This document is a Request for Proposal for the Optionally Manned Fighting Vehicle Phase 3 and 4 Detailed Design, Prototype Build and Test effort. The Army Contracting Command - Detroit Arsenal is seeking proposals to design, develop and deliver prototypes and technical data for the Optionally Manned Fighting Vehicle. Up to three contracts may be awarded for this effort with a period of performance of 54 months. Offerors must propose pricing for a base award of 7 prototypes and technical data, with an option for 4 additional prototypes that may be exercised at the Government's discretion. Proposals are due by 12:00pm on November 1, 2022. The Government intends to conduct a full and open competition using Best Value procedures, evaluating factors such as performance, intellectual property rights, affordability, digital maturity and manufacturability. The RFP includes requirements for proposals, the statement of work, data requirements, and evaluation criteria. Classified information will only be released to offerors with the appropriate facility clearance and need to know.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W56HZV-22-R-0026
X
2022JUL01
2022NOV0112:00pm
DOA4
2022JUL01 SEE SCHEDULE
W56HZV
ACC-DTA
6501 E. 11 MILE RD.
DETROIT ARSENAL, MI 48397-5000
DARNELL JENNINGS II
(586)282-9039
CCTA-CBH-B
DARNELL.JENNINGS.CIV@ARMY.MIL
1 153
X 1
X 12 X 18
X 52 X 53 X 55
X 60
X 63
X 72
X 111
X 114
X 128
X 146
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: DARNELL JENNINGS II
Buyer Office Symbol/Telephone Number: CCTA-CBH-B/(586)282-9039
Type of Contract 1: Firm Fixed Price
Kind of Contract: System Acquisition Contracts
*** End of Narrative A0000 ***
Optionally Manned Fighting Vehicle (OMFV)
Executive Summary
This Executive Summary is provided as an overview of selected points of the solicitation. It is not intended to provide all information included therein. Offerors are responsible to carefully read, understand and comply with the solicitation in its entirety. In the event of any inconsistencies between this Executive Summary and the solicitation, the solicitation shall rule.
A.1 OMFV Program Vision
The Optionally Manned Fighting Vehicle (OMFV) will serve as the Army's Infantry Fighting Vehicle (IFV) tasked to maneuver through the enemy's security zone as part of a combined arms team for the purpose of creating an advantageous position, relative to the enemy, and providing protection and direct fire lethality while manned or remotely operated. In the close fight, the OMFV enables the ability of dismounted elements to maneuver by detecting and destroying targets at a range beyond the enemy's capability.
A.1.1 Transformational Elements
The OMFV will transform how Soldiers and squads accomplish their mission in the following ways.
A.1.1.1 Enable Command and Control
The OMFV will enable command and control at the platoon level and higher by rapidly generating, receiving, and passing information to dismounted elements, other vehicles, and command nodes.
A.1.1.2 Provide Decisive Lethality
The OMFV will be able to detect, engage, and destroy enemy infantry fighting vehicles beyond the range of the enemy's primary weapon system, and rapidly defeat dismounted enemy threats. The OMFV will also enhance formation lethality by providing target acquisition data, shared situational understanding, and the lethal effects required to protect and orient the dismounted element.
A.1.1.3 Enhance Organizational Effectiveness
The OMFV will improve organizational effectiveness by reducing the logistics burden on the Armored Brigade Combat Team (ABCT). This will be achieved through enhanced reliability and on-board diagnostics and prognostics; ease of maintenance with the use of standard, common tools; and reduced burdens on the supply chain in terms of spare parts, fuel, and munitions.
A.1.1.4 Ability to Rapidly Adapt
The OMFV will adopt the latest digital engineering techniques, which will allow rapid adaptation by possessing Growth margins that allow for the insertion and integration of future technologies.
Designed from the beginning using a Modular Open Systems Approach (MOSA) and based on an Army-defined and owned open architecture standard, OMFV provides the Army an affordable pathway to OEM-independent upgrades at the hardware component level. As technology and software evolves, the Army's open architecture standard allows the OMFV to modernize rapidly at a reduced cost. This will also offer more opportunities for increased industry competition and innovation over the OMFV's lifecycle.
This digital approach to delivering OMFV creates a situation where the Army can affordably upgrade at the pace of technological advancement, and reduce the risk posed by strategic unpredictability with respect to the level of capability OMFVs provide the ABCTs.
A.2 Program Overview
A.2.1 Fundamentals
The Army is conducting a five (5) phased acquisition approach to design, prototype, test, and produce the OMFV.
The Army is committed to adopting digital engineering best practices, agile software development using a DevSecOps approach, and a cloud-based infrastructure in support of the OMFV program. The adoption of these principles are key enablers to support the rapid adoption, testing, and integration of future technologies.
2 153
W56HZV-22-R-0026 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
OMFV is the U.S. Army's first ground combat vehicle designed using modern digital engineering tools and techniques. OMFV Contractors will develop the OMFV using Models Based System Engineering (MBSE) and within the digital domain to communicate the design's maturity and evolution via a series of interconnected digital models throughout the program lifecycle.
