Attachment 00 PWS Annex G - Pavement Clearance.pdf

PDF 164 KB Posted

Attached to
Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany
Solicitation number
W564KV20R2000
Issued by

About this file

This document contains a Performance Work Statement (PWS) Annex and description of a related federal contract opportunity. The PWS Annex outlines requirements for snow and ice removal services at U.S. Army Garrison Rheinland-Pfalz locations in Germany. Services include plowing and sweeping roads, sidewalks, parking lots, and other paved areas. Specific priorities and response timelines are defined based on facility types. The contract opportunity is for base maintenance and facilities maintenance/repair services at approximately 15 locations within the USAG-RP footprint in Germany. The estimated value is $375 million over a five-year ordering period and nine-month option. The solicitation is expected to be released in Q1 2020 as a full and open competition single-award IDIQ contract with both FFP and T&M CLINs. The NAICS code is 561210 for facilities support services.

View the file

Other files

File Type Posted
TE-0004 Sembach Facilities Listing.pdf PDF
TE-0058 water oil grease coalescence starch separators.pdf PDF
TE-0047 Railroad tracks.pdf PDF
TE-0075F Husterhoeh Kaserne.pdf PDF
TE-0076B Daenner Kasern.pdf PDF
TE-0013B Barriers Bollards Tire Spikes - Locations.pdf PDF
TE-0040 Switch Gear.pdf PDF
TE-3031 Intr Eletrical Sys (Emergency Lights).pdf PDF
TE-0075O Pulaski Barracks.pdf PDF
TE-5031 Intr Elect Sys emerg lights 7983.pdf PDF
TE-0075S WSA FC.pdf PDF
TE-5024 Lightning Prot GAD 7983.pdf PDF
ATTACHMENT 21 Electrical Systems.pdf PDF
FINAL RFP W564KV20R2000 10-Mar-2020.pdf PDF
TE-2014 Fences GR.pdf PDF
Attachment 00 PWS Annex N - Environmental Services.pdf PDF
TE-0043 Storm Drain System washracks.pdf PDF
TE-0049 Bridges.pdf PDF
TE-4032 HVAC GAD 7815.pdf PDF
TE-0065a KMC locations requiring an Environmental Officer.pdf PDF
TE-2061 PestGR GRUENSTADT.pdf PDF
TE-0025 Air Comp and Air Tanks.pdf PDF
TE-1020b Emergency Generators-UPS report form GAD.pdf PDF
TE-3029 Fire Protec Sys CO2 CWS.pdf PDF
TE-0042 Utility Meter (Electro).pdf PDF
TE-3054 Installed Bldg Equipment Equipment in Place CWS.pdf PDF
TE-0051 Road markings traffic and directional signs.pdf PDF
ATTACHMENT 03 Estimated Workload.pdf PDF
TE-1021 Operation of Standby Gen GAD.pdf PDF
TE-1061 Pest GAD GR.pdf PDF
TE-0076X Breitenwald Range.pdf PDF
TE-0076A TECHNICAL EXHIBITS FOR STREET SWEEPING KMC.pdf PDF
TE-3039 Utility Privatization.pdf PDF
TE-0055 Sembach Heating System Specification.pdf PDF
TE-0026 Fire Alarm and Det Sys.pdf PDF
TE-2034 Gas Exhaust System GR.pdf PDF
TE-1052 Heating Systems GAD.pdf PDF
TE-0062 Prohibited Pesticides.pdf PDF
TE-0002 Security Zones updated.pdf PDF
TE-0076R ROB Overview.pdf PDF
TE-0027 Fire Prot Systems H2O.pdf PDF
TE-0076D Helisat.pdf PDF
TE-0075C DRMO.pdf PDF
TE-5048 Scales GAD 7983.pdf PDF
ATTACHMENT 04 Price Book FINAL 20200310.xlsx XLSX spreadsheet
TE-1043 Storm Drain Sys Washracks GAD.pdf PDF
TE-5038 Solar Systems Photovoltaik GAD 7983.pdf PDF
TE-1015 Gates GAD.pdf PDF
TE-0075K LARMC.pdf PDF
TE-4026 Fire Alarm Detec Sys GAD 7815.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PWS Annex G, Pavement Clearance Page 1 of 8

