Performance Requirement Summary (PRS) Program: Afghan National Maintenance Strategy
Solicitation: W56HZV-15-R-0139 Attachment #: 0009
Statements Standards/AQLs Incentive/Remedy
3.1 Training and
Mentoring
a) Develop and provide training and mentoring to the ANDSF at the locations identified in Attachment 0002 and per the ANDSF personnel density projections by location as described in Attachment 0003.
b) Each national and regional work site maintains an annual average operational readiness rate (reference calculation in
Glossary definition of OR) above the numbers in the table below for the life of the contract or at transition.
MOD
Materiel STD AQL
Mobile Strike
Force Vehicle
(MSFV)
90% 70%
Mine Resistance
Ambush Protected
(MRAP)
90% 70%
MRAP Recovery
Vehicle (MRV) 90% 70%
High Mobility
Multipurpose
Wheeled Vehicle
(HMMWV) M1151
(Minus
Ambulance)
80% 70%
High Mobility
Multipurpose
Wheeled Vehicle
90% 70%
b) Incentive Achievement of annual average Operational Readiness (OR) AQLs to support Annual Incentive Fee determination.
UNCLASSIFIED
DISTRIBUTION A: Approved for public release, distribution is unlimited
(HMMWV) M1152
(Ambulance)
Fuel (Petroleum, Oils, and
Lubricants (POL))
Tanker
80% 70%
Medium Tactical
Vehicle (MTV)
Recovery Vehicle
85% 70%
Wrecker 8T W /
Boom 85% 70%
Flatbed Wrecker 80% 70%
Remaining
Wheeled Vehicles 80% 60%
Mine Rollers 80% 70%
Remaining Ground
Equipment 80% 60%
MOI
Materiel STD AQL
High Mobility
Multipurpose
Wheeled Vehicle
(HMMWV) M1151
(Minus
Ambulance)
80% 70%
High Mobility
Multipurpose
Wheeled Vehicle
(HMMWV) M1152
(Ambulance)
90% 70%
Fuel (Petroleum, Oils, and
Lubricants (POL))
Tanker
80% 70%
Medium Tactical
Vehicle (MTV)
Recovery Vehicle
85% 70%
Wrecker 8T W /
Boom 85% 70%
Flatbed Wrecker 80% 70%
Light Tactical
Vehicle (LTV) 80% 70%
Remaining
Wheeled Vehicles 70% 60%
Ground Equipment 80% 60%
3.1.1
Maintenance
Education Teams
(MET)
Provide training and mentoring at the maintenance management and maintainer levels (as described in Attachment 0003).
3.1.1.1
Management
Training and
Mentoring
a) Maintenance Management
Training and Mentoring conducted
IAW 3.1.1.1
b) All Trainer/Mentors meet the minimum experience requirements per 3.1.1.1.
Five years senior level maintenance management experience maintaining commercial, non-standard and standard NATO military vehicles, ground equipment respectively
One year of mentoring experience
b) Remedy:
Replacement of unqualified contactor personnel at no additional cost to the Government
3.1.1.2
Training
a) Maintenance Training conducted IAW 3.1.1.2
b) All Trainer personnel meet the minimum experience requirements per 3.1.1.2.
b) Remedy:
Replacement of unqualified contactor personnel at no
Five years of experience maintaining commercial, non-standard and standard NATO military vehicles and ground equipment.
3.1.1.2.1
Mobile Maintenance
Training (MMT)
a) Mobile maintenance training conducted at the organizational levels listed in Attachment 0020
IAW with 3.1.1.2.1
b) All trainer personnel have a minimum of five years of experience maintaining commercial, non-standard and standard NATO military vehicles and ground equipment
b) Remedy:
Replacement of unqualified contactor personnel at no
3.1.2
Supply Chain
STD: Starting at FOC and continuing throughout the period of performance, ANDSF supply system to be 100% accurate when compared to physical inventories for Class IX parts.