A.2.2 Phase 3: Detailed Design and Phase 4: Prototype Build and Test
The purpose of Phase 3 is to conduct detailed design activities to mature the OMFV designs and will culminate in a critical design review (CDR). Immediately following Phase 3 is Phase 4, Prototype Build and Test. The purpose of Phase 4 is to verify performance against the performance specification. Late in this phase, a Limited User Test will be conducted. In addition to the delivery of prototypes, the Contractor will develop, mature, and deliver a virtual prototype of their design. These phases will be a single contract with up to 3 contracts awarded.
A.2.3 Phase 5: Production and Fielding
The purpose of this phase is to have a single LRIP contract for production, testing and initial fielding. Activities include Pre-
Production Quality Testing (PQT) and Initial Operational Testing and Evaluation (IOT&E). This single contract is planned to be awarded from a competition limited to the Phase 3/4 Contractors. The Army is finalizing the criteria to select the LRIP contract, but are currently exploring performance, MOSA compliance, intellectual property (IP) rights provided, AUMP, end to end digital thread, and manufacturability. The Government intends to require follow-on production of the OMFV to occur in the United States (US).
A.3 OMFV Phase 3/4 Solicitation and Contract
The RFP requires up to 11 prototype vehicles (7 for a contract award and an option for 4 additional vehicles), as well as two Ballistic
Hulls and Turrets, Armor Coupons, digital model twins, and data.
The OMFV Phase 3/4 RFP is a Full and Open Competition. The Army intends to award up to three firm-fixed price contracts with a 54 month period of performance. Formal source selection procedures will be used. See Sections L and M for information required to be submitted in proposals and evaluation of proposals. VATEP (Value Adjusted Total Evaluated Price)will be utilized as part of the overall Price evaluation.
The Army is considering including an Economic Price Adjustment provision for prototype material for the option vehicles. Any such provision will be added by amendment.
A.3.1 Solicitation
This solicitation is for the Detailed Design, Prototype, Build and Test (Phases 3 and 4), and is solicited on a Firm-Fixed-Price basis.
The solicitation requires proposals for a total of 11 prototypes, 7 for a contract award and an option for 4 additional prototypes.
Information in this solicitation takes precedence over any information shared by the Government preceding the solicitation release, including but not limited to, information shared at one-on-one sessions, draft solicitation, or through Q&As released to date.
Assertion of Restrictions: The Offeror shall include in its proposal submission, its Assertion of Restrictions Attachment 0012
(Technical Data and Assertions). Additionally, any proposed special license(s) shall follow the format prescribed within Attachment 0013
(Special License Requirements).
Availability of Funding and Affordability: Contract award(s) will be made subject to the availability of funding. Affordability is addressed at M.3.1.
A.4 Phase 3/4 Proposal Evaluation
The Army will conduct a full and open competition using Best Value Source Selection procedures for the award of up to three contracts during third quarter of Fiscal Year (FY) 23. The Army reserves the right to make fewer than three awards if the value of additional awards up to three would offer only limited benefit (See M.1.1).
A.5 Administrative
Eligibility requirements for award and Rejection Criteria are included in the solicitation. Offerors should carefully review the solicitation to ensure all requirements for award are met.
Access to Classified, Controlled Unclassified Information (CUI), and Export Controlled Documents: All Offerors must have a valid FCL including safeguarding at SECRET level in order to respond to this solicitation. See Attachment 72 (Department of Defense (DD) Form
254,Contract Security Classification Specification) for security requirements. For Export Controlled information, it is the responsibility of the Offeror, not the Government, to obtain the appropriate export licenses, or process the appropriate export license exemption, necessary for authorization to share information with foreign vendors. Offerors who did not recieve CUI under the 17 June
2022 Draft release shall send their request to the general mailbox identified below. Your request shall include the following:
i. Your Company's name and address
ii. Your Name, Title, Office phone number and email address
iii. Copy of the approved DD Form 2345
3 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Points of Contact (POCs):
Michael Chaney, Procuring Contracting Officer
586-282-5057 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil
Joe Felice, Contract Specialist
586-282-9450 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil
James Giacchina, Contract Specialist
586-282-4131 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil
A.6 Army Contracting Command - Detroit Aresnal (DTA) Ombudsperson
Information regarding the Ombudsperson for this contract is located at the following website: http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html
A.7 Public Activity Involvement
Subcontract opportunities under this solicitation and any resulting contracts are open to competition between Department of Defense activities and private firms. In addition, Army Industrial Facilities are available to sell manufactured articles or to perform work at such Facilities on behalf of Offerors, in certain circumstances and as permitted by law. Rock Island Arsenal, Waterlivet Arsenal, Anniston Army Depot, Sierra Army Depot, or Red River Army Depot have expressed interest in securing subcontracting opportunities under this RFP. For information related to the capabilities of these facilities visit the following links:
http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC%20P3Contact%20Information.pdf?ver=2017-09-18-073343-597 http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC_0817_RESOURCE-GUIDE.pdf?ver=2017-10-03-110207-990
A.8 Acknowledgement of Amendments
Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date in the box below:
Amendment Number: Date:
A.9 Electronic Contracting
All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website
(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
Pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the submission.
Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the
Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
*** END OF NARRATIVE A0001 ***
1. The purpose of Amendment 0001 to Solicitation W56HZV-22-R-0026 is to incorporate revisions as follows:
4 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
a. Section B: __________
i. CLIN 0003 is updated to delete the delivery date of 1703 days after award.
ii. CLIN 0003 inspection is changed from destination to origin.
b. Section C: __________
i. C.2.4.1 is modified to correct an administrative error. CDRL 041 is changed to CDRL E041.
ii. C.2.12 is modified to update the paint requirement as follows:
From:
C.2.12 Corrosion Prevention and Control
The Contractor shall develop, deliver, maintain, and comply with a Corrosion Prevention and Control Plan (CPCP) IAW CDRL E031 and Attachment 0082 (Chemical Agent Resistant Coating Drawing).
To:
C.2.12 Corrosion Prevention and Control
C.2.12.1 The Contractor shall develop, deliver, maintain, and comply with a Corrosion Prevention and Control Plan (CPCP) IAW
CDRL E031 and Attachment 0082 (Chemical Agent Resistant Coating Drawing).
C.2.12.2 The interior of the prototype vehicles and BH&Ts shall be painted Gloss White Chip No. 17925 of SAE AMS-STD-595 in accordance with Attachment 0082. The USG will specify the exterior color of prototype vehicles and BH&Ts NLT PDR.
iii. Add the word independent in reference to crew sight as follows:
From:
C.3.1 Technology Maturation Planning
If the Contractor's design is equipped with a cannon other than an XM913, and/or 3rd Generation Forward Looking Infrared (3GF)
B-kit components for crew sight, the Contractor shall deliver a technical report IAW CDRL E079.
The report shall contain the following information between the Contractor's system design and the Contractor's design with key technologies integrated (XM913 and/or 3rd Generation Forward Looking Infrared (3GF) B-kit components for crew sight):
a. Performance differences
b. Size differences
c. Non-recurring costs to implement (Engineering and Logistics)
d. Estimated schedule to implement
e. BOM differences of parts that would have to be redesigned, not used, and/or new parts
f. Any additional information critical information related to the integration of these key technologies
To:
C.3.1 Technology Maturation Planning
If the Contractor's design is equipped with a cannon other than an XM913, and/or 3rd Generation Forward Looking Infrared (3GF)
B-kit components for crew independent sight, the Contractor shall deliver a technical report IAW CDRL E079.
The report shall contain the following information between the Contractor's system design and the Contractor's design with key technologies integrated (XM913 and/or 3rd Generation Forward Looking Infrared (3GF) B-kit components for crew independent sight):
a. Performance differences
b. Size differences
c. Non-recurring costs to implement (Engineering and Logistics)
d. Estimated schedule to implement
e. BOM differences of parts that would have to be redesigned, not used, and/or new parts
f. Any additional information critical information related to the integration of these key technologies
iv. Define Ballistic Hull and Turret (BH&T) in C.5.2.4 as follows:
5 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
From:
C.5.2.4 Active Protective System (APS) System Testing
If the Contractor's design includes an Active Protective System (APS), the Contractor shall provide one of the two BH&T assets delivered IAW Attachment 0051 (PPT Schedule) be outfitted with a complete, working APS system for APS system testing.
To:
C.5.2.4 Ballistic Hull and Turret (BH&T)
The Contractor shall deliver two BH&T assets IAW Attachment 0051 (PPT Schedule).
C.5.2.4.1 BH&T Definition
A "Ballistic Hull and Turret (BH&T)" is defined as:
1. A basic hull structure that incorporates (when in the design) seats, false floor, spall liners, armor modules, grilles, hatches, access covers, fuel tanks, periscopes, onboard energetics compartmentalization, and structural components required for transportability (e.g., lifting eyes);
2. A basic turret structure that includes the gun mount and gun shield, and incorporates (when in the design) seats, spall liners, armor modules, grilles, hatches, access covers, periscopes, onboard energetics compartmentalization, and structural components required for transportability (e.g., lifting eyes); and
3. CE armor solutions.
C.5.2.4.2 Active Protective System (APS) System Testing
If the Contractor's design includes an Active Protective System (APS), the Contractor shall provide one of the two BH&T assets delivered IAW Attachment 0051 (PPT Schedule) to be outfitted with a complete, working APS system for APS system testing.
c. Section E: __________
i. Paragraph E.2, Final Inspection Record, is revised as follows:
From:
E.2 Final Inspection Record
The contractor shall deliver a Preliminary Final Inspection Record (PFIR) IAW CDRL T017 to be used for prototype vehicle inspection at the contractor's site prior to any shipments and for acceptance at end of contract performance. The PFIR shall be organized to be compatible with assemblies, installation, and end item performance. The PFIR shall contain all examinations and tests that are performed on a single unit during its manufacture and final inspection. The PFIR shall list each vehicle characteristic or function to be inspected from the vehicle specification.
