W56HZV-22-R-0026_Conformed_26SEP2022.pdf

PDF 542 KB Posted

Attached to
Optionally Manned Fighting Vehicle (OMFV) Request for Proposal (RFP) W56HZV-22-R-0026
Solicitation number
W56HZV-22-R-0026
Issued by

About this file

This is a Request for Proposal for the Optionally Manned Fighting Vehicle Phase 3 and 4 Detailed Design, Prototype Build and Test effort. The Army is seeking proposals for the design, development, and delivery of 7 prototype vehicles as well as 2 Ballistic Hulls and Turrets, armor coupons, digital models and data. Proposals are due by 12:00pm on July 1, 2022. The Army intends to award up to three firm-fixed price contracts with a period of performance of 54 months. Source selection procedures will be used to evaluate proposals based on factors including technical approach, management approach, and past performance. The Army will consider price as part of the overall best value determination. The solicitation requires compliance with the OMFV Objective Architecture and the use of Modular Open Systems Approach in system design. The Contractor must develop and maintain a digital System Architecture Model and establish traceability to requirements.

View the file

Other files

File Type Posted
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-140.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-139.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-124.pdf PDF
Attachment_0091_Digital_System_Model_Rev004.docx DOCX document
W56HZV-22-R-0026_0004.pdf PDF
Attachment_0075_OMFV_Program_Schedule_Rev003 (Distro A) (30 Aug 2022).docx DOCX document
Attachment_0055_Vehicle_Vulnerability_Data_Instructions (Distro A) (29 Mar 2022).docx DOCX document
W56HZV-22-R-0026_Conformed_16SEP2022.pdf PDF
W56HZV-22-R-0026_0003.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-109.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-95.pdf PDF
W56HZV-22-R-0026_Conformed_24AUG2022.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-68.pdf PDF
Attachment_0091_Digital_System_Model_Rev003.docx DOCX document
W56HZV-22-R-0026_0002.pdf PDF
Attachment_0034_Critical_Task_List_Rev001.pdf PDF
Distro A - OMFV RFP W56HZV-22-R-0026 QA 01-52.pdf PDF
Attachment_0091_Digital_System_Model_Rev002.docx DOCX document
OMFV RFP W56HZV-22-R-0026_0001.pdf PDF
W56HZV-22-R-0026_Conformed_5AUG2022.pdf PDF
OMFV RFP W56HZV-22-R-0026 Questions and Answers (7 July 22).pdf PDF
Attachment_0057_Active_Protection_Data Rev001.xlsx XLSX spreadsheet
Attachment_0064_Process_Simulate_Rev001.docx DOCX document
Attachment_0061_Tracked_Vehicle_Dynamics_Datasheet_Rev001.xlsx XLSX spreadsheet
Attachment_0088_OMFV_Bill_of_Materials_(BOM) Rev001.xlsx XLSX spreadsheet
Attachment_0091_Digital_System_Model_Rev001.docx DOCX document
Attachment_0042_ATPD_2232.pdf PDF
Attachment_0083 Logistics Schedule Rev001.xlsx XLSX spreadsheet
Attachment_0072 DD254 (Rev002).pdf PDF
Attachment_0011_Developmental_Level_TDP_Instructions_Rev001.docx.pdf PDF
Attachment_0045_PPMx_Characteristics_Rev001.xlsx XLSX spreadsheet
Attachment_0089_Attribute Selection Worksheet.pdf PDF
Attachment_0017_Request_for_Use_of_Prohibited_Material.docx DOCX document
Attachment_0019_Small_Business_Participation_Factor_Workbook_Instructions.docx DOCX document
Attachment_0024_RMF_Package_Deliverables_Rev002.docx DOCX document
W56HZV-22-R-0026.pdf PDF
Attachment_0099_Data_Architecture_Artifacts_OTD.docx DOCX document
Attachment_0012_Technical_Data_and_Assertions_Rev001.xlsx XLSX spreadsheet
Attachment_0060_Vehicle_Data_Package_for_Propulsion_System_Rev001.xlsx XLSX spreadsheet
Attachment_0033_PTM_Crosswalk_Template_Rev001.xlsx XLSX spreadsheet
Attachment_0100_ATTLA_Universal_Data_Sheet_Rev001.xlsx XLSX spreadsheet
Attachment_0043_After_Action_Report_Sample.docx DOCX document
Attachment_0016_Small_Business_Participation_Factor_Workbook_Rev001.xlsx XLSX spreadsheet
Attachment_0075_OMFV_Program_Schedule_Rev002.docx.docx DOCX document
Attachment_0048_IUID_Sample_Data_Plate.docx DOCX document
Attachment_0013_Special_License_Requirements.docx DOCX document
Attachment_0047_Advanced_Manufacturing_Candidate_Parts_List_Rev001.xlsx XLSX spreadsheet
Attachment_0090_CoSite_Data_Instructions.docx DOCX document
Attachment_0058_AFES_Analysis_Information_Request.docx DOCX document
Attachment_0077_Prognostics_Predictive_Maintenance_System_Information.docx DOCX document
Show 40 more

Latest 50 of 59 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under

DPAS (15 CFR 700)

Rating Page of Pages

2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)

Negotiated (RFP)

7. Issued By Code 8. Address Offer To (If Other Than Item 7)

NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).

Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address

Call: Area Code Number Ext.

11. Table Of Contents

(X) Sec. Description Page(s) (X) Sec. Description Page(s)

Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses

B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.