Annex G

Pavement Clearance 12

28 January 2020

PWS Annex G, Pavement Clearance Page 2 of 8

1. General Information.

1.1 Overview. The Contractor shall perform snow removal and ice control services for roads, rail yards, sidewalks (excluding those adjacent to occupied buildings), parking lots, service roads, streets, steps, entranceways, and handicapped ramps for the installations in order of designated priority levels (I, II, or III). The Contractor shall maintain streets, public sidewalks, steps, and parking lots safe and passable to ensure that the operational mission is not impaired in the event of ice or snowstorm. The Contractor shall furnish all qualified personnel, equipment, and supplies as needed to perform snow, ice, and sand removal. The Contractor shall ensure a preparedness to perform snow removal and ice control services for designated areas within the USAG-RP, as shown in applicable Technical Exhibits (TE-0075A through TE-0075U), 24 hours a day, 7 days a week, between November 1 and May 1, including German and American holidays and upon request of the COR. Snow, ice, and sand removal shall be performed in accordance with Host Nation requirements, Army regulations. The Contractor shall initiate snow and ice control when snowfall or ice accumulation as described in this Section is met, or upon request of the COR or the designated representative., The Contractor shall prepare to initiate snow and ice control in advance. An online real time report shall be made available to the DPW during snow and ice control actions, which shall provide the real time status of snow removal actions at all times. The Contractor shall apply traction material in a conservative manner to minimize damage to the environment while providing for the safety and prevention of accidents of all personnel traveling or walking on the designated areas. The Contractor shall assume all liabilities under German law for injuries resulting from non-performance of snow, ice, and sand removal. Contractor shall document all Snow, Ice Sand Removal, Street sweeping and cleaning action for the purposes of reporting into ISR by the DPW.

1.2 Snow, Ice, and Sand Removal Plan. The Contractor shall provide a PMP for Snow and Ice Removal detailing how, when, and with what resources the Contractor will carry out the tasks to maintain the standards established in this Section). Due to the emergency nature of this functional area, the Snow and Ice PMP additionally shall contain the following, with input from the IC where necessary:

(1) An action plan for accomplishing work in accordance with priorities and time periods contained in this PWS;

(2) An action plan for extremely heavy snowfalls, equipment failures, and employee absences;

(3) A plan for weather monitoring and employee recall procedures;

(4) A plan for coordination with security personnel (for example, military police); (5) A snow fence and marker plan;

(6) A plan detailing the locations and replenishment of emergency sand in roadside boxes;

(7) A plan for the removal of site surplus materials at the end of the snow season (such as salt, rollsplitt, and de-icing agents) resulting from snow and ice control activities on pavements;

PWS Annex G, Pavement Clearance Page 3 of 8

The Contractor shall repair all roads, sidewalks, parking areas, non- paved areas, grassed areas, and structures that are damaged as a result of the Contractor’s snow removal process.

Repairs affecting the trafficability and safety of personnel shall be repaired within five working days, weather permitting. All damages shall be repaired to previous condition following the winter damage. Repairs resulting from Contractor damage shall be completed at no additional cost to the Government.

2.0 Description of Services.

2.1 Scope. Pavement clearance includes, but is not limited to, the following: plowing and sweeping of sand or snow from roads, access control points (ACP), railroads, airfield pavements, taxiways, aprons, driveways and parking areas by pushing and piling the snow into adjacent areas or by collecting and removing sand. Historical data on routine pavement clearing (street sweeping) and emergency snow, ice, and sand removal is provided by the Directorate of Public Works (DPW). The Contractor shall begin clearing from areas identified in the Snow and Ice Removal Plan when accumulations have reached 5 cm or within 1 hour of notification by the COR/ACOR. Snow, ice or sand) removal shall be cleared from walkways, doorways, and gates to provide full opening and safe access for personnel and equipment. Snow or sand piles shall not be left in the plowed or swept areas.

2.1.1 Specialized Locations.

2.1.1.1 Paved Roads and Access Control Points (ACP). The Contractor shall clear roads and ACPs. The Contractor shall clear primary roads to support the safe movement of emergency vehicles. The Contractor shall ensure all ACPs are operational at all times, regardless of storm intensity. The Contractor shall deploy the assets necessary to ensure the road network is trafficable IAW the Snow, Ice, and Sand Removal Plan. Once removal operations commence, the Contractor shall continue these operations until is removed from the full width of streets, including intersections. The Contractor shall clear all primary roads NLT 0600 hours. 2.1.1.2 Parking Areas. The Contractor shall clear parking areas. Snow and ice or sand shall be removed from the full width of the parking areas and pushed to designated locations. The Contractor shall clear parking areas of snow and ice or sand.

