Attachment_0020_Pricing_Attachment.xlsx

XLSX spreadsheet 34 KB Posted

Attached to
Army Single Family ISO Shelter
Solicitation number
W56HZV18R0057
Issued by

About this file

This pricing attachment for an Army contract solicitation seeks unit pricing for fabrication of tactical expandable shelters and associated panels. The contract will have a two-year base period and three one-year options for a total of five years. Required supplies include one-side and two-side expandable shelters in 60-amp and 100-amp configurations, as well as removable intake, return and closeout panels. Pricing is to be provided for the base ordering period, two ordering period option years, and three optional production years. The Army Materiel Command Contracting Command at Detroit Arsenal intends to award a single requirements contract for these shelters and panels.

Updated Attachment 0020- Pricing Attachment (Updated per Solicitation Amendment 0002)

View the file

Other files

File Type Posted
W56HZV-18-R-0057_Conformed_Copy_14_JUN_2018.pdf PDF
W56HZV-18-R-0057_AMD_0004.pdf PDF
QAs_(3)_for_ISO_Shelter.pdf PDF
Attachment_0020_Pricing_Attachment.xlsx XLSX spreadsheet
Attachment_0002_SOW_for_ISO_Two-sided_Shelter_TM_-13&P-20180523.docx DOCX document
W56HZV18R0057-0003.pdf PDF
Attachment_0005_TWO_SIDED_Provisioning_SOW_7_June__2018.doc DOC document
Attachment_0001_SOW_for_ISO_One-Sided_Shelter_TM_-13&P-20180523.docx DOCX document
Attachment_0007_SOW_for_MERWS_TM_-13&P_20180523.docx DOCX document
Attachment_0004_One_Sided_SIDED_Provisioning_SOW_7_June__2018.doc DOC document
Q&As_(2).pdf PDF
W56HZV18R0057-0002.pdf PDF
Q&As_(1).pdf PDF
W56HZV18R0057-0001.pdf PDF
Attachment_0010_Camouflage_Pattern,_ISO_One_Side_Exp.pdf PDF
CDRLs.zip ZIP file
Attachment_0011_Camouflage_Pattern,_ISO_Two_Side_Exp.pdf PDF
Attachment_0007_SOW_for_MERWS_TM_-13&P_20180312_HLD.DOCX DOCX document
W56HZV18R0057.pdf PDF
Attachment_0004_One_Sided_SIDED_Provisioning_SOW_5_March_2018_FINAL_(003....doc DOC document
Attachment_0001_SOW_for_ISO_One-Sided_Shelter_TM_-13&P-20180315_HLD.DOCX DOCX document
Attachment_0003_ISO_Shelter_Exp_One_Side,_Two_Side_PKG_SOW.DOCX DOCX document
Attachment_0020_Pricing_Attachment.xlsx XLSX spreadsheet
Attachment_0012_TDPL_5-4-2828_One_Side_Exp_60_amp.zip ZIP file
Attachment_0023_SBP-Certification-Subcontractor.docx DOCX document
Attachment_0002_SOW_for_ISO_Two-sided_Shelter_TM_-13&P-20180315_HLD.DOCX DOCX document
Attachment_0009_MTA_Supportability_Analysis_MERWS_14_APRIL_2017.docx DOCX document
Attachment_0015_TDPL_5-4-3201_Two_Side_Exp_100_amp.zip ZIP file
Attachment_0021_SBP-Workbook.xlsx XLSX spreadsheet
Attachment_0013_TDPL_5-4-3200_One_Side_Exp_100_amp.zip ZIP file
Attachment_0006_Draft_ECP,_Hinged_Endwall_Closeout_Panel_Option_(5-4-320....pdf PDF
Attachment_0024_First-Article-Waiver-Worksheet.pdf PDF
Attachment_0008_MERWS__Provisioning_SOW_5_March_2018_FINAL_(003).doc DOC document
Attachment_0014_TDPL_5-4-3118_Two_Side_Exp_60_amp.zip ZIP file
Attachment_0022_SBP-WorkbookInstructions.docx DOCX document
Attachment_0005_TWO_SIDED_Provisioning_SOW_5_March_2018_FINAL_(003).doc DOC document
Attachment_0016_TDPL_17-2-1250_MERWS.zip ZIP file
Attachment_0019_PPQ.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions

Instructions - Price Attachment 0020
1) Cells that require inputs are highlighted in yellow
2) All cells that are highlighted in yellow must be completed
3) Propose prices for FAT CLINs even if requesting a waiver
4) Do not adjust formulas or otherwise manipulate any of the other (non-yellow highlighted) cells.
5) The required inputs are used to auto calculate the Total Proposed Price on the "PRICE SUMMARY" Worksheet
6) Do not make any changes or modifications to this attachment except for those cells highlighted in yellow

PRICE SUMMARY

Offeror's Name:
PeriodPRICE
BASE ORDERING PERIOD 2 YEARS$ - 0
PRODUCTION - Year 1$ - 0
PRODUCTION - Year 2$ - 0
PRODUCTION - Year 3$ - 0
PRODUCTION - Year 4$ - 0
PRODUCTION - Year 5$ - 0
TOTAL PROPOSED PRICE$ - 0

&P

Base Period CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

BASE ORDERING PERIOD
0001Pre-Production Engineering Technical Data Package Review$0.001$0.00
0002First Article Test Unit Fabrication and First Article Testing - One Side Expandable, 100 Amp, NSN 5411-01-295-3433$0.001$0.00
0003First Article Test Unit Fabrication and First Article Testing (CSC Only) - One Side Expandable, 100 Amp, NSN 5411-01-295-3433 (CSC Only)$0.001$0.00
0004First Article Test Unit Fabrication and First Article Testing - Two Side Expandable, 100 Amp, NSN 5411-01-294-9866$0.001$0.00
0005First Article Test Unit Fabrication and First Article Testing (CSC Only)- Two Side Expandable, 100 Amp, NSN 5411-01-294-9866$0.001$0.00
0006First Article Test Unit Refurbishment - One Side Expandable$0.001$0.00
0007First Article (CSC Only) Test Unit Refurbishment - One Side Expandable$0.001$0.00
0008First Article Test Unit Refurbishment - Two Side Expandable$0.001$0.00
0009First Article (CSC Only) Test Unit Refurbishment - Two Side Expandable$0.001$0.00
0010Contract Data Requirements List
A001CDRL A001 Maintenance Allocation Chart (MAC)$0.001$0.00
A002CDRL A002 Provisioning Parts List (PPL)$0.001$0.00
A003CDRL A003 Engineering Data For Provisioning (EDFP)$0.001$0.00
A004CDRL A004 Technical Manual including RPSTL (-13&P)$0.001$0.00
A005CDRL A005 Validation Plan for TM (-13&P)$0.001$0.00
A006CDRL A006 Validation Report for TM (-13&P)$0.001$0.00
A007CDRL A007 Packaging Data (LMI)$0.001$0.00
A008CDRL A008 Special Packaging Instructions (SPI)$0.001$0.00
A009CDRL A009 Product Drawings and Associated Lists$0.001$0.00
A010CDRL A010 First Article Test/Inspection PlanNSP1NSP
A011CDRL A011 First Article Test ReportNSP1NSP
A012CDRL A012 First Article (CSC Only) Test/Inspection PlanNSP1NSP