C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)

14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror

15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such

Address In Schedule

AWARD (To be completed by Government)

19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation

22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code

26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)

W56HZV-22-R-0026

X

2022JUL01

2022NOV0112:00pm

DOA4

2022JUL01 SEE SCHEDULE

W56HZV

ACC-DTA

6501 E. 11 MILE RD.

DETROIT ARSENAL, MI 48397-5000

JOSEPH FELICE

(586)282-9450

CCTA-ALH-C

JOSEPH.A.FELICE5.CIV@ARMY.MIL

1 160

X 1

X 18 X 24

X 59 X 60 X 62

X 67

X 70

X 79

X 118

X 121

X 135

X 153

CONTINUATION SHEET

Reference No. of Document Being Continued Page of

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

SECTION A - SUPPLEMENTAL INFORMATION

THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED

Buyer Name: JOSEPH FELICE

Buyer Office Symbol/Telephone Number: CCTA-ALH-C/(586)282-9450

Type of Contract 1: Firm Fixed Price

Kind of Contract: System Acquisition Contracts

*** End of Narrative A0000 ***

Optionally Manned Fighting Vehicle (OMFV)

Executive Summary

This Executive Summary is provided as an overview of selected points of the solicitation. It is not intended to provide all information included therein. Offerors are responsible to carefully read, understand and comply with the solicitation in its entirety. In the event of any inconsistencies between this Executive Summary and the solicitation, the solicitation shall rule.

A.1 OMFV Program Vision

The Optionally Manned Fighting Vehicle (OMFV) will serve as the Army's Infantry Fighting Vehicle (IFV) tasked to maneuver through the enemy's security zone as part of a combined arms team for the purpose of creating an advantageous position, relative to the enemy, and providing protection and direct fire lethality while manned or remotely operated. In the close fight, the OMFV enables the ability of dismounted elements to maneuver by detecting and destroying targets at a range beyond the enemy's capability.

A.1.1 Transformational Elements

The OMFV will transform how Soldiers and squads accomplish their mission in the following ways.

A.1.1.1 Enable Command and Control

The OMFV will enable command and control at the platoon level and higher by rapidly generating, receiving, and passing information to dismounted elements, other vehicles, and command nodes.

A.1.1.2 Provide Decisive Lethality

The OMFV will be able to detect, engage, and destroy enemy infantry fighting vehicles beyond the range of the enemy's primary weapon system, and rapidly defeat dismounted enemy threats. The OMFV will also enhance formation lethality by providing target acquisition data, shared situational understanding, and the lethal effects required to protect and orient the dismounted element.

A.1.1.3 Enhance Organizational Effectiveness

The OMFV will improve organizational effectiveness by reducing the logistics burden on the Armored Brigade Combat Team (ABCT). This will be achieved through enhanced reliability and on-board diagnostics and prognostics; ease of maintenance with the use of standard, common tools; and reduced burdens on the supply chain in terms of spare parts, fuel, and munitions.

A.1.1.4 Ability to Rapidly Adapt

The OMFV will adopt the latest digital engineering techniques, which will allow rapid adaptation by possessing Growth margins that allow for the insertion and integration of future technologies.

Designed from the beginning using a Modular Open Systems Approach (MOSA) and based on an Army-defined and owned open architecture standard, OMFV provides the Army an affordable pathway to OEM-independent upgrades at the hardware component level. As technology and software evolves, the Army's open architecture standard allows the OMFV to modernize rapidly at a reduced cost. This will also offer more opportunities for increased industry competition and innovation over the OMFV's lifecycle.

This digital approach to delivering OMFV creates a situation where the Army can affordably upgrade at the pace of technological advancement, and reduce the risk posed by strategic unpredictability with respect to the level of capability OMFVs provide the ABCTs.

A.2 Program Overview

A.2.1 Fundamentals

The Army is conducting a five (5) phased acquisition approach to design, prototype, test, and produce the OMFV.

2 160

W56HZV-22-R-0026 REPRINT

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

The Army is committed to adopting digital engineering best practices, agile software development using a DevSecOps approach, and a cloud-based infrastructure in support of the OMFV program. The adoption of these principles are key enablers to support the rapid adoption, testing, and integration of future technologies.

OMFV is the U.S. Army's first ground combat vehicle designed using modern digital engineering tools and techniques. OMFV Contractors will develop the OMFV using Models Based System Engineering (MBSE) and within the digital domain to communicate the design's maturity and evolution via a series of interconnected digital models throughout the program lifecycle.

A.2.2 Phase 3: Detailed Design and Phase 4: Prototype Build and Test

The purpose of Phase 3 is to conduct detailed design activities to mature the OMFV designs and will culminate in a critical design review (CDR). Immediately following Phase 3 is Phase 4, Prototype Build and Test. The purpose of Phase 4 is to verify performance against the performance specification. Late in this phase, a Limited User Test will be conducted. In addition to the delivery of prototypes, the Contractor will develop, mature, and deliver a virtual prototype of their design. These phases will be a single contract with up to 3 contracts awarded.

A.2.3 Phase 5: Production and Fielding

The purpose of this phase is to have a single LRIP contract for production, testing and initial fielding. Activities include Pre-

Production Quality Testing (PQT) and Initial Operational Testing and Evaluation (IOT&E). This single contract is planned to be awarded from a competition limited to the Phase 3/4 Contractors. The Army is finalizing the criteria to select the LRIP contract, but are currently exploring performance, MOSA compliance, intellectual property (IP) rights provided, AUMP, end to end digital thread, and manufacturability. The Government intends to require follow-on production of the OMFV to occur in the United States (US).

A.3 OMFV Phase 3/4 Solicitation and Contract

The RFP requires up to 11 prototype vehicles (7 for a contract award and an option for 4 additional vehicles), as well as two Ballistic

Hulls and Turrets, Armor Coupons, digital model twins, and data.

The OMFV Phase 3/4 RFP is a Full and Open Competition. The Army intends to award up to three firm-fixed price contracts with a 54 month period of performance. Formal source selection procedures will be used. See Sections L and M for information required to be submitted in proposals and evaluation of proposals. VATEP (Value Adjusted Total Evaluated Price)will be utilized as part of the overall Price evaluation.

The Army is considering including an Economic Price Adjustment provision for prototype material for the option vehicles. Any such provision will be added by amendment.

A.3.1 Solicitation

This solicitation is for the Detailed Design, Prototype, Build and Test (Phases 3 and 4), and is solicited on a Firm-Fixed-Price basis.

The solicitation requires proposals for a total of 11 prototypes, 7 for a contract award and an option for 4 additional prototypes.

