This document is Amendment 0003 to Solicitation W519TC-24-R-2015 for RIA HVAC Services at the Rock Island Arsenal in Illinois. The amendment addresses several contractor questions, including clarification on the government's expectations for preventive maintenance, demand maintenance orders, and project work orders.

Key details include:

  • Vendors must request controlled documents by email to the specified government points of contact.
  • Bonds are not required with proposal submission but are required for each project work order over $150,000.
  • The government expects the contractor to develop and maintain a comprehensive Preventive Maintenance Plan, with small repairs covered under Demand Maintenance Orders.
  • The government will provide access to the HVAC monitoring software, and the contractor is responsible for acquiring necessary hardware, software, and licenses.
  • Resumes are required for the GFEBS Project Manager and BAS/DDC Controls Technician positions.
  • There is no collective bargaining agreement in effect.
  • The contractor is responsible for all required employee training and certifications.

View the file

Other files for this federal contract opportunity

Other files attached to RIA HVAC Services, newest first.
File Type Posted
Attachment 0041 Site Visit Sign In.pdf PDF
W519TC-24-R-2015 Amendment 0002.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 02APR2024.pdf PDF
Attachment 0004 Price Matrix 26MAR2024.xlsx XLSX spreadsheet
Attachment 0040 Labor and Material Summary DMOs 25MAR2024.pdf PDF
W519TC-24-R-2015 Amendment 0001.pdf PDF
Attachment 0003 Basis for Award.pdf PDF
Attachment 0005 Davis Bacon Wage Determination 15MAR2024.pdf PDF
Attachment 0031 TE 5.2-07 -- USAG-RIA PM GUIDE - 20230821.pdf PDF
Attachment 0034 TE 5.4-02 -- USAG-RIA PWO Workload Summary.pdf PDF
Attachment 0037 TE 6.0-02 -- Transmittal Record.pdf PDF
Attachment 0038 TE 7.1-01 -- Prevailing Wage Rates 19MAR2024.pdf PDF
W519TC-24-R-2015.pdf PDF
Attachment 0007 Past Performance Questionnaire.docx DOCX document
Attachment 0008 Small Business Participation Plan.docx DOCX document
Attachment 0017 TE 1.10-02 -- DD Form 1348-1A, Issue Release Receipt Document.pdf PDF
Attachment 0018 TE 1.10-03 -- ODC Equipment Tracker.xlsx XLSX spreadsheet
Attachment 0019 TE 2.1-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED PROPERTY.pdf PDF
Attachment 0020 TE 2.1-02 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SERVICES.pdf PDF
Attachment 0022 TE 2.3-01 -- Standard Form 701 -- Activity Security Checklist.pdf PDF
Attachment 0039 Site Visit Map.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 20 MAR 2024.pdf PDF
Attachment 0002 Instructions to Offerors.pdf PDF
Attachment 0004 Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 TE 1.10-01 -- Refrigeration Removal Certifications.pdf PDF
Attachment 0029 TE 5.2-05 -- Chilled Water Services.pdf PDF
Attachment 0035 TE 5.8-01 -- USAG-RIA Operation of Major Comfort Boiler Plants_20240301.pdf PDF
Attachment 0036 TE 6.0-01 -- USAG-RIA HVAC&R Contract Deliverables.pdf PDF
Attachment 0006 SCA Wage Determination 26DEC2023.pdf PDF
B08 Attachment 0009 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
Attachment 0015 TE 1.2-04 -- USACE Accident Investigation Report.pdf PDF
Attachment 0021 TE 2.2-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SPACES.pdf PDF
Attachment 0023 TE 2.3-02 -- ISWMP REVISION March 23.pdf PDF
Attachment 0024 TE 2.4-01 -- USAG-RIA Integrated Cultural Resource Management.pdf PDF
Attachment 0026 TE 5.2-02 -- USAG-RIA Refrigerant Log Tally.xlsx XLSX spreadsheet
Attachment 0027 TE 5.2-03 -- USAG-RIA Chiller Heat Exchanger Evaluation.pdf PDF
Attachment 0033 TE 5.4-01 -- USAG-RIA DMO Workload Summary.pdf PDF
Attachment 0032 TE 5.2-08 -- USAG-RIA PERFORMANCE EXPECTATIONS- 20230820.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See Summary of Changes