A013CDRL A013 First Article (CSC Only) Test ReportNSP1NSP
A014CDRL A014 Production Test/Inspection Plan$0.001$0.00
A015CDRL A015 Safety Assessment Report$0.001$0.00
A016CDRL A016 Pre-Production Engineering Technical Data Package ReportNSP1NSP
A017CDRL A017 Minutes of MeetingsNSP1NSP
B001CDRL B001 Maintenance Allocation Chart (MAC)$0.001$0.00
B002CDRL B002 Provisioning Parts List (PPL)$0.001$0.00
B003CDRL B003 Engineering Data For Provisioning (EDFP)$0.001$0.00
B004CDRL B004 Technical Manual including RPSTL (-13&P)$0.001$0.00
B005CDRL B005 Validation Plan for TM (-13&P)$0.001$0.00
B006CDRL B006 Validation Report for TM (-13&P)$0.001$0.00
B007CDRL B007 Packaging Data (LMI)$0.001$0.00
B008CDRL B008 Special Packaging Instructions (SPI)$0.001$0.00
B009CDRL B009 Product Drawings and Associated Lists$0.001$0.00
B010CDRL B010 First Article Test/Inspection PlanNSP1NSP
B011CDRL B011 First Article Test ReportNSP1NSP
B012CDRL B012 First Article (CSC Only) Test/Inspection PlanNSP1NSP
B013CDRL B013 First Article (CSC Only) Test ReportNSP1NSP
B014CDRL B014 Production Test/Inspection Plan$0.001$0.00
B015CDRL B015 Safety Assessment Report$0.001$0.00
B016CDRL B016 Pre-Production Engineering Technical Data Package ReportNSP1NSP
C001CDRL C001 Maintenance Allocation Chart (MAC) for MERWS$0.001$0.00
C002CDRL C002 Provisioning Parts List (PPL) for MERWS$0.001$0.00
C003CDRL C003 Engineering Data For Provisioning (EDFP) for MERWS$0.001$0.00
C004CDRL C004 Technical Manual including RPSTL (-13&P) for MERWS$0.001$0.00
C005CDRL C005 Validation Plan for TM (-13&P) for MERWS$0.001$0.00
C006CDRL C006 Validation Report for TM (-13&P) for MERWS$0.001$0.00
C007CDRL C007 Packaging Data (LMI) for MERWS$0.001$0.00
C008CDRL C008 Special Packaging Instructions (SPI) for MERWS$0.001$0.00
C009CDRL C009 LORA for MERWS$0.001$0.00
C010CDRL C010 MTA for MERWS$0.001$0.00
C011CDRL C011 Product Drawings and Associated Lists for MERWS$0.001$0.00
C012CDRL C012 First Article Test/Inspection Plan for MERWSNSP1NSP
C013CDRL C013 First Article Test Report for MERWSNSP1NSP
C014CDRL C014 Production Test/Inspection Plan for MERWS$0.001$0.00
C015CDRL C015 Safety Assessment Report for MERWS$0.001$0.00
C016CDRL C016 Pre-Production Engineering Technical Data Package Report for MERWSNSP1NSP
0011Pre-Production Engineering Technical Data Package Review for MERWS$0.001$0.00
0012First Article Test Unit Fabrication and First Article Testing - MERWS$0.001$0.00
0013First Article Test Unit Refurbishment - MERWS$0.001$0.00
TOTAL BASE PERIOD PRICE$0.00