Information in this solicitation takes precedence over any information shared by the Government preceding the solicitation release, including but not limited to, information shared at one-on-one sessions, draft solicitation, or through Q&As released to date.

Assertion of Restrictions: The Offeror shall include in its proposal submission, its Assertion of Restrictions Attachment 0012

(Technical Data and Assertions). Additionally, any proposed special license(s) shall follow the format prescribed within Attachment 0013

(Special License Requirements).

Availability of Funding and Affordability: Contract award(s) will be made subject to the availability of funding. Affordability is addressed at M.3.1.

A.4 Phase 3/4 Proposal Evaluation

The Army will conduct a full and open competition using Best Value Source Selection procedures for the award of up to three contracts during third quarter of Fiscal Year (FY) 23. The Army reserves the right to make fewer than three awards if the value of additional awards up to three would offer only limited benefit (See M.1.1).

A.5 Administrative

Eligibility requirements for award and Rejection Criteria are included in the solicitation. Offerors should carefully review the solicitation to ensure all requirements for award are met.

Access to Classified, Controlled Unclassified Information (CUI), and Export Controlled Documents: All Offerors must have a valid FCL including safeguarding at SECRET level in order to respond to this solicitation. See Attachment 72 (Department of Defense (DD) Form

254,Contract Security Classification Specification) for security requirements. For Export Controlled information, it is the responsibility of the Offeror, not the Government, to obtain the appropriate export licenses, or process the appropriate export license exemption, necessary for authorization to share information with foreign vendors. Offerors who did not recieve CUI under the 17 June

2022 Draft release shall send their request to the general mailbox identified below. Your request shall include the following:

i. Your Company's name and address

3 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

ii. Your Name, Title, Office phone number and email address

iii. Copy of the approved DD Form 2345

Points of Contact (POCs):

Michael Chaney, Procuring Contracting Officer

586-282-5057 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil

Joe Felice, Contract Specialist

586-282-9450 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil

James Giacchina, Contract Specialist

586-282-4131 usarmy.detroit.peo-gcs.mbx.ngcv-omfv-contracting@mail.mil

A.6 Army Contracting Command - Detroit Aresnal (DTA) Ombudsperson

Information regarding the Ombudsperson for this contract is located at the following website: http://acc.army.mil/contractingcenters/acc-wrn/CompMgmtOffice.html

A.7 Public Activity Involvement

Subcontract opportunities under this solicitation and any resulting contracts are open to competition between Department of Defense activities and private firms. In addition, Army Industrial Facilities are available to sell manufactured articles or to perform work at such Facilities on behalf of Offerors, in certain circumstances and as permitted by law. Rock Island Arsenal, Waterlivet Arsenal, Anniston Army Depot, Sierra Army Depot, or Red River Army Depot have expressed interest in securing subcontracting opportunities under this RFP. For information related to the capabilities of these facilities visit the following links:

http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC%20P3Contact%20Information.pdf?ver=2017-09-18-073343-597 http://www.amc.army.mil/Portals/9/Documents/AMC%20Publications/AMC_0817_RESOURCE-GUIDE.pdf?ver=2017-10-03-110207-990

A.8 Acknowledgement of Amendments

Acknowledge all the amendments received from the Government by identifying the amendment number and its issue date in the box below:

Amendment Number: Date:

A.9 Electronic Contracting

All Army Contracting Command Detroit Arsenal solicitations will be publicized on the System for Award Management website

(https://www.sam.gov ). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.

Pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.

It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the submission.

Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the

Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.

*** END OF NARRATIVE A0001 ***

4 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

1. The purpose of Amendment 0001 to Solicitation W56HZV-22-R-0026 is to incorporate revisions as follows:

a. Section B: __________

i. CLIN 0003 is updated to delete the delivery date of 1703 days after award.

ii. CLIN 0003 inspection is changed from destination to origin.

b. Section C: __________

i. C.2.4.1 is modified to correct an administrative error. CDRL 041 is changed to CDRL E041.

ii. C.2.12 is modified to update the paint requirement as follows:

From:

C.2.12 Corrosion Prevention and Control

The Contractor shall develop, deliver, maintain, and comply with a Corrosion Prevention and Control Plan (CPCP) IAW CDRL E031 and Attachment 0082 (Chemical Agent Resistant Coating Drawing).

To:

C.2.12 Corrosion Prevention and Control

C.2.12.1 The Contractor shall develop, deliver, maintain, and comply with a Corrosion Prevention and Control Plan (CPCP) IAW

CDRL E031 and Attachment 0082 (Chemical Agent Resistant Coating Drawing).

C.2.12.2 The interior of the prototype vehicles and BH&Ts shall be painted Gloss White Chip No. 17925 of SAE AMS-STD-595 in accordance with Attachment 0082. The USG will specify the exterior color of prototype vehicles and BH&Ts NLT PDR.

iii. Add the word independent in reference to crew sight as follows:

From:

C.3.1 Technology Maturation Planning

If the Contractor's design is equipped with a cannon other than an XM913, and/or 3rd Generation Forward Looking Infrared (3GF)

B-kit components for crew sight, the Contractor shall deliver a technical report IAW CDRL E079.

The report shall contain the following information between the Contractor's system design and the Contractor's design with key technologies integrated (XM913 and/or 3rd Generation Forward Looking Infrared (3GF) B-kit components for crew sight):

a. Performance differences

b. Size differences

c. Non-recurring costs to implement (Engineering and Logistics)

d. Estimated schedule to implement

e. BOM differences of parts that would have to be redesigned, not used, and/or new parts

f. Any additional information critical information related to the integration of these key technologies

To:

C.3.1 Technology Maturation Planning

If the Contractor's design is equipped with a cannon other than an XM913, and/or 3rd Generation Forward Looking Infrared (3GF)

B-kit components for crew independent sight, the Contractor shall deliver a technical report IAW CDRL E079.