1. CONTRACT ID CODE PAGE OF PAGES

1 13

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Apr-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W519TC24R2015

X 9B. DATED (SEE ITEM 11)

21-Mar-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Apr-2024

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W519TC24R2015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0003

The purpose of Amendment 0003 to Solicitation W519TC-24-R-2015 is as follows:

1. Vendors with a need-to-know may request controlled documents (Attachments 0010, 0011, 0012, 0013, 0014, 0025, 0028, and 0030) via email to lindsay.p.park.civ@army.mil and Kathleen.m.ward20.civ@army.mil.

2. To address the following contractor questions:

o We would like to clarify if any type of bonding is required for the project?

Answer: Bonds are not required with proposal submission but are required for each PWO over $150,000.00.

o Referencing Attachment 0031 TE 5.2.07 RIA Preventive Maintenance (PM) Guide is it the Government’s intention to provide repairs and replacement made under PM, or to have the contractor to request DMO’s through ARMA to repair failed or failing part/components? The PWS states that any equipment needing repair is to be repaired with a DMO. Below are some examples:

- Page 16 Fan Assembly, Item 4: Check fan belt tension. Check belt for wear and replace annually.

- Page 17 Refrigerant, Item 2: Check refrigerant oil levels for refrigerants systems with oil pressure/level controls. Repair, replace, or adjust as needed to ensure proper operation, as applicable.

- Page 18 Compressor, Item 1: Check compressor oil level and/or pressure on refrigerant systems having oil level and/or pressure measurement means.

Repair, replace, or adjust as needed to ensure proper control.

- Page 42 Item 4: Check compressed-air system (e.g., compressor, dryer, receiver, blowdown valve, pressure regulators) for proper operation. Check for evidence of oil carryover and condition of oil filter. Repair or replace as needed to ensure proper operation.

Answer: No. The government's expectation is to receive preventive maintenance services, encompassing all inspections, testing, routine servicing, and maintenance activities in accordance with prescribed manufacturer guidelines and intervals (frequencies), as detailed in Section 1.2 titled "Objective" on page 1 of the PWS.

In essence, the Government expects the Contractor develop and maintain a Preventive Maintenance Plan (PMP). The requirements of the PMP plan are Firm Fixed Price (FFP) item/actions. They include tasks such as verification, measurement, draining, cleaning, adjusting, aligning, checking, rust removal, painting corroded surfaces, lubrication, inspection, testing, vibration analysis, routine servicing, filling reports and logs, and entering requests for DMOs in ArMA. Furthermore, the Government expects the Contractor to include the replacement of bulbs, belts, backup batteries, air filters, labels, and oil changes within the frequencies indicated in the PWS and TE 5.2-07 as part of routine services.

Additionally, the Government expects that Contractor Demand Maintenance Orders (DMOs) FFP will cover small repairs and all unscheduled repair and unscheduled servicing needs. Examples of small repairs include:

Example 1: During the execution of a PMO to an Air Handling Unit (AHU), if the Contractor identifies that the fan motor is deficient and requires repair, along with damage to bearings, belts, shields, and non-functioning temperature sensors and gauges.

If, the Contractor identifies that the most cost-effective repair option for the Government is to replace the fan motor, bearings, belts, shields, temperature sensors, and gauge. The Contractor shall then request a DMO for repair by replacement the fan motor, bearings, shields, temperature sensors, and gauge in ArMA. Please note that replacing the belt shall be part of the FFP of the PMO and shall not be part of the DMO FFP.

Example 2: During the execution of a PMO to a Condensing Unit (CU), the Contractor identifies a deficient compressor and low refrigerant (R-410A) charge, the most cost-effective repair option for the Government is to replace the compressor and add 20 lbs. of refrigerant (R-410A) to the system. The Contractor shall request a DMO for repair by replacement, replace the compressor and add 20 lbs. of refrigerant (R-410A) to the system in ArMA.

