W52P1J16R0001_Conformed_copy_through_amd0010.pdf
PDF 310 KB Posted
- Attached to
- Logistics Civil Augmentation Program (LOGCAP) V Federal contract opportunity
- Solicitation number
- W52P1J-16-R-0001
About this file
This federal contract opportunity notice provides details for Request for Proposal W52P1J-16-R-0001 for Logistics Civil Augmentation Program V logistical support services. The U.S. Army Contracting Command-Rock Island intends to issue the RFP on or about November 6, 2017. LOGCAP V will provide global support services to the Geographical Combatant Commands and Army Service Component Commands, including setting the theater, supply operations, transportation, engineering, base camp services, and other logistics and sustainment support. The estimated maximum contract value is $82 billion over 10 years. The Army intends to award a minimum of four and up to six Indefinite Delivery, Indefinite Quantity contracts to offerors whose proposals are most beneficial. A setting the theater requirement will be awarded as a task order to each awardee, satisfying the minimum guarantee. Performance task orders will also be awarded initially.
View the file
Other files for this federal contract opportunity
Show all 50
Logistics Civil Augmentation Program (LOGCAP) V has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER AND AWARD 1. This Contract Is A Rated Order Under
DPAS (15 CFR 700)
Rating Page of Pages
2. Contract Number 3. Solicitation Number 4. Type of Solicitation 5. Date Issued 6. Requisition/Purchase Number Sealed Bid (IFB)
Negotiated (RFP)
7. Issued By Code 8. Address Offer To (If Other Than Item 7)
NOTE: In sealed bid solicitations ‘offer’ and ‘offeror’ mean ‘bid’ and ‘bidder’.
SOLICITATION
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in item 8, or if handcarried, in the depository located in until (hour) local time (Date).
Caution - Late Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. For Information A. Name B. Telephone (No Collect Calls) C. E-mail Address
Call: Area Code Number Ext.
11. Table Of Contents
(X) Sec. Description Page(s) (X) Sec. Description Page(s)
Part I - The Schedule Part II - Contract Clauses A Solicitation/Contract Form I Contract Clauses
B Supplies or Services and Prices/Costs Part III - List Of Documents, Exhibits, And Other Attach.
C Description/Specs./Work Statement J List of Attachments D Packaging and Marking Part IV - Representations And Instructions E Inspection and Acceptance K Representations, Certifications, and F Deliveries or Performance Other Statements of Offerors G Contract Administration Data L Instrs., Conds., and Notices to Offerors H Special Contract Requirements M Evaluation Factors for Award
OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____ calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. Discount For Prompt Payment 10 Calendar Days (%) 20 Calendar Days (%) 30 Calendar Days (%) Calendar Days (%) (See Section I, Clause No. 52.232-8)
14. Acknowledgment of Amendments (The offeror acknowledges Amendment No. Date Amendment No. Date receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):
15A. Name and Code Facility 16. Name and Title of Person Authorized to Sign Offer Address of (Type or Print) Offeror
15B. Telephone Number 15C. Check if Remittance Address is 17. Signature 18. Offer Date Area Code Number Ext. Different From Above – Enter such
Address In Schedule
AWARD (To be completed by Government)
19. Accepted As To Items Numbered 20. Amount 21. Accounting And Appropriation
22. Authority For Using Other Than Full And Open Competition: 23. Submit Invoices To Address Shown In Item
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
24. Administered By (If other than Item 7) Code 25. Payment Will Be Made By Code
26. Name of Contracting Officer (Type or Print) 27. United States Of America 28. Award Date
(Signature of Contracting Officer)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
AUTHORIZED FOR LOCAL REPRODUCTION Standard Form 33 (Rev. 9-97) Previous edition is unusable Prescribed By GSA-FAR (48 CFR) 53.214(c)
W52P1J-16-R-0001 X
2017NOV20
2018FEB2604:00pm
NONE
2017NOV20 SEE SCHEDULE
W52P1J
ARMY CONTRACTING COMMAND - RI
ROCK ISLAND, IL 61299-8000
BLDGS 60 & 62
ALEJANDRA C. FIGUEROA
(309)782-1371
CCRC-LB
ALEJANDRA.C.FIGUEROA.CIV@MAIL.MIL
1 121
X 1
X 13 X 15
X 18 X 19
X 20
X 22
X 31
X 89
X 90
X 98
X 114
CONTINUATION SHEET
Reference No. of Document Being Continued Page of
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION A - SUPPLEMENTAL INFORMATION
THE FOLLOWING AMENDMENTS HAVE BEEN INCORPORATED
Buyer Name: ALEJANDRA C. FIGUEROA
Buyer Office Symbol/Telephone Number: CCRC-LB/(309)782-1371
Type of Contract 1: Cost Plus Fixed Fee
Type of Contract 2: Firm Fixed Price
Kind of Contract: Service Contracts
*** End of Narrative A0000 ***
1. Request for Proposal (RFP) W52P1J-16-R-0001 is for Logistics Civil Augmentation Program (LOGCAP) V support services detailed in the
Performance Work Statement (PWS) (Attachment 0001) to the Geographical Combatant Commands (GCCs) and Army Service Component Commands
(ASCCs) throughout the full range of military operations. This includes support to the following commands globally:
Northern Command (NORTHCOM/USARNORTH)
Southern Command (SOUTHCOM/USARSO)
European Command (EUCOM/USAREUR)
African Command (AFRICOM/USARAF)
Central Command (CENTCOM/USARCENT)
Pacific Command (PACOM/USARPAC)
2. LOGCAP services are available to support the US Army, Joint Forces, and other Department of Defense (DoD) components, and other select supported agencies as directed by the Department of the Army G-4.
3. This acquisition is being issued under the authority of the Federal Acquisition Regulation (FAR) Part 37, which describes the policy and procedures for procuring services in a performance based contracting environment. This contract will replace the current LOGCAP IV, Kuwait Base Operations and Security Services [excluding security], and Qatar Base Operations and Security Services Contracts. Under the
Armys Strategic Sourcing Initiative, LOGCAP has been designated as a Preferred Source by the Assistant Secretary of the Army
(Acquisition, Logistics, and Technology) and therefore, the potential to incorporate additional contracts under LOGCAP V exists.
