Attachment 0029 TE 5.2-05 -- Chilled Water Services.pdf

PDF 120 KB Posted

Attached to
RIA HVAC Services Federal contract opportunity
Solicitation number
W519TC-24-R-2015
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

This document is a Technical Exhibit that describes the chilled water services required under the RIA HVAC Services contract. It outlines the full-service visits for chemical water treatment of open and closed cooling water loops. This includes monthly testing and monitoring of the cooling tower water, making necessary adjustments to system set points and chemical feed, and cleaning system components. The services also include laboratory analysis support for on-site testing and troubleshooting. The cost for air filters, lubricants, belts, and coil cleaning supplies should be included in the bid for Preventive Maintenance. This Technical Exhibit is an attachment to the RIA HVAC Services solicitation, which is seeking proposals for HVAC&R systems maintenance and repair services at the Rock Island Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to RIA HVAC Services, newest first.
File Type Posted
W519TC-24-R-2015 Amendment 0003.pdf PDF
Attachment 0041 Site Visit Sign In.pdf PDF
W519TC-24-R-2015 Amendment 0002.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 02APR2024.pdf PDF
Attachment 0004 Price Matrix 26MAR2024.xlsx XLSX spreadsheet
Attachment 0040 Labor and Material Summary DMOs 25MAR2024.pdf PDF
W519TC-24-R-2015 Amendment 0001.pdf PDF
Attachment 0003 Basis for Award.pdf PDF
Attachment 0005 Davis Bacon Wage Determination 15MAR2024.pdf PDF
Attachment 0031 TE 5.2-07 -- USAG-RIA PM GUIDE - 20230821.pdf PDF
Attachment 0034 TE 5.4-02 -- USAG-RIA PWO Workload Summary.pdf PDF
Attachment 0037 TE 6.0-02 -- Transmittal Record.pdf PDF
Attachment 0038 TE 7.1-01 -- Prevailing Wage Rates 19MAR2024.pdf PDF
W519TC-24-R-2015.pdf PDF
Attachment 0007 Past Performance Questionnaire.docx DOCX document
Attachment 0008 Small Business Participation Plan.docx DOCX document
Attachment 0017 TE 1.10-02 -- DD Form 1348-1A, Issue Release Receipt Document.pdf PDF
Attachment 0018 TE 1.10-03 -- ODC Equipment Tracker.xlsx XLSX spreadsheet
Attachment 0019 TE 2.1-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED PROPERTY.pdf PDF
Attachment 0020 TE 2.1-02 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SERVICES.pdf PDF
Attachment 0022 TE 2.3-01 -- Standard Form 701 -- Activity Security Checklist.pdf PDF
Attachment 0039 Site Visit Map.pdf PDF
Attachment 0006 SCA Wage Determination 26DEC2023.pdf PDF
B08 Attachment 0009 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
Attachment 0015 TE 1.2-04 -- USACE Accident Investigation Report.pdf PDF
Attachment 0021 TE 2.2-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SPACES.pdf PDF
Attachment 0023 TE 2.3-02 -- ISWMP REVISION March 23.pdf PDF
Attachment 0024 TE 2.4-01 -- USAG-RIA Integrated Cultural Resource Management.pdf PDF
Attachment 0026 TE 5.2-02 -- USAG-RIA Refrigerant Log Tally.xlsx XLSX spreadsheet
Attachment 0027 TE 5.2-03 -- USAG-RIA Chiller Heat Exchanger Evaluation.pdf PDF
Attachment 0033 TE 5.4-01 -- USAG-RIA DMO Workload Summary.pdf PDF
Attachment 0032 TE 5.2-08 -- USAG-RIA PERFORMANCE EXPECTATIONS- 20230820.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 20 MAR 2024.pdf PDF
Attachment 0002 Instructions to Offerors.pdf PDF
Attachment 0004 Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 TE 1.10-01 -- Refrigeration Removal Certifications.pdf PDF
Attachment 0035 TE 5.8-01 -- USAG-RIA Operation of Major Comfort Boiler Plants_20240301.pdf PDF
Attachment 0036 TE 6.0-01 -- USAG-RIA HVAC&R Contract Deliverables.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT 5.2 - 05

CHILLED WATER SERVICES

DESCRIPTION OF SERVICES

(1) FULL-SERVICE VISITS FOR CHEMICAL WATER TREATMENT (OPEN AND CLOSED LOOPS)

A qualified service technician shall service facilities at least once a month during the operational season to perform the appropriate testing of water in each system to determine water treatment effectiveness.

Cooling Tower Water Evaluation Services:

Test of city water for hardness, M-alkalinity, chlorides, iron, pH and conductivity.

Test system water for hardness, M-alkalinity, chlorides, iron, pH and conductivity.

Test system water for chemical level.

Compare system water test results to city water test results.

Cooling Tower Monitoring Services:

Make adjustments to system set points and chemical feed if necessary.

Clean conductivity probe.

Calibrate conductivity controller.

Clean bleed-off solenoid valve, if required.

Clean spray nozzles, if required.

LABORATORY ANALYSIS - This program includes laboratory support for on-site testing procedures for verification or troubleshooting as required. The laboratory provides state of the art analysis equipment and chemists.

Water treatment and legionella services are required on cooling towers to prevent bacterial growth. The cost for all air filters, lubricants, belts and coil cleaning supplies should be included in the bid for Preventive Maintenance.

File details come from the government source that posted it. Updated .