TE-1020b Emergency Generators-UPS report form GAD.pdf
PDF 120 KB Posted
- Attached to
- Facilities Maintenance and Repair, Base Maintenance Services for US Army Garrison Rheinland Pfalz, Germany
- Solicitation number
- W564KV20R2000
About this file
This document contains a federal contract opportunity announcement and related facility maintenance report form. The U.S. Army intends to issue a solicitation for a single-award IDIQ contract to provide all management, material, supplies, supervision, personnel, labor, facilities, transportation, general and specialized equipment, and maintenance and repair services for approximately 15 locations within the U.S. Army Garrison Rheinland Pfalz footprint in Germany. The contract would have a five-year ordering period and nine-month option period, with a ceiling of $375 million. Services would include base maintenance for buildings and emergency generators. The maintenance report form provides templates for documenting location information, equipment details, service and testing intervals, and test results for generators and uninterruptible power supplies.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Installation Emerg.Device Location Bldg.No Served Bldgs.No. Manufacturer Build Year Power Source Power Source Size kW Power Output kVA Fuel Type Tank Capacity Ltr. Total Run Time hrs. Battery DC/UPS Number Batteries DC Voltage Date Batteries Inst./Replaced Gen/UPS Service Interval Service Date Gen/UPS Test Interval Test Date Testing Load Type Test Results
Dropdown Menu Dropdown Menu Dropdown Menu Dropdown Menu Dropdown Menu Dropdown Menu Dropdown Menu Dropdown Menu Engine Diesel Annualy 1/Jul/2019 Annualy 1/Jul/2019 Generator Simulated Load Passed
Generator / UPS Location Info Energy generation type info UPS Info Service/Test Info
Generator Engine Diesel Annualy Engine Test Run only Passed UPS Batteries Gas Semi-annualy Generator Simulated Load Failed Other: type: Natural Gas Quarterly Generator Real Load Other:
Electricity Monthly Other:
Weekly Daily other:
| Sheet1 |
| Sheet2 |
File details come from the government source that posted it. Updated .