4. This will be a formal source selection with full and open competition. This RFP will result in a minimum of four (4), and up to six
(6), Indefinite Delivery, Indefinite Quantity (IDIQ) contract awards. Awards will be based on a Best Value tradeoff. The U.S.
Government reserves the right to reject any or all proposals and make no award if such action is in the best interest of the U.S.
Government. Task orders will be awarded at the time of the basic contract awards In Accordance With (IAW) section B CLINs.
5. Pursuant to FAR 9.103, a contract will only be awarded to a contractor that the PCO determines to be responsible. Offeror must be able to demonstrate that it meets the standards of responsibility as set forth in FAR 9.104. The Government reserves the right to conduct a pre-award survey on any or all Offerors, and if applicable, joint venture partners, contractors included in teaming arrangements, and major subcontractors.
6. Each basic IDIQ contract Period of Performance (PoP) will be an initial five-year ordering period and options for five additional one year ordering periods. For proposal purposes, PoP will start on tentative award date, 13 September 2018. The subsequent PoPs for the basic IDIQs are as follows:
Five-year initial ordering period: 13 September 2018 - 12 September 2023 and potential options
Option 1 ordering period: 13 September 2023 - 12 September 2024
Option 2 ordering period: 13 September 2024 - 12 September 2025
Option 3 ordering period: 13 September 2025 - 12 September 2026
Option 4 ordering period: 13 September 2026 - 12 September 2027
2 121
W52P1J-16-R-0001 REPRINT
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Option 5 ordering period: 13 September 2027 - 12 September 2028
7. The maximum dollar amount for all contracts cumulatively is $82,000,000,000.00. The minimum guarantee for each LOGCAP V contract is the base year of the setting the theater requirement identified as PWS paragraph 02.01 that is aligned with each GCC/ASCC (See setting the theater requirements Attachments 0025 - 0030).
8. The setting the theater task orders will be awarded with a one (1) year base plus nine (9) - one (1) year option periods. For proposal purposes, PoP will start on tentative award date, 13 September 2018. The subsequent PoPs for the task orders are as follows:
Base Year: 13 September 2018 - 12 September 2019
Option year 1: 13 September 2019 - 12 September 2020
Option year 2: 13 September 2020 - 12 September 2021
Option year 3: 13 September 2021 - 12 September 2022
Option year 4: 13 September 2022 - 12 September 2023
Option year 5: 13 September 2023 - 12 September 2024
Option year 6: 13 September 2024 - 12 September 2025
Option year 7: 13 September 2025 - 12 September 2026
Option year 8: 13 September 2026 - 12 September 2027
Option year 9: 13 September 2027 - 12 September 2028
9. Performance task orders awarded at the time of the basic contracts will consist of a one (1) year base plus four (4) - one year option periods. A transition period will occur from date of award until which time the successful offeror achieves full operational capability service performance. Transition period(s) will be finalized after award. Both the incumbent and the successful offeror, in conjunction with the Government, shall perform transition related activities in good faith to affect a complete, safe, and secure assumption of responsibilities without impacting facility operations as required by the PWS. For proposal purposes, transition periods will start on tentative award date, 13 September 2018. Performance task orders PoPs will vary based on later determined transition period timelines.
10. When deciding whether to exercise options, the Government will consider the awardees previous years performance on the task order.
The determination to exercise option years will be made IAW FAR 17.207, Exercise of Options.
11. The task orders may utilize fixed price, cost reimbursable, time-and materials or labor-hour Contract Line Item Numbers (CLINs).
12. Subsequent task orders are anticipated to be issued during the performance period of this contract. The Government intends to provide all awardees a fair opportunity to be considered for each order unless one of the exceptions in FAR 16.505(b)(2) apply.
Procedures and evaluation criteria for competitions will be tailored specific to the requirements and detailed in the task order RFP.
FAR 16.505(b)(v) will be considered when developing the task order specific procedures.
13. Award is subject to FAR Clause 52.232-18, Availability of Funds.
14. The Government is employing the services of Productivity Solutions Corporation (PSC) to assist in the analysis of resources and costs of proposals submitted for evaluation under this solicitation. This assistance is of a technical nature, and in no way supplants the Governments exclusive responsibility for the award decision. The contract with PSC prohibits the unauthorized use or disclosure of any data submitted with proposals or in any way associated with this acquisition. All offerors will be required to enter into agreements with PSC permitting necessary access and establishing proper protections (see FAR 9.505-4(b)). The PSC contract prohibits the unauthorized use or disclosure of any data submitted with proposals or in any way associated with this acquisition. In accordance with
FAR subpart 9.5, PSC is prohibited from either offering on this solicitation (as a prime, subcontractor, or advisor) or participating in any resultant contract in any aforementioned role.
15. Notice of Organizational Conflicts of Interest (OCI): Jacobs Technology Inc. and any affiliates, subsidiaries, or subcontractors and
PSC and any affiliates, subsidiaries, or subcontractors have OCIs, and are precluded from offering a proposal as either a prime or a subcontractor, or from participating as a member of any team competing for these contracts and/or any other resultant contracts stemming from this RFP. The Government reserves the right to reject any offer it considers to represent an OCI. Offerors are directed to FAR 9.5 for further information on OCIs for detailed OCI contract restrictions/requirements.
16. Offerors must be able obtain a U.S. Facility Clearance equal to the highest classification stated on the DD 254 Contract Security
Classification Specification (Attachment 0024). Reference DoDD 5220.22 National Industrial Security Program Operating Manual for additional information. This facility clearance may also apply to affiliates, team members, and subcontractors if they will have access to classified information. Offerors shall submit the required Facility Clearances for all entities who will be handling classified information (to include, but not limited to: teaming arrangements, any joint ventures, and subcontractors) within 90 days of contract award. If the offeror fails to obtain the required facility clearance, its contract may be terminated.
17. Defense Federal Acquisition Regulation Supplement (DFARS) 252.234-7001 (DEV 2015-O0017) Notice Of Earned Value Management System
(Deviation 2015-O0017) and 252.234-7002 (DEV 2015-O0017) Earned Value Management System (Deviation 2015-O0017) are included in the RFP, however are not applicable to the task order requirements being competed. The clauses are included to give notice to offerors that it
3 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
may be required for later projects/task orders and will be indicated at that time.
