Mechanical Services / HVAC
Solicitation number
W52P1J-19-R-5002
Issued by

About this file

Attachment 0028 -- TE 6.0

View the file

Other files

File Type Posted
W52P1J19C5009_--_final.pdf PDF
Attachment_0028_--_Tech_Exhibit_6.0_--_Performance_Requirements_Summary_--_27JUN2019.xlsx XLSX spreadsheet
Amendment_0004.pdf PDF
Attachment_0007_--_Price_Matrix_--_07JUN2019.xlsx XLSX spreadsheet
Amendment_0003.pdf PDF
W52P1J-19-R-5002-0002.pdf PDF
Attachment_0007_--_Price_Matrix_--_05JUN2019.xlsx XLSX spreadsheet
Attachment_0025_--_Tech_Exhibit_3.0_--_PM_Requirements_--_06JUN2019.xls XLS spreadsheet
Attachment_0001_--_PWS_--_30MAY2019.pdf PDF
Attachment_0030_--_B348_Photos_--_22MAY2019.pdf PDF
Attachment_0029_--_Site_Visit_Attendee_List_--_22MAY2019.pdf PDF
Amendment_0001_to_W52P1J19R5002.pdf PDF
Attachment_0031_--_Anticipated_Subcontractors_Form_--_28MAY2019.pdf PDF
Attachment_0023_--_Tech_Exhibit_2.2_--_Equipment_Datebase_Input_Forms.xls XLS spreadsheet
Attachment_0008_--_Accessing_Secure_Attachments_--_HVAC-Mechanical_Services_Solicitation.DOCX DOCX document
Attachment_0012_--_Tech_Exhibit_1.0_--_Comfort_Cooling_Chillers.pdf PDF
Attachment_0014_--_Tech_Exhibit_1.2_--_Dry_Coolers.pdf PDF
Attachment_0013_--_Tech_Exhibit_1.1_--_YRCL_Chillers.pdf PDF
Attachment_0016_--_Tech_Exhibit_1.4_--_Refrigerant_Log_Tally.xls XLS spreadsheet
Attachment_0027_--_Tech_Exhibit_5.0_--_Historical_DMO_PWO_Data.pdf PDF
Attachment_0006_--_RIA_Access_Control_Record_Check_Form_--_HVAC-Mechanical_Services_Solicitation.pdf PDF
Attachment_0010_--_Past_Performance_Questionnaire_--_HVAC-Mechanical_Services_Solicitation.docx DOCX document
Attachment_0024_--_Tech_Exhibit_2.3_--_ODC_Equipment_Tracker.xlsx XLSX spreadsheet
Attachment_0002_--_Davis_Bacon_Wage_Rates_--_03MAY2019.pdf PDF
Attachment_0005_--_TE_List_--_HVAC-Mechanical_Services_Solicitation.docx DOCX document
Attachment_0019_--_Tech_Exhibit_1.7_--_Chiller_Heat_Exchanger_Evaluation.pdf PDF
Attachment_0009_--_Small_Business_Questionnaire_--_HVAC-Mechanical_Services_Solicitation.docx DOCX document
Attachment_0025_--_Tech_Exhibit_3.0_--_PM_Requirements.xls XLS spreadsheet
Attachment_0026_--_Tech_Exhibit_4.0_--_Predictive_PM_Requirements.pdf PDF
Attachment_0017_--_Tech_Exhibit_1.5_--_Refrigeration_Removal_Certifications.pdf PDF
Attachment_0004_--_Government_Furnished_Property_--_HVAC-Mechanical_Services_Solicitation.pdf PDF
Attachment_0003_--_SCA_Wage_Rates_--_26DEC2018.pdf PDF
Attachment_0018_--_Tech_Exhibit_1.6_--_Side_Stream_Filters.pdf PDF
Attachment_0015_--_Tech_Exhibit_1.3_--_Cooling_Towers.pdf PDF
Attachment_0020_--_Tech_Exhibit_1.8_--_Local_Water_Composition.pdf PDF
W52P1J-19-R-5011_--_Solicitation__--_10MAY2019.pdf PDF
Attachment_0001_--_PWS_--_01MAR2019.pdf PDF
Attachment_0007_--_Price_Matrix_--_29APR2019.xlsx XLSX spreadsheet
Show all 38