2.1.2 Sidewalks. The Contractor shall schedule and perform snow and ice control on all sidewalks. The Contractor shall remove built-up ice on sidewalks, excluding those sidewalks that are adjacent to occupied buildings.

(1) The Contractor shall clear sidewalks up to the building or steps leading into the building. The Contractor shall maintain sidewalks along the installations’ outside perimeter fences IAW the respective city ordinance (Staedtische Verordnung). The Contractor shall be responsible for all liabilities resulting from violation of the ordinances and injuries resulting from non-performance of this Contract.

(2) Sidewalks adjacent to primary roads shall be designated as Priority I. 5 cm of snow or ice shall not be allowed to accumulate on any primary walkways. These sidewalks shall be cleared

PWS Annex G, Pavement Clearance Page 4 of 8 and appropriate traction material applied prior to 0700 hours .

(3) Application of Traction Material. The Contractor shall clear public sidewalks and walkways of snow and ice and cover them with gritting or de-icing material, IAW Host Nation laws, to ensure that sidewalks are safely passable. Traction material for customer use to control ice on pavements shall be provided by the Contractor and maintained in furnished boxes or containers prior to the winter season start. Sand and Salt (bags) shall be distributed. Following snow and ice storms, the Contractor shall verify the availability of traction material in furnished roadside boxes. Boxes shall be filled to at least 30% capacity and refilled as necessary during the season. Surplus traction control material resulting from snow and ice control activities on pavements shall be removed and hauled away by the Contractor at the end of the winter season (NLT the end of May). Sand and Salt (bags) shall be removed from boxes/containers, and stored.

Sand and Saltboxes/containers shall be removed, kept dry, and stored for use during the next winter season.

2.1.2.1 Snow Shoveling and Ice Removal. The Contractor shall snow shovel stairs and sidewalks and apply ice melt as needed for each building. Ice melts (salt) shall be placed on stairs and sidewalks for each building.

2.1.2.2 Catch Basins. The Contractor shall remove snow from all catch basins to allow free drainage. The Contractor shall clear basins at the end of each snowstorm.

2.1.2.3 Hydrants. The Contractor shall remove snow from and around the hydrants to ensure access. The cleared area shall be, at a minimum, approximately three (3) feet in radius from the hydrant. The Contractor shall clear access to hydrants at the end of each snowstorm.

2.1.2.4 Dumpsters. The Contractor shall remove snow from and around the dumpsters to allow for pedestrian access to dispose of refuse. The Contractor shall clear access to dumpsters at the end of each snowstorm.

2.1.2.5 HVAC Clearing. The Contractor shall ensure HVAC units are kept clear of snow and ice and all control panels are accessible from all sides. This shall be accomplished by means other than plowing (e.g., snow blowing or hand shoveling).

2.1.2.6 Sand or Snow Stockpile Removal. When specifically requested by the COR, the Contractor shall remove stockpiles to designated on-post locations.

2.2 Removal Priorities. The priority of pavement clearance shall be IAW Government approved Snow and Ice Removal Plan.

2.2.1 Clearing Primary Roads (Priority 1)

Following initial snow or ice accumulation or upon the request of the COR, the Contractor shall immediately undertake snow and ice control and removal on primary roads, including major roads, roads adjacent to 24-hour operation facilities, roads providing access to fire and emergency services, access control points, and routes to mission-critical facilities, which shall be

PWS Annex G, Pavement Clearance Page 5 of 8 designated Priority I. Contractor’s response time shall be within one (1) hour of initial snow or ice accumulation or COR request. Five (5) cm of snow or ice shall not be allowed to accumulate on any primary road pavement, and the Contractor shall continuously maintain ice control in traffic areas. Primary roads shall be the first roads cleared, and appropriate gritting and traction material shall be applied prior to 0700 hours. The Contractor shall proactively initiate snow removal based upon existing and predicted weather conditions.