18. Offerors are advised that this solicitation is unclassified and that all submissions to the Government shall be unclassified. ANY
OFFEROR WHO SUBMITS A PROPOSAL TO THE GOVERNMENT WHICH CONTAINS ANY CLASSIFIED INFORMATION WILL BE EXCLUDED FROM THE COMPETITIVE RANGE
AND ITS PROPROSAL WILL BE ELIMINATED FROM CONSIDERATION FOR AWARD.
19. No costs will be paid or reimbursed in conjunction with this RFP to include any questions and comments solicited, without exception.
20. All contractual provisions specified are obligatory for the prime contractor. The prime contractor is responsible for enforcing contractual provisions upon any subcontractors/suppliers/vendors proposed.
21. The successful Offeror's proposal in response to this solicitation may be incorporated into the resultant contract in whole or in part at the time of the award. If incorporated, the Offeror's proposal will therefore be a material term of this contract and failure to fully implement it could result in termination. No revisions/changes to the contractor's proposal may be made after award without prior approval of the PCO.
22. This final RFP prevails over draft versions that were previously posted to .
23. For questions pertaining to this RFP please contact Brian Knutson, Contracting Officer at brian.a.knutson2.civ@mail.mil, phone (309)
782-8679 or Alejandra Figueroa, Contract Specialist, Alejandra.c.figueroa.civ@mail.mil, phone (309) 782-1371 and copy the LOGCAP V email usarmy.ria.acc.mbx.logcapv@mail.mil.
*** END OF NARRATIVE A0001 ***
The purpose of Amendment 0001 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate revised Section H, paragraph H.5 Labor Agreements to change reference from H.7 to H.5. Sentence now states H.5 supplements but does not supersede the contractors obligations to be compliant with all applicable labor laws pursuant to the Basic
Contract, Section I.
2. Incorporate FAR 52.217-8 and FAR 52.204-8 fill-in language.
3. Remove the following clauses:
52.211-15, DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS
52.228-2, ADDITIONAL BOND SECURITY
52.228-11, PLEDGES OF ASSETS
52.228-14, IRREVOCABLE LETTER OF CREDIT
52-237-4511, CONTRACTOR MANPOWER REPORTING
252.223-7003, CHANGE IN PLACE OF PERFORMANCE - - AMMUNITION AND EXPLOSIVES
252.225-7994, ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR RECORDS IN THE UNITED STATES CENTRAL COMMAND THEATER OF OPERATIONS
(DEVIATION 2015-O0013)
4. Add the following clauses:
252.225-7979, ADDITIONAL ACCESS TO CONTRACTOR AND SUBCONTRACTOR RECORDS IN THE UNITED STATES CENTRAL COMMAND THEATER OF OPERATIONS
(DEVIATION 2018-O0008)
52.243-2, CHANGES - COST-REIMBURSEMENT (AUG 1987) -- ALTERNATE III
52.247-12, SUPERVISION, LABOR, OR MATERIALS
52.249-2, TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
5. Incorporate revised Section L:
Please note Attachment 0039 identifies other updates made via this RFP amendment.
a. Paragraph L.2 revised to include reference to additional POC: Alejandra Figueroa, Alejandra.c.figueroa.civ@mail.mil.
b. Paragraphs L.5, reference to SF33 changed to SF30
c. Paragraph L.5, revised e-mail address of proposal submittal from brian.a.knutson2.civ@mail.mil" to usarmy.ria.acc.mbx.logcapv@mail.mil .
d. Paragraph L.7.1.(2)b. revised to change words should to shall.
4 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
e. Paragraph L.7.1.(2)f. reference to term clarifications removed.
f. Paragraph L.8.4. revised relevancy descriptions.
g. Paragraph L.8.10., add reference to critical subcontractors.
h. Paragraph L.9.1.(1)b. revised to clarify language.
i. Paragraph L.10.1.b.2 revised to reflect changes in paragraph 2.b of Attachment 15.
j. Paragraph L.10.2.d revised to insert the phrase of the between the words copy and completed.
6. Incorporate revised Section M:
Please note Attachment 0039 identifies other updates made via this RFP amendment.
a. Paragraph M.3. revised to change may to will. Added sentence The Government will hold discussions with Offerors included in the competitive range.
b. Paragraph M.8.4.a. Factor 1 Technical/Management, added paragraph (iv) risk descriptions.
c. Paragraph M.8.4.b. Factor 2 Past Performance, paragraph (i) add reference to critical subcontractors.
d. Subparagraphs under M.8.4.d.(iv) revised to reflect the reorganization of the Grand Total Price Summary tab in Attachment 0016.
7. Incorporate revised Attachments:
a. Attachment 0001 - LOGCAP V PWS.
b. Attachment 0015:
i. Revised paragraph 1.b to clarify how escalation is applied to material and equipment plug numbers and direct offerors attention to the assumptions tab of the Technical Exhibits.
ii. Revised paragraph 2.a.(1) to reflect a change in the layout of the Grand Total Price Summary worksheet of Attachment
0016.
iii.Revised paragraph 2.b to instruct offerors how to generate the total cost, total fee, and total cost plus fee summaries.
iv.Revised paragraph 2.b.(4) to add for proposal purposes at the end of the paragraph.
c. Attachment 0016:
i. Reorganized the Grand Total Price Summary tab layout.
ii. Revised note number 4 of the Labor Details and ODC Details tabs to refer offerors to the Technical Exhibits to obtain the
CLIN numbers.
d. Attachment 17: Instruction 7 revised the cell reference, and the overall text to clarify how the worksheets are used for evaluation purposes
e. Attachment 18: Both subparagraphs to paragraph 1.b.(5) revised to be more inclusive of various types of costs that may be required by the collective bargaining agreements and/or wage determinations.
f. Attachment 0019 - Small Business Participation to remove Total row for C.
g. Attachment 0021 - Regional Capability Matrix.
h. Attachment 0022 - Contract Performance Questionnaire to state requested by the closing date of the RFP and consistent mailboxes to submit questionnaires.
i. Attachment 0023 - Labor Job Descriptions
j. Attachment 0031 - CLIN Structure
5 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
k. Attachment 0033 - Technical Exhibit M Health Services Personnel
l. Attachment 0034 and 0035 - NTC Collective Bargaining Agreements to add wage determination cover sheets.
m. Requirements workbooks; Attachments 0002-0010 and 0025-0030.