The report shall contain the following information between the Contractor's system design and the Contractor's design with key technologies integrated (XM913 and/or 3rd Generation Forward Looking Infrared (3GF) B-kit components for crew independent sight):

a. Performance differences

b. Size differences

c. Non-recurring costs to implement (Engineering and Logistics)

d. Estimated schedule to implement

e. BOM differences of parts that would have to be redesigned, not used, and/or new parts

f. Any additional information critical information related to the integration of these key technologies

5 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

iv. Define Ballistic Hull and Turret (BH&T) in C.5.2.4 as follows:

From:

C.5.2.4 Active Protective System (APS) System Testing

If the Contractor's design includes an Active Protective System (APS), the Contractor shall provide one of the two BH&T assets delivered IAW Attachment 0051 (PPT Schedule) be outfitted with a complete, working APS system for APS system testing.

To:

C.5.2.4 Ballistic Hull and Turret (BH&T)

The Contractor shall deliver two BH&T assets IAW Attachment 0051 (PPT Schedule).

C.5.2.4.1 BH&T Definition

A "Ballistic Hull and Turret (BH&T)" is defined as:

1. A basic hull structure that incorporates (when in the design) seats, false floor, spall liners, armor modules, grilles, hatches, access covers, fuel tanks, periscopes, onboard energetics compartmentalization, and structural components required for transportability (e.g., lifting eyes);

2. A basic turret structure that includes the gun mount and gun shield, and incorporates (when in the design) seats, spall liners, armor modules, grilles, hatches, access covers, periscopes, onboard energetics compartmentalization, and structural components required for transportability (e.g., lifting eyes); and

3. CE armor solutions.

C.5.2.4.2 Active Protective System (APS) System Testing

If the Contractor's design includes an Active Protective System (APS), the Contractor shall provide one of the two BH&T assets delivered IAW Attachment 0051 (PPT Schedule) to be outfitted with a complete, working APS system for APS system testing.

c. Section E: __________

i. Paragraph E.2, Final Inspection Record, is revised as follows:

From:

E.2 Final Inspection Record

The contractor shall deliver a Preliminary Final Inspection Record (PFIR) IAW CDRL T017 to be used for prototype vehicle inspection at the contractor's site prior to any shipments and for acceptance at end of contract performance. The PFIR shall be organized to be compatible with assemblies, installation, and end item performance. The PFIR shall contain all examinations and tests that are performed on a single unit during its manufacture and final inspection. The PFIR shall list each vehicle characteristic or function to be inspected from the vehicle specification.

To:

E.2 Final Inspection Record

E.2.1 The contractor shall deliver a Preliminary Final Inspection Record (PFIR) IAW CDRL T017 to be used for prototype vehicle inspection at the contractor's site prior to any shipments and for acceptance at end of contract performance. The PFIR shall be organized to be compatible with assemblies, installation, and end item performance. The PFIR shall contain all examinations and tests that are performed on a single unit during its manufacture and final inspection. The PFIR shall list each vehicle characteristic or function to be inspected from the vehicle specification.

E.2.1.1 Prior to vehicle shipment at the test site or shipped in place, the contractor shall conduct an inspection utilizing the

PFIR and provide with the vehicle.

E.2.1.2 At the conclusion of Production Prove Out Testing final acceptance (DD250) of test vehicles shall be performed on each vehicle in as-is condition. The contractor shall provide a PFIR prior to vehicle delivery to the Government that will only document the test vehicles condition.

d. Section H: __________

i. The following paragraphs have been added for the reliability incentive as follows:

6 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

H.14 Reliability Incentive

H.14.1 General. The OMFV PSPEC defines the Mean Miles Between Systems Abort (MMBSA) reliability requirement. Attachments 0051

(Production Prove-out Test Schedule) and 0070 (Reliability Growth Planning Model) specify the planned reliability events (PPT1 and

PPT2) and the expected MMBSA performance at conclusion of each event. This provision establishes incentive awards for exceeding expected performance at conclusion of each event.

H.14.2 Applicable conditions. The USG anticipates conducting reliability testing at various locations, timeframes, and planned mileage IAW Attachment 0051 (Production Prove-out Test Schedule). However, the actual vehicles/locations, timeframes, and mileage may differ from anticipated Regardless of any differences, testing conducted prior to the Corrective Action Period (CAP) constitutes PPT1, and testing conducted after the CAP constitutes PPT2.

H.14.3 MMBSA determination. At the conclusion of PPT1 and PPT2, the USG will calculate the demonstrated MMBSA for the Hardware and

Software(HW/SW) values of Test Incident Reports (TIRs) IAW Attachment 0052 (Failure Definition and Scoring Criteria (FDSC)) as calculated below:

H.14.3.1 The USG will make PPT MMBSA determination(s) without regard to any assessment conferences or fix effectiveness factors

(FEFs) related to any corrective actions. The MMBSA will be calculated as a point estimate based on the actual total PPT RAM miles

(for all the Contractor's RAM vehicles accumulated from the beginning to end of each PPT), divided by the total HW/SW PPT System

Aborts(SAs) as reported during each PPT. Test Center data shall be the single data source for RAM miles and SAs, as opposed to data or results generated in any digital engineering model, or otherwise. The USGs calculated MMBSA pursuant under this provision will be final.

H.14.4 Award amounts. The incentive award amount for each event is detailed below (Table 1 and Table 2) and is determined using the

USG calculated MMBSA. The award amount for each event will be earned separately and without consideration of the other event. Both events are eligible for incentive awards if the MMBSA values meet the Table conditions. The award amounts are definite for each mileage range and they will not be prorated within a range.

