Attachment0017.pdf

PDF 97 KB Posted

Attached to
Trucks and Truck Tractors, Wheeled
Solicitation number
W56HZV15R0139
Issued by

About this file

Attachment 0017

View the file

Other files

File Type Posted
Solicitation_W56HZV-15-R-0139_Additional_Industry_Questions_(22_Sep_16).pdf PDF
W56HZV-15-R-0139_Conformed_21_Sep_2016.pdf PDF
Attachment0002.xlsx XLSX spreadsheet
W56HZV15R0139-0005.pdf PDF
Attachment0002.xlsx XLSX spreadsheet
W56HZV15R0139-0004.pdf PDF
Attachment0002.xlsx XLSX spreadsheet
W56HZV15R0139_Conformed_15_Sep_2016.pdf PDF
Attachment0002.pdf PDF
W56HZV-15-R-0139_Amendment_0004.pdf PDF
Solicitation_W56HZV-15-R-0139_Additional_Industry_Questions_ _Answers_13SEP16.pdf PDF
Attachment0032.xlsx XLSX spreadsheet
Attachment0011.xlsx XLSX spreadsheet
W56HZV15R0139-0003.pdf PDF
W56HZV-15-R-0139_Conformed.pdf PDF
Attachment0002.xlsx XLSX spreadsheet
Attachment0019.xlsx XLSX spreadsheet
Solicitation_W56HZV-15-R-0139_Industry_Questions_31_Aug_16.xps XPS file
W56HZV15R0139-0002.pdf PDF
Attachment0019.xlsx XLSX spreadsheet
Attachment0026.pdf PDF
Attachment0007.xlsx XLSX spreadsheet
Attachment0006.pdf PDF
Attachment0011.xlsx XLSX spreadsheet
Attachment0004.xlsx XLSX spreadsheet
Attachment0022.pdf PDF
Attachment0031.docx DOCX document
Attachment0021.pdf PDF
Attachment0002.xlsx XLSX spreadsheet
Attachment0016.xlsx XLSX spreadsheet
W56HZV15R0139-0001.pdf PDF
Attachment0023.pdf PDF
Attachment0018.xlsx XLSX spreadsheet
Attachment0025.pdf PDF
Attachment0028.xlsx XLSX spreadsheet
Attachment0012.pdf PDF
Attachment0004.xlsx XLSX spreadsheet
Attachment0007.xlsx XLSX spreadsheet
Attachment0005.xlsx XLSX spreadsheet
Attachment0009.pdf PDF
Attachment0015.docx DOCX document
Attachment0021.pdf PDF
Attachment0024.pdf PDF
Attachment0022.pdf PDF
Attachment0013.xlsx XLSX spreadsheet
Attachment0030.xlsx XLSX spreadsheet
Attachment0001.xlsx XLSX spreadsheet
Attachment0026.pdf PDF
Attachment0003.xlsx XLSX spreadsheet
Attachment0011.xlsx XLSX spreadsheet
Show 40 more

Latest 50 of 57 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMOD / ANA Decree 4.9

Ministry of National Defense

Office of the Assistant Minister of Acquisition, Technology, Logistics

Decree 4.9

Maintenance Management Policy and Procedures

28 FEB 2010

Program: Afghan National Maintenance Strategy Solicitation #: W56HZV-15-R-0139 Attachment: 0017

UNCLASSIFIED

DISTRIBUTION STATEMENT A. Approved for public release, distribution is unlimited.

Chapter 2

FUNDAMENTALS

Introduction. Afghanistan National Army (ANA) maintenance elements are required to anticipate, analyze, and tailor available resources for effective, timely support of complex systems. Success will be based on the operational availability, maintainability, and reliability of the ANA equipment. Sustaining decisive land force combat through synchronized maintenance operations will challenge commanders at all levels. Maintenance leaders must understand customer requirements, the overall support concept, and the ANA maintenance system to have the correct capabilities in the right place at the right time.

2-1. Section I – Maintenance. Maintenance is a combat service support function that supports equipment and its associated systems in the field and garrison.

2-1.1. It sustains materiel in an operational status, restores it to serviceable condition, or upgrades its functional utility through modification or product improvement.

2-1.2. The ANA maintenance system designates the scope of tasks performed by maintenance activities.