8. Provide Attachment 0024 - DD 254 Contract Security Clarification Specification.
9. Incorporate the following Attachments:
a. Attachment 0038 - LOGCAP V Clause Matrix. Attachment 0038 is to provide applicability of FAR, DFARS, and AFARS clauses to task orders.
b. Attachment 0039 - RFP Q&As to provide answers to Offerors questions in response to the RFP. Please note this attachment identifies other updates made via this RFP amendment.
c. Attachment 0040 - San Bernardino California Wage Determination 15-5629 for the National Training Center.
d. Attachment 0041 - LOGCAP V Distance Chart
e. Attachment 0042 - NTC CBA Job Descriptions
f. Attachment 0043 - TE F2 Report Format
10. Provide the Point of Contact for Productivity Solutions Corporation: Bhupen Patel, bhupen.patel@pscfederal.com.
11. Extend proposal due date to 12 February 2018 and time of 4:00 PM Central Time, as indicated on page one of the SF 30.
12. Award date is tentatively changed from 13 September 2018 to 10 October 2018. Therefore subsequent Periods of Performance (PoPs) for the basic Indefinite Delivery, Indefinite Quantity (IDIQs) and Setting the Theater task orders are as follows:
Basic IDIQs:
Five-year initial ordering period: 10 October 2018 - 9 October 2023 and potential options
Option 1 ordering period: 10 October 2023 - 9 October 2024
Option 2 ordering period: 10 October 2024 - 9 October 2025
Option 3 ordering period: 10 October 2025 - 9 October 2026
Option 4 ordering period: 10 October 2026 - 9 October 2027
Option 5 ordering period: 10 October 2027 - 9 October 2028
Setting the Theater Task Orders:
Base Year: 10 October - 9 October 2019
Option year 1: 10 October 2019 - 9 October 2020
Option year 2: 10 October 2020 - 9 October 2021
Option year 3: 10 October 2021 - 9 October 2022
Option year 4: 10 October 2022 - 9 October 2023
Option year 5: 10 October 2023 - 9 October 2024
Option year 6: 10 October 2024 - 9 October 2025
Option year 7: 10 October 2025 - 9 October 2026
Option year 8: 10 October 2026 - 9 October 2027
Option year 9: 10 October 2027 - 9 October 2028
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0002 ***
The purpose of Amendment 0002 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Add the following information to Section L, paragraph L.5:
If Offerors choose to hand deliver printed copies, please contact Brian Knutson at (309) 782-8679 or Alejandra Figueroa at (309) 782-
1371 prior to arrival in order to deliver printed copies. Information for gaining access to the Rock Island Arsenal can be found at the
6 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
following Rock Island Arsenal Garrison website: https://www.usagria.army.mil/accessrequests/ .
2. Revise Section L, paragraph L.7.1.(1)b. to correct page limit. The paragraph now states, "Page Limit: Fifteen (15) pages per
GCC/ASCC."
3. Revise Section M, paragraph M.8.4.b.(vii)c. to add the following sentence to the Neutral Confidence description, "The offeror may not be evaluated favorably or unfavorably on the factor of past performance."
Unless revised herein, all other terms and conditions remain unchanged.
*** END OF NARRATIVE A0003 ***
The purpose of Amendment 0003 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following new attachments:
a. Attachment 0044 - CBA to SCA Crosswalk
b. Attachment 0045 - RFP Q&As Round 2. Attachment 0045 provides answers to Offerors questions in response to the RFP Amendment
0001. Please note this attachment identifies other updates made via this amendment.
2. Incorporate the following revised attachments:
a. Attachment 0001 - LOGCAP V PWS Rev2
b. Attachments 0002 through 0010 - Requirements Tech Exhibit Workbooks Rev2
c. Attachment 0017 - FFP Pricing Template Rev2
d. Attachment 0021 - Regional Capability Matrix Rev2
e. Attachments 0025 through 0030 - Setting the Theater Tech Exhibit Workbooks Rev2
f. Attachment 0039 - RFP Q&A's Rev1. Formatting changes only.
g. Attachment 0042 - NTC CBA Job Descriptions Rev1
3. Incorporate revised Section L narrative. This amendment replaces the previous Section L narrative L0001 in its entirety. Section L revisions are as follows:
a. Paragraph L.5 revised to incorporate "most recent" to SF30.
b. Paragraph L.7.1.(2)f.3. revised to incorporate "and Approach".
c. Additional revisions are referenced in Attachment 0045 - RFP Q&A's Round 2.
4. Incorporate revised Section M narrative. This amendment replaces the previous Section M narrative M0001 in its entirety. Section M revisions are as follows:
a. Paragraph M.8.4.a.(ii) revised to incorporate "and Approach".
b. Paragraph M.8.4.d.(v) revised to change reference of (4)(b) to (iv)(b).
5. Extend proposal due date to 26 February 2018 and time of 4:00 PM Central Time, as indicated on page one of the SF30.
6. Award date is tentatively changed from 10 October 2018 to 24 October 2018. Therefore, subsequent Periods of Performance (PoPs) for the basic Indefinite Delivery, Indefinite Quantity (IDIQ) and Setting the Theater task orders are as follows:
Basic IDIQs:
Five-year initial ordering period: 24 October 2018 - 23 October 2023 and potential options
Option 1 ordering period: 24 October 2023 - 23 October 2024
7 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Option 2 ordering period: 24 October 2024 - 23 October 2025
Option 3 ordering period: 24 October 2025 - 23 October 2026
Option 4 ordering period: 24 October 2026 - 23 October 2027
Option 5 ordering period: 24 October 2027 - 23 October 2028
Setting the Theater Task Orders:
Base Year: 24 October 2018 - 23 October 2019
Option year 1: 24 October 2019 - 23 October 2020
Option year 2: 24 October 2020 - 23 October 2021
Option year 3: 24 October 2021 - 23 October 2022
Option year 4: 24 October 2022 - 23 October 2023
Option year 5: 24 October 2023 - 23 October 2024
Option year 6: 24 October 2024 - 23 October 2025
Option year 7: 24 October 2025 - 23 October 2026
Option year 8: 24 October 2026 - 23 October 2027
Option year 9: 24 October 2027 - 23 October 2028
Unless revised herein, all other terms and conditions remain unchanged.