AQL: Starting at FOC and continuing throughout the period of performance, 95% accuracy.
b) Incentive Achievement of Accuracy AQLs to support Annual Incentive Fee determination.
3.1.2.1.
Supply Chain
Training and
Mentoring
a) Supply Chain Management
Training and Mentoring conducted
IAW 3.1.2.1.
b) All Trainer/Mentors meet the minimum experience requirements per 3.1.2.1.
Five years of experience in maintenance supply support
Two years of experience in property accountability
One year of experience in maintenance supply mentoring
b) Remedy:
Replacement of unqualified contactor personnel at no
3.1.2.2.
Supply Support
Mentoring
a) Supply Support Training and
Mentoring conducted IAW 3.1.2.2.
b) All Trainer/Mentors meet the
b) Remedy:
Replacement of unqualified contactor personnel at no minimum experience requirements per 3.1.2.2.
Three years of experience in maintenance supply support
One year of experience in property accountability additional cost to the
3.1.2.3.
Warehouse Supply
Chain Management
a) Warehouse Supply Chain
Management Training and
Mentoring conducted IAW 3.1.2.3.
b) All Trainer/Mentors meet the minimum experience requirements per 3.1.2.3.
Five years of experience in warehouse supply support
Two years of experience in property accountability
One year of experience in warehouse supply chain management mentoring.
b) Remedy:
Replacement of unqualified contactor personnel at no additional cost to the
3.1.2.4.
Warehouse Supply
Mentoring
a) Warehouse Supply Training and Mentoring conducted IAW
3.1.2.4.
b) All Trainer/Mentors have a minimum of three years of experience in warehouse supply support.
b) Remedy:
Replacement of unqualified contactor personnel at no additional cost to the
3.1.2.5
Mobile Supply Support and Warehouse Supply Support Training
a) Mobile Supply Support/
Warehouse Supply Support training conducted at the organizational levels listed in
Attachment 0020 IAW 3.1.2.5
b) All Trainer/Mentors meet the minimum experience requirements per 3.1.2.5.
Three years of experience in maintenance supply support
b) Remedy:
Replacement of unqualified contactor personnel at no
One year of experience in property accountability.
3.1.3.
Quality Control
a) Quality Control Training conducted IAW 3.1.3.
b) All Trainers meet the minimum experience requirements per
3.1.3.
Three years of experience maintaining commercial non-standard and standard NATO military vehicles and ground equipment
Two years of experience in
QC in a maintenance operation or facility
b) Remedy:
Replacement of unqualified contactor personnel at no additional cost to the
3.2.1
Vehicle and Ground Equipment Maintenance Support
a) Technical Inspections and maintenance support for vehicles and ground equipment.
b) Preventative repairs IAW 3.2.1
c) Use of ANDSF manual and
CORE-VMS to record all maintenance actions
3.2.1.1
Scheduled and Unscheduled Maintenance
a) Scheduled and unscheduled
Maintenance in IAW 3.2.1.1.
b) All personnel meet the minimum experience requirements per 3.2.1.1.
Quality Control (QC):
Three years of experience in the maintenance vehicles and ground equipment; and two years of experience in QC
Welders: Welding certification (American Welding Society (AWS), Canadian Standard Association (CSA) or
b) Remedy:
Replacement of unqualified contactor personnel at no
European Committee for Standardization (CEN))
Welding Inspectors: Five years of welding experience; and Welding
Inspector Certification
(Certified Welding
Inspector (CWI) (U.S or
Canadian), United
Kingdom Welding Institute
(CSWIP) or British Institute
PCN level 2.
c) MOD:
STD: Complete 50% of the maintenance work orders in the base year, 30% of maintenance work orders in option year one (1), 20% of maintenance work orders in option year two (2), 10% of maintenance work orders in option year three (3) and 0% of maintenance work orders in option year four (4).