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 1

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION ONE GENERAL INFORMATIONDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
2.0 DESCRIPTION OF SERVICES IAW PARAGRAPHS 2.1 THROUGH 2.70%
a) HVAC Scope IAW 2.1LOT SIZE IS NUMBERPLANNEDMONTH12
b) Chiller Scope IAW 2.2OF CALENDAR DAYSSAMPLING
c) Boiler Scope IAW 2.3
d) Preventive Maintenance IAW 2.4
e) DDC Operations IAW 2.5
f) Water Treatment Consultant IAW 2.6
g) Predictive PM IAW 2.7
2.8 DATABASE MAINTENANCE IAW PARAGRAPH 2.80%PLANNEDMONTH12
a) Mechanical Equipment IAW 2.8.1LOT SIZE IS NUMBERSAMPLING
b) Predictive PM IAW 2.8.2OF CALENDAR DAYS
4.1 EXPERIENCE, QUALIFICATIONS, AND WORK PERFORMANCE CLASSIFICATIONS IAW PARAGRAPH 4.10%PLANNEDMONTH12
a) Contract Supervision IAW 4.1.1LOT SIZE IS NUMBERSAMPLING
b) Administrative IAW 4.1.2OF CALENDAR DAYS
c) Estimating IAW 4.1.3
d) Data Collection
e) Water Treatment Operators
5.0 CONTRACTOR PERFORMANCE EVALUATION IAW PARAGRAPH 5.00%PLANNEDMONTH12
a) 5.1 Quality Contril Program IAW 5.1LOT SIZE IS NUMBERSAMPLING
b) Quality Assurance IAW 5.2OF CALENDAR DAYS
6.1.10 DOCUMENTATION PARAGRAPH 6.1.100%PLANNEDMONTH12
a) Maintenance Order Documentation IAW 6.1.10.1LOT SIZE IS NUMBERSAMPLING
b) Time Keeping Documentation IAW 6.1.10.2OF CALENDAR DAYS
6.2 WORK MANAGEMENT- GFEBS IAW PARAGRAPH 6.20%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
6.4 PREVENTIVE MAINTENANCE ORDERS IAW PARAGRAPH 6.4
2.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
8.0 CONTRACTOR PLANS AND PROGRAMS IAW PARAGRAPH 8.2 THROUGH 8.140%
a) Contingency Plan IAW 8.1LOT SIZE IS NUMBERPLANNEDEA12
b) Property Control System Plan IAW 8.2REPORTS DUESAMPLING
c) Management Plan IAW 8.3IN THE MONTH
d) Quality Control Plan IAW 8.6
e) Phase-In/Phase-Out Plan IAW 8.7
f) Environmental Protection Plan IAW 8.8
g) Safety Program IAW 8.9
h) Utility Conversation Program IAW 8.10
i) PM Plans IAW 8.11
j) DMO/PWO Plans IAW 8.12
k) Work Administration Plan IAW 8.13
l) Mechanical Equipment Database Operating Plan 8.14
11.1 REFRIGERANT OPERATIONS IAW 11.10%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
13.0 DOCUMENT ADMINISTRATION IAW 13.0
0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
14.0 CONTRACTOR MANPOWER REPORT (CMRA) IAW 14.00%
LOT SIZE IS NUMBERPLANNEDEA1
REPORTS DUESAMPLING
IN THE MONTH

