Attachment_0009_MTA_Supportability_Analysis_MERWS_14_APRIL_2017.docx

DOCX document 24 KB Posted

Attached to
Army Single Family ISO Shelter
Solicitation number
W56HZV18R0057
Issued by

About this file

This document contains a maintenance task analysis and supportability analysis for an end item, as well as details of an Army federal contract opportunity.

The maintenance task analysis identifies steps, spares, tools, skill levels, and facilities required to perform corrective and preventative maintenance tasks on the end item. It will be used to generate a maintenance allocation chart. The supportability analysis requires identifying all maintenance tasks in end item hardware sequence and coding them according to provided tables, including action, interval, level and times. It must also specify personnel, common tools, special tools, and training requirements.

The Army contract opportunity is a requirements contract to provide two models of expandable Army Standard Family ISO shelters with 60 or 100 amp electrical service. This is a best value competitive solicitation seeking proposals on a full and open basis. The Army intends to award one firm-fixed-price, indefinite-delivery/indefinite-quantity contract for a two-year base period and three one-year options, with a period of performance through May 2023.

Attachment 0009

View the file

Other files

File Type Posted
W56HZV-18-R-0057_Conformed_Copy_14_JUN_2018.pdf PDF
W56HZV-18-R-0057_AMD_0004.pdf PDF
QAs_(3)_for_ISO_Shelter.pdf PDF
Attachment_0020_Pricing_Attachment.xlsx XLSX spreadsheet
Attachment_0002_SOW_for_ISO_Two-sided_Shelter_TM_-13&P-20180523.docx DOCX document
W56HZV18R0057-0003.pdf PDF
Attachment_0005_TWO_SIDED_Provisioning_SOW_7_June__2018.doc DOC document
Attachment_0001_SOW_for_ISO_One-Sided_Shelter_TM_-13&P-20180523.docx DOCX document
Attachment_0007_SOW_for_MERWS_TM_-13&P_20180523.docx DOCX document
Attachment_0004_One_Sided_SIDED_Provisioning_SOW_7_June__2018.doc DOC document
Attachment_0020_Pricing_Attachment.xlsx XLSX spreadsheet
Q&As_(2).pdf PDF
W56HZV18R0057-0002.pdf PDF
Q&As_(1).pdf PDF
W56HZV18R0057-0001.pdf PDF
Attachment_0010_Camouflage_Pattern,_ISO_One_Side_Exp.pdf PDF
CDRLs.zip ZIP file
Attachment_0011_Camouflage_Pattern,_ISO_Two_Side_Exp.pdf PDF
Attachment_0007_SOW_for_MERWS_TM_-13&P_20180312_HLD.DOCX DOCX document
W56HZV18R0057.pdf PDF
Attachment_0004_One_Sided_SIDED_Provisioning_SOW_5_March_2018_FINAL_(003....doc DOC document
Attachment_0001_SOW_for_ISO_One-Sided_Shelter_TM_-13&P-20180315_HLD.DOCX DOCX document
Attachment_0003_ISO_Shelter_Exp_One_Side,_Two_Side_PKG_SOW.DOCX DOCX document
Attachment_0020_Pricing_Attachment.xlsx XLSX spreadsheet
Attachment_0012_TDPL_5-4-2828_One_Side_Exp_60_amp.zip ZIP file
Attachment_0023_SBP-Certification-Subcontractor.docx DOCX document
Attachment_0002_SOW_for_ISO_Two-sided_Shelter_TM_-13&P-20180315_HLD.DOCX DOCX document
Attachment_0015_TDPL_5-4-3201_Two_Side_Exp_100_amp.zip ZIP file
Attachment_0021_SBP-Workbook.xlsx XLSX spreadsheet
Attachment_0013_TDPL_5-4-3200_One_Side_Exp_100_amp.zip ZIP file
Attachment_0006_Draft_ECP,_Hinged_Endwall_Closeout_Panel_Option_(5-4-320....pdf PDF
Attachment_0024_First-Article-Waiver-Worksheet.pdf PDF
Attachment_0008_MERWS__Provisioning_SOW_5_March_2018_FINAL_(003).doc DOC document
Attachment_0014_TDPL_5-4-3118_Two_Side_Exp_60_amp.zip ZIP file
Attachment_0022_SBP-WorkbookInstructions.docx DOCX document
Attachment_0005_TWO_SIDED_Provisioning_SOW_5_March_2018_FINAL_(003).doc DOC document
Attachment_0016_TDPL_17-2-1250_MERWS.zip ZIP file
Attachment_0019_PPQ.doc DOC document
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPORTABILITY ANALYSES