Table #1 (PPT1): USG Calculated MMBSA Range for PPT1 ___________________________________ PPT1 Incentive Award ____________________

MMBSA< 557 miles $0

MMBSA> or = 557 miles, but < 650 miles $2 Million

MMBSA> or = 650 miles $4 Million (Maximum PPT1 Award)

Table #2 (PPT2): USG Calculated MMBSA Range for PPT2 ___________________________________ PPT2 Incentive Award ____________________

MMBSA< 686 miles $0

MMBSA> or = 686 miles, but < 800 miles $2 Million

MMBSA> or = 800 miles $4 Million (Maximum PPT2 Award)

H.14.5 Notification and payment. The Procuring Contracting Officer (PCO) will notify the contractor of the USG's calculated MMBSA results after all TIRs are scored for each event and make payment by unilateral modification promptly thereafter subject to the availability of funds. The parties agree that the USG determinations under this provision are final and are not subject to the

Disputes provision of this contract.

ii. The following paragraphs have been added for the Economic Price Adjustment (EPA) under the Prototype Option (CLIN 0003):

H.15 ECONOMIC PRICE ADJUSTMENT - CLIN 0003

H.15.1 The purpose of this section is to provide for economic price adjustment, upward or downward, for the vehicle prototype option CLIN 0003. Any such price adjustment will be determined by completion of the EPA Table (Attachment 0107). This clause applies only to the prototype option CLIN 0003; no adjustment will be applied to CLIN 0002 BH&T (B001), Base Prototype Vehicles (B002), Armor Coupons (B003), detailed design of the prototypes, and applicable testing.

H.15.2 Any price adjustment will be determined by completion of the EPA Table (Attachment 0107) located at the end of this provision and is applicable only to prototype vehicles under CLIN 0003.

The Contracting Officer will utilize the most recently published PPI index (even if preliminary) as of 30 September 2024 to calculate the upward or downward price adjustment IAW Attachment 0107. The index and price subject to adjustment are as follows:

Index - PPI Code 33612, Heavy Duty Truck Manufacturing. Published by U.S. Department of Labor Bureau of Labor Statistics in its publication, PPI Detailed Report.

7 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

H.15.3 A total of 65 percent (65%) of the contract price for the CLIN 0003 Prototype Option (H.8) is the portion of the Price

Subject to Adjustment, hereinafter referred to as the "PSA", for all adjustments herein.

H.15.4 Under this clause, the maximum increase will be no more than $4,800,000. There will be no limitation on the amount of decrease under this clause.

H.15.5 Economic price adjustment to the contract price will be made against CLIN 0003, IAW Attachment 0107:

H.15.5.1 When the actual index value (Column (4)) is within the non-adjustment band (Column (3)), no adjustment will be made.

H.15.5.2 When the actual index value (Column (4)) is outside the non-adjsutment band (Column (3)), the amount in Column (7) will be the adjustment to contract price for CLIN 0003 (rounded to the nearest dollar) subject to the maximum increase stated in H.15.4.

H.15.6 Any Economic Price Adjustment will be incorporated by a unilateral contract modification prior to 31 December 2024, which will include adjusted contract price to CLIN 0003 only.

H.15.7 In the event any index cited is discontinued or substantially altered by the Bureau of Labor Statistics, the parties shall mutually agree on an appropriate substitute index to be effective as of the date of index discontinuance or alteration.

In the event an index is discontinued or substantially altered, the parties will proceed to mutually establish a replacement index.

If mutual agreement cannot be reached prior to 30 September 2024, the Contracting Officer may make a unilateral index replacement.

Alternatively, the parties may continue to mutually proceed to establish a replacement index. In this case, the Government may exercise the option using the contract price (as a billing price), pending agreement on a replacement index needed to calculate the price adjustment.

H.15.8 The contractor warrants that the prices set forth in this clause do not include allowances for any contingency to the extent covered by this clause.

H.15.9 Regardless of the actual cost during the performance of this contract, economic price adjustments will be made only as provided herein.

H.15.10 The contractor shall certify on a final adjusting invoice that the amounts invoiced under this contract reflect all decreases required by this clause.

H.15.11 Pricing actions pursuant to the "Changes" clause or other provisions within this contract will be priced as though there were no provision for Economic Price Adjustment. All changes made that result in a new contract price under CLIN 0003 prior to option exercise will be reflected in the PSA.

e. Section I: __________

i. Clause 252.232-7015 Performance-Based Payments Representation has been deleted.

f. Section J: __________

i. Exhibit A is revised as follows:

a. The page count for Exhibit A is corrected to reflect 112 in lieu of 138.

b. CDRL T001 Authority block is revised from DI-SESS-81704 to DI-NDTI-80566A.

c. CDRL T002 Authority block is revised from DI-MISC-80508B to DI-NDTI-80809B.

d. CDRL L025 is revised as follows:

From:

Block 12 and 13: If an item was classified as a Special Group Item (SGI) the Contractor shall deliver the SGI's Packaging

Validation Report concurrent with the packaging data deliverable (L029).

To:

Block 12 and 13: If an item was classified as a Special Group Item (SGI) the Contractor shall deliver the SGI's Packaging

Validation Report.

The Contractor shall deliver at least 30% Packaging Validation Report 30 days after the completion of each Provisioning

Conference (PC).

The Contractor shall deliver at least 60% Packaging Validation Report 60 days after the completion of each PC.

The Contractor shall deliver all 100% Packaging Validation Report 90 days after the completion of each PC.

8 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

e. CDRL L030 is revised as follows:

From:

Blocks 12 and 13: If an item was classified as a Special Group Item (SGI), the Contractor shall deliver the SGI's Special

Packaging Instructions concurrent with the packaging data deliverable (L029).

To:

Block 12 and 13: If an item was classified as a Special Group Item (SGI), the Contractor shall deliver the SGI's Special

Packaging Instructions.

The Contractor shall deliver at least 30% Special Packaging Instructions 30 days after the completion of each Provisioning

Conference (PC).

The Contractor shall deliver at least 60% Special Packaging Instructions 60 days after the completion of each PC.