AQL: Complete 50% of the maintenance work orders in the base year, 30% of maintenance work orders in option year one (1), 20% of maintenance work orders in option year two (2), 10% of maintenance work orders in option year three (3) and 0% of maintenance work orders in option year four (4).
MOI:
STD: Complete 95% of the maintenance work orders in the base year, 75% of maintenance work orders in option year one (1), 55% of maintenance work orders in option year two (2), 35% of
c) Incentive Achievement of Maintenance Work Order Completion Percentage AQLs to support Annual Incentive Fee determination maintenance work orders in option year three (3) and 15% of maintenance work orders in option year four (4).
AQL: Complete 95% of the maintenance work orders in the base year, 75% of maintenance work orders in option year one (1), 55% of maintenance work orders in option year two (2), 35% of maintenance work orders in option year three (3) and 15% of maintenance work orders in option year four (4).
FOR Both MOD and MOI:
d) STD: 100% of maintenance work orders are completed within the timeframe indicated in
Attachment 0017 unless deferred with COR approval.
AQL: 100% are completed within the timeframe indicated in
Attachment 0017 unless deferred with COR approval
e) STD: 100% of maintenance work orders completed to Fully
Mission Capable (FMC) on first inspection
AQL: 95% of maintenance work orders completed to FMC on first inspection
d) Incentive
Maintenance Work Order Completion Timeframe AQLs to support Annual Incentive Fee determination
e) Incentive
Maintenance Work Order First Inspection AQLs to support Annual Incentive Fee determination
3.2.1.1.1
Deferred
Deferred maintenance IAW
3.2.1.1.1
3.2.1.1.2
Controlled Substitution
Controlled Substitution IAW 3.2.1.1.2
3.2.1.2
Contact Teams
a) Maintenance Personnel to augment Organizational/Provincial Maintenance IAW 3.2.1.2
b) Remedy:
Replacement of unqualified contactor personnel at no additional cost to the
3.2.2
Afghanistan
Component
Overhaul Program
(ACOP)
Conduct technical inspections and provide overhaul and repair support for repairable items at
Afghanistan Component Overhaul
Program (ACOP) locations identified in Attachment 0002 IAW
3.2.2.
a) STD: Complete 100% of all repairable item work orders at the
ACOP locations listed in
Attachment 0002.
AQL: Complete 100% of all repairable item work orders at the
ACOP locations listed in
Attachment 0002.
b) STD: 100% pass rate on first inspection.
AQL: 95% pass rate on first inspection.
c) STD: The contractor shall initiate a work order within 3 calendar days of receiving a repairable item.
AQL: The contractor shall initiate a work order within 3 calendar days of receiving a repairable item
d) STD: The repair of the repairable item shall be completed within 5 calendar days after initiation of work order.
AQL: The repair of the repairable item shall be completed within 5 calendar days after initiation of work order.
3.2.2.1
Packaging of Repairable Items
Packaging and marking of repairable items IAW 3.2.2.1
3.2.3
Contractor
Managed Class IX
Parts
a) Ordering, tracking, and distribution of Class IX Parts IAW 3.2.3
b) Identification of counterfeit Class IX parts from initial inventory
c) STD: The contractor shall inventory, warehouse and input all
Class IX parts into CORE-IMS upon receipt from the USG no later than 30 days after Full
Operational Capability (FOC).
AQL: The contractor shall inventory, warehouse and input all Class IX parts into CORE-IMS upon receipt from the USG no later than 30 days after Full Operational Capability (FOC).
3.2.3.1
Authorized
Stockage List (ASL)
a) STD: Starting at FOC and of performance, 100% accountability of ASL Class IX parts will match CORE-IMS reports
AQL: Starting at FOC and continuing throughout the period of performance, 100% of ASL
Class IX parts will be accounted for (physically on hand, correlated to a current work order or a valid requisition) and match CORE-IMS reports.
b) STD: Starting at FOC and continuing throughout the period of performance, 100% of upward adjustments to ASL shall be delivered within 90 days after
CDRL A009 approval.