Ordering Period 1 CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

PRODUCTION - Year 1
0101Shelter, Tactical, One Side Expandable, 60 Amp, Tan$0.001$0.00
0102Shelter, Tactical, One Side Expandable, 60 Amp, Green$0.001$0.00
0103Shelter, Tactical, One Side Expandable, 60 Amp, Camouflage$0.001$0.00
0104Shelter, Tactical, One Side Expandable, 100 Amp, Tan$0.001$0.00
0105Shelter, Tactical, One Side Expandable, 100 Amp, Green$0.001$0.00
0106Shelter, Tactical, One Side Expandable, 100 Amp, Camouflage$0.001$0.00
0107Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Tan$0.001$0.00
0108Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Green$0.007$0.00
0109Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Camouflage$0.001$0.00
0110Shelter, Tactical, Two Side Expandable, 60 Amp, Tan$0.001$0.00
0111Shelter, Tactical, Two Side Expandable, 60 Amp, Green$0.001$0.00
0112Shelter, Tactical, Two Side Expandable, 60 Amp, Camouflage$0.001$0.00
0113Shelter, Tactical, Two Side Expandable, 100 Amp, Tan$0.001$0.00
0114Shelter, Tactical, Two Side Expandable, 100 Amp, Green$0.001$0.00
0115Shelter, Tactical, Two Side Expandable, 100 Amp, Camouflage$0.001$0.00
0116Panel Option 1. Modify Existing Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, for New One Side or Two Side Expandable Shelter. Modify, then paint, and install in the new shelter per paragraph C.7.1.3.1. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0117Panel Option 2. Modify Existing GFE Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, provided as Government Furnished Equipment (GFE). Modify, repaint, then crate for shipment per paragraph C.7.1.3.2. Panel shall be painted as same color as when received, unless otherwise specified in Delivery Order$0.001$0.00
0118Panel Option 3. Fabricate New Solid Closeout Panel (Non-modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Non-modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), paint, then crate panel for shipment per paragraph C.7.1.3.3. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0119Panel Option 4. Fabricate New Solid Closeout Panel (Modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), modify, paint, and then crate panel for shipment per paragraph C.7.1.3.4. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0120Panel Option 5. Fabricate Removable ECU Intake Panel - Noun: Fabricate Removable 21" X 21" ECU Intake Panel IAW Drawing 5-4-2856. Fabricate Removable 21" X 21" ECU Intake Panel (5-4-2856), paint, then crate panel for shipment per paragraph C.6.1.1.5. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0121Panel Option 6. Fabricate Removable ECU Return Panel - Noun: Fabricate Removable 21" X 21" ECU Return Panel IAW Drawing 5-4-2857. Fabricate Removable 21" X 21" ECU Return Panel (5-4-2857), paint, then crate panel for shipment per paragraph C.7.1.3.6. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0122Panel Option 7. Fabricate Solid Closeout Panel - Noun: Fabricate Removable 21" X 21" Solid Closeout Panel IAW Drawing 5-4-2853. Fabricate Removable 21" X 21" Solid Closeout Panel (5-4-2853), paint, then crate panel for shipment per paragraph C.7.1.3.7. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0123Panel Option 8. Fabricate PM SKOT Panels – Noun: Fabricate two types of Removable 83.25" x 84.75" Wall Panel configurations, Wall Panel 1 (per drawing 11A7001033) and Wall Panel 2 (per drawing 11A7001032). Wall Panel 1 shall be painted in accordance with the notes of drawing 11A7001033 and Wall Panel 2 shall be painted in accordance with the notes of drawing 11A7001032, per paragraph C.7.1.3.8. The completed Wall Panels shall be crated ready for shipment.$0.0021$0.00
TOTAL ORDERING PERIOD 1 PRICE$0.00