*** END OF NARRATIVE A0004 ***
The purpose of Amendment 0004 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate new Attachment 0046 - RFP Q&A's Round 3. Attachment 0046 provides answers to Offerors questions in response to previous amendments.
2. Incorporate revised Attachment 0002 - Kuwait Tech Exhibit Rev3 and Attachment 0005 - EUCOM Tech Exhibit Rev3.
3. Notify Offerors that the tentative award date remains 24 October 2018 for award of the basic Indefinite Delivery, Indefinite
Quantity contracts, setting the theater task orders, and performance task orders.
Unless revised herein, all other terms and conditions remain unchanged.
*** END OF NARRATIVE A0005 ***
The purpose of Amendment 0005 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0001 - LOGCAP V PWS - REV3. Changes are reflected in blue text.
b. Attachment 0002 - KUWAIT TECH EXHIBIT - REV4
c. Attachment 0003 - AP OTHER TECH EXHIBIT - REV3
d. Attachment 0004 - IRAQ TECH EXHIBIT - REV3. Please note the labor mix ratios in the assumptions tab.
e. Attachment 0005 - EUCOM TECH EXHIBIT - REV4
f. Attachment 0006 - KWAJALEIN TECH EXHIBIT - REV3
g. Attachment 0007 - NTC TECH EXHIBIT - REV3
h. Attachment 0008 - AFRICOM TECH EXHIBIT - REV3
i. Attachment 0009 - SOTO CANO TECH EXHIBIT - REV3
j. Attachment 0010 - AFGHANISTAN TECH EXHIBIT - REV3. Please note the labor mix ratios in the assumptions tab.
k. Attachment 0015 - COST PRICE PROPOSAL REQUIREMENTS - REV2. Language added to address DBA waivers for Romania and Turkey, Federal
Supply System, transition and material & equipment plug numbers, internet access/phone use for service performance, and update
Subcontract Summary (see paragraph 2.e).
l. Attachment 0016 - COST REIMBURSABLE PRICING PROPOSAL FORMAT - REV2. See "Subcontract Summary" tab.
m. Attachment 0017 - FFP PRICING TEMPLATE - REV3. See new "Small Business" tab and revised "Instructions" tab.
n. Attachment 0025 - CENTCOM STT TECH EXHIBIT - REV3
o. Attachment 0026 - AFRICOM STT TECH EXHIBIT - REV3
p. Attachment 0027 - SOUTHCOM STT TECH EXHIBIT - REV3
q. Attachment 0028 - EUCOM STT TECH EXHIBIT - REV3
r. Attachment 0029 - PACOM STT TECH EXHIBIT - REV3
8 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
s. Attachment 0030 - NORTHCOM STT TECH EXHIBIT - REV3
t. Attachment 0031 - CLIN STRUCTURE - REV2. An additional note has been added to the FFP Requirements tab.
u. Attachment 0033 - TECHNICAL EXHIBIT M - HEALTH SERVICES PERSONNEL CREDENTIALING - REV2
Please note: Changes to Attachments 0002 - 0010 and 0025-0030 are highlighted in yellow.
2. Incorporate revision to RFP Section L paragraph L.10.1.b.5. This amendment replaces the previous Section L narrative L0001 in its entirety.
3. Award is tentatively changed from 24 October 2018 to 19 December 2018. Therefore, subsequent Periods of Performance (PoPs) are as follows:
a. Basic IDIQs:
Five-year initial ordering period: 19 December 2018 - 18 December 2023 and potential options
Option 1 ordering period: 19 December 2023 - 18 December 2024
Option 2 ordering period: 19 December 2024 - 18 December 2025
Option 3 ordering period: 19 December 2025 - 18 December 2026
Option 4 ordering period: 19 December 2026 - 18 December 2027
Option 5 ordering period: 19 December 2027 - 18 December 2028
b. Setting the Theater Task Orders:
Base Year: 19 December 2018 - 18 December 2019
Option year 1: 19 December 2019 - 18 December 2020
Option year 2: 19 December 2020 - 18 December 2021
Option year 3: 19 December 2021 - 18 December 2022
Option year 4: 19 December 2022 - 18 December 2023
Option year 5: 19 December 2023 - 18 December 2024
Option year 6: 19 December 2024 - 18 December 2025
Option year 7: 19 December 2025 - 18 December 2026
Option year 8: 19 December 2026 - 18 December 2027
Option year 9: 19 December 2027 - 18 December 2028
c. Performance task orders awarded at the time of the basic IDIQ contracts will consist of a transition period, a one (1) year base period, and four (4) - one year option periods. A transition period will occur from date of award until such time the successful offeror achieves full operational capability service performance. As such, the resulting task orders actual periods of performance may vary.
For proposal purposes, Offerors shall assume the following dates:
Transition: 19 December 2018 - 18 June 2019
Base Year: 19 June 2019 - 18 June 2020
Option year 1: 19 June 2020 - 18 June 2021
Option year 2: 19 June 2021 - 18 June 2022
Option year 3: 19 June 2022 - 18 June 2023
Option year 4: 19 June 2023 - 18 June 2024
4. Site locations will be provided to Offerors in an e-mail separate from the amendment posting.
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0006 ***
The purpose of Amendment 0006 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0001 - LOGCAP V PWS REV4. Changes are reflected in blue text.