AQL: Starting at FOC and continuing throughout the period of performance, 95% upward adjustments to ASL shall be delivered within 90 days after
CDRL A009 approval.
3.2.3.2
Parts (Vehicles and
Ground Equipment)
a) Class IX Parts Management
IAW 3.2.3.2
b) Part ordering due to unavailability IAW 3.2.3.2
c) STD: Starting at FOC and continuing throughout the period of performance, 100% of Class IX part orders filled from CMPS on hand and shall be available for delivery within 48 hours of contractor receipt of Afghan Parts
Request Form (Attachment 0008).
AQL: Starting at FOC and continuing throughout the period of performance, 95% of Class IX part orders filled from CMPS on hand and shall be available for delivery within 48 hours of contractor receipt of Afghan Parts Request Form (Attachment 0008).
d) STD: Starting at FOC and continuing throughout the period of performance, 100% of Class IX part orders that are unavailable in the CMPS shall be procured and delivered to the requiring maintenance location within 120 days of receipt of Afghan Parts
Request Form (Attachment 0008).
AQL: Starting at FOC and of performance, 100% of Class IX part orders that are unavailable in the contractor’s managed parts supply shall be procured and delivered to the requiring maintenance location within 120 days of receipt of Afghan Parts Request Form (Attachment 0008).
3.2.3.3
Parts (ACOP)
Class IX Parts Management IAW 3.2.3.3
3.2.4
Consumables
Consumable procurement and usage IAW 3.2.4
3.2.5
Damage and Abuse
Contractor-caused damage reporting
3.3
Personnel Security Personnel Security IAW 3.3
Personnel Security Arming
3.4 Life Support Life support IAW 3.4
3.4.1 Central Workshop
and Central Supply
Depot
No contractor personnel residing at Central Workshop and Central
Supply Depot
3.5 Facility
Facility management IAW 3.5
3.5.1 Central
Maintenance
Facility (CMF)
Contractor obtained a CMF IAW
3.5.1
3.6
Facilities
Management and
Maintenance
Facilities Management and
Maintenance IAW 3.6
4.1 Safety
a) Compliance with Public Law 91-
596 (Occupational Safety and
Health Act (OSHA)) and the
Environmental, Safety, and
Occupational Health (ESOH)
(DODD 4715.1E).
b) When required, the contractor shall complete a Significant Incident Reports (SIR)
4.2
Intra-Theater
Transportation
a) Transportation within
Afghanistan
b) Transportation conducted IAW
4.2
4.3
Technical Information
a) Procurement of other TMs not listed in Attachment 0005 necessary to perform this contract.
b) Develop and provide training materials necessary to perform this contract
4.3.1
Translation a) Human translation of all training materials and TMs.
b) The English language version of the TM and training material and its Dari translations shall be identical in regards to tasks and content.
4.4 Recovery
Operations
Recovery of any GFE or Contractor Acquired Property
(CAP) IAW 4.4
4.5 Government
Property (GP)
GP Reporting
4.6 Communication Request to supplement
communication capabilities IAW 4.6
4.7.1
Quality Program
Plan (QPP)
Develop and maintain an effective Quality Program Plan (QPP) to ensure services are performed in accordance with this contract
4.8
Performance and
Cost Reporting
Report performance and cost
4.9 Risk Management
and Plan and
a) Risk management plan
Status Reporting b) Risk Management Status Reporting
4.10 Security
Requirements
Security Requirements IAW 4.10
Note: All requirements under section 4.10 and the subsections apply to this standard
H.1.1. Incentive Fee
Reporting
Contractor shall report its yearly
AQLs
Incentive:
Review to support Annual Incentive Fee Determination
H.1.2. Eligibility and
Limitation of
Incentive Fee
The contractor shall meet the
Acceptable Quality Levels (AQL)
(as defined in glossary) identified in PWS 3.1; 3.1.2; and 3.2.1.1.
Incentive:
Determination of incentive fee