Example 3: During the execution of a PMO to a Condensing Unit (CU), the Contractor identifies a deficient compressor and low refrigerant (R-22) charge, the most cost-effective repair option for the Government is to replace the CU with a new unit using refrigerant R-410A. This change in refrigerant will also require the replacement of piping and cooling coils in the AHU. The Contractor shall assess if this repair exceeds the limits of a DMO established in the PWS, as outlined in section 5.3.2 titled "Work Order Retrieval, Execution, and Closure" on page 41. If repairs remain within the limits (see section 5.3.2 of the PWS), the Contractor shall request a DMO in ArMA for repair by replacing the CU, coils, pipes, refrigerant, and other parts as necessary. If the work exceeds a limit, the Contractor shall report to the Government (via email) that a PWO shall be required to execute repairs, as per Part 5, section 5.7.

o Is it the Government’s intent to test year-round chillers with straight water? These are not low pressure refrigerants and leaks will be found when they are running, not by warming the bundle.

Answer: The TE 5.2-07 USAG-RIA PM Guide is a Government Guide, Contractor can present PM plan with better ways to execute all PM work. All preventive maintenance shall follow manufacturer recommendations, refer to section 1.2 called “Objectives” in page 1. For your convenience we are including part of the section below:

“Preventive maintenance includes all inspections, testing, routine service, and maintenance services in accordance with prescribed manufacturer guidelines and intervals. All work not specifically mentioned, which is required to ensure that maintenance is complete and is within the intent of this contract, shall be performed without additional cost.”

o Reference Attachment 0040 – were all these costs from the HVAC Maintenance Contract?

Answer: Attachment 0040, titled 'Labor and Material Summary DMOs 25MAR2024,' offers a comprehensive overview of historical task data completed between March 15, 2020, and June 14, 2023. This attachment provides detailed information, including labor hours and material costs associated with each individual task.

o Will DMOs be issued per piece of equipment? For example, if a space is overheating and several components of the heating system are found to be in need of repair, will a DMO be issued for each component?

Answer: The Government's expectation is that in the event of a claim, such as the one described above regarding the HVAC system's performance, the Contractor promptly identifies and addresses any deficiencies. Identifying deficiencies in a claim is covered under the Operational Firm Fixed Price (FFP) of the contract. Once a deficiency is identified and a path forward is determined, a single Demand Maintenance Order (DMO) shall be initiated. The Government expects the Contractor to repair all equipment found to be deficient under this DMO, which is paid under the DMO FFP. If the work exceeds the DMO limit (see section 5.3.2 of the PWS), the Contractor shall report to the Government (via email) that a PWO shall be required to execute repairs, as per Part 5, section 5.7. Additionally, the Contractor's proactive approach in investigating and resolving issues efficiently is valued and contributes to the smooth operation of the facilities, enhancing overall satisfaction with the contract's services, paid under the operational FFP.

o Does the GFEBS Plant Maintenance Process Overview certification meet the GFEBS Plant Maintenance – Preventive Maintenance role that is called out in Key Point #2 in Attachment 0002 Instruction to Offerors? There is a preventive maintenance section with the Process Overview course.

Answer: The GFEBS Plant Maintenance-Preventive Maintenance role necessitates obtaining two (2) certifications. The first certification is the GFEBS Essentials or GFEBS Overview Certification. The second certification is the GFEBS Plant Maintenance Process Overview certification."

o Ref Attachment 0002, Page 7-8: Is the Government’s intention for a sample task to be a preventative maintenance checklist for what work will be performed on different types of equipment?

Answer: No. The Sample Task is not intended to be a mere checklist. It serves as an opportunity for Offerors, to demonstrate their HVAC related problem-solving experience and methodology for resolving issues that HVAC issues. It provides insight into how the offeror has interpreted the information given in the PWS and how the Offeror will approach resolving issues routinely encountered at Rock Island Arsenal.

o What are the e-mail file size restrictions for attachments for proposal submission?

Answer: The max attachment size limit is 20 megabytes (MB) per email.

o I do not see where the government owned DDC software packages and software keys are listed as government furnished property. Are we to assume that these software packages and keys are no longer in the possession of the government, and we are responsible for acquiring new licenses and keys, or subcontract other control vendors to perform the necessary software backups on all the different controls on the Arsenal?