b. Attachment 0002 - KUWAIT TECH EXHIBIT REV5
c. Attachment 0003 - AP OTHER TECH EXHIBIT REV4
d. Attachment 0004 - IRAQ TECH EXHIBIT REV4
e. Attachment 0005 - EUCOM TECH EXHIBIT REV5
f. Attachment 0006 - KWAJALEIN TECH EXHIBIT REV4
g. Attachment 0007 - NTC TECH EXHIBIT REV4
9 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
h. Attachment 0008 - AFRICOM TECH EXHIBIT REV4
i. Attachment 0009 - SOTO CANO TECH EXHIBIT REV4
j. Attachment 0010 - AFGHANISTAN TECH EXHIBIT REV4
k. Attachment 0012 - COST VARIANCE REPORT TEMPLATE REV1
l. Attachment 0015 - COST PRICE PROPOSAL REQUIREMENTS REV3
m. Attachment 0021 - REGIONAL CAPABILITY MATRIX REV3
n. Attachment 0025 - CENTCOM STT TECH EXHIBIT REV4
o. Attachment 0026 - AFRICOM STT TECH EXHIBIT REV4
p. Attachment 0027 - SOUTHCOM STT TECH EXHIBIT REV4
q. Attachment 0028 - EUCOM STT TECH EXHIBIT REV4
r. Attachment 0029 - PACOM STT TECH EXHIBIT REV4
s. Attachment 0030 - NORTHCOM STT TECH EXHIBIT REV4
Please note: Changes to Attachments 0002 - 0010 and 0025-0030 are highlighted in yellow or are reflected in blue text.
2. Incorporate new Attachment 0047 - RFP Q&As Round 4.
3. Incorporate revisions to RFP Section L paragraphs L.7.1(1)b. and L.7.1(2)d. This amendment replaces the previous Section L narrative L0001 in its entirety.
4. Add Section L narrative L0002.
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0007 ***
The purpose of Amendment 0007 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0002 - Kuwait Tech Exhibit - Rev6
b. Attachment 0005 - EUCOM Tech Exhibit - Rev6
c. Attachment 0006 - Kwajalein Tech Exhibit - Rev5
d. Attachment 0009 - Soto Cano Tech Exhibit - Rev5
e. Attachment 0015 - Cost Price proposal Requirements - Rev4
f. Attachment 0016 - Cost Reimbursable Pricing Proposal Format - Rev3
g. Attachment 0017 - FFP Pricing Template - Rev4
h. Attachment 0031 - CLIN Structure - Rev3
Please note: Changes to Attachments 0002, 0005, 0006, and 0009 are highlighted in yellow or are reflected in blue text.
2. Revisions have been made to attachments 0015, 0016, and 0031 to address intra-theater plug numbers.
3. Incorporate new Attachment 0048 - RFP Q&As Round 5.
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0008 ***
The purpose of Amendment 0008 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0005 - EUCOM Tech Exhibit - Rev7
b. Attachment 0032 - Technical Exhibit H.1 - PRS & AQL - Rev1
c. Attachment 0043 - TE F2 Report Format - Rev1
10 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
2. Attachment 0011 - Workload Data Report Template and Attachment 0012 - Cost Variance Report Format are removed as attachments to the
RFP and are incorporated in Attachment 0043 - TE F2 Report Format - Rev1.
3. Incorporate new Attachment 0049 - RFP Q&As Round 6.
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0009 ***
The purpose of Amendment 0009 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0002 - Kuwait Tech Exhibit - Rev7
b. Attachment 0003 - AP Other Tech Exhibit - Rev5
c. Attachment 0004 - Iraq Tech Exhibit - Rev5
d. Attachment 0005 - EUCOM Tech Exhibit - Rev8
e. Attachment 0006 - Kwajalein Tech Exhibit- Rev6
f. Attachment 0007 - NTC Tech Exhibit - Rev5
g. Attachment 0008 - AFRICOM Tech Exhibit - Rev5
h. Attachment 0009 - Soto Cano Tech Exhibit - Rev6
i. Attachment 0010 - Afghanistan Tech Exhibit - Rev5
j. Attachment 0025 - CENTCOM STT Tech Exhibit - Rev5
k. Attachment 0026 - AFRICOM STT Tech Exhibit - Rev5
l. Attachment 0027 - SOUTHCOM STT Tech Exhibit - Rev5
m. Attachment 0028 - EUCOM STT Tech Exhibit - Rev5
n. Attachment 0029 - PACOM STT Tech Exhibit - Rev5
o. Attachment 0030 - NORTHCOM STT Tech Exhibit - Rev5
Please note: Changes to Attachments 0002-0010 and 0025-0030 are highlighted in yellow or are reflected in blue text.
2. Award is tentatively changed from 19 December 2018 to 12 April 2019. Therefore, subsequent Periods of Performance (PoPs) are as follows:
a. Basic IDIQs:
Five-year initial ordering period: 12 April 2019 - 11 April 2024 and potential options
Option 1 ordering period: 12 April 2024 - 11 April 2025
Option 2 ordering period: 12 April 2025 - 11 April 2026
Option 3 ordering period: 12 April 2026 - 11 April 2027
Option 4 ordering period: 12 April 2027 - 11 April 2028
Option 5 ordering period: 12 April 2028 - 11 April 2029
b. Setting the Theater Task Orders:
Base Year: 12 April 2019 - 11 April 2020
Option year 1: 12 April 2020 - 11 April 2021
Option year 2: 12 April 2021 - 11 April 2022
Option year 3: 12 April 2022 - 11 April 2023
Option year 4: 12 April 2023 - 11 April 2024
Option year 5: 12 April 2024 - 11 April 2025
Option year 6: 12 April 2025 - 11 April 2026
Option year 7: 12 April 2026 - 11 April 2027
Option year 8: 12 April 2027 - 11 April 2028
Option year 9: 12 April 2028 - 11 April 2029
c. For proposal purposes, Offerors shall assume the following dates for Performance task orders awarded at the time of the basic
IDIQ contracts:
Transition: 12 April 2019 - 11 October 2019
Base Year: 12 October 2019 - 11 October 2020
Option year 1: 12 October 2020 - 11 October 2021
11 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Option year 2: 12 October 2021 - 11 October 2022
Option year 3: 12 October 2022 - 11 October 2023
Option year 4: 12 October 2023 - 11 October 2024
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0010 ***
The purpose of Amendment 0010 to Request for Proposal (RFP) W52P1J-16-R-0001 is as follows.