The Contractor shall perform as a first priority snow, ice, sleet, and sand removal to ensure that Critical Facilities remain freely accessible at all times. Traction materials shall be applied at critical points, such as entrances, walkways, exterior stairways, slopes, and other areas so that public access and foot traffic are not hindered. No more than 5 cm of ice or snow shall be allowed to accumulate on Priority I walkways

2.2.2 Clearing Secondary Roads (Priority II). Secondary roads, including cross- connecting roads, range roads, and roads leading to administrative facilities, training facilities, and other community facilities shall be designated Priority II. These roads shall be cleared after all Priority I locations are within the allowed accumulation of 5 cm of snow or ice, or as described by the PMP. After Priority I roads are cleared, 5 cm of snow or ice shall not be allowed to accumulate on any secondary roads and they shall be cleared within four hours of notification.

2.2.3 Clearing Service Roads (Priority III). Service roads, including training area roads, storage areas, pump stations, electrical switch stations, and other service roads, shall be designated Priority III. These roads shall be cleared after all Priority I and II locations are within the allowed accumulation of 5 cm of snow or ice, and they shall be cleared within six hours of notification,.

2.2.4 Clearing Primary Parking Lots (Priority I). Primary parking lots shall be designated Priority I, and shall be cleared prior to secondary roads. Primary parking lots shall not be allowed to accumulate more than 5 cm of snow and ice.

2.2.5 Clearing Secondary Parking Lots (Priority III). Secondary roads, including cross-connecting roads, range roads, and roads leading to administrative facilities, training facilities, and other community facilities shall be designated Priority II. These roads shall be cleared after all Priority I locations are within the allowed accumulation of 5 cm of snow or ice. After Priority I roads are cleared, 5 cm of snow or ice shall not be allowed to accumulate on any secondary roads and they shall be cleared within four hours of notification.

2.3 Pre-Treatment and Clearing. The Contractor shall ensure safe walking and driving conditions by immediately removing ice from accumulated areas. The Contractor shall coordinate with the COR/ACOR to pre-treat areas with de-icing material, salt and/or sand, prior to forecasted storms. The Contractor shall apply a salt-brine solution to roads, parking lots, and sidewalks as pre-treatment before a snow or ice event. The Contractor shall remove and dispose of excess accumulations of de-icing material, if applicable, off Government property.

2.3.1 De-icing Material/Sand/Salt. The use of sand, salt, or a mixture thereof shall be used IAW local regulations and local policy. The Contractor shall ensure all materials used are in compliance with local laws and regulations. The allowable amount of material passing a No. 200 sieve as determined by the American Association of State Highway and Transportation Officials (AASHTO) -T11, Standard Method of Test for Materials Finer Than 75-μm (No.200) in Mineral Aggregates by Washing, shall not exceed 10% by weight. The maximum particle size for sand

PWS Annex G, Pavement Clearance Page 6 of 8 borrow shall be M1.04.0 Type A, one fourth inch (¼”). At the end of the Snow Removal Season, the Contractor shall remove excess sand from sidewalks and parking lots. No other materials shall be used without the COR/ACOR authorization.

2.3.2 Ice Control Abrasives. The Contractor shall apply abrasives for ice control as per conditions stipulated in the Snow and Ice Removal Plan. Abrasives shall consist of treated salt which shall be treated with an Environmentally Preferred Product (EPP).

2.4 De-icing Supplies. The Contractor shall provide and maintain salt barrels. Salt barrels shall not be placed earlier than 2 weeks before the first forecasted freeze. The Contractor shall remove salt barrels within 2 weeks of the last forecasted freeze. Salt barrels shall have weather protective lids and shall be placed in designated locations. Salt barrels shall contain a tool or scoop for the individual application of salt. The Contractor shall be responsible for all barrels, tools, equipment, and all materials required. The Contractor shall keep the barrels three-quarters (¾) full of de-icing materials/salt through the winter season. The Contractor shall replace or repair any damaged barrels and lids within one (1) day after notification by the COR/ACOR.

2.4.1 On-Call De-icing Materials. Parking lots and sidewalks shall be de-iced as an on-call requirement. The application shall be a complete coverage of the parking area.

2.4.2 Snow Plowing and Ice Removal Standby. The Contractor shall standby on-site, to snow plow/sweep and remove ice within two (2) hours of notification from the COR/ACOR. The Government will provide the Contractor a designated staging area to park and secure equipment and a secure area to stockpile supplies.