Answer: Software keys and licenses are not specifically listed in the Technical Exhibits (TEs). The Rock Island Arsenal HVAC Monitoring System (EnteliWEB) operates on a hybrid Direct Digital Control (DDC) system with both open and closed software/hardware components. The Government provides access to the Rock Island HVAC Monitoring Software, EnteliWEB, through five (5) Government computers listed in Attachment 0019 TE 2.1-01 USAG List of Government Furnished Property. The Government expects the Contractor to gain administrative access to the open-source software solely via the main workstation during the Phase-In and Phase-Out periods of the contract. While the software resides on Government servers within the NEC, it is expected that the Contractor will update the software annually by acquiring a 1-year maintenance subscription from Delta and coordinate all work with the NEC to meet software updates. This update work is considered part of the Firm Fixed Price (FFP) Preventive Maintenance Orders (PMOs) under the contract.

Furthermore, the Government expects the Contractor to be responsible for acquiring all necessary material, equipment, and tools for accessing both closed-source software and hardware, both in the workstation and in the field. No Demand Maintenance Orders (DMOs), Operational Work Orders (OWOs), or Project Work Orders (PWOs) will be issued for the acquisition of additional computers to perform work. Additionally, it is expected that the new Contractor will acquire all necessary equipment, tools, and materials to perform PMOs, DMOs, OWOs, and PWOs under this contract, including computers, software keys, licenses, and other items required to work in the field (such as mechanical rooms and other areas). Work in the field will involve diagnostics, backup, programming, troubleshooting, and handling both open and closed software and hardware components. Please note that the RIA HVAC Monitoring System and other HVAC systems operate with multiple Control Systems utilizing versions from the early 2000s.

o Ref PWS 2.1.7.3.6, Page 9: Is the GFEBS Project Manager Coordinator different from the GFEBS Project Manager?

Answer: No.

o Please confirm that the Offeror is only required to submit Part 1 of the Past Performance.

Answer: Offerors shall first complete Part 1 of the Past Performance Questionnaire (PPQ). A technical representative responsible for the past/current contract shall complete Part II and email the entire questionnaire to the Contracting Office no later than proposal due date. Vendors are not required to obtain a copy of the completed questionnaire, but the PPQ will count towards the maximum page limit for Past Performance.

o Ref Attachment 0002, Phase 1, Key Point #2 & Key Point #3, 1: Our interpretation is that resumes are required for the GFEBS Project Manager and the BAS/DDC controls Tech. Please confirm.

Answer: Correct, resumes for both positions are required with proposal submissions.

o Please provide the Collective Bargaining Agreement (CBA) in effect on the current contract:

Answer: There is not a CBA.

o Should the Offerors send proposal volumes in a single email? Is there a file size limit to individual email messages for the primary POC?

Answer: Offerors may send multiple emails for proposal volumes so long as it is clear that all emails are connected to the submission as the max attachment size limit is 20 megabytes (MB) per email.

o Ref Site Visit: Are all portions of Preventive Maintenance Orders (PMOs) allowed to be self-performed, i.e., Boilers and Chillers. Etc?

Answer: Yes, please refer to PWS Section 2.1.8 – Professional Qualifications on page

10. The awarded Contractor is responsible for ensuring that:

a. All Contractor employees and associated subcontractors possess the necessary certifications or licenses required by the State of Illinois or the State of Iowa for the specific areas of work they will perform.

b. Employees are certified or licensed in the appropriate Environmental Protection

Agency (EPA) areas as required.

c. All required documentation of certification or licensure for Contractor personnel is submitted to the COR/ACOR at least twenty-four (24) hours prior to employees commencing performance. (Please refer to Section 2.17.3.3 “Contractor Key Personnel” for more restrictive notification requirements for Key Personnel and Emergency POCs).

To provide further clarity, here are two (2) samples:

Example #1: The Government expects that individuals (whether Award Contractor employees or subcontractor employees) operating, maintaining, and repairing boilers shall be trained and certified according to applicable Federal, State, local, or host nation standards. In the absence of such certification requirements, individuals should adhere to the Fourth-Class Power Engineer Certification Program of the National Institute for the Uniform Licensing of Power Engineers, Inc.