2-1.3. It provides support planning requirements for maintenance of materiel systems when fielded and after fielding, and it establishes requirements for managing activities that physically perform maintenance.

2-1.4. Maintenance levels addressed below form guidelines for determining which specific maintenance tasks are assigned to each level. They are a means to select the scope of maintenance at various command levels.

2-2. THE AFGHANISTAN NATIONAL ARMY MAINTENANCE SYSTEM. Management of the ANA maintenance system depends on effectively transitioning repair functions from the unit level to the National. Highly complex maintenance operations are performed at Central Work Shop (National Depot Level) while units perform PMCS operations.

2-3. MAINTENANCE LEVELS. The ANA maintenance system, less aircraft, consists of a flexible, 3 level system. Each unique level makes a different contribution to the overall maintenance system.

2-4. ORGANIZATIONAL SUPPORT. This level of maintenance support is performed by unit (Infantry and Combat Support Battalions) elements and the Brigade Combat Service Support Kandak.

2-4.1. Unit equipment operators perform Preventive Maintenance Checks and Services and (limited replacement) maintenance on their equipment. The operators are assisted by the maintenance personnel from their Kandak Support Platoon. This level of maintenance requires less than 12 man-hours and performed using common tools for minor repairs involving adjustments and quick replacement of repair parts or assemblies.

Program: Afghan National Maintenance Strategy Solicitation #: W56HZV-15-R-0139 Attachment: 0017

2-4.2. Backup maintenance is provided by the Maintenance and Supply Company of the Brigade Combat Service Support Kandak. This maintenance consists of services, removal and replacement of Line Replaceable Units (LRUs) and requires the effort of 24 man-hours in addition to the work of the unit maintenance personnel. LRU is defined as whole units (starters, radiators, alternators, etc.)

These tasks include replacement of assemblies may also include limited repairs to the assemblies and limited light machine tool support and a wider range of repair parts. It has increased skill levels, and specialized support facility capabilities. Initial diagnostics are performed and equipment is evaluated before equipment is evacuated to general support.

2-5. GENERAL SUPPORT. This level of maintenance support is performed by the Maintenance Company of the Corps Logistics Battalion (CLB) within the Corps’ Area of Responsibility (AOR).

2-5.1. It consists of backup maintenance support to the Brigade Combat Service Support Kandaks and all other units operating in the Corps AOR. It also consists of removal and replacement of Line Replaceable Units (LRUs) and requires the effort of 36 man-hours in addition to the works of the Organizational Support level.

2-5.2. These tasks include replacement of major assemblies like engines, transmissions, and transfer cases. General support repairs assemblies and performs light machine tool support, and a wider range of repair parts. It has increased skill levels, and more specialized support facilities. Extensive diagnostics are performed and equipment is evaluated before equipment is evacuated to national support.

2-6. NATIONAL SUPPORT (DEPOT). This level of maintenance includes repair, overhaul, and rebuild of individual components, major and sub-assemblies, modules, and end items. Sub assemblies include alternators, starters, and generators. Major assemblies include engines, transmissions, and transfer cases.

2-6.1. This level of maintenance support within the Afghan National Army system performs tasks that require extensive engineering skills and facilities. These repairs are time consuming and require the use of extensive machine tools, test equipment, and facilities.

2-6.2. This level handles requirements that exceed the 36 man hours of general support. The National Depot Support sites are located in Kabul at the Central Workshop (ANA).

2-7. LEVELS OF WAR. Coordination of maintenance operations occurs at all levels of war:

2-7.1. Strategic. National depot level maintenance operations are largely the purview of the Central Workshop in concert with industrial and civilian sector. National level maintenance management primarily links the nation’s economic base (people resources, and industry) to its military operations.

2-7.2. Operational. General Support maintenance links strategic capabilities to tactical requirements through the Corps Logistics Battalions. At this level, the maintenance system both drives and supports the supply system. Support maintenance works to meet tactical requirements, and may provide commodity oriented repair of components and end items to support the supply system. The primary focus is to maximize the number of operational combat systems available to support the tactical battle.

Program: Afghan National Maintenance Strategy Solicitation #: W56HZV-15-R-0139 Attachment: 0017

AMOD / ANA Decree 4.9
Chapter 2

File details come from the government source that posted it. Updated .