1. Incorporate the following revised attachments:
a. Attachment 0002 - Kuwait Tech Exhibit - Rev8
b. Attachment 0003 - AP Other Tech Exhibit - Rev6
c. Attachment 0004 - Iraq Tech Exhibit - Rev6
d. Attachment 0005 - EUCOM Tech Exhibit - Rev9
e. Attachment 0006 - Kwajalein Tech Exhibit - Rev7
f. Attachment 0007 - NTC Tech Exhibit - Rev6
g. Attachment 0008 - AFRICOM Tech Exhibit - Rev6
h. Attachment 0009 - Soto Cano Tech Exhibit - Rev7
i. Attachment 0010 - Afghanistan Tech Exhibit - Rev6
Please note: Changes to Attachments 0002-0010 are highlighted in orange.
2. Incorporate new Attachment 0050 - RFP Q&As Round 7.
Unless revised herein, all original terms and conditions remain unchanged.
*** END OF NARRATIVE A0011 ***
12 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
Offerors shall complete Attachment 0031 - CLIN Structure. Attachment 0031 shall align with offeror's cost/price proposal.
The Government may establish additional CLINs/Sub-CLINs, when necessary, to support new site locations and/or in support of additional requiring activities/funding sources.
*** END OF NARRATIVE B0001 ***
13 121
PIIN/SIIN
Page of
Name of Offeror or Contractor:
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Reference No. of Document Being Continued
MOD/AMD
0001 CLIN PLACEHOLDER - SEE ATTACHMENT 0031 $ ______________________________________ __________________
SERVICE REQUESTED: CLIN PLACEHOLDER - SEE ATTACH
CLIN CONTRACT TYPE:
Cost Plus Fixed Fee
Inspection and Acceptance _________________________
INSPECTION: Destination ACCEPTANCE: Destination
Deliveries or Performance _________________________
14 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
Regulatory Cite Title Date Regulatory Cite Title Date _______________ ______________________________________________________________________ ____________ _______________ ______________________________________________________________________ ____________
C-1 5152.225-5902 FITNESS FOR DUTY AND MEDICAL/DENTAL CARE LIMITATIONS JUN/2015
(ECC-A)
(a) The contractor shall ensure the individuals they deploy are in compliance with the current USCENTCOM Individual Protection and
Individual/Unit Deployment Policy, including TAB A, Amplification of the Minimal Standards of Fitness for Deployment to the CENTCOM AOR, unless a waiver is obtained in accordance with TAB C, CENTCOM Waiver Request. The current guidance is located at http://www2.centcom.mil/sites/contracts/Pages/GCP.aspx.
(b) The contractor shall perform the requirements of this contract notwithstanding the fitness for duty of deployed employees, the provisions for care offered under this section, and redeployment of individuals determined to be unfit.
(c) Contractor personnel who deploy for multiple tours, which exceed 12 months in total, must be re-evaluated for fitness to deploy every 12 months IAW the current USCENTCOM Individual Protection and Individual/Unit Deployment Policy standards. An examination will remain valid for 15 months from the date of the physical. This allows an examination to be valid up to 90 days prior to deployment.
Once a deployment begins, the examination will only be good for a maximum of 12 months. Any medical waivers received will be valid for a maximum of 12 months. Failure to obtain an updated medical waiver before the expiration of the current waiver renders the employee unfit and subject to redeployment.
(d) The contractor bears the responsibility for ensuring all employees are aware of the conditions and medical treatment available at the performance location. The contractor shall include this information in all subcontracts with performance in the theater of operations.
(e) In accordance with military directives (DoDI 3020.41, DoDI 6000.11, CFC FRAGO 09-1038, DoD Federal Acquisition Regulation Supplement
(DFARS) PGI 225.74), resuscitative care, stabilization, hospitalization at a Role 3 military treatment facility (MTF) for emergency life-limb-eyesight care will be provided along with assistance for urgent patient movement. Subject to availability, an MTF may provide reimbursable treatment for emergency medical or dental services (e.g., broken bones, lacerations, broken teeth or lost fillings).
(f) Routine and primary medical care are not authorized. Pharmaceutical services are not authorized for known or routine prescription drug needs of the individual. Routine dental care, examinations and cleanings are not authorized
(g) Notwithstanding any other provision of the contract, the contractor shall be liable for any and all medically-related services or patient movement rendered. To view reimbursement rates that will be charged for services at all DoD deployed medical facilities please go to the following website: http://comptroller.defense.gov/FinancialManagement/Reports/rates2014.aspx.
(End of Clause)
C-2 5152.225-5904 MONTHLY CONTRACTOR CENSUS REPORTING AUG/2014
(ECC-A)
Contractor shall provide monthly employee census information to the Contracting Officer, by province, for this contract. Information shall be submitted either electronically or by hard-copy. Information shall be current as of the 25th day of each month and received by the Contracting Officer no later than the first day of the following month. The following information shall be provided for each province in which work was performed:
The total number (prime and subcontractors at all tiers) employees.
The total number (prime and subcontractors at all tiers) of U.S. citizens.
The total number (prime and subcontractors at all tiers) of local nationals (LN).
The total number (prime and subcontractors at all tiers) of third-country nationals (TCN).
Name of province in which the work was performed.
The names of all company employees who enter and update employee data in the Synchronized Pre-deployment & Operational Tracker (SPOT)
IAW DFARS 252.225-7995 or DFARS DoD class deviation 2014-O0018.
(End of Clause)
C-3 5152.225-5907 MEDICAL SCREENING AND VACCINATION REQUIREMENTS FOR CONTRACTOR JUN/2015
(ECC-A) EMPLOYEES OPERATING IN THE CENTCOM AREA OF RESPONSIBILITY (AOR)
(a) All contractor employees are required to be medically, dentally, and psychologically fit for deployment and performance of their contracted duties as outlined in the Defense Federal Acquisition Regulation Supplement (DFARS) clause 252.225-7995, Contractor Personnel
15 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
Performing in the United States Central Command Area of Responsibility. This clause requires all contractor personnel to meet the theater specific medical qualifications established by the Geographic Combatant Commander before deploying to, being granted installation access, or performing work under the resultant contract. In the USCENTCOM Area of Operation (AOR), the required medical screening, immunizations, and vaccinations are specified in the current USCENTCOM individual Protection and Individual Unit Deployment
Policy and DoD Instruction (DODI) 3020.41, Operational Contract Support (OCS). Current medical screening, immunization, and vaccination requirements are available at http://www2.centcom.mil/sites/contracts/Pages/GCP.aspx. The current DODI is available at http://www.dtic.mil/whs/directives/corres/ins1.html. The current list of immunization and vaccination requirements are available at http://www.vaccines.mil.