Example #2: The Government expects that individuals (whether Contractor employees or subcontractor employees) operating, maintaining, and repairing air conditioners, evaporative cooling systems, dehumidification units, mechanical ventilation equipment, etc., be certified HVAC technicians.

o Ref PWS Section 4.0 “No more than 0% defects of the total number of DMOs per month”: Please confirm that 100% inspections with 0 defects is correct.

Answer: Correct. It is mandatory to have zero defects in all Priority 1 Demand Maintenance Orders (DMOs). All Priority 1 DMOs will undergo inspection, ensuring that 100% of them are completed in accordance with (IAW) the PWS measures for response timeliness and quality repair.

o Ref Site Visit: For HVAC, are there Variable Air Volume (VAV) on the asset list?

Answer: Correct. Please refer to Attachment 0012 TE 1.2-02 Equipment List and Attachment 0013 & 0014 TE 1.2-03 Equipment Locations.

o Ref PWS 2.1.9: Will the Government issue security clearance cards to escort recurring subcontractors?

Answer: No. Please refer to PWS Section 2.4.1.2 titled Secure Area Access on page 26 of the PWS, which indicates: “Portions of the work under the contract are performed in secure areas and all persons requiring access to a secure area will be escorted by the activity or Government personnel. In the case of escort, forty-eight (48) hours advance notice to the activity shall be required except in emergency or urgent work. Contractor employees requiring access to secure areas shall be free of felony convictions, and prior Military Service Members shall have an honorable discharge (See DD Form 254, Department of Defense Contract Security Classification Specification).”

o Ref PWS 2.4.2.6: Can asbestos and mold awareness training be accomplished by the offeror with internal toolbox talks/meetings?

Answer: The Contractor will be the sole responsible party for providing asbestos and mold awareness training to its employees. The awardee shall coordinate with the COR to confirm the provided training will be sufficient.

o Ref Attachment 0033 TE 5.4-01 DMO Workload Summary: Can the Government please provide a history of emergency, urgent, and routine DMOs for the past three years?

Answer: No. The requested data is not currently available in a format that would be relevant for bidding purposes.

o Ref Attachment 0034 TE 5.4-02 PWO Workload Summary: Can the Government please provide a listing of the dollar value of PWOs over the past three years?

Answer: No. The provided breakouts for DMOs/PWOs is intended to provide offerors with enough information to interpret the equivalent number of DMOs/PWOs under the limits of the current PWS.

o Ref Attachment 0033 TE 5.4-01 DMO Workload Summary: Are there any contractor Limits of Liability (LOL) for DMOs performed?

Answer: No.

o Ref Attachment 0021 TE 2.2-01 List of Govt Furnished Spaces: Please clarify the building/office location of GFEBS terminal for contractor use.

Answer: The Government will grant access to GFEBS Software via Government laptops (Attachment 0019 TE 2.1-01). The assignment of computers, location of Contractor employee, and workload to Contractor employees is at the discretion of the Contractor.

o Ref Attachment 0021 TE 2.2-01 List of Govt Furnished Spaces: Please clarify the building/office location for BAS/DDC control contractor use.

Answer: The Government will grant access to EnteliWEB via Government laptops. The assignment of computers, location of Contractor employee, and workload to Contractor employees is at the discretion of the Contractor.

o Ref PWS 2.1.7.3.5, Page 8: How many GFEBS terminals are provided by the Government?

Answer: Five (5) Government laptops will be furnished per Attachment 0019 TE 2.1-01.

The Government will provide access to GFEBS Software via Government laptops. It is at the Contractor's discretion to assign computers and workload to their employees.

o Ref PWS 5.8.4, Page 55: How many BAS/DDC computer terminals are provided?

Answer: Five (5) Government laptops will be furnished per Attachment 0019 TE 2.1-01.

The Government will provide access to EnteliWEB via Government laptops. It is at the Contractor's discretion to assign computers and workload to their employees.

o Ref PWS 5.8.4, Page 55: Does the contractor have interface with the Energy Savings Performance Contractor (ESPC)?