The Contractor shall deliver all 100% Special Packaging Instructions 90 days after the completion of each PC.

ii. Attachment 0010 is revised from REV 001 dated 28 Jun 2022 to REV 002 dated 03 Aug 2022.

iii. Attachment 0018 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 28 July 2022.

iv. Attachment 0020 is revised from REV 001 dated 28 Jun 2022 to REV 002 dated 28 Jul 2022.

v. Attachment 0027 is revised from REV 002 dated 28 Jun 2022 to REV 003 dated 28 Jul 2022.

vi. Attachment 0034 is revised from original dated 29 Mar 2002 to REV 001 dated 03 Aug 2022.

vii. Attachment 0044 is revised from REV 002 dated 23 Jun 2022 to REV 003 dated 22 Jul 2022.

viii. Attachment 0051 is revised from REV 002 dated 16 Jun 2022 to REV 003 dated 19 Jul 2022.

ix. Attachment 0055 is deleted.

x. Attachment 0070 is revised from original dated 21 Jun 2022 to REV 001 dated 28 Jul 2022.

xi. The title for Attachment 0072 is corrected to reflect the Revision Number as 002 in lieu of 004.

xii. Attachment 0091 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 04 Aug 2022.

xiii. Attachment 0097 is revised from REV 001 dated 29 Jun 2022 to REV 002 dated 04 Aug 2022.

xiii. Attachment 0100 is corrected to reflect the date as "28 Jun 2022" in lieu of "29 Mar 2022".

xiv. Attachment 0102 is revised from original dated 01 Apr 2022 to REV 001 dated 05 Aug 2022.

xiv. Attachment 0107 Economic Price Adjustment Table (CUI) dated 04 Aug 2022.

*See attachment revision logs for specific changes under each attachment.

g. Section L: __________

i. Revise L.3.2.1 to remove reference to Attachment 0055 as follows:

From:

L.3.2.1 Subfactor 1: Survivability

Evaluated item A (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.4.1)

Evaluated item B (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.5.1)

Evaluated item C (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.8.1)

Evaluated item D (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.9.1, 4.1.10.1)

Signature Management (CPSPEC 2.1.1)

Signature Management (CPSPEC 2.2.1)

Specific, additional Instructions for Factor 1, Subfactor 1: Survivability

In addition to the substantiating data required by L.3.1, the Offeror shall provide:

Performance values proposed for the listed PSPECS IAW the instructions provided within

Attachment 0018 (Technical Performance Data Instructions).

Armor Recipe Characteristics (Attachment 0053).

Underbody Analysis Data Instructions (Attachment 0054).

Vehicle Vulnerability Data Instructions (Attachment 0055).

Active Protection Data (Attachment 0057).

To:

L.3.2.1 Subfactor 1: Survivability

Evaluated item A (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.4.1)

9 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Evaluated item B (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.5.1)

Evaluated item C (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.8.1)

Evaluated item D (PSPEC-1090, CPSPEC 4.1, 4.1.1, 4.1.9.1, 4.1.10.1)

Signature Management (CPSPEC 2.1.1)

Signature Management (CPSPEC 2.2.1)

Specific, additional Instructions for Factor 1, Subfactor 1: Survivability

In addition to the substantiating data required by L.3.1, the Offeror shall provide:

Performance values proposed for the listed PSPECS IAW the instructions provided within

Attachment 0018 (Technical Performance Data Instructions).

Armor Recipe Characteristics (Attachment 0053).

Underbody Analysis Data Instructions (Attachment 0054).

Active Protection Data (Attachment 0057).

ii. Revise the SysML format in L.4.3 as follows:

From:

L.4.3 GCIA Sample Task

2 - The offeror shall modify and submit the government provided GCIA Sample Task Logical Model to show compliance with GCIA 2.0, fixing the identified deviations in the model. The Offeror cannot change the requirements in the GCIA Sample Task Logical

Model. The Offeror shall submit the modified GCIA Sample Task Logical Model in the same format as it's delivered (SysML

V1.6) and shall follow the model changing guidelines specified in the model to make the necessary fixes.

To:

L.4.3 GCIA Sample Task

2 - The offeror shall modify and submit the government provided GCIA Sample Task Logical Model to show compliance with GCIA 2.0, fixing the identified deviations in the model. The Offeror cannot change the requirements in the GCIA Sample Task Logical

Model. The Offeror shall submit the modified GCIA Sample Task Logical Model in SysML 1.4 or newer 1.x (not SysML 2.x), which is compatible with MagicDraw 2021. The offeror shall follow the model changing guidelines specified in the model to make the necessary fixes.

iii. Paragraph L.7.14 is added as follows: The Offeror shall consolidate and identify, in Volume 5, all GFP it proposes to use for performance under the resultant contract based on the list of GFP offered by the Government within Attachment 0044 (GFM List).

iv. Paragraph L.7.15 is added as follows: List all the programming languages, as well as the tools and build process, planned to be used in the development of the OMFV software.

h. Section M: __________

i. The Funding Schedule Table in Paragraph M.3.1.1 as follows:

From:

Funding Period Basic Award Amount ($M) _______________________________________________

Award - Dec 31, 2023 $ 108.5

Jan 01, 2024 - Dec 31, 2024 $ 286.1

Jan 01, 2025 - Dec 31, 2025 $ 208.7

Jan 01, 2026 - Dec 31, 2026 $ 143.0

Jan 01, 2027 - End of contract $ 65.2 ____________________________________________

Total $ 811.4

Funding Period Option Amount ($M) _______________________________________________

Award - Dec 31, 2025 $ 71.8

Jan 01, 2026 - Dec 31, 2026 $ 1.6

Jan 01, 2027 - End of contract $ 1.3 ____________________________________________

Total $ 74.3

To:

10 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

Funding Period Basic Award Amount ($M) _______________________________________________

Award - Dec 31, 2023 $ 108.5

Jan 01, 2024 - Dec 31, 2024 $ 286.0

Jan 01, 2025 - Dec 31, 2025 $ 208.7

Jan 01, 2026 - Dec 31, 2026 $ 143.0

Jan 01, 2027 - End of contract $ 65.2 ____________________________________________

Total $ 811.4

Funding Period Option Amount ($M) _______________________________________________

Award - Dec 31, 2025 $ 71.8

Jan 01, 2026 - Dec 31, 2026 $ 1.6

Jan 01, 2027 - End of contract $ 1.4 ____________________________________________

Total $ 74.8

*** END OF NARRATIVE A0002 ***

1. The purpose of Amendment 0002 to Solicitation W56HZV-22-R-0026 is to incorporate revisions as follows:

a. Section C: _____________

i. C.2.1 is modified in part to provide clarification as follows:

From: "...physical architecture elements to the lowest level component in the Contractor's Bill of Materials (BOM)."

