Exhibit_E_-_OTA011_CMTR.pdf

PDF 46 KB Posted

Attached to
Army Targetry Systems (ATS) III Federal contract opportunity
Solicitation number
W56HZV-15-R-0130
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

Exhibit E - OTA011 CMTR

View the file

Other files for this federal contract opportunity

Other files attached to Army Targetry Systems (ATS) III, newest first.
File Type Posted
W56HZV18D0005.pdf PDF
W56HZV18D0004.pdf PDF
W56HZV18D0003.pdf PDF
W56HZV18D0002.pdf PDF
W56HZV18D0001.pdf PDF
ATS_III_QAs_20APR2017.pdf PDF
W56HZV15R0130-0004.pdf PDF
Attachment_0017_FASIT_PD_ICD_(DRAFT).pdf PDF
ATS_III_QAs_18APR2017.pdf PDF
ATS_III_QAs_14APR2017.pdf PDF
W56HZV15R0130-0003.pdf PDF
Attachment_0001_ATS_III_PD_v3.1.2.pdf PDF
ATS_III_QAs_30MAR2017.pdf PDF
Attachment_0007_-_Appendix_D_Vehicle_Combat_Identification_(VCID)_Power_Control_Unit_(PCU).pdf PDF
Attachment_0004_-_Appendix_A_Target_Drawings.pdf PDF
Attachment_0003_-_Appendix_H_Live_Training_Transformation_(LT2)_Video_Service-Oriented_Architecture_(SOA)(H).pdf PDF
W56HZV-15-R-0130_Amd_0002.pdf PDF
Attachment_0008_-_Appendix_G_Example_Iron_Maiden_Target.pdf PDF
Attachment_0006_-_Appendix_E_REmoted_Target_Systems_(RETS)_Drawings.pdf PDF
Attachment_0001_-_Performance_Description.pdf PDF
Attachment_0001_-_Performance_Description.pdf PDF
Attachment_0003-Live_Training_Transformation_(LT2)_Video_Service-Oriented_Architecture_(SOA)(H).pdf PDF
Attachment_0011_-_QA_Checklist.xlsx XLSX spreadsheet
Attachment_0015_-_Small_Business_Participation_Certification-Subcontractor.docx DOCX document
Attachment_0010_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0006_-_REmoted_Target_Systems_(RETS)_Drawings.pdf PDF
Attachment_0014_-_Small_Business_Participation_Factor_Workbook_Instructions.docx DOCX document
Exhibit_D_-_OTA010_WQR_Spreadsheet.xlsx XLSX spreadsheet
Attachment_0008_-_Example_Iron_Maiden_Target.pdf PDF
Attachment_0004_-_Target_Drawings.pdf PDF
Exhibit_C_-_OTA007_Manuals.docx DOCX document
Attachment_0001_-_Performance_Description.pdf PDF
Attachment_0009_-_Past_Performance_Relevance_Matrix.docx DOCX document
Attachment_0012_-_Price_Evaluation_Sheet.xlsx XLSX spreadsheet
Attachment_0005_-_Technical_Manual_OMEGA_60B2_Battlefield_Effects_Simulator_(BES).pdf PDF
Attachment_0007_-_Vehicle_Combat_Identification_(VCID)_Power_Control_Unit_(PCU).pdf PDF
W56HZV-15-R-0130.pdf PDF
ATS_III_QAs_Master.pdf PDF
Attachment_0015_-_SBP-Certification-Subcontractor.docx DOCX document
Attachment_0013_-_Small_Business_Participation_Workbook.xlsx XLSX spreadsheet
Attachment_0012_-_Price_Evaluation_Sheet.xlsx XLSX spreadsheet
Attachment_0010_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_0009_-_Past_Performance_Relevance_Matrix.docx DOCX document
Attachment_0008_-_Example_Iron_Maiden_Target_(Appendix_G).pdf PDF
Attachment_0007_-_Vehicle_Combat_Identification_(VCID)_Power_Control_Unit_(PCU)(Appendix_D).pdf PDF
Attachment_0005_-_Technical_Manual_OMEGA_60B2_Battlefield_Effects_Simulator_(BES)_(Appendix_B).pdf PDF
Attachment_0004_-_Target_Drawings_(Appendix_A).pdf PDF
Attachment_0003-Live_Training_Transformation_(LT2)_Video_Service-Oriented_Architecture_(SOA)(H).pdf PDF
Attachment_0001_-_PD.docx.pdf PDF
Responses_to_Questions_for_First_Draft_RFP.pdf PDF
Show all 50

Army Targetry Systems (ATS) III has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. Scope:

7. Project References:

Certified Material Test Report page 1

1. Contract #: 2. Delivery Order: 3. Date of Test:

4. Contractor:

Validation Testing Of:

ATS III Spec Verification

6. CLIN:

8. Point of Contact:

10. Administered by:

9. Test Oversight By:

17. Equipment: 18. Test Tools:

11. Observed by:

12. Q/A Signed By:

Test Overview

14. Data Recording Method:

ATS III Performance Description

13. Input Requirements (PD Reference):

15. Test Evaluation Criteria: 16. User System Acceptance Criteria:

Test Resources Required

19. Description of Procedure:

20. Results:

Test

CMTR Format Instructions for ATS III Block 1: ATS III Contract Number

Block 2: ATS III Delivery order number (if applicable)

Block 3: Date of test described

Block 4: Contractor Name address and phone number

Block 5: N/A

Block 6: List the CLIN to be tested

Block 7: N/A

Block 8: Contractor Point of Contact

Block 9: Contractor individual who was oversight on the testing

Block 10: Individual/s who administered test

Block 11: List all observers (if applicable)

Block 12: List QA with contractor who sign off on testing (if applicable)

Block 13: PD reference used for testing

Block 14: List recording method (observation, written report, photos, etc.)

Block 15: List what criteria you are testing to.

Block 16: List what the minimum acceptance criteria is

Block 17: List what equipment is used for testing

Block 18: Test tools used during the testing

Block 19: Describe in detail how test was performed (us additional sheet if necessary)

Block 20: List results of test.

ATS III CMTR Sheet - Copy
Sheet1

CMTR Format Instructions

File details come from the government source that posted it. Updated .