Attachment_0083 Logistics Schedule Rev001.xlsx
XLSX spreadsheet 60 KB Posted
- Solicitation number
- W56HZV-22-R-0026
About this file
This document includes an attachment and solicitation related to the Optionally Manned Fighting Vehicle program. The attachment provides a logistics schedule for the OMFV program through Phase IV, outlining key milestones and deliverables for prototype development, testing, and production from contract award through several years post-award. The solicitation is for Phase III and IV detailed design, prototype build, and testing efforts. Responses are due in accordance with instructions in the attached RFP W56HZV-22-R-0026. The Army Contracting Command - Detroit Arsenal is releasing the solicitation on behalf of the Program Manager Maneuver Combat Systems. Offerors must follow provided instructions to request unclassified or classified attachments.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
| Attachment 0083 | ||
| Logistics Schedule | ||
| Solicitation No. W56HZV-22-R-0026 | ||
| Revision 001 | ||
| 16-Jun-2022 |
Distribution Statement A: Approved for public release; distribution is unlimited.
Change Log
| All data on this worksheet is subject to the contractor's disclosure statement(s) found on the "Contractor Coversheet" | ||
| Metadata Reference | ||
| File Name | 1.a | Attachment 0083 Logistics Schedule Rev001 |
| Reference Attachment | 2.a | Attachment 0083 |
| Contract Number | 2.b | W56HZV-22-R-0026 |
| Last Date Updated | 2.c | 16-Jun-2022 |
| Revision # | Date | Change Description |
| 000 | 3/14/22 | a. Base Document w. CUI Markings |
| 001 | 6/16/22 | a. Update to reflect Prototype changes |
b. Updated TM acronym to Preliminary Technical Manual (PTM)
(add additional rows as necessary)
Logistics Schedule
| Attachment 0083 | ||||||||||||||||||
| W56HZV-22-R-0026 | ||||||||||||||||||
| 1-3 | 4-6 | 7-9 | 10-12 | 13-15 | 16-18 | 19-21 | 22-24 | 25-28 | 29-30 | 31-33 | 34-36 | 37-39 | 40-42 | 43-45 | 46-48 | 49-51 | 52-54 |
| Note: | |
| Soldier touchpoints |
PSM-IPTs conducted quarterly until CDR, monthly after CDR
Prototype Build / Integrate 7 per Contractor Phase III Phase IV Logistics Training Support Package * Vehicle Test(PPT) ACAT 1B Program of Record M&S / Sub System Testing TADSS Study TADSS Development Middle Tier Acquisition (Section 804) Logistics Analysis
MA NET
* Contractor shall determine schedule.
Months post Contract Award
Acronyms Acronym Meaning
| ADP | Advanced Diagnostics and Prognostics |
| AMCPL | Advanced Manufacturing Candidate Parts List |
| APSA | Analysis of Product Support Alternatives |
| ATC | Aberdeen Test Center |
| Auth | Authentication |
| AWCF | Army Working Capital Fund |
| BCA | Business Case Analysis |
| BN | Battalion |
| CAP | Corrective Action Period |
| CDD | Capability Development Document |
| CDR | Critical Design Review |
| Cert | Certification |
| CPD | Capability Production Document |
| DEV or Dev | Development |
| DI | Data Interchange |
| DLA | Defense Logistics Agency |
| DMSMS | Diminishing Manufacturing Sources and Material Shortages |
| DP | Decision Point |
| DT | Developmental Testing |
| ECP | Engineering Change Proposal |
| ETC | Embedded Training Concept |
| FLT | Fault |
| FM | Field Maintenance |
| FRC | Final Reproducible Copy |
| FRP | Full-Rate Production |
| FUE | First Unit Equipped |
| ICR | Initial Concept Review |
| IKPT | Instructor and Key Personnel Training |
| Inc | Incurment |
| Ins | Isolation |
| Instr | Instructor |
| IOT | Initial Operational Test |
| IOTE | Initial Operational Test and Evaluation |
| KTR | Contractor |
| LCSP | Life-Cycle Sustainment Plan |
| LOG | Logistics |
| LORA | Level of Repair Analysis |
| LP | Limited Production |
| LPD | Logistics Product Data |
| LRIP | Low-Rate Initial Production |
| LUT | Limited User Test |
| M&S | Modeling and Simulation |
| MAC | Maintenance Allocation Chart |
| Mat'l | Material |
| MCR | Maintainability Concept Review |
| MERR | Maintainability Evaluation Readiness Review |
| MR | Material Release |
| MS | Milestone |
| MTA | Maintenance Task Analysis |
| MTA RFP | Middle Tier Acquisition Request for Proposal |
| NET | New Equipment Training |
| NMWR | National Maintenance Work Requirements |
| OP | Operator |
| PDR | Preliminary Design Review |
| PPT | Production prove-out test |
| PQT | Production Quality Testing |
| PSA | Product Support Analysis |
| P-SPEC | Performance Specification |
| PSM-IPT | Product Support Manager Integrated Product Team |
| PTM | Preliminary Technical Manual |
| Req | Requirement |
| RFP | Request for Proposal |
| RTC | Redstone Test Center |
| SA | Supportability Assessment |
| SFR | System Functional Review |
| SRR | System Requirements Review |
| SSEB | Source Selection Evaluation Board |
| SSP | System Support Package |
| SOWM | Start of Work Meeting |
| TADSS | Training Aids, Devices, Simulators, and Simulations |
| TC | Type Classification |
| PTM | Preliminary Technical Manual |
| TSP | Test Support Package |
| Val | Validation |
| VEH | Vehicle |
| Ver | Verification |
| WSMR | White Sands Missile Range |
| YTC | Yakima Training Center |