(b) The USCENTCOM policy requires contractors to ensure adequate health management is available for Tuberculosis (TB) screening, diagnosis, treatment, and isolation during the life of the contract. This includes management and compliance with all prescribed public health actions regarding TB and the responsibility to ensure adequate health management is available at the Contractors medical provider or local economy providers location for all contractor and subcontractor employees throughout the life of the contract. The contractor shall maintain medical screening documentation, in English, and make it available to the Contracting Officer, military public health personnel, or Base Operations Center installation access badging personnel upon request.
(1) U.S. Citizens are considered Small-Risk Nationals (SRNs) as the U.S. has less than 25 TB cases per 100,000 persons. A TB testing method of either a TB skin test (TST) or Interferon Gamma Release Assay (IGRA) may be used for pre-deployment and annual re-screening of all U.S. Citizens employed under the contract. For a contact investigation, all personnel with a positive TST or IGRA will be evaluated for potential active TB with a symptom screen, exposure history and CXR. A physical copy of all TST, IGRA, and/or CXRs and radiographic interpretation must be provided at the deployment center designated in the contract, or as otherwise directed by the Contracting
Officer, prior to deployment and prior to installation access badge renewal.
(2) Other Country Nationals (OCNs) and Local Nationals (LNs) shall have pre-deployment/employment testing for TB using a Chest x-ray
(CXR) and a symptom survey completed within 3 months prior to the start of deployment/employment, with annual re-screening prior to installation access badge renewal. This is the only way to verify interval changes should an active case of TB occur. When conducting annual re-screening, the Contractors medical provider or local economy provider will look for interval changes from prior CXRs and review any changes in the symptom survey. A physical copy of the CXR film with radiographic interpretation showing negative TB results must be provided to the Base Operations Center prior to the start of deployment/employment, with annual re-screening prior to installation access badge renewal.
(3) After arrival in the USCENTCOM AOR, all cases of suspected or confirmed active TB must be reported to the theater Preventive
Medicine (PM) Physician and/or TB Consultant within 24 hours. Contact tracing, and medical coding, have specific requirements. After consultation with the Theater PM or TB Consultant, the contractor or sub-contractor with suspected or confirmed TB are required to be evacuated to the closest civilian hospital for treatment. The Contractor is responsible for management and compliance with all prescribed public health actions. The employee, contractor/sub-contractor shall be transported out of theater following three (3) consecutive negative sputum smears.
(c) All employees, contractors and sub-contractors, involved in food service, water and/or ice production facilities must be pre-screened prior to deployment and re-screened annually for signs and symptoms of infectious diseases. This includes a stool sample test for ova and parasites. Additionally, all employees, contractors and sub-contractors, will have completed: (1) the full series of immunization for Typhoid and Hepatitis A (full series) immunizations per the Centers for Disease Control and Prevention guidelines (e.g.
typhoid vaccination booster is required every 2 years); (2) the required TB tests; and (3) screening for Hepatitis B and C.
(d) Proof of pre-deployment and deployment medical screening, immunizations, and vaccinations (in English) for employees, contractors and sub-contractors shall be made available to the designated Government representative throughout the life of the contract, and provided to the Contracting Officer, for a minimum of six (6) years and (3) months from the date of final payment under the contract.
(End of Clause)
C-4 5152.236-5900 ELECTRICAL AND STRUCTURAL BUILDING STANDARDS FOR CONSTRUCTION DEC/2011
(ECC-A) PROJECTS
(a) The standards set forth herein are the minimum requirements for the contract. These standards must be followed unless a more stringent standard is specifically included. In such case the most stringent standard shall be required for contract acceptance.
(b) The contractor, in coordination with the Contracting Officer, Base Camp Mayor, Base/Unit Engineers, and requiring activity shall evaluate, upgrade, build, and/or refurbish buildings to a safe and livable condition. This work may include refurbishment, construction, alterations, and upgrades. All work shall be in accordance with accepted standards of quality.
(c) As dictated by the Unified Facilities Criteria (UFC) the contract shall meet:
(1) the minimum requirements of United States National Fire Protection Association (NFPA) 70, 16 121
Name of Offeror or Contractor:
PIIN/SIIN MOD/AMD
(2) 2011 National Electrical Code (NEC) for new construction
(3) 2008 National Electrical Code (NEC) for repairs and upgrades to existing construction
(4) American National Standards Institute (ANSI) C2, and
(5) United States National Electrical Safety Code (NESC).
(d) These standards must be met when it is reasonable to do so with available materials. When conditions dictate deviation apply British
Standard (BS 7671, Edition 17 defacto standard for 50 HZ installations). Any deviations from the above necessary to reflect market conditions, shall receive prior written approval from a qualified engineer and the Contracting Officer.
(e) The following internet links provide access to some of these standards:
UFC: http://www.wbdg.org/ccb/browse_cat.php?o=29&c=4
NFPA 70: http://www.nfpa.org
NESC: http://www.standards.ieee.org/nesc
(End of Clause)
C-5 5152.247-5900 INBOUND/OUTBOUND CARGO AND CONTRACTOR EQUIPMENT CENSUS APR/2012
(ECC-A)
a. Movement and coordination of inbound and outbound cargo in Afghanistan is critical to ensuring an effective drawdown. The contractor shall provide visibility of their inbound cargo and equipment via the Synchronized Pre-deployment Operational Tracker (SPOT) census for their contract. This requirement includes the prime's, and subcontractor's at all tiers, cargo and equipment. The contractor shall report any individual piece of equipment valued at $50,000 or more. Incoming cargo and equipment census data shall be input 30 days prior to start of performance or delivery of supplies and quarterly thereafter for inbound and outbound equipment.
b. This reporting is required on Rolling Stock (RS), Non Rolling Stock (RNRS), and Twenty foot Equivalent Units…
This is the start of the file's text. The full file is on GovTribe.