Ordering Period 2 CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

PRODUCTION - Year 2
0201Shelter, Tactical, One Side Expandable, 60 Amp, Tan$0.001$0.00
0202Shelter, Tactical, One Side Expandable, 60 Amp, Green$0.001$0.00
0203Shelter, Tactical, One Side Expandable, 60 Amp, Camouflage$0.001$0.00
0204Shelter, Tactical, One Side Expandable, 100 Amp, Tan$0.001$0.00
0205Shelter, Tactical, One Side Expandable, 100 Amp, Green$0.001$0.00
0206Shelter, Tactical, One Side Expandable, 100 Amp, Camouflage$0.001$0.00
0207Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Tan$0.001$0.00
0208Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Green$0.0022$0.00
0209Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Camouflage$0.001$0.00
0210Shelter, Tactical, Two Side Expandable, 60 Amp, Tan$0.001$0.00
0211Shelter, Tactical, Two Side Expandable, 60 Amp, Green$0.001$0.00
0212Shelter, Tactical, Two Side Expandable, 60 Amp, Camouflage$0.001$0.00
0213Shelter, Tactical, Two Side Expandable, 100 Amp, Tan$0.001$0.00
0214Shelter, Tactical, Two Side Expandable, 100 Amp, Green$0.001$0.00
0215Shelter, Tactical, Two Side Expandable, 100 Amp, Camouflage$0.001$0.00
0216Panel Option 1. Modify Existing Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, for New One Side or Two Side Expandable Shelter. Modify, then paint, and install in the new shelter per paragraph C.7.1.3.1. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0217Panel Option 2. Modify Existing GFE Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, provided as Government Furnished Equipment (GFE). Modify, repaint, then crate for shipment per paragraph C.7.1.3.2. Panel shall be painted as same color as when received, unless otherwise specified in Delivery Order$0.001$0.00
0218Panel Option 3. Fabricate New Solid Closeout Panel (Non-modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Non-modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), paint, then crate panel for shipment per paragraph C.7.1.3.3. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0219Panel Option 4. Fabricate New Solid Closeout Panel (Modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), modify, paint, and then crate panel for shipment per paragraph C.7.1.3.4. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0220Panel Option 5. Fabricate Removable ECU Intake Panel - Noun: Fabricate Removable 21" X 21" ECU Intake Panel IAW Drawing 5-4-2856. Fabricate Removable 21" X 21" ECU Intake Panel (5-4-2856), paint, then crate panel for shipment per paragraph C.6.1.1.5. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0221Panel Option 6. Fabricate Removable ECU Return Panel - Noun: Fabricate Removable 21" X 21" ECU Return Panel IAW Drawing 5-4-2857. Fabricate Removable 21" X 21" ECU Return Panel (5-4-2857), paint, then crate panel for shipment per paragraph C.7.1.3.6. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0222Panel Option 7. Fabricate Solid Closeout Panel - Noun: Fabricate Removable 21" X 21" Solid Closeout Panel IAW Drawing 5-4-2853. Fabricate Removable 21" X 21" Solid Closeout Panel (5-4-2853), paint, then crate panel for shipment per paragraph C.7.1.3.7. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0223Panel Option 8. Fabricate PM SKOT Panels – Noun: Fabricate two types of Removable 83.25" x 84.75" Wall Panel configurations, Wall Panel 1 (per drawing 11A7001033) and Wall Panel 2 (per drawing 11A7001032). Wall Panel 1 shall be painted in accordance with the notes of drawing 11A7001033 and Wall Panel 2 shall be painted in accordance with the notes of drawing 11A7001032, per paragraph C.7.1.3.8. The completed Wall Panels shall be crated ready for shipment.$0.0032$0.00
0224Production Unit Fabrication – MERWS, 100 Amp, Green$0.001$0.00
0225Production Unit Fabrication – MERWS, 100 Amp, Tan$0.001$0.00
TOTAL ORDERING PERIOD 2 PRICE$0.00