Answer: No. Direct interface with Rock Island Arsenal (RIA) Energy Savings Performance (ESPC) Contractor is not required as part of the scope of work on this contract. However, the Government's expectations include collaboration with Contractors to ensure quality service. Please refer to:

a. Section 1.2 “… Contractor shall perform, coordinate, and complete the requirements of the contract in cooperation with any other Contractors or trades performing work at Rock Island Arsenal, Illinois promptly and diligently as required by the standards, of this contract.”

b. Section 5.8.2 “The Contractor shall provide scheduled PM on equipment that is identified in this PWS, to include HVAC&R system operations, scheduling of startups and shutdowns, and programming of building space temperature set points, as driven by season, time of day, use of energy, and mission requirements…” o Ref PWS 7.4.5.1, Page 93: Are contractor employees allowed to bring personal cell phones for job use?

Answer: Contractor employees are required to adhere to all Contractor and Federal policies regarding the use of personal cell phones while at work. It is the Government's expectation that certain portions of the Contractor's work will be performed in secure areas where no electronics, including cell phones, are permitted.

Please refer to PWS Section 2.4.1.1. ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES: “The Contractor and all associated subcontractors’ employees shall comply with applicable Installation, facility, and local security policies and procedures. The Contractor workforce shall comply with all personal identity verification (PIV) requirements as directed by DoD, Headquarters Department of the Army (HQDA), and local policy. The KO/COR will request changes in Contractor security matters or processes if the Force Protection Condition (FPCON) at any individual facility or Installation changes.”

o Ref PWS 7.5.4, Page 95: Are there any restrictions on the number of contractor-furnished vehicles to be used on the contract?

Answer: No restriction exists. However, please refer to requirements of Section 2.4 “Special Requirements” of the PWS.

o Ref Site Visit: Please provide details on rooftop chillers that are owned by tenants. Is the contractor responsible for PMO, DMO, PWO, OJO on tenant-owned equipment?

Answer: Yes, Contractor will be responsible for repairing tenant equipment at tenant discretion via discretionary DMOs and discretionary PWOs.

o Ref PWS 2.2.6, Page 13: Is the HVAC contractor responsible for fire extinguishers in mechanic rooms?

Answer: No. The Contractor is not responsible for portable fire extinguishers in mechanical rooms.

o Does the HVAC contractor have direct interface with the RIA Base Operations

Support contractor?

Answer: No. Direct interface with Rock Island Arsenal (RIA) Base Operations Support (BASEOPs) Contractor is not required as part of the scope of work on this contract.

However, the Government expectations include for Contractors to collaboration for a quality service, refer to Section 1.2 Objectives.

o Are their restrictions on improvements that the new contractor can make on existing HVAC equipment?

Answer: All improvements are initiated based on Government decisions, ensuring that projects align with strategic goals. Recommendations are welcome, however, approval from the contracting officer and the initiation/issuance of a DMO or PWO is required before any improvement work begins to ensure effective coordination and adherence to project guidelines.

o Ref PWS 3.0, Page 37: Please clarify the number of Government Quality Assurance

Evaluators assigned to the HVAC contract.

Answer: This number varies. The Government is committed to ensuring quality by assigning Government Quality Assurance Evaluators as needed.

o Ref PWS 2.4.2.4, Page 28: Please clarify which cybersecurity requirements the contractor must meet.

Answer: The following link is for the required training:

https://public.cyber.mil/training/cyber-awareness-challenge/. The awardee shall coordinate with the COR prior to initiating this training to ensure the correct version is completed.

o Ref Site Visit: Please provide the number and type of window unit air conditioning units located inside the JRTC buildings overlooking the factory floor.

Answer:

Offeror to refer to:

TE 1.2-01: USAG-RIA List of Buildings (Page 9 of 12) TE 1.2-02: USAG-RIA HVAC&R Equip List TE 1.2-03: USAG-RIA Drawings of HVAC&R Equipment Locations TE 5.2-06: USAG-RIA Equipment Type List o Ref PWS 2.1.7.3.5, Page 8: Please clarify if the current GFEBS version is being retired and a new GFEBS version is to be installed.

Answer: No, it is not being retired.

o Ref PWS 2.4.3.2, Page 29: Can the Government provide the names of subcontractors that the incumbent contractor is using, the type of work performed, and the number of visits requiring escort service/year?

