Instructions
INSTRUCTIONS:
1. A separate worksheet is provided for each GCC/ASCC, plus one additional worksheet to capture Small Business information for all of the GCC/ASCCs. The offeror shall not combine the individual worksheets into one worksheet.
2. The following instructions apply to the GCC/ASCC worksheets:
a. Cells requiring entries from the contractor are highlighted in blue. Offerors shall not change the format or the formulas of each worksheet except as provided herein. Each worksheet is protected to prevent changes to the table. The cells to the right and below the table may be used for workspace if needed as they are not protected.
b. The offeror shall insert the name and date of its proposal for each GCC/ASCC worksheet in the spaces provided.
c. The offeror shall insert its total proposed firm fixed price for each GCC/ASCC period of performance and PWS within the appropriate cell in column B. Note that these prices are the TOTAL firm fixed prices for their respective period of performance and PWS. They are not unit prices.
d. The offeror shall insert its proposed unit prices for additional theater analyses, concepts of support, and exercise support for each GCC/ASCC period of performance and PWS within the appropriate cell in column D. Note that these prices are to be unit prices for a quantity of one each. The Government may or may not award these additional units, and if any units are awarded, the award may be for a quantity less than the quantity shown in column E. The quantities for any units that are awarded shall be in whole units. A fractional quantity will not be awarded.
e. The price for the FAR 52.217-8 Option to Extend Services Period for evaluation purposes will be calculated by the spreadsheet. The firm requirements (i.e., the prices included in Column B) are calculated by applying a factor of 0.5 to the Option Year 9 fixed prices to reflect a maximum six month period of performance. The requirements for the additional theater analyses, concepts of support, and exercise support are calculated by applying the Option Year 9 proposed unit prices to half the quantities specified in Option Year 9.
f. The tables will calculate the grand total price for each GCC/ASCC. The price shown in cell I86 of each GCC/ASCCs worksheet is the price that will be used for evaluation purposes for that GCC/ASCC.
3. The offeror shall also populate the Small Business worksheet that is located after the FFP Template - SOUTHCOM worksheet. This worksheet is not password protected. Cells requiring entries from the contractor are highlighted in blue. This data will be used in combination with data from the cost reimbursable performance task orders to validate the offeror's small business information provided in Attachment 0019. The data contained in this worksheet will not be used to evaluate the offeror's total proposed price for the firm fixed priced task orders. Additional instructions for filling out this worksheet are contained therein.
FFP Template - EUCOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| EUCOM - CLIN 0010AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
FFP Template - PACOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| PACOM - 0012AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
FFP Template - CENTCOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| CENTCOM - CLIN 0001AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
FFP Template - NORTHCOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| NORTHCOM - CLIN 0014AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
FFP Template - AFRICOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| AFRICOM - CLIN 0006AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
FFP Template - SOUTHCOM
| LOGCAP V FIRM FIXED PRICED PRICING TEMPLATE |
| SOUTHCOM - CLIN 0008AA |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
FIRM REQUIREMENT ADDITIONAL QUANTITIES
(may or may not be awarded)
| DESCRIPTION | TOTAL PRICE | UNIT PRICE | QTY | UNIT OF MEASURE | OPTION TOTAL PRICE | GRAND TOTAL PRICE | Check Figure (should be $0) |
| SETTING THE THEATER - BASE YEAR | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 1 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 2 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 3 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 4 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 5 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 6 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 7 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 8 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - OPTION YEAR 9 | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | | 2 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | | 2 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | $ - 0 | $ - 0 | $0.00 |
| SETTING THE THEATER - FAR 52.217-8 OPTION TO EXTEND SERVICES | | | | | | | |
| PWS 02.01 Setting the Theater - Pre-Activation Planning | $ - 0 | | | | | $ - 0 | |
| PWS 02.01.01 Theater Analysis | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.02 Develop Concept of Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| PWS 02.01.03 Exercise Support | $ - 0 | $ - 0 | 1 | Each | $ - 0 | $ - 0 | |
| Subtotal | $ - 0 | | | | $ - 0 | $ - 0 | $0.00 |
GRAND TOTAL PRICE $ - 0 $ - 0 $ - 0 $0.00
Small Business
| IDENTIFICATION OF SUBCONTRACTOR/SMALL BUSINESS DOLLARS |
| INSERT OFFEROR'S NAME HERE |
| INSERT PROPOSAL DATE HERE |
| Line No. | | EUCOM | PACOM | CENTCOM | NORTHCOM | AFRICOM | SOUTHCOM |
| 1 | Small business dollars | | | | | | |
| 2 | Subcontractor dollars | | | | | | |
| 3 | | | | | | | |
| 4 | Small Disadvantaged Business | | | | | | |
| 5 | Women-Owned Small Business | | | | | | |
| 6 | HUBZone Small Business | | | | | | |
| 7 | Veteran-Owned Small Business | | | | | | |
| 8 | Service-Disabled Veteran-Owned Small Business | | | | | | |
INSTRUCTIONS: This table is for the purpose of identifying small business and subcontractor dollars included in the Setting the Theater prices. Instructions are as follows:
1. The dollars to be included in this table shall be for all periods from the Base Year through the FAR 52.217-8 Option to Extend Services period. There is no requirement for the data for each GCC to be broken out by the individual periods.
2. Line 1: Insert the estimated total small business dollars proposed for each GCC/ASCC in the appropriate cell.
3. Line 2: Insert the estimated total subcontractor dollars (both large and small) proposed for each GCC/ASCC in the appropriate cell.
4. Lines 4 through 8: Insert the dollars associated with each of the five socio-economic categories for each GCC/ASCC in the appropriate cell. Note that the socio-economic categories are listed in the same order as Attachment 0019.
5. The dollars entered into the above table SHOULD NOT include the prime contractor's add-ons and fees.