Ordering Period 3 CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

PRODUCTION - Year 3 FIRST OPTIONAL ORDERING PERIOD
0301Shelter, Tactical, One Side Expandable, 60 Amp, Tan$0.001$0.00
0302Shelter, Tactical, One Side Expandable, 60 Amp, Green$0.001$0.00
0303Shelter, Tactical, One Side Expandable, 60 Amp, Camouflage$0.001$0.00
0304Shelter, Tactical, One Side Expandable, 100 Amp, Tan$0.001$0.00
0305Shelter, Tactical, One Side Expandable, 100 Amp, Green$0.001$0.00
0306Shelter, Tactical, One Side Expandable, 100 Amp, Camouflage$0.001$0.00
0307Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Tan$0.001$0.00
0308Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Green$0.0016$0.00
0309Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Camouflage$0.001$0.00
0310Shelter, Tactical, Two Side Expandable, 60 Amp, Tan$0.001$0.00
0311Shelter, Tactical, Two Side Expandable, 60 Amp, Green$0.001$0.00
0312Shelter, Tactical, Two Side Expandable, 60 Amp, Camouflage$0.001$0.00
0313Shelter, Tactical, Two Side Expandable, 100 Amp, Tan$0.001$0.00
0314Shelter, Tactical, Two Side Expandable, 100 Amp, Green$0.001$0.00
0315Shelter, Tactical, Two Side Expandable, 100 Amp, Camouflage$0.001$0.00
0316Panel Option 1. Modify Existing Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, for New One Side or Two Side Expandable Shelter. Modify, then paint, and install in the new shelter per paragraph C.7.1.3.1. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0317Panel Option 2. Modify Existing GFE Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, provided as Government Furnished Equipment (GFE). Modify, repaint, then crate for shipment per paragraph C.7.1.3.2. Panel shall be painted as same color as when received, unless otherwise specified in Delivery Order$0.001$0.00
0318Panel Option 3. Fabricate New Solid Closeout Panel (Non-modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Non-modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), paint, then crate panel for shipment per paragraph C.7.1.3.3. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0319Panel Option 4. Fabricate New Solid Closeout Panel (Modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), modify, paint, and then crate panel for shipment per paragraph C.7.1.3.4. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0320Panel Option 5. Fabricate Removable ECU Intake Panel - Noun: Fabricate Removable 21" X 21" ECU Intake Panel IAW Drawing 5-4-2856. Fabricate Removable 21" X 21" ECU Intake Panel (5-4-2856), paint, then crate panel for shipment per paragraph C.6.1.1.5. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0321Panel Option 6. Fabricate Removable ECU Return Panel - Noun: Fabricate Removable 21" X 21" ECU Return Panel IAW Drawing 5-4-2857. Fabricate Removable 21" X 21" ECU Return Panel (5-4-2857), paint, then crate panel for shipment per paragraph C.7.1.3.6. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0322Panel Option 7. Fabricate Solid Closeout Panel - Noun: Fabricate Removable 21" X 21" Solid Closeout Panel IAW Drawing 5-4-2853. Fabricate Removable 21" X 21" Solid Closeout Panel (5-4-2853), paint, then crate panel for shipment per paragraph C.7.1.3.7. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0323Panel Option 8. Fabricate PM SKOT Panels – Noun: Fabricate two types of Removable 83.25" x 84.75" Wall Panel configurations, Wall Panel 1 (per drawing 11A7001033) and Wall Panel 2 (per drawing 11A7001032). Wall Panel 1 shall be painted in accordance with the notes of drawing 11A7001033 and Wall Panel 2 shall be painted in accordance with the notes of drawing 11A7001032, per paragraph C.7.1.3.8. The completed Wall Panels shall be crated ready for shipment.$0.0024$0.00
0324Production Unit Fabrication – MERWS, 100 Amp, Green$0.001$0.00
0325Production Unit Fabrication – MERWS, 100 Amp, Tan$0.001$0.00