Section 5 - Chiller OPS

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION FIVE SPECIFIC TASK REQUIREMENTS-CHILLERSDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
1.1 GENERAL SCOPE IAW PARAGRAPH 1.12.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
1.2 PM OPERATING PLAN, MILESTONE CHART, AND PM CHECKLIST IAW PARAGRAPH 1.20%
LOT SIZE IS NUMBERPLANNEDEA3
REPORTS DUESAMPLING
IN THE MONTH
1.3 SEASONAL CHILLER OPERATIONS IAW PARAGRAPH 1.30%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
1.4 YEAR-ROUND COOLING CHILLERS IAW PARAGRAPH 1.40%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
1.5 REFRIGERANT TALLYING IAW PARAGRAPH 1.50%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
1.6 REMOTE MONITORING IAW PARAGRAPH 1.62.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
1.7 DDC PROGRAMMING AND MONITORING IAW PARAGRAPH 1.7
0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
1.8 SIDE STREAM FILTERS IAW PARAGRAPH 1.80%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
1.9 WATER TREATMENT IAW PARAGRAPH 1.90%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
1.10 EDDY CURRENT TESTING IAW PARAGRAPH 1.100%
LOT SIZE IS NUMBERPLANNEDMONTHEA
REPORTS DUESAMPLING
IN THE YEAR
1.11 REPORTING REQUIREMENTS IAW PARAGRAPH 1.110%
LOT SIZE IS NUMBERPLANNEDEA6
REPORTS DUESAMPLING
IN THE MONTH

DMOs_PWOs

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION FIVE-DMOs/PWOsDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
5.1 SCOPE IAW PARAGRAPH 5.10.0%PLANNEDMONTHLY12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
5.2 SPECIFIC MAINTENANCE AND PROJECT ORDER TASKS IAW PARAGRAPH 5.22.5%PLANNEDMONTHLY12
a) Supervisor and Coordination IAW 5.2.2LOT SIZE IS NUMBERSAMPLING
b) GFEBS IAW 5.2.4OF CALENDAR DAYS
c) Operations and Maintenance Manuals IAW 5.2.6IN THE MONTH
d) DMOs IAW 5.2.7
e) PWOs IAW 5.2.8-5.2.10
5.3 PWO PRICING PROPOSALS IAW PARAGRAPH 5.30.0%PLANNEDEANA
LOT SIZE IS NUMBERSAMPLING
PRICING PROPOSALS
SUBMITTED IN MONTH
5.4 CONVERSION OF DMO TO PWO IAW PARAGRAPH 5.40.0%PLANNEDMONTHLY12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
5.6 DMO/PWO COMPLETION DOCUMENTS IAW PARAGRAPH 5.60.0%PLANNEDMONTHLYNA
LOT SIZE IS NUMBERSAMPLING
OF REQUIRED SUBMISSIONS
IN MONTH.
5.7 UTILITY AND BUILDING DRAWING UPDATES IAW PARAGRAPH 5.70.0%PLANNEDSEMI-ANNUALLY2
LOT SIZE IS NUMBER OFSAMPLING
SUBMITTED REQUIREMENTS
PER CONTRACT YEAR
5.8 REPORTING REQUIREMENTS IAW PARAGRAPH 5.80.0%PLANNEDEA3
LOT SIZE IS NUMBERSAMPLING
REPORTS DUE
IN MONTH

Section 5 - HVAC

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION FIVE SPECIFIC TASK REQUIREMENTS-HVACDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
2.1 GENERAL SCOPE IAW PARAGRAPH 1.12.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
2.2 BAS OPERATIONS IAW PARAGRAPH 2.22.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
2.3 HVAC COMMUNICATIONS AND ADDRESSES IAW PARAGRAPH 2.30%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
2.4 TEMPERATURE REQUIREMENTS IAW PARAGRAPH 2.42.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH

Section 5 - Predictive PM

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION FIVE- PREDICTIVE PMDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
4.1 HVAC PREDICTIVE PM SCOPE IAW PARAGRAPH 4.12.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
4.2 SPECIFIED EQUIPMENT IAW PARAGRAPH 4.20%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
4.3 PREDICTIVE PM PLANS IAW PARAGRAPH 4.30.0%PLANNEDEA3
a) Operating Plan IAW 4.3.1LOT SIZE IS NUMBERSAMPLING
b) Predictive PM Database Operating Plan IAW 4.3.2SUBMITTED REQUIREMENTS
c) Milestone ChartIN MONTH
4.4 DATA COLLECTION DEVICE CALIBRATION IAW PARAGRAPH 4.40.0%PLANNEDANNUAL1
LOT SIZE IS NUMBERSAMPLING
OF REPORTS DUE ANNUALLY
4.5 DATA ANALYSIS IAW PARAGRAPH 4.52.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF REPORTS DUE
IN THE MONTH
4.8 REPORTING REQUIREMENTS IAW PARAGRAPH 4.80%PLANNEDEA6
LOT SIZE IS NUMBERSAMPLING
OF REPORTS DUE
IN THE MONTH