Answer: No, we are unable to provide the requested information.

o Ref PWS 2.4.4.6, Page 31: Is the contractor responsible for transporting hazardous waste material to a central receiving point?

Answer: Yes, per PWS 2.4.4.6 “The Contractor shall remove and dispose of manifested hazardous waste generated by contract activities from the installation to an approved off-post permitted hazardous waste disposal facility”.

o Ref PWS 2.3.3.3, Page 18: Is there a PMO Plan that will be provided to the incoming contractor?

Answer: No. Development of the Preventive Maintenance Plan (PMP) is the successful awardee’s responsibility. The plan shall be reviewed and approved by the KO/COR.

o Ref PWS 2.3.3.4, Page 18: Is there a PWO Plan that will be provided to the incoming contractor?

Answer: No. Development of the Project Work Order Plan is the successful awardee’s responsibility. The plan shall be reviewed and approved by the KO/COR.

3. All other terms and conditions remain unchanged.

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

ATTACHMENTS LIST

Number Attachment Title Availability 0001 Performance Work Statement (PWS) 02APR2024 Public Access 0002 Instructions to Offerors Public Access 0003 Basis for Award Public Access 0004 Price Matrix 26MAR2024 Public Access 0005 Davis Bacon Wage Determination Public Access 0006 Service Contract Act (SCA) Wage Determination Public Access 0007 Past Performance Questionnaire Public Access 0008 Small Business Participation Plan Public Access 0009 Vendor Guide Contract Opportunities All Topics Public Access 0010 TE 1.1-01 USAG-RIA Map Controlled Access – Request via email 0011 TE 1.2-01 USAG-RIA List of Buildings Controlled Access - Request via email 0012 TE 1.2-02 USAG-HVAC&R Equipment List Controlled Access - Request via email 0013_0014 TE 1.2-03 USAG-RIA Drawings of HVAC&R

Equipment Locations 25MAR2024 Controlled Access - Request via email

0015 TE 1.2-04 USACE Accident Investigation Report Public Access 0016 TE 1.10-01 Refrigeration Removal Certifications Public Access 0017 TE 1.10-02 DD Form 1348-1A, Issue Release Receipt

Document Public Access

0018 TE 1.10-03 ODC Equipment Tracker Public Access 0019 TE 2.1-01 USAG-RIA List of Government Furnished

Property Public Access

0020 TE 2.1-02 USAG-RIA List of Government Furnished Services

Public Access

0021 TE 2.2-01 USAG-RIA List of Government Furnished Spaces

Public Access

0022 TE 2.3-01 Standard Form 701 – Activity Security Checklist

Public Access

0023 TE 2.3-02 ISWMP Revision March 23 Public Access 0024 TE 2.4-01 USAG-RIA Integrated Cultural Resources

Management Public Access

0025 TE 5.2-01 USAG-RIA Operation of Major Comfort Chiller Plants

Controlled Access - Request via email

0026 TE 5.2-02 USAG-RIA Refrigerant Log Tally Public Access 0027 TE 5.2-03 USAG-RIA Chiller Heat Exchanger

Evaluation Public Access

0028 TE 5.2-04 UMSC RIA HW SW List Controlled Access - Request via email

0029 TE 5.2-05 Chilled Water Services Public Access 0030 TE 5.2-06 USAG-RIA Equipment Type List Controlled Access - Request via email 0031 TE 5.2-07 USAG-RIA PM Guide 20230821 (PDF) Public Access 0032 TE 5.2-08 USAG-RIA Performance Expectations Public Access 0033 TE 5.4-01 USAG-RIA DMO Workload Summary Public Access 0034 TE 5.4-02 USAG-RIA PWO Workload Summary Public Access 0035 TE 5.8-01 USAG-RIA Operation of Major Comfort

Boiler Plants Public Access

0036 TE 6.0-01 USAG-RIA HVAC&R Contract Deliverable Public Access 0037 TE 6.0-02 Transmittal Record Public Access 0038 TE 7.1-01 Prevailing Wage Rate Public Access 0039 Site Visit Map Public Access