TOTAL ORDERING PERIOD 3 PRICE $0.00

Ordering Period 4 CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

PRODUCTION - Year 4 SECOND OPTIONAL ORDERING PERIOD
0401Shelter, Tactical, One Side Expandable, 60 Amp, Tan$0.001$0.00
0402Shelter, Tactical, One Side Expandable, 60 Amp, Green$0.001$0.00
0403Shelter, Tactical, One Side Expandable, 60 Amp, Camouflage$0.001$0.00
0404Shelter, Tactical, One Side Expandable, 100 Amp, Tan$0.001$0.00
0405Shelter, Tactical, One Side Expandable, 100 Amp, Green$0.001$0.00
0406Shelter, Tactical, One Side Expandable, 100 Amp, Camouflage$0.001$0.00
0407Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Tan$0.001$0.00
0408Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Green$0.008$0.00
0409Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Camouflage$0.001$0.00
0410Shelter, Tactical, Two Side Expandable, 60 Amp, Tan$0.001$0.00
0411Shelter, Tactical, Two Side Expandable, 60 Amp, Green$0.001$0.00
0412Shelter, Tactical, Two Side Expandable, 60 Amp, Camouflage$0.001$0.00
0413Shelter, Tactical, Two Side Expandable, 100 Amp, Tan$0.001$0.00
0414Shelter, Tactical, Two Side Expandable, 100 Amp, Green$0.001$0.00
0415Shelter, Tactical, Two Side Expandable, 100 Amp, Camouflage$0.001$0.00
0416Panel Option 1. Modify Existing Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, for New One Side or Two Side Expandable Shelter. Modify, then paint, and install in the new shelter per paragraph C.7.1.3.1. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0417Panel Option 2. Modify Existing GFE Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, provided as Government Furnished Equipment (GFE). Modify, repaint, then crate for shipment per paragraph C.7.1.3.2. Panel shall be painted as same color as when received, unless otherwise specified in Delivery Order$0.001$0.00
0418Panel Option 3. Fabricate New Solid Closeout Panel (Non-modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Non-modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), paint, then crate panel for shipment per paragraph C.7.1.3.3. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0419Panel Option 4. Fabricate New Solid Closeout Panel (Modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), modify, paint, and then crate panel for shipment per paragraph C.7.1.3.4. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0420Panel Option 5. Fabricate Removable ECU Intake Panel - Noun: Fabricate Removable 21" X 21" ECU Intake Panel IAW Drawing 5-4-2856. Fabricate Removable 21" X 21" ECU Intake Panel (5-4-2856), paint, then crate panel for shipment per paragraph C.6.1.1.5. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0421Panel Option 6. Fabricate Removable ECU Return Panel - Noun: Fabricate Removable 21" X 21" ECU Return Panel IAW Drawing 5-4-2857. Fabricate Removable 21" X 21" ECU Return Panel (5-4-2857), paint, then crate panel for shipment per paragraph C.7.1.3.6. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0422Panel Option 7. Fabricate Solid Closeout Panel - Noun: Fabricate Removable 21" X 21" Solid Closeout Panel IAW Drawing 5-4-2853. Fabricate Removable 21" X 21" Solid Closeout Panel (5-4-2853), paint, then crate panel for shipment per paragraph C.7.1.3.7. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0423Panel Option 8. Fabricate PM SKOT Panels – Noun: Fabricate two types of Removable 83.25" x 84.75" Wall Panel configurations, Wall Panel 1 (per drawing 11A7001033) and Wall Panel 2 (per drawing 11A7001032). Wall Panel 1 shall be painted in accordance with the notes of drawing 11A7001033 and Wall Panel 2 shall be painted in accordance with the notes of drawing 11A7001032, per paragraph C.7.1.3.8. The completed Wall Panels shall be crated ready for shipment.$0.0020$0.00
0424Production Unit Fabrication – MERWS, 100 Amp, Green$0.001$0.00
0425Production Unit Fabrication – MERWS, 100 Amp, Tan$0.001$0.00

TOTAL ORDERING PERIOD 4 PRICE $0.00

Ordering Period 5 CLIN Number Supplies/Services Unit Price/Each Quantity Ext Price