Section 5 - PM

REQUIRED SERVICE:MAXIMUMN ALLOWABLENORMALUNITSQUANTITYOPTION
SECTION FIVE SPECIFIC TASK REQUIREMENTS-SCHEDULED PM REQUIREMENTSDEGEE OF DEVIATIONMETHOD OF
FROM REQD AQLSURVEILLANCE
3.1 GENERAL SCOPE IAW PARAGRAPH 3.12.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.2 PM OPERATING PLAN IAW PARAGRAPH 3.20%PLANNEDEA2
PM Milestone Chart IAW 3.2.1LOT SIZE IS NUMBERSAMPLING
PM Historical Data Plan IAW 3.2.2OF REPORTS DUE
IN THE MONTH
3.3 HIT LIST IAW PARAGRAPH 3.30%PLANNEDEA1
LOT SIZE IS NUMBERSAMPLING
OF SUBMISSIONS DUE
IN THE MONTH
3.4.1 FILTER CHANGES IAW PARAGRAPH 3.4.15.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.2-3.4.3 COIL CLEANING IAW PARAGRAPHS 3.4.2-3.4.32.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.4 WINDOW AC UNITS IAW PARAGRAPH 3.4.42.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.5 SEASONAL LOGGING REPORT AND MAINTENANCE IAW PARAGRAPH 3.4.52.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.6 BELT REPLACEMENT AND SHEAVE INSPECTION IAW PARAGRAPH 3.4.62.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
3.4.7 SPIKE ENERGY GREASING IAW PARAGRAPH 3.4.72.5%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.8 AIR COMPRESSOR RELIEF VALVE IAW PARAGRAPH 3.4.80.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.9 AIR COMPRESSOR IAW PARAGRAPH 3.4.90.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.10 AIR DRYERS IAW PARAGRAPH 3.4.100.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.11 NATURAL GAS FURNACES IAW PARAGRAPH 3.4.110.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.12 NATURAL GAS BOILERS IAW PARAGRAPHS 3.4.120.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.13 AHUs IAW PARAGRAPH 3.4.130.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.14 IR HEATERS IAW PARAGRAPH 3.4.142.5%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.15 DIRECT DIGITAL CONTROLLERS IAW PARAGRAPH 3.4.150.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.16 SIDE STREAM FILTERS IAW PARAGRAPH 3.4.160.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.17 HOT WATER SYSTEM TEST SAMPLING IAW PARAGRAPH 3.4.170.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.18 WATER TREATMENT OF HOT WATER SYSTEMS IAW PARAGRAPH 3.4.180.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.19 VFDs IAW PARAGRAPH 3.4.190.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.20 HEAT EXCHANGERS IAW PARAGRAPH 3.4.200.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.21 ELECTRIC HEATERS IAW PARAGRAPH 3.4.212.5%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.22 VRF UNITS SAMPLES IAW PARAGRAPH 3.4.220.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.23 UNIT HEATERS IAW PARAGRAPH 3.4.242.5%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.24 LOW SPEED FANS IAW PARAGRAPH 3.4.24
0.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.25 EXHAUST FANS IAW PARAGRAPH 3.4.25
0.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.26 GAS UNIT HEATERS IAW PARAGRAPH 3.4.260.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.27 IR VACUUM FANS IAW PARAGRAPH 3.4.270.0%PLANNEDMONTH12
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.28 STEAM RELATED IAW PARAGRAPH 3.4.280.0%PLANNEDMONTH8
LOT SIZE IS NUMBERSAMPLING
OF CALENDAR DAYS
IN THE MONTH
3.4.29 SYSTEM FLUSH IAW PARAGRAPH 3.4.290.0%PLANNEDEAVARIES
LOT SIZE IS NUMBERSAMPLING
OF SYSTEMS TO BE FLUSHED
3.5 REPORTING REQUIREMENTS IAW PARAGRAPH 3.50.0%PLANNEDEA6
LOT SIZE IS NUMBERSAMPLING
OF REPORTS IN THE MONTH