A01-Attachment 0005 STARLite Prov Rqmt_01302019.pdf

PDF 235 KB Posted

Attached to
STARLite ER SAR/GMTI
Solicitation number
W56JSR-18-R-0008
Issued by

About this file

This document contains a Provisioning Requirements Statement and related federal contract opportunity notice. The Provisioning Requirements Statement outlines requirements for the STARLite ER radar sensor system, including the need for a provisioning guidance conference, engineering data for provisioning to be provided in digital format, inclusion of provisioning screening and a provisioning performance schedule. The related federal contract opportunity is a presolicitation notice for a sole source, five-year IDIQ contract for sustainment services, engineering support, repairs and obsolescence monitoring for the STARLite ER SAR/GMTI system. The opportunity is being solicited by the Army Contracting Command and is intended for Northrop Grumman Systems Corporation as the original equipment manufacturer and sole provider.

View the file

Other files

File Type Posted
A01-Attachment 0008 STARLite DD254_SIGNED.PDF PDF
A01-Attachment 0003 STARLite QASP 20190124.pdf PDF
A01-Attachment 0004 STARLite Parts List_01302019.pdf PDF
Section L STARLite_08Oct2019_FINAL.DOCX DOCX document
A01-Attachment 0006 STARLite Data Rqmts Form_01302019.pdf PDF
A01-Attachment 0007 STARLite Data Elements Defs_01302019.pdf PDF
A01-Attachment 0002 STARLite Acronyms_01302019.pdf PDF
A07- Solicitation W56JSR-18-R-0008_02.pdf PDF
A01-Attachment 0001 - STARLite ER PWS Amd 02.pdf PDF
Attrachment 0009-CDRL A012 Performance and Cost Report Worksheet Jan 202....xlsx XLSX spreadsheet
Exh A_STARLite_Base_CDRL_8 JAN 2020.docx DOCX document
A01-Base_PWS_STARLite_NMC_FINAL_7__24_2019_(updated).docx DOCX document
Amend_0001_W56JSR_18_R_0008.pdf PDF
A01-STARLite_Base_CDRL_(A001-A014)_24_July_2019_Amend_0001.docx DOCX document
A01-DA_FORM_2410.pdf PDF
STARLite_ER_Parts_List.docx DOCX document
STARLite_ER_QASP_FINAL.docx DOCX document
A01_STARLite_ER_Appendix_C_-_Intel_Access.doc DOC document
A01-Attachment_0007__STARLite_ER_Data_Elements_Defs.docx DOCX document
A01-Attachment_0006_STARLite_ER_Data_Rqmts_Form.docx DOCX document
A01-Attachment_0010__STARLite_ER_DD254_SIGNED.pdf PDF
A01-STARLite_Base_CDRL_(A001-A014)_19_July_2019.docx DOCX document
A01_STARLite_ER_FOUO_Appendix_D.doc DOC document
A01_STARLite_ER_Appendix_A-_COMSEC.doc DOC document
A01-Base_PWS_STARLite_NMC_FINAL_7_19_2019.docx DOCX document
A01-Attachment_0005__STARLite_ER_Prov_Rqmt.docx DOCX document
W56JSR_18_R_0008_Final_Solicitation.pdf PDF
A01-Attachment_0002__STARLite_ER_Acronyms.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 0005 – STARLite ER Provisioning Requirements Statement (Provisioning

Screening required)

Provisioning Requirements Statement

Provisioning Requirements Statement ARP No.

Title of ARP

Provisioning Activity (address and zip code)

USA C-E LCMC, ABERDEEN PROVING GROUNDS, MD 21005

ATTN: safari.s.king.civ@mail.mil

Provisioning Requirements

1 Guidance Conference

Required X Not Required

Place Aberdeen Proving Grounds, Maryland

Date DD MONTH YEAR Time TBD Estimated number of days 3

If required, fill out Place, Date, Time and number of days. See Block 14, Note 1

2 IPR/Provisioning Conference

Place Contractor Facility

F Date DD MONTH YEAR Time TBD Estimated number of days

Contractor is

To have a sample of the component or End Item at the conference

Sample Article

Will be viewed at the conference

X Will be disassembled at the conference

If required, fill out Place, Date, Time and number of days. See Block 14, Note 2

3 Manufacturers or Commercial Manuals Required X Not Required

4 Incremental Submission of Provisioning

Technical Data

X Authorized

Not Authorized

5 Provisioning Screening X Required Not Required

If required, results must be incorporated into the Provisioning Parts List (PPL)

6 Resident Provisioning Team (RPT) Will be established X Will not be established

7 Interim Release Authorized X Not Authorized

This Provisioning Requirements Statement (PRS) is furnished and will be prepared in accordance with the

Performance Work Statement (PWS). Deliverable Provisioning Technical Documentation (PTD) and Engineering

Data for Provisioning (EDFP) Requirements will be specified on Contract Data Requirements List (CDRL).

8 Engineering Data For Provisioning

(EDFP)

Hardcopy X Digital Format

9 EDFP will be sequenced by: X PLISN X Reference Number

Reference Designation Other

If Other, explain

10 Tools And Equipment X Will Be Will Not Be

Included in the PPL. See Block 14, Note 3

11 Provisioning Performance Schedule

(PPS)/milestone chart

X Required Not Required

See Block 14, Note 4

12 Repair Kits and Repair Sets X Will Be Will Not Be

Included in the PPL.

13 Bulk Item List See Block 14, Note 5

14 NOTES:

1. IPR/Provisioning Conference already occurred.

2. SPECIAL TOOLS and TEST EQUIPMENT will be listed in the PPL as “B” indentured items with the NHA being the End Item.

These items will be shown in the RPSTL in section three. Source code must be “PE”. Must also include

Basis Of Issue.

Provisioning Category Code coded as “D”.

3. Items with Source Code of “M” (Make) must have associated “P” coded item on the Bulk List. Bulk List is shown as the last figure of section two in the RPSTL. Bulk Items will be listed in the PPL as “B” indentured items with the NHA being the End Item. Must include Provisioning Category Code coded as “E”.

DICTIONARY OF ABBREVIATIONS

CONF ........... CONFERENCE PIO...............PROVISIONED ITEM ORDER

CNTR ........... CONTRACTOR PL.................PARTS LIST

DRF ............. DATA REQUIREMENT FORM PPL..............PROVISIONING PARTS LIST

GUID ............ GUIDANCE PPS..............PROVISIONING PERFORMANCE

SCHEDULE

IPR .............. IN-PROCESS REVIEW PROV...........PROVISIONING

NR ............... NUMBER REQ'D..........REQUIRED

PAR ............ PARAGRAPH PRS..............PROVISIONING REQUIREMENT

STATEMENT

PCL ............. POST CONFERENCE LIST

4.

File details come from the government source that posted it. Updated .