To: "...physical architecture elements to the lowest replaceable or repairable assembly, subassembly, and repair part, _________________________________________________________________ as determined in the LORA, in the Contractor's Bill of Materials (BOM)." __________________________

ii. C.5.2.6 is modified in part to provide clarification as follows:

From: "The Contractor shall repair/refurbish prototypes, at no cost to USG, for subsequent test events IAW Attachment

0051 (PPT Schedule)."

To: "The Contractor shall repair/refurbish prototypes, at no additional cost to USG, for subsequent test events IAW __________

Attachment 0051 (PPT Schedule)."

iii. C.6.4 is modified in part to replace FEMCA with DFMEA/CA:

From: "C.6.4 Failure Modes, Effects, and Criticality Analysis (FMECA)

The Contractor shall develop and deliver the FMECA and its source data IAW CDRL T007 and Attachment 0105 (DFMEA), and within the OMFV System Architecture Model IAW CDRL E041.

The Contractor shall mitigate the critical failure modes in the FMECA that will result when mission profile life cycle loads are imposed.

The Contractor shall flow down all FMECA provisions as detailed in CDRL T007 to its SubContractors and suppliers.

To: "C.6.4 Design Failure Modes and Effects Analysis (DFMEA) and Criticality Analysis (CA)(DFMEA/CA) _________________________________________________________________________________________

The Contractor shall perform, develop, and deliver the DFMEA/CA IAW CDRL T007 and Attachment 0105, and within the OMFV ________ ________

System Architecture Model (CDRL E041) using GEIA-STD-0009 as a guide. __________________________________________

Failure modes shall be ranked by calculating a risk priority number (RPN) using failure severity, failure probability, ______________________________________________________________________________________________________________________ and likelihood of detection. Critical failure modes shall be identified with mission profile life cycle loads imposed. ______________________________________________________________________________________________________________________

The Contractor shall document the results of the failure mode analysis and mitigation, including how mitigations of ___________________________________________________________________________________________________________________ critical failure modes reduce the RPN IAW CDRL T007 and Attachment 0105. ________________________________________________________________________

The Contractor shall flow down all DFMEA/CA (Attachment 0105) provisions to its Subcontractors and suppliers." __________________________

b. Section J: _____________

i. Exhibit A is revised from 04-AUG-2022 to 16-AUG-2022.

ii. Attachment 0008 is revised from REV 005 dated 30-JUN-2022 to REV 006 dated 22-AUG-2022.

11 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

iii. Attachment 0018 is revised from REV 002 dated 28-JUL-2022 to REV 003 dated 23-AUG-2022.

iv. Attachment 0027 is revised from REV 003 dated 28-JUL-2022 to REV 004 dated 19-AUG-2022.

v. Attachment 0028 is revised from REV 000 dated 17-MAY-2022 to REV 001 dated 24-JUN-2022.

vi. Attachment 0029 is revised from REV 005 dated 30-JUN-2022 to REV 006 dated 04-AUG-2022.

vii. Attachment 0046 is revised from REV 000 dated 13-JUN-2022 to REV 001 dated 08-AUG-2022.

viii. Attachment 0067 is revised from REV 000 dated 21-JUN-2022 to REV 001 dated 24-AUG-2022.

ix. Attachment 0085 is revised from REV 000 dated 19-MAY-2022 to REV 001 dated 15-AUG-2022.

x. Attachment 0091 is revised from REV 002 dated 04-AUG-2022 to REV 003 dated 15-AUG-2022.

xi. Attachment 0093 is revised from REV 000 to REV 001 dated 18-AUG-2022.

xii. Attachment 0105 Title is changed to "Design Failure Modes and Effects Analysis (DFMEA) and Criticality Analysis (CA) (DFMEA/CA), dated 15-AUG-2022.

c. Section L: _____________

i. L.1.9 is modified in part to provide clarification as follows:

From: "Each volume listed above shall be submitted on a separate set of DVDs utilizing Microsoft (MS) Word, MS Excel, MS

PowerPoint, MS Project, MS Access, or PDF compatible formats; with the exception of CAD (must be in PTC CREO v7) or other models, which theOfferor may submit on hard drives with a Firewire or eSATA interface. All MS files shall..."

To: "Each volume listed below in L.2 shall be submitted on a separate set of DVDs utilizing Microsoft (MS) Word, MS Excel, ____________

MS PowerPoint, MS Project, MS Access, or PDF compatible formats; with the exception of CAD (must be in PTC CREO v7) or other models, which the Offeror may submit on hard drives with a Firewire or eSATA interface. Submit three copies of ______________________ each volume. All MS files shall..." ____________

ii. L.3.1 is modified to add the following sentence:

"The Government reserves the right to use final deliverables from the OMFV Phase 2 contracts (if a Phase 2 contractor) as substantiating data for proposal evaluation."

iii. L.3.2.3 is modified in part to the following:

From: Primary Optics (PSPEC-1491, CPSPEC 1.5.2)

Commander's Optics (PSPEC-1492, CPSPEC 1.5.2)

To: Primary Optics (PSPEC-1491, CPSPEC 1.5.2, Table 1.6(T), Table 1.8(O) Stationary to Stationary) _____________________________________________________

Commander's Optics (PSPEC-1492, CPSPEC 1.5.2, Table 1.6 (T), Table 1.8(O) Stationary to Stationary) ______________________________________________________

iv. L.3.2.4 is modified in part to the following:

From: Capabilities proposed above Threshold up to Objective PSPEC Priority 1 and Priority 2 requirements; or

PSPEC Priority 3 threshold or above requirements.