To:
E.2 Final Inspection Record
E.2.1 The contractor shall deliver a Preliminary Final Inspection Record (PFIR) IAW CDRL T017 to be used for prototype vehicle inspection at the contractor's site prior to any shipments and for acceptance at end of contract performance. The PFIR shall be organized to be compatible with assemblies, installation, and end item performance. The PFIR shall contain all examinations and tests that are performed on a single unit during its manufacture and final inspection. The PFIR shall list each vehicle characteristic or function to be inspected from the vehicle specification.
E.2.1.1 Prior to vehicle shipment at the test site or shipped in place, the contractor shall conduct an inspection utilizing the
PFIR and provide with the vehicle.
E.2.1.2 At the conclusion of Production Prove Out Testing final acceptance (DD250) of test vehicles shall be performed on each vehicle in as-is condition. The contractor shall provide a PFIR prior to vehicle delivery to the Government that will only document the test vehicles condition.
d. Section H: __________
i. The following paragraphs have been added for the reliability incentive as follows:
H.14 Reliability Incentive
6 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
H.14.1 General. The OMFV PSPEC defines the Mean Miles Between Systems Abort (MMBSA) reliability requirement. Attachments 0051
(Production Prove-out Test Schedule) and 0070 (Reliability Growth Planning Model) specify the planned reliability events (PPT1 and
PPT2) and the expected MMBSA performance at conclusion of each event. This provision establishes incentive awards for exceeding expected performance at conclusion of each event.
H.14.2 Applicable conditions. The USG anticipates conducting reliability testing at various locations, timeframes, and planned mileage IAW Attachment 0051 (Production Prove-out Test Schedule). However, the actual vehicles/locations, timeframes, and mileage may differ from anticipated Regardless of any differences, testing conducted prior to the Corrective Action Period (CAP) constitutes PPT1, and testing conducted after the CAP constitutes PPT2.
H.14.3 MMBSA determination. At the conclusion of PPT1 and PPT2, the USG will calculate the demonstrated MMBSA for the Hardware and
Software(HW/SW) values of Test Incident Reports (TIRs) IAW Attachment 0052 (Failure Definition and Scoring Criteria (FDSC)) as calculated below:
H.14.3.1 The USG will make PPT MMBSA determination(s) without regard to any assessment conferences or fix effectiveness factors
(FEFs) related to any corrective actions. The MMBSA will be calculated as a point estimate based on the actual total PPT RAM miles
(for all the Contractor's RAM vehicles accumulated from the beginning to end of each PPT), divided by the total HW/SW PPT System
Aborts(SAs) as reported during each PPT. Test Center data shall be the single data source for RAM miles and SAs, as opposed to data or results generated in any digital engineering model, or otherwise. The USGs calculated MMBSA pursuant under this provision will be final.
H.14.4 Award amounts. The incentive award amount for each event is detailed below (Table 1 and Table 2) and is determined using the
USG calculated MMBSA. The award amount for each event will be earned separately and without consideration of the other event. Both events are eligible for incentive awards if the MMBSA values meet the Table conditions. The award amounts are definite for each mileage range and they will not be prorated within a range.
Table #1 (PPT1): USG Calculated MMBSA Range for PPT1 ___________________________________ PPT1 Incentive Award ____________________
MMBSA< 557 miles $0
MMBSA> or = 557 miles, but < 650 miles $2 Million
MMBSA> or = 650 miles $4 Million (Maximum PPT1 Award)
Table #2 (PPT2): USG Calculated MMBSA Range for PPT2 ___________________________________ PPT2 Incentive Award ____________________
MMBSA< 686 miles $0
MMBSA> or = 686 miles, but < 800 miles $2 Million
MMBSA> or = 800 miles $4 Million (Maximum PPT2 Award)
H.14.5 Notification and payment. The Procuring Contracting Officer (PCO) will notify the contractor of the USG's calculated MMBSA results after all TIRs are scored for each event and make payment by unilateral modification promptly thereafter subject to the availability of funds. The parties agree that the USG determinations under this provision are final and are not subject to the
Disputes provision of this contract.
ii. The following paragraphs have been added for the Economic Price Adjustment (EPA) under the Prototype Option (CLIN 0003):
H.15 ECONOMIC PRICE ADJUSTMENT - CLIN 0003
H.15.1 The purpose of this section is to provide for economic price adjustment, upward or downward, for the vehicle prototype option CLIN 0003. Any such price adjustment will be determined by completion of the EPA Table (Attachment 0107). This clause applies only to the prototype option CLIN 0003; no adjustment will be applied to CLIN 0002 BH&T (B001), Base Prototype Vehicles (B002), Armor Coupons (B003), detailed design of the prototypes, and applicable testing.
H.15.2 Any price adjustment will be determined by completion of the EPA Table (Attachment 0107) located at the end of this provision and is applicable only to prototype vehicles under CLIN 0003.
The Contracting Officer will utilize the most recently published PPI index (even if preliminary) as of 30 September 2024 to calculate the upward or downward price adjustment IAW Attachment 0107. The index and price subject to adjustment are as follows:
Index - PPI Code 33612, Heavy Duty Truck Manufacturing. Published by U.S. Department of Labor Bureau of Labor Statistics in its publication, PPI Detailed Report.
H.15.3 A total of 65 percent (65%) of the contract price for the CLIN 0003 Prototype Option (H.8) is the portion of the Price
Subject to Adjustment, hereinafter referred to as the "PSA", for all adjustments herein.