1.Maintenance Task Analysis (MTA)
1.1Introduction:The Maintenance Task Analysis is the identification of the steps, spares and materials, tools, support equipment, personnel skill levels and facility issues that must be considered for a given repair task. It also includes the elapsed time required for the performance of each maintenance task. MTA’s cover both corrective and preventative maintenance tasks, and when complete, identify all physical resources required to support the system. The MTA and shall be used to provide input to generate the Maintenance Allocation Chart (MAC).
1.2Requirements:The Contractor will perform a MTA for the {End Item Name}. The analysis will be conducted, documented, and submitted using the Microsoft Excel template provided (see attachment 1) and contain elements and coding information contained in Table I-V below:
a.In End Item hardware top-down-breakdown sequence.
b.All preventive and corrective maintenance actions shall be identified.
c.All spares and support equipment required to perform each maintenance task.
d.All tasks, tools recommended for training will be identified.

Data Elements (Reference: GEIA-STD-0007-A) Table I

DATA PRODUCT TITLE
DATA TYPE NUMBER/ADDITIONAL INFORMATION
Provisioning List Item Sequence Number (PLISN)
4120 refer to PSOW for sequencing
Next Higher Assembly PLISN
3580
Logistics Support Analysis Control Number (LCN)
2970
Indenture Code
2520 Option 4

Commercial and Government Entity Code (CAGE) Code

Reference Number
4400
Federal Supply Class (FSC)
2280
National Item Identification Number (NIIN)
3520
Item Name
2780 Approved Item Name from DLIS H6 or Provisioning Conference
Quantity per Assembly (QPA)
4220
Quantity per End Item (QPEI)
4210
Unit of Issue
5700
Unit of Issue Price
5710 Actual Price required
Source, Maintenance and Recoverability Code (SMR Code)
4830 IAW AR 700-82
Maintenance Function
See Table II/III (MIL-STD 40051-w/ch 3)
Task Action Code
See Table II/III
Task Interval Code
See Table II/III/IV
Task Level
See Table II/V
Combined Task Code
Combined Action, Interval, Level codes
Task Times (By Level of Maintenance)
Displayed as whole/tenths ex. 2.2 hours
Personnel Requirements
Number of personnel required per task
Military Occupational Specialty (MOS)
MOS(s) required to perform task
Annual Task Frequency
Number of times task is performed annually
Refer to TM
List TM if applicable
Common Tool Requirements
List Common Toolkits only i.e GMTK
Special Tool Requirements
List Name, CAGE, Part Number and cost of each tool required
Training Requirements
Identify whether training requirement exists for that particular task

Table II Maintenance Task

(FUNCTION)

Maintenance Task

(ACTION CODE)

Maintenance Task

(INTERVAL)

Maintenance Task

(LEVEL)

Inspect
A
Y=Battlefield Damage Assessment and Repair
C=Operator/

Crew

Test
B
Q=Calendar
F=Maintainer

Service

C

C=Daily
H=Below Depot
Adjust
D
D=During Operation
D=Depot
Align
E
J=Emergency
Calibrate
F
P=Monthly

Remove/ Replace

H
K=Normal
Repair
J
R=Overhaul Cycle
Overhaul
K
E=Periodic Phase Inspection
Rebuild
R
H=Post Operative/Post Flight