If the Offeror identifies capabilities outside the PSPEC to enable Two Soldier Crew, the contractor shall propose PSPEC language for those capabilities. Add and identify the performance values proposed for the capabilitites proposed IAW the instructions provided within Attachment 0018 (Technical Performance Data Instructions).

To: Capabilities proposed Threshold or above up to Objective PSPEC Priority 1 and Priority 2 requirements; or ___________________________

PSPEC Priority 3 Threshold or above up to Objective requirements. _________ _______________

If the Offeror identifies capabilities outside the PSPEC to enable Two Soldier Crew, the contractor shall propose PSPEC language for those capabilities. Add and identify the performance values proposed for the capabilities proposed IAW the ____________ instructions provided within Attachment 0018 (Technical Performance Data Instructions).

v. L.4 is modified in part to provide clarification as follows:

From: "L.4 Volume 2: Persistent Modernization Factor"

To: "L.4 Volume 2: The Persistent Modernization Factor contains two Subfactors:" ___ ________________________

d. Section M: _____________

i. M.1.1 is modified in part to provide clarification as follows:

12 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

From: "The Performance Factor is further divided into Subfactors, as described in M.4.1."

To: "The Performance Factor is further divided into Subfactors, as described in M.4.1. The Persistent Modernization Factor is ______________________________________ further divided into Subfactors, as described in M.4.2." ________________________________________________________

ii. M.4.2 is modified in part to provide clarification as follows:

From: "See L.4.1.2 and M.3.2 which address no proposal revisions for the Sample Tasks."

To: "The Persistent Modernization Factor contains two Subfactors which are approximately equal in importance: ________________________________________________________________________________________________________

1. DE Sample Task __________________

2. GCIA Sample Task ____________________

See L.4.1.2 and M.3.2 which address no proposal revisions for the Sample Tasks."

iii. M.4.1.1 is modified in part to provide clarification as follows:

From: "Assess the probability/risk that the Offeror's system will achieve the proposed level of performance for all evaluated requirements within the delivery schedule of the solicitation/contract based on the evaluation of Offeror's proposal."

To: "Assess the probability/risk that the Offeror's system will achieve the proposed level of performance for all evaluated requirements within the delivery schedule of the solicitation/contract based on the evaluation of Offeror's proposal and Phase 2 final deliverables substantiating data (L.3.1)." _________________________________________________________

e. Exhibit A, Contract Data Requirement List (CDRL): ___________________________________________________

i. CDRL E019, Block 16 (REMARKS), is revised in part as follows:

From: "...VA Method 1 (DAG) or VA Method 1 (DAG) 30 days after..."

To: "...VA Method 1 (DAG) or VA Method 2 (DAG) 30 days after..." _

ii. CDRL P004, Block 16 (REMARKS), is revised in part as follows:

From: "...results reported to the COR 60 calendar days after contract award."

To: "...results reported to the COR 15 calendar days after completion of training." _____________________________________________

iii. CDRL T007, Block 2 (TITLE OF DATA ITEM), is revised as follows:

From: "Design Failure Modes, Effects, and Criticality Analysis"

To: "Design Failure Modes, Effects Analysis (DFMEA), and Criticality Analysis (CA) (DFMEA/CA)" ________________ _______________

*** END OF NARRATIVE A0003 ***

1. The purpose of Amendment 0003 to Solicitation W56HZV-22-R-0026 is to incorporate revisions as follows:

a. Section C: _____________

i. C.2.14.1.2 and C.2.14.1.3 are revised in part to fix a typo as follows:

From: "The Contractor shall use 2015 Boundary JACK\'99 Digital Human Models..."

To: "The Contractor shall use 2015 Boundary JACK Digital Human Models..." ____________

ii. C.5.2.16 is revised in part for clarification as follows:

From: "...prototype vehicles in an as-is condition"

To: "...prototype vehicles based on each vehicle's condition at the end of PPT." ___________________________________________________

13 160

Name of Offeror or Contractor:

PIIN/SIIN MOD/AMD

b. Section E: _____________

i. E.2.1.2 is revised in part for clarification as follows:

From: "At the conclusion of Production Prove Out Testing final acceptance (DD250) of test vehicles shall be performed on each vehicle in as-is condition. The contractor shall provide a PFIR prior to vehicle delivery to the Government that will only document the test vehicles condition."

To: "At the conclusion of Production Prove Out Testing final acceptance (DD250) of test vehicles shall be performed on each vehicle based on each vehicle's condition at the end of PPT. The contractor shall provide an updated PFIR IAW CDRL T017 ___________________________________________________ _________ _____________ prior to vehicle delivery to the Government that will document the test vehicle's condition at the end of PPT." _____________ _ _________________

c. Section J: _____________

i. Attachment 0004, GCIA Sample Task Logical Model, is added with a date of 09-SEP-2022.

ii. Attachment 0008, OMFV Objective Architecture (P-SPEC), date is corrected from 22-AUG-2022 to 24-AUG-2022.

iii. Attachment 0018, Technical Performance Data Instructions, is revised from REV 003 dated 23-AUG-2022 to REV 004 14-SEP-2022.

iv Attachment 0055, Vehicle Vulnerability Data Instructions, dated 29 March 2022 is added.

v. Attachment 0075, OMFV Program Schedule is revised from REV 002 dated 24-JUN-2022 to REV 003 dated 30-AUG-2022.

d. Section L: _____________

i. L.1.8 and L.6.3 are modified in part to replace the "FAR 19.101" reference with "FAR 2.101".

ii. L.4.3 is modified in part to provide clarifications as follows:

From: "The Government will provide a GCIA Sample Task Logical Model with intentionally introduced deviations from GCIA v2.0

(Attachment 0028: GCIA v2.0 SysML Model and Attachment 0102: GCIA v2.0 Data Architecture Model) from the perspective of modularity, interoperability, use of open standards, open interfaces, reduced coupling and increased cohesion as implemented in the GCIA.

The Government will release the GCIA Sample Task Logical Model no later than 45 days prior to the close of the solicitation. All deviations from GCIA v2.0..."

To: "Specific additional Instructions for…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .