ATS III Q&As 30MAR2017
View the file
Other files for this federal contract opportunity
Show all 50
Army Targetry Systems (ATS) III has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q No. Doc Doc Ref Question/Comments Answer/Response Status
1 Solicitation L.1.5 Clarify past performance allowance - is it 25 pages total, or per example?
(3 examples = 75 pages)
The page limit for Offeror's Volume II: Past Performance Factor submittal is 25 pages total.
Answered
Solicitation &
Attachments
Section B &
Attachment
Please confirm that we do not have to populate the solicitation section B
- pages 7- 136 for pricing. All pricing needs to go in attachment 0012.
Attachment 0012 - Price Evaluation Sheet shall be completed by the Offeror. Offerors are not required to populate Section B of the Standard Form 33. Answered
Solicitation &
Attachments
A.1 &
Attachment
Ref Sol A.1 - page 2 - Export control. It references Attachment 0002 -which I cannot find any attachment referencing Export control.
Attachment 0002 is the TC25-8 training circular. What exactly is the export attachment? Is this an ITAR requirement?
Section A.1 states in part, "This solicitation contains an Export Controlled Attachment
(Attachment 0002)," meaning that the contents of Attachment 0002 - TC 2508 Training Ranges are export controlled.
Answered
4 Solicitation L.3.1(b)
On the past performance examples- it states that ranges have to be
TRACR controlled with a minimum of the following targetry devices: 70
SITS, 20 MITs and 20 SATs. Please clarify that all 3 PP examples need to meet these minimum target quantities, and it is not a cumulative sum of all 3 ranges put together.
The Offeror shall submit up to three contracts in support of past performance. Each individual contract example submitted in support of past performance shall demonstrate the ability to produce, install, and successfully complete ranges controlled by TRACR with a minimum of the following Targetry Devices: 70 SITs, 20 MITs, and 20 SATs. Answered
5 PD 3.2.1.5.4
PD Section 3.2.1.5.4 Frequency allocation - Will the Government please change this section to read "A single frequency design shall be available, however alternative designs that use more than one frequency or short-range radios using frequencies not requiring licensing may be proposed as options for use on ranges where such choices are allowed. All radio devices are subject to approval by the Army Spectrum Management
Office."?
Concur. See PD revision to section 3.2.1.5.4.
Answered:
Addressed via
Amendment 0002
6 PD 3.2.4
PD Section 3.2.4 Cable Interfaces - Will the Government please allow the use of a cap with lanyard as a method of covering the RJ45 receptacle?
Concur. See changes to PD Section 3.2.4. Answered:
Addressed via
Amendment 0002
7 PD 3.2.4
PD Section 3.2.4 Cable Interfaces - Will the Government please change the rating of the FD boxes to NEMA 4?
No.
Answered
8 PD 3.2.4
PD Section 3.2.4 Cable Interfaces - Will the Government please clarify if there will be a standard FD box defined that is ensured to fit two MIL-C-
26482 Amphenol connectors? Our research has shown that there are many different types of FD boxes available, some of which by the nature of their casting, will not allow the connectors to be installed properly.
The USG will only require that one cable interface be included per FD box. See changes to PD
Section 3.2.4.
Answered:
Addressed via
Amendment 0002
9 PD 3.3.3.4.1
PD Section 3.3.3.4.1 Portable SIT and SAT- Will the Government please allow the SCU to be made of aluminum?
Concur. See changes to PD Section 3.3.3.4.1. Answered:
Addressed via
Amendment 0002
10 PD 3.3.1.10
PD Section Table 1 - TM Requirements Note 5 - Will the Government please change the requirement to read "Target arms, target clamps, and stabilizers are excluded from the weight requirement if they are detachable."?
Since target clamps are part of the target arm, they will be allowed. Clarification has been added to Table 1, Note 5 of the PD for target clamps. Stabilizers will not be excluded from the weight.
Answered:
Addressed via
Amendment 0002
ATS III QAs 30MAR2017.xlsx Page 1 of 4
11 PD 3.6.4.4
PD Section 3.6.4.4 HHC Weight- Will the Government please change the requirement to read "The HHC shall be supported by a carrying strap.
The HHC shall weigh less than 10 lbs with an internal power source and shall weigh less than a total of 15 lbs with an external power source/radio unit. If an external power source is required, an additional carrying strap shall support it. The HHC shall be capable of one-hand operations while being supported by the other hand."?
Concur. See changes to PD section 3.6.4.4.
Answered:
Addressed via
Amendment 0002
Solicitation &
PD
Section J & 2.3
REF PD – Section 2.3 – Drawings lists Appendix A as target drawings.
Please confirm that Appendix A is actually attachment 0004 – target drawings, Appendix B is attachment 05, etc… In general - The section
2.0 – Applicable Reference Documents- does not align with the attachment numbers and Appendix letters
Section J revised to incorporate appropriate Appendix reference in Attachment titles.
Answered:
Addressed via
Amendment 0002
13 Solicitation L.1.6.1.2 &
L.1.6.6
REF SOL Proposal submission – Per L.1.6.1.2 – proposals must be hand carried or mailed on CD’s or DVD’s – BUT section L.1.6.6 Electronic Files
– says the offeror’s proposal shall be submitted electronically and formatted…… - Please clarify how proposals are to be submitted.
Section L.1.6.1.2 pertains to the delivery method required for proposals.
Section L.1.6.6 pertains to the file type requirements for proposals. Answered
14 Solicitation L.1.4
REF SOL L.1.4 Proposal Content … It is the offerors responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates full understanding of and the ability to comply with solicitation requirements…. This language suggests a technical description of products that meet the solicitation and PD – however, there is no requirement for a technical document as listed in the 4 volumes of information requested. Please clarify if we must have a well written proposal with detailed information demonstrating understanding and ability.
In accordance with L.1.4, "It is the Offeror's responsibility to submit a well-written proposal, with adequately detailed information, which clearly demonstrates full understanding of and the ability to comply with the solicitation requirements."
Answered
15 PD 3.6.3.5
What are the power requirements of the UPS for ATS III? Per Section C.3.3. Power. "For Alternating Current (AC) powered ranges the contractor shall interface with the provided power on the range… Site specific power requirements will be specified in the RFDOP. "
Answered
16 PD 3.6.3.5
What is the operating environment of the UPS, i.e. is it in a protected room or in a transit case out doors? Will it be subjected to heat, cold, dust, rain, etc. or will it be shielded from the elements?
Per Section C.3.3. Power. "For Alternating Current (AC) powered ranges the contractor shall interface with the provided power on the range… Site specific power requirements will be specified in the RFDOP. " Answered
17 Solicitation N/A
How can a small business get/stay connected to the participating companies to provide their power solution?
You may contact small business or PTAC and they will be happy to assist you with pairing you up to another large business. Below are some links to the helpful pages.
http://acc.army.mil/contractingcenters/acc-wrn/index.html http://www.dla.mil/HQ/SmallBusiness/PTAP.aspx
Answered
18 PD
2.3 &
3.3.3.1.8.4 &
3.3.3.3.8
BES Control - the PD has no reference to BES control for any device. It is listed as Appendix B (Att 005) but the only reference I can find with BES is in the 3.3.3.1.8- Moving TM Cycle under 3.3.3.1.8.4 - Signal BES to fire
(MAT only), and 3.3.3.3.8 - a statement under the MAT lifting arms telling provisions for mounting a BES to the MAT. Please clarify which
TM's are required to control the BES, (Both Omega 36 and 60) as well as which modes.
The BES interface/control is described in the Section C.3.9.14
Answered
ATS III QAs 30MAR2017.xlsx Page 2 of 4
19 Solicitation Section B
ATS III PD 3.3.2.1.2 SIT target arms. The SIT device shall accommodate two target arm types: a target arm that raises/lowers one target (SIT) and a target arm that raises/lowers two targets at a time (DTASIT). For
CLIN 0041-0045 DTA (Double Target Arm), is it the USG's intent that only the Double Target Arm is priced under this CLIN, or a DTASIT be priced?
CLINs 0041 thru 0045 are for Double Target Arms (DTA) to be added to Stationary Infantry
Targets (SIT).
Answered
20 PD 3.2.14.11
ATS III PD 3.2.14.11 Lightning protection.- The lightning protection system shall include an indicator status light, be modular, and support ease of maintenance and replacement. Do the Data/communication
Surge arrestors require indicator lights or do only the power surge protectors require indicator lights?
Only the power surge protection requires indicator lights. See change to PD section 3.2.14.11 for clarification.
Answered:
Addressed via
Amendment 0002
21 PD 3.5.1
The distinction between the ILS, the ALS and the LS is unclear. Does LS refer to the ILS, the ALS or both in the following sentence?
"The LS shall be made from ballistic grade materials sufficient to withstand .50 cal ball ammunition (M2 Heavy Barrel Machine Gun) shot at a minimum distance of 0.25 miles."
Lifting Shields (LS) refers to both. Specific requirements to each will call out ILS or ALS specifically.
Answered
22 Solicitation Sections
L & M
ATS III Solicitation Sect L & M, it appears there is a disconnect between
Sect L, and the information needed to adequately perform Sect M evaluation, using the requested Vol I - IV layout. As the Past
Performance Volume currently requires information on only up to 3
Recent and Relevant contracts, is it the USG's intent for Offerors to show compliance to Sect C (SOW) and Attach 1 (PD) requirements in the Past
Performance Volume, or does the USG require a separate Volume to show technical compliance?
The solicitation does not require a separate volume to show technical compliance.
Answered
23 PD Version Date
On March 9, 2017 a document was posted Attachment_0001_-
_Performance_Description.pdf, dated Jan 2016
In the draft solicitation a more recent version was uploaded:
On Dec 22, 2016 a document was posted Attachment_0001_-
_PD.docx.pdf, dated Nov 2016. Can you please confirm that
Attachment_0001_-_Performance_Description.pdf, dated Jan 2016 is the valid document version for the final solicitation?
The PD is correct, but had an incorrect version date. The revised copy was uploaded to FBO via
Amendment 0001.
Answered:
Addressed via
Amendment 0001
Amendment
Attachment
Can you please explain why the last amendment (001) dated 15-MAR.
removed the attachment 009 - Past Performance Relevance worksheet?
I assume the past performance requirement has not been removed. The form is well organized and is a useful guide for making sure we populate all the pertinent information. The form clearly states that if more space is needed that we can use additional pages. My ultimate question - can we still use that form?
Offerors may use the matrix for their own reference, but the matrix should not be submitted with your proposal package and will not be considered by the Government as part of any proposals submitted. The matrix was incorrectly added to the solicitation, and subsequently removed via Amendment 0001.
Answered
25 PD 2.3
Will the Government please provide drawing s for Infantry Targets
11829332 and 13067209?
Attachment 0004 - Target Drawings has been revised to include all drawings. Answered:
Addressed via
Amendment 0002
ATS III QAs 30MAR2017.xlsx Page 3 of 4
26 Solicitation L.1.5 &
L.3.2(m)
Section L.1.5 “Proposal Content” limits Offerors to 25 pages for Volume
II, Past Performance Factor. It directs the Offeror to “See L.3.” Section
L.3.2 (m) instructs Offerors to “Copies of the Statements of Work from each of the submitted contracts to establish the relevance of the contract to the scope of work activities listed in L.3.1(b) above.” Do the
SOW’s count in the overall page limit?
Statements of Work (SOW) submitted as part of Volume II: Past Performance Factor do count against the total Volume II page limit of 25 pages.
Answered
27 PD 3.2.2.1.1.3
PD Section 3.2.2.1.1.3 be electric start - Will the Government please change this section to read "be electric start (Excluding MIT/MATs on board generators)"?
The Government has removed the electric start requirement. See PD Section 3.2.2.1.1.3 for revision.
Answered:
Addressed via
Amendment 0002
28 Solicitation C.3.2
SOW Section C3.2 Range design specifications - . . . Target silhouettes and other ancillary items shall be considered part of the Installation CLIN and shall be priced within it, unless specifically called out as a separate line item in the RFDOP." Will the Government please clarify what items they are referring to when stating "ancillary items"?
C.3.2 answers what is to be included in the price of each CLIN. Target silhouettes and anything else that does not fit the description of what is to be included in the price of a CLIN, shall be priced in the Installation CLIN for the associated project.
Answered
29 PD 3.2.14.11
PD Section 3.2.14.11 Lightning Protection- "The lightning protection system shall include an indicator status light, be modular, and support ease of maintenance and replacement." Will the Government confirm that the above statement pertains to the tower lightning protection?
Data surge suppressors typical to protect down range data wires are passive devices and do not have indicator lights.
Only the power surge protection requires indicator lights. See change to PD section 3.2.14.11 for clarification.
Answered:
Addressed via
Amendment 0002
30 Solicitation L.1.6.1.2
VCC at Detroit arsenal informed us that in order to hand carry personally our proposal we would need someone from the bid room building 231 to sponsor us. How do we get sponsorship in order to personally deliver the proposal?
Refer to instructions in Section L.1.6.1.2.
Answered
31 Solicitation L.1.6 Is the primary and backup set of media delivered in two separate packages?
Refer to instructions in Section L.1.6.
Answered