A=Preoperative/ Pre-flight

M=Quarterly

B=Scheduled

N=Semi-annually

F=Special

T=Turnaround

G=Unscheduled

L=Weekly

Table III

Maintenance Function
Task Action Code
Definition
Inspect
A
To determine the serviceability of an item by comparing its physical, mechanical, and/or electrical characteristics with established standards through examination (e.g., by sight, sound, or feel). This includes scheduled inspection and gauging’s and evaluation of cannon tubes.
Test
B
To verify serviceability by measuring the mechanical, pneumatic, hydraulic, or electrical characteristics of an item and comparing those characteristics with prescribed standards on a scheduled basis, i.e., load testing of lift devices and hydrostatic testing of pressure hoses.
Service
C
Operations required periodically to keep an item in proper operating condition; e.g., to clean (includes decontaminate, when required), to preserve, to drain, to paint, or to replenish fuel, lubricants, chemical fluids, or gases. This includes scheduled exercising and purging of recoil mechanisms. The following are examples of service functions:

a. Unpack. To remove from packing box for service or when required for the performance of maintenance operations.

b. Repack. To return item to packing box after service and other maintenance operations.

c. Clean. To rid the item of contamination.

d. Touch up. To spot paint scratched or blistered surfaces.

e. Mark. To restore obliterated identification.

Adjust
D
To maintain or regulate, within prescribed limits, by bringing into proper position, or by setting the operating characteristics to specified parameters.
Align
E
To adjust specified variable elements of an item to bring about optimum or desired performance.
Calibrate
F
To determine and cause corrections to be made or to be adjusted on instruments of test, measuring, and diagnostic equipment used in precision measurement. Consists of comparisons of two instruments, one of which is a certified standard of known accuracy, to detect and adjust any discrepancy in the accuracy of the instrument being compared.
Remove/Install
G
To remove and install the same item when required to perform service or other maintenance functions. Install may be the act of emplacing, seating, or fixing into position a spare, repair part, or module (component or assembly) in a manner to allow the proper functioning of an equipment or system.
Replace
H
To remove an unserviceable item and install a serviceable counterpart in its place. “Replace” is authorized by the MAC and assigned maintenance level is shown as the third position code of the Source, Maintenance, Recoverability (SMR) code.
Repair
J
The application of maintenance services, including fault

location/troubleshooting, removal/installation, disassembly/assembly procedures and maintenance actions to identify troubles and restore serviceability to an item by correcting specific damage, fault, malfunction, or failure in a part, subassembly, module (component or assembly), end item, or system.

Overhaul
K
That maintenance effort (service/action) prescribed to restore an item to a completely serviceable/operational condition as required by maintenance standards in appropriate technical publications. Overhaul is normally the highest degree of maintenance performed by the Army. Overhaul does not normally return an item to like new condition.
Rebuild
R
Consists of those services/actions necessary for the restoration of unserviceable equipment to a like new condition in accordance with original manufacturing standards. Rebuild is the highest degree of material maintenance applied to Army equipment. The rebuild operation includes the act of returning to zero those age measurements (e.g., hours/miles) considered in classifying Army equipment/components.

Table IV

Task Interval Code
Definition
A
Preoperative – Inspection accomplished prior to the first operation of the day
B
Scheduled – Inspection/corrective action task performed on a scheduled basis that does not have its own Task Action Code. Task frequency shall reflect the scheduled nature of the task
D
During operation – Occurring during each operation
G
Unscheduled – Those unpredictable maintenance requirements that had not been previously planned, but require prompt attention to maintain the system in operational condition
H
Postoperative – Inspection accomplished after each operation
J
Emergency – Condition resulting from an unforeseen combination of circumstances that calls for immediate action to prevent injury to personnel and/or damage to the equipment
K
Normal – Operational tasks as part of the normal operating environment of the system
L
Weekly – Inspection/service performed on a weekly basis
M
Monthly - Inspection/service performed on a monthly basis
N
Quarterly - Inspection/service performed on a quarterly basis
P
Semiannual - Inspection/service performed on a semi-annual basis
Q
Yearly - Inspection/service performed on an annual basis

Table V

Level Code
Definition
C
Crew/Operator
F
Maintainer
H
Below Depot
D
Depot (Specialized Repair Activity/Contractor)

10 May 2013 Supportability Analysis Module X Vers. 1

File details come from the government source that posted it. Updated .