2.5 Pavement Sweeping. The Contractor shall provide sweeping services for scheduled removal of dirt and debris from paved areas, as provided in TE-0076A through TE-0076X.

Contractor shall update TEs(Arch GIS). The Contractor shall perform sweeping services during hours that will cause minimal disruption to traffic and shall sweep in accordance with the standards of the industry. Contractor may accomplish sweeping after regular work hours, if necessary. Unscheduled Paved Surface Sweeping and Cleaning. The Contractor shall complete unscheduled paved surface sweeping and cleaning services that exceed the levels provided for in the scheduled sweeping and cleaning specified in TE-0076A through TE-0076X. The Contractor shall perform these unscheduled sweeping and cleaning services by DMO The Contractor shall perform out-of- cycle pavement and surfaced area sweeping and waste removal at roadsides only upon request by the COR.

2.5.1 Airfields, helipads, runways, aprons, refueling points, and access control points shall be cleared of snow, ice, and sand in accordance with Host Nation requirements, Army regulations.

2.6 Inoperable Vehicles. The Contractor shall move all vehicles interfering with snow removal or ice control operations to a designated location. The Contractor shall remove inoperable vehicles. The Contractor shall assume liability for damages to vehicles caused by Contractor employee negligence.

PWS Annex G, Pavement Clearance Page 7 of 8

2.7 Safety. The Contractor shall ensure snow or sand removal equipment that is slow moving or otherwise creates an unsafe condition are clearly visible to oncoming traffic and bystanders (e.g., equipped with rotating or flashing amber lights).

2.8 Clearing Railroads. The Contractor shall ensure that rail yards, to include all rails, signals and switches, and railroad crossings are kept clear of snow and ice and that the switches are fully operational at all times during the severe weather season. Snow and ice shall be removed from all railroad crossings and railroad switches prior to rail movements.

2.9 Clearing Sidewalks

(1) General: The Contractor shall schedule and perform snow and ice control on all sidewalks within the designated areas as described in the PMP. The Contractor shall remove built-up ice on sidewalks, excluding those sidewalks that are adjacent to occupied buildings.

Ice control methods used by the Contractor shall keep clear 90% of the surface area of all sidewalks. The Contractor shall clear sidewalks up to the building or steps leading into the building. The Contractor shall maintain sidewalks along the installations’ outside perimeter fences IAW the respective city ordinance (Staedtische Verordnung). The Contractor shall be responsible for all liabilities resulting from violation of the ordinances and injuries resulting from non-performance of this Contract.

(2) Sidewalks Adjacent to Primary Roads: Sidewalks adjacent to primary roads shall be designated as Priority I. 5 cm of snow or ice shall not be allowed to accumulate on any primary walkways. These sidewalks shall be cleared and appropriate traction material applied prior to 0700 hours or as described in the PMP.

(3) Application of Traction Material: The Contractor shall clear public sidewalks and walkways of snow and ice and cover them with gritting or de-icing material, IAW Host Nation laws.

2.10 Storage of Materials. The Contractor shall obtain sufficient traction control materials prior to the start of the season and store for immediate use. The Contractor shall install, maintain, and fill sandboxes to a full level by 1 November every year. After each snow and ice control action, snow and ice control boxes will be checked for quantity and filled as necessary. After the winter season, but not before 1 April or after 15 May, the containers shall be emptied, cleaned, and removed. Storage methods and facilities shall be IAW Army and Host Nation regulations.

Storage of traction control materials containing salt or other environmentally sensitive materials shall be covered and additional pollution prevention measures taken to preclude discharges to the environment.

2.11 Other Removal Task

(1) Accumulated snow shall be removed and, if necessary, transported to and stockpiled in an area where normal traffic flow and parking will not be hindered. Accumulated snow shall be removed, transported, and stockpiled in an area that will allow for normal vehicle traffic flow, parking and foot traffic. Snow removal from stockpiled areas shall be removed after Priority III areas have been cleared.

(2) The Contractor shall clear snow and cover surfaces with gritting traction material. The Contractor shall proactively initiate snow removal based upon existing and predicted weather

PWS Annex G, Pavement Clearance Page 8 of 8 conditions. The timeframes for Contractor performance shall be cleared based upon the priorities established in this Section.

1. General Information.
2.0 Description of Services.