7 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
H.15.4 Under this clause, the maximum increase will be no more than $4,800,000. There will be no limitation on the amount of decrease under this clause.
H.15.5 Economic price adjustment to the contract price will be made against CLIN 0003, IAW Attachment 0107:
H.15.5.1 When the actual index value (Column (4)) is within the non-adjustment band (Column (3)), no adjustment will be made.
H.15.5.2 When the actual index value (Column (4)) is outside the non-adjsutment band (Column (3)), the amount in Column (7) will be the adjustment to contract price for CLIN 0003 (rounded to the nearest dollar) subject to the maximum increase stated in H.15.4.
H.15.6 Any Economic Price Adjustment will be incorporated by a unilateral contract modification prior to 31 December 2024, which will include adjusted contract price to CLIN 0003 only.
H.15.7 In the event any index cited is discontinued or substantially altered by the Bureau of Labor Statistics, the parties shall mutually agree on an appropriate substitute index to be effective as of the date of index discontinuance or alteration.
In the event an index is discontinued or substantially altered, the parties will proceed to mutually establish a replacement index.
If mutual agreement cannot be reached prior to 30 September 2024, the Contracting Officer may make a unilateral index replacement.
Alternatively, the parties may continue to mutually proceed to establish a replacement index. In this case, the Government may exercise the option using the contract price (as a billing price), pending agreement on a replacement index needed to calculate the price adjustment.
H.15.8 The contractor warrants that the prices set forth in this clause do not include allowances for any contingency to the extent covered by this clause.
H.15.9 Regardless of the actual cost during the performance of this contract, economic price adjustments will be made only as provided herein.
H.15.10 The contractor shall certify on a final adjusting invoice that the amounts invoiced under this contract reflect all decreases required by this clause.
H.15.11 Pricing actions pursuant to the "Changes" clause or other provisions within this contract will be priced as though there were no provision for Economic Price Adjustment. All changes made that result in a new contract price under CLIN 0003 prior to option exercise will be reflected in the PSA.
e. Section I: __________
i. Clause 252.232-7015 Performance-Based Payments Representation has been deleted.
f. Section J: __________
i. Exhibit A is revised as follows:
a. The page count for Exhibit A is corrected to reflect 112 in lieu of 138.
b. CDRL T001 Authority block is revised from DI-SESS-81704 to DI-NDTI-80566A.
c. CDRL T002 Authority block is revised from DI-MISC-80508B to DI-NDTI-80809B.
d. CDRL L025 is revised as follows:
From:
Block 12 and 13: If an item was classified as a Special Group Item (SGI) the Contractor shall deliver the SGI's Packaging
Validation Report concurrent with the packaging data deliverable (L029).
To:
Block 12 and 13: If an item was classified as a Special Group Item (SGI) the Contractor shall deliver the SGI's Packaging
Validation Report.
The Contractor shall deliver at least 30% Packaging Validation Report 30 days after the completion of each Provisioning
Conference (PC).
The Contractor shall deliver at least 60% Packaging Validation Report 60 days after the completion of each PC.
The Contractor shall deliver all 100% Packaging Validation Report 90 days after the completion of each PC.
e. CDRL L030 is revised as follows:
8 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
From:
Blocks 12 and 13: If an item was classified as a Special Group Item (SGI), the Contractor shall deliver the SGI's Special
Packaging Instructions concurrent with the packaging data deliverable (L029).
To:
Block 12 and 13: If an item was classified as a Special Group Item (SGI), the Contractor shall deliver the SGI's Special
Packaging Instructions.
The Contractor shall deliver at least 30% Special Packaging Instructions 30 days after the completion of each Provisioning
Conference (PC).
The Contractor shall deliver at least 60% Special Packaging Instructions 60 days after the completion of each PC.
The Contractor shall deliver all 100% Special Packaging Instructions 90 days after the completion of each PC.
ii. Attachment 0010 is revised from REV 001 dated 28 Jun 2022 to REV 002 dated 03 Aug 2022.
iii. Attachment 0018 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 28 July 2022.
iv. Attachment 0020 is revised from REV 001 dated 28 Jun 2022 to REV 002 dated 28 Jul 2022.
v. Attachment 0027 is revised from REV 002 dated 28 Jun 2022 to REV 003 dated 28 Jul 2022.
vi. Attachment 0034 is revised from original dated 29 Mar 2002 to REV 001 dated 03 Aug 2022.
vii. Attachment 0044 is revised from REV 002 dated 23 Jun 2022 to REV 003 dated 22 Jul 2022.
viii. Attachment 0051 is revised from REV 002 dated 16 Jun 2022 to REV 003 dated 19 Jul 2022.
ix. Attachment 0055 is deleted.
x. Attachment 0070 is revised from original dated 21 Jun 2022 to REV 001 dated 28 Jul 2022.
xi. The title for Attachment 0072 is corrected to reflect the Revision Number as 002 in lieu of 004.
xii. Attachment 0091 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 04 Aug 2022.
xiii. Attachment 0097 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 04 Aug 2022.
xiii. Attachment 0100 is corrected to reflect the date as "28 Jun 2022" in lieu of "29 Mar 2022".
xiv. Attachment 0102 is revised from original dated 01 Apr 2022 to REV 001 dated 05 Aug 2022.
xiv. Attachment 0107 Economic Price Adjustment Table (CUI) dated 04 Aug 2022.