PRODUCTION - Year 5 THIRD OPTIONAL ORDERING PERIOD
0501Shelter, Tactical, One Side Expandable, 60 Amp, Tan$0.001$0.00
0502Shelter, Tactical, One Side Expandable, 60 Amp, Green$0.001$0.00
0503Shelter, Tactical, One Side Expandable, 60 Amp, Camouflage$0.001$0.00
0504Shelter, Tactical, One Side Expandable, 100 Amp, Tan$0.001$0.00
0505Shelter, Tactical, One Side Expandable, 100 Amp, Green$0.001$0.00
0506Shelter, Tactical, One Side Expandable, 100 Amp, Camouflage$0.001$0.00
0507Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Tan$0.001$0.00
0508Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Green$0.0012$0.00
0509Shelter, Tactical, One Side Expandable, 100 Amp, Solid Hinged Endwall, Camouflage$0.001$0.00
0510Shelter, Tactical, Two Side Expandable, 60 Amp, Tan$0.001$0.00
0511Shelter, Tactical, Two Side Expandable, 60 Amp, Green$0.001$0.00
0512Shelter, Tactical, Two Side Expandable, 60 Amp, Camouflage$0.001$0.00
0513Shelter, Tactical, Two Side Expandable, 100 Amp, Tan$0.001$0.00
0514Shelter, Tactical, Two Side Expandable, 100 Amp, Green$0.001$0.00
0515Shelter, Tactical, Two Side Expandable, 100 Amp, Camouflage$0.001$0.00
0516Panel Option 1. Modify Existing Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, for New One Side or Two Side Expandable Shelter. Modify, then paint, and install in the new shelter per paragraph C.7.1.3.1. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0517Panel Option 2. Modify Existing GFE Solid Closeout Panel - Noun: Modify Existing 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, provided as Government Furnished Equipment (GFE). Modify, repaint, then crate for shipment per paragraph C.7.1.3.2. Panel shall be painted as same color as when received, unless otherwise specified in Delivery Order$0.001$0.00
0518Panel Option 3. Fabricate New Solid Closeout Panel (Non-modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Non-modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), paint, then crate panel for shipment per paragraph C.7.1.3.3. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0519Panel Option 4. Fabricate New Solid Closeout Panel (Modified) - Noun: Fabricate New 58.5" X 77" Solid Closeout Panel IAW Drawing 5-4-4790, as a Sole Component to meet field requirements (Panel is Modified). Fabricate New 58.5" X 77" Solid Closeout Panel (5-4-4790), modify, paint, and then crate panel for shipment per paragraph C.7.1.3.4. Panel shall be painted one of the three below colors as specified in Delivery Order$0.001$0.00
0520Panel Option 5. Fabricate Removable ECU Intake Panel - Noun: Fabricate Removable 21" X 21" ECU Intake Panel IAW Drawing 5-4-2856. Fabricate Removable 21" X 21" ECU Intake Panel (5-4-2856), paint, then crate panel for shipment per paragraph C.6.1.1.5. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0521Panel Option 6. Fabricate Removable ECU Return Panel - Noun: Fabricate Removable 21" X 21" ECU Return Panel IAW Drawing 5-4-2857. Fabricate Removable 21" X 21" ECU Return Panel (5-4-2857), paint, then crate panel for shipment per paragraph C.7.1.3.6. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0522Panel Option 7. Fabricate Solid Closeout Panel - Noun: Fabricate Removable 21" X 21" Solid Closeout Panel IAW Drawing 5-4-2853. Fabricate Removable 21" X 21" Solid Closeout Panel (5-4-2853), paint, then crate panel for shipment per paragraph C.7.1.3.7. Panel shall be painted one of the three below colors as specified in Delivery Order.$0.001$0.00
0523Panel Option 8. Fabricate PM SKOT Panels – Noun: Fabricate two types of Removable 83.25" x 84.75" Wall Panel configurations, Wall Panel 1 (per drawing 11A7001033) and Wall Panel 2 (per drawing 11A7001032). Wall Panel 1 shall be painted in accordance with the notes of drawing 11A7001033 and Wall Panel 2 shall be painted in accordance with the notes of drawing 11A7001032, per paragraph C.7.1.3.8. The completed Wall Panels shall be crated ready for shipment.$0.0020$0.00
0524Production Unit Fabrication – MERWS, 100 Amp, Green$0.001$0.00
0525Production Unit Fabrication – MERWS, 100 Amp, Tan$0.001$0.00
TOTAL ORDERING PERIOD 5 PRICE$0.00

File details come from the government source that posted it. Updated .