-18-R-0008
About this file
This document contains a Provisioning Requirements Statement and related federal contract opportunity notice. The Provisioning Requirements Statement outlines requirements for the STARLite ER radar sensor system, including the need for a provisioning guidance conference, engineering data for provisioning to be provided in digital format, inclusion of provisioning screening and a provisioning performance schedule. The related federal contract opportunity is a presolicitation notice for a sole source, five-year IDIQ contract for sustainment services, engineering support, repairs and obsolescence monitoring for the STARLite ER SAR/GMTI system. The opportunity is being solicited by the Army Contracting Command and is intended for Northrop Grumman Systems Corporation as the original equipment manufacturer and sole provider.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0005 – STARLite ER Provisioning Requirements Statement (Provisioning
Screening required)
Provisioning Requirements Statement
Provisioning Requirements Statement ARP No.
Title of ARP
Provisioning Activity (address and zip code)
USA C-E LCMC, ABERDEEN PROVING GROUNDS, MD 21005
ATTN: safari.s.king.civ@mail.mil
Provisioning Requirements
1 Guidance Conference
Required X Not Required
Place Aberdeen Proving Grounds, Maryland
Date DD MONTH YEAR Time TBD Estimated number of days 3
If required, fill out Place, Date, Time and number of days. See Block 14, Note 1
2 IPR/Provisioning Conference
Place Contractor Facility
F Date DD MONTH YEAR Time TBD Estimated number of days
Contractor is
To have a sample of the component or End Item at the conference
Sample Article
Will be viewed at the conference
X Will be disassembled at the conference
If required, fill out Place, Date, Time and number of days. See Block 14, Note 2
3 Manufacturers or Commercial Manuals Required X Not Required
4 Incremental Submission of Provisioning
Technical Data
X Authorized
Not Authorized
5 Provisioning Screening X Required Not Required
If required, results must be incorporated into the Provisioning Parts List (PPL)
6 Resident Provisioning Team (RPT) Will be established X Will not be established
7 Interim Release Authorized X Not Authorized
This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with the
Performance Work Statement (PWS). Deliverable Provisioning Technical Documentation (PTD) and Engineering
Data for Provisioning (EDFP) Requirements will be specified on Contract Data Requirements List (CDRL).
8 Engineering Data For Provisioning
(EDFP)
Hardcopy X Digital Format
9 EDFP will be sequenced by: X PLISN X Reference Number
Reference Designation Other
If Other, explain
10 Tools And Equipment X Will Be Will Not Be
Included in the PPL. See Block 14, Note 3
11 Provisioning Performance Schedule
(PPS)/milestone chart
X Required Not Required
See Block 14, Note 4
12 Repair Kits and Repair Sets X Will Be Will Not Be
Included in the PPL.
13 Bulk Item List See Block 14, Note 5
14 NOTES:
1. IPR/Provisioning Conference already occurred.
2. SPECIAL TOOLS and TEST EQUIPMENT will be listed in the PPL as “B” indentured items with the NHA being the End Item.
These items will be shown in the RPSTL in section three. Source code must be “PE”. Must also include
Basis Of Issue.
Provisioning Category Code coded as “D”.
3. Items with Source Code of “M” (Make) must have associated “P” coded item on the Bulk List. Bulk List is shown as the last figure of section two in the RPSTL. Bulk Items will be listed in the PPL as “B” indentured items with the NHA being the End Item. Must include Provisioning Category Code coded as “E”.
DICTIONARY OF ABBREVIATIONS
CONF ........... CONFERENCE PIO...............PROVISIONED ITEM ORDER
CNTR ........... CONTRACTOR PL.................PARTS LIST
DRF ............. DATA REQUIREMENT FORM PPL..............PROVISIONING PARTS LIST
GUID ............ GUIDANCE PPS..............PROVISIONING PERFORMANCE
SCHEDULE
IPR .............. IN-PROCESS REVIEW PROV...........PROVISIONING
NR ............... NUMBER REQ'D..........REQUIRED
PAR ............ PARAGRAPH PRS..............PROVISIONING REQUIREMENT
STATEMENT
PCL ............. POST CONFERENCE LIST
4.
File details come from the government source that posted it. Updated .