*See attachment revision logs for specific changes under each attachment.
g. Section L: __________
i. Revise L.3.2.1 to remove reference to Attachment 0055 as follows:
From:
L.3.2.1 Subfactor 1: Survivability
Evaluated item A (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.4.1)
Evaluated item B (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.5.1)
Evaluated item C (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.8.1)
Evaluated item D (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.9.1, 4.1.10.1)
Signature Management (CPSPEC 2.1.1)
Signature Management (CPSPEC 2.2.1)
Specific, additional Instructions for Factor 1, Subfactor 1: Survivability
In addition to the substantiating data required by L.3.1, the Offeror shall provide:
Performance values proposed for the listed PSPECS IAW the instructions provided within
Attachment 0018 (Technical Performance Data Instructions).
Armor Recipe Characteristics (Attachment 0053).
Underbody Analysis Data Instructions (Attachment 0054).
Vehicle Vulnerability Data Instructions (Attachment 0055).
Active Protection Data (Attachment 0057).
To:
L.3.2.1 Subfactor 1: Survivability
Evaluated item A (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.4.1)
Evaluated item B (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.5.1)
Evaluated item C (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.8.1)
Evaluated item D (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.9.1, 4.1.10.1)
9 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Signature Management (CPSPEC 2.1.1)
Signature Management (CPSPEC 2.2.1)
Specific, additional Instructions for Factor 1, Subfactor 1: Survivability
In addition to the substantiating data required by L.3.1, the Offeror shall provide:
Performance values proposed for the listed PSPECS IAW the instructions provided within
Attachment 0018 (Technical Performance Data Instructions).
Armor Recipe Characteristics (Attachment 0053).
Underbody Analysis Data Instructions (Attachment 0054).
Active Protection Data (Attachment 0057).
ii. Revise the SysML format in L.4.3 as follows:
From:
L.4.3 GCIA Sample Task
2 - The offeror shall modify and submit the government provided GCIA Sample Task Logical Model to show compliance with GCIA 2.0, fixing the identified deviations in the model. The Offeror cannot change the requirements in the GCIA Sample Task Logical
Model. The Offeror shall submit the modified GCIA Sample Task Logical Model in the same format as it's delivered (SysML
V1.6) and shall follow the model changing guidelines specified in the model to make the necessary fixes.
To:
L.4.3 GCIA Sample Task
2 - The offeror shall modify and submit the government provided GCIA Sample Task Logical Model to show compliance with GCIA 2.0, fixing the identified deviations in the model. The Offeror cannot change the requirements in the GCIA Sample Task Logical
Model. The Offeror shall submit the modified GCIA Sample Task Logical Model in SysML 1.4 or newer 1.x (not SysML 2.x), which is compatible with MagicDraw 2021. The offeror shall follow the model changing guidelines specified in the model to make the necessary fixes.
iii. Paragraph L.7.14 is added as follows: The Offeror shall consolidate and identify, in Volume 5, all GFP it proposes to use for performance under the resultant contract based on the list of GFP offered by the Government within Attachment 0044 (GFM List).
iv. Paragraph L.7.15 is added as follows: List all the programming languages, as well as the tools and build process, planned to be used in the development of the OMFV software.
h. Section M: __________
i. The Funding Schedule Table in Paragraph M.3.1.1 as follows:
From:
Funding Period Basic Award Amount ($M) _______________________________________________
Award - Dec 31, 2023 $ 108.5
Jan 01, 2024 - Dec 31, 2024 $ 286.1
Jan 01, 2025 - Dec 31, 2025 $ 208.7
Jan 01, 2026 - Dec 31, 2026 $ 143.0
Jan 01, 2027 - End of contract $ 65.2 ____________________________________________
Total $ 811.4
Funding Period Option Amount ($M) _______________________________________________
Award - Dec 31, 2025 $ 71.8
Jan 01, 2026 - Dec 31, 2026 $ 1.6
Jan 01, 2027 - End of contract $ 1.3 ____________________________________________
Total $ 74.3
To:
Funding Period Basic Award Amount ($M) _______________________________________________
Award - Dec 31, 2023 $ 108.5
Jan 01, 2024 - Dec 31, 2024 $ 286.0
10 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Jan 01, 2025 - Dec 31, 2025 $ 208.7
Jan 01, 2026 - Dec 31, 2026 $ 143.0
Jan 01, 2027 - End of contract $ 65.2 ____________________________________________
Total $ 811.4
Funding Period Option Amount ($M) _______________________________________________
Award - Dec 31, 2025 $ 71.8
Jan 01, 2026 - Dec 31, 2026 $ 1.6
Jan 01, 2027 - End of contract $ 1.4 ____________________________________________
Total $ 74.8
*** END OF NARRATIVE A0002 ***
11 153
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
0001 OMFV DETAILED DESIGN, PROTOTYPE, BUILD AND TEST 1 LO $ $ _______________________________________________ ______________ __________________
SERVICE REQUESTED: OMFV PHASE 3 AND 4 BASE
CLIN CONTRACT TYPE:
Firm Fixed Price
CLIN 0001 is for design, development, Prototype build, and test for 7 Prototype deliverables. The
Prototypes shall be delivered IAW Attachment 0051
(PPT Schedule).
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 1643
FOB POINT: Destination
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
0002 HARDWARE DELIVERABLES _____________________
B001 BALLISTIC HULL & TURRET 2 EA $ ** NSP ** $ ** NSP ** _______________________ ______________ __________________
COMMODITY NAME: HULL & TURRET
Packaging and Marking _____________________
All deliverables under this CLIN shall be packaged
12 153
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
and marked IAW the requirements detailed in Section
D.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 1126
002 1 1338
FOB POINT: Destination
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
BH&T shall be shipped to Aberdeen Proving Ground IAW
Attachment 0051 (Production Prove-Out Test Schedule).
(End of narrative F001)
B002 PROTOTYPE VEHICLES 7 EA $ ** NSP ** $ ** NSP ** __________________ ______________ __________________
COMMODITY NAME: PROTOTYPES
Packaging and Marking _____________________
All deliverables under this CLIN shall be packaged and marked IAW the requirements detailed in Section
D.
(End of narrative D001)
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
13 153
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 2 1126
002 2 1152
003 2 1187
004 1 1218
FOB POINT: Destination
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
Prototype Vehicles (PV) shall be shipped to the following locations IAW Attachment 0051 (Production
Prove-Out Test Schedule):
Location SHIP TO DoDAAC ________________________ ______________
PV1-2: Aberdeen Proving Ground W81C5M
PV3-4: Yuma Proving Ground (YPG) W905MY
PV5: Aberdeen Proving Ground W81C5M
PV6: White Sands Missile Range/YPG W81C39/W905MY
PV7: Aberdeen Proving Ground W81C5M
(End of narrative F001)
B003 ARMOR COUPONS 1 EA $ ** NSP ** $ ** NSP ** _____________ ______________ __________________
COMMODITY NAME: VEHICLE ARMOR
Armor Coupons shall be IAW Attachment 0069 (Armor
Coupons).
All deliverables under this CLIN shall be IAW the requirements detailed in Section F and inspection shall be IAW the requirements detailed in Section E.
(End of narrative B001)
Packaging and Marking _____________________
All deliverables under this CLIN shall packaged and marked in accordance with the requirements detailed in Section D.
(End of narrative D001)
14 153
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
DOC SUPPL
REL CD MILSTRIP ADDR SIG CD MARK FOR TP CD ______ ________ ______ ______ ________ _____
001 3
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 1004
FOB POINT: Destination
SHIP TO:
(W56HZV) XU W4GG HQ US ARMY TACOM
6501 EAST 11 MILE ROAD
ARMY CONTRACTING COMMAND WARREN
DETROIT ARSENAL,MI,48397-5000
Armor Coupons shall be shipped to Aberdeen Proving
Ground IAW Attachment 0051 (Production Prove-Out Test
Schedule).
(End of narrative F001)
0003 PROTOTYPE OPTION 1 LO $ $ ________________ ______________ __________________
SERVICE REQUESTED: OPTION VEHICLES
CLIN CONTRACT TYPE:
Firm Fixed Price
Prototype Vehicles (Section C.11), all Option
Prototype vehicle work under this CLIN shall be performed in accordance with Section C, Statement of
Work. This CLIN will be incrementally funded in accordance with B.1. The vehicle(s) shall be shipped to the location specified IAW H.8 and Attachment 0051
(PPT Schedule).
The USG reserves the unilateral right to incrementally exercise and incrementally fund the option. This may result in additional CLINs needed to track the unexercised portion of the option and allow for multiple funding lines.
(End of narrative B001)
Packaging and Marking _____________________
Inspection and Acceptance _________________________
INSPECTION: Origin ACCEPTANCE: Destination
15 153
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0004 CONTRACT DATA REQUIREMENTS LIST (CDRL) ______________________________________
A001 CONTRACT DATA REQUIREMENTS LIST 1 LO $ ** NSP ** _______________________________ __________________
SERVICE REQUESTED: CDRL'S
Technical Data as set forth in Contract Data
Requirements List (CDRL) DD form 1423, in Section J hereinafter referred to as Exhibit A.
Each CDRL listed in Exhibit A of Section J is set forth in the Exhibit Line Items below.
(End of narrative B001)
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
DEL REL CD QUANTITY DAYS AFTER AWARD __________ ______________ ________________
001 1 1643
16 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
B.1 Incremental Funding
B.1.1 CLIN 0001
The Government will provide funds under CLIN 0001 on an incremental basis IAW Defense Acquisition Regulation Supplement (DFARS) 252.232-
7007. It is estimated that the amounts shown are sufficient for the performance of the work in each of the cited funding periods.
The following is the Incremental Funding Schedule for the CLIN 0001:
Funding Period Amount
Award - Dec 31, 2023 $XXX*
Jan 01, 2024 - Dec 31, 2024 $XXX*
Jan 01, 2025 - Dec 31, 2025 $XXX*
Jan 01, 2026 - Dec 31, 2026 $XXX*
Jan 01, 2027 - End of contract $XXX*_____________________________________________
Total $XXX*
*To be Proposed by the Contractor. Not to Exceed the amounts stated in M.3.1.1.
B.1.2 CLIN 0003 Prototype Option
If the Option is exercised, (ref. C.11 & H.8), CLIN 0003 will be funded on an incremental basis IAW Defense Acquisition Regulation
Supplement (DFARS) 252.232-7007. The following is the Incremental Funding Schedule for CLIN 0003:
Funding Period Amount
Award - Dec 31, 2025 $XXX*
Jan 01, 2026 - Dec 31, 2026 $XXX*
Jan 01, 2027 - End of contract $XXX*_____________________________________________
Total $XXX*
*To be Proposed by the Contractor. Not to Exceed the amounts stated in M.3.1.1.
*** END OF NARRATIVE B0001 ***
17 153
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 Introduction
This contract is for the Detailed Design and Prototype Build and Test of the Optionally Manned Fighting Vehicle (OMFV). The United
States Government (USG) is implementing a digital acquisition program IAW Attachment 0075 (OMFV Program Schedule). The digital approach is intended to significantly streamline the standalone documents delivered by the Contractor, while providing the USG unparalleled insight to the design, with the goal of improving cost, schedule and performance.
The USG has implemented a Models Based Systems Engineering approach with an OMFV Objective Architecture to better communicate the requirements of the OMFV system in a clear and concise manner. The Contractor will develop the system architecture and design based on
OMFV Objective architecture. The program is requiring Contractors to manage and maintain the system design and requirement compliance status in a model-based environment, the contract requires the implementation and use of the Ground Combat Systems Common Infrastructure
Architecture (GCIA) provided within the OMFV Objective Architecture and DevSecOps software development to enable the USG to quickly upgrade the OMFV in the future in a Government hosted environment.
As referred to in this contract, the number of days refers to calendar days unless stated otherwise.
C.1.1 OMFV Requirements
The Contractor shall comply with the requirements within Attachment 0008 (OMFV Objective Architecture) and Attachment 0029 (Classified
Specification) in the design of the OMFV.
The Contractor shall research, design, develop, and deliver technical data and computer software as required by the SOW and CDRLs.
C.2 Systems Engineering
The Contractor shall develop and deliver a Digital Engineering Management Plan (DEMP) IAW CDRL E002 and Attachment 0097 (OMFV Digital
Engineering Strategy).
The DEMP shall include the Contractor's configuration management plan for developing and maintaining model-based technical baselines throughout the program lifecycle IAW the technical baseline definitions in EIA-649-1.
The DEMP shall include the Contractor's approach to use Modeling, Simulation, & Analysis (MS&A) in order to reduce risk entering physical test.
C.2.1 OMFV System Architecture Model
The Contractor shall develop an integrated System Architecture Model for the OMFV IAW CDRL E041, Attachment 0067 (CDRL Architecture
Model), and Attachment 0091 (Digital System Model).
The OMFV System Architecture Model (CDRL E041) shall decompose Attachment 0008 (OMFV Objective Architecture) into the requirements and functional, logical, and physical architectural elements that satisfy the USG's Performance Specification (PSPEC) IAW Attachment 0008
(OMFV Objective Architecture) and Attachment 0091 (Digital System Model).
The Contractor shall establish and maintain bi-directional traceability between the OMFV System Architecture Model (CDRL E041) and
Attachment 0008 (OMFV Objective Architecture); including requirements, functional, logical, and physical architecture elements to the lowest level component in the Contractor's Bill of Materials (BOM). The contractor shall ensure all data rights markings IAW DFARS are captured in the System Model (CDRL E041) for all model elements.
C.2.1.1 Specification Tree
The Contractor shall develop, maintain, and deliver a Specification Tree that defines the hierarchical and inter-relationship of the specifications that fully represent the requirements of the OMFV system, including Attachment 0008 (OMFV Objective Architecture) and
Contractor specifications (SSS, SRS, IRS, etc.), IAW CDRL E083, Attachment 0067 (CDRL Architecture Model), and Attachment 0091 (Digital
System Model).
C.2.1.2 System / Sub-system Specifications (SSS)
The Contractor shall develop, maintain, and deliver the SSS for the OMFV IAW CDRL E081 which are identified in the Specification Tree.
C.2.1.3 System / Sub-system Design Descriptions (S/SDD)
The Contractor shall develop, maintain, and deliver the S/SDD for the OMFV IAW CDRL E082 for systems and sub-systems identified in the
Specification Tree (CDRL E083).
C.2.1.4 Requirements Traceability Verification Matrix (RTVM)
The Contractor shall deliver a RTVM IAW CDRL E077 which show the full bi-directional traceability and verification across the requirements contained in the Specification Tree.
C.2.2 Model-Based Design, Simulation, and Test
The Contractor shall execute modeling, simulation, and analysis (MS&A) throughout the life…