Attachment 0032 TE 5.2-08 -- USAG-RIA PERFORMANCE EXPECTATIONS- 20230820.pdf

PDF 49 KB Posted

Attached to
RIA HVAC Services Federal contract opportunity
Solicitation number
W519TC-24-R-2015
Issued by
Department of the Army Materiel Command Contracting Command Rock Island Arsenal

About this file

The provided document is a list of visual and performance indicators related to preventive maintenance of HVAC systems. The visual indicators include signs of component degradation, fluid leaks, unusual noise or vibration, loose or missing fasteners, corrosion, and biological growth. The performance indicators cover issues such as improper filter operation, inability to maintain design temperatures, and deviations in energy consumption. This document appears to be an attachment or appendix to the RIA HVAC Services solicitation, which requests proposals for HVAC and refrigeration system maintenance and repair services at the Rock Island Arsenal in Illinois. The solicitation is being issued by the Army Contracting Command - Rock Island.

View the file

Other files for this federal contract opportunity

Other files attached to RIA HVAC Services, newest first.
File Type Posted
W519TC-24-R-2015 Amendment 0003.pdf PDF
Attachment 0041 Site Visit Sign In.pdf PDF
W519TC-24-R-2015 Amendment 0002.pdf PDF
Attachment 0040 Labor and Material Summary DMOs 25MAR2024.pdf PDF
W519TC-24-R-2015 Amendment 0001.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 02APR2024.pdf PDF
Attachment 0004 Price Matrix 26MAR2024.xlsx XLSX spreadsheet
W519TC-24-R-2015.pdf PDF
Attachment 0007 Past Performance Questionnaire.docx DOCX document
Attachment 0008 Small Business Participation Plan.docx DOCX document
Attachment 0017 TE 1.10-02 -- DD Form 1348-1A, Issue Release Receipt Document.pdf PDF
Attachment 0018 TE 1.10-03 -- ODC Equipment Tracker.xlsx XLSX spreadsheet
Attachment 0019 TE 2.1-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED PROPERTY.pdf PDF
Attachment 0020 TE 2.1-02 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SERVICES.pdf PDF
Attachment 0022 TE 2.3-01 -- Standard Form 701 -- Activity Security Checklist.pdf PDF
Attachment 0039 Site Visit Map.pdf PDF
Attachment 0001 ROCK ISLAND ARSENAL - MECHANICAL PWS -- 20 MAR 2024.pdf PDF
Attachment 0002 Instructions to Offerors.pdf PDF
Attachment 0004 Price Matrix.xlsx XLSX spreadsheet
Attachment 0016 TE 1.10-01 -- Refrigeration Removal Certifications.pdf PDF
Attachment 0029 TE 5.2-05 -- Chilled Water Services.pdf PDF
Attachment 0035 TE 5.8-01 -- USAG-RIA Operation of Major Comfort Boiler Plants_20240301.pdf PDF
Attachment 0036 TE 6.0-01 -- USAG-RIA HVAC&R Contract Deliverables.pdf PDF
Attachment 0006 SCA Wage Determination 26DEC2023.pdf PDF
B08 Attachment 0009 VENDOR GUIDE Contract Opportunities All Topics.pptx PPTX presentation
Attachment 0015 TE 1.2-04 -- USACE Accident Investigation Report.pdf PDF
Attachment 0021 TE 2.2-01 -- USAG-RIA LIST OF GOVERNMENT FURNISHED SPACES.pdf PDF
Attachment 0023 TE 2.3-02 -- ISWMP REVISION March 23.pdf PDF
Attachment 0024 TE 2.4-01 -- USAG-RIA Integrated Cultural Resource Management.pdf PDF
Attachment 0026 TE 5.2-02 -- USAG-RIA Refrigerant Log Tally.xlsx XLSX spreadsheet
Attachment 0027 TE 5.2-03 -- USAG-RIA Chiller Heat Exchanger Evaluation.pdf PDF
Attachment 0033 TE 5.4-01 -- USAG-RIA DMO Workload Summary.pdf PDF
Attachment 0003 Basis for Award.pdf PDF
Attachment 0005 Davis Bacon Wage Determination 15MAR2024.pdf PDF
Attachment 0031 TE 5.2-07 -- USAG-RIA PM GUIDE - 20230821.pdf PDF
Attachment 0034 TE 5.4-02 -- USAG-RIA PWO Workload Summary.pdf PDF
Attachment 0037 TE 6.0-02 -- Transmittal Record.pdf PDF
Attachment 0038 TE 7.1-01 -- Prevailing Wage Rates 19MAR2024.pdf PDF
Show all 38

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TE 5.2-08 – USAG-RIA PERFORMANCE EXPECTATIONS

The following are a list of visual indicators of deficiencies related to preventive maintenance.

1. Deformation, discoloration, contamination, or oxidation of component surfaces.

2. Fluid or vapor leakage evidence.

3. Excessive or abnormal noise or vibration.

4. Loose or missing fasteners.

5. Unusual ice, frost, or condensate formation.

6. Worn or damaged electrical or thermal insulating materials

7. Unacceptably high levels of surface corrosion or scale accumulation

8. Unacceptable high accumulated dirt or sludge

9. Visible biological growth (fungi, algae, or bacteria)

10. Failure of an essential insulation system; condensation or physical damage present

11. Clogged or overflowing drains

12. Overheated electrical equipment

13. Obviously failed equipment

14. Abnormal building pressures

The following are a list of performance indicators of deficiencies related to preventive maintenance.

1. Filter operation outside established criterion such as pressure drop

2. Chiller incapable of producing leaving water temperature within original design

3. Air flow from any air handler is not within design requirements

4. Space temperature exceeds setpoint objectives

5. Condensing water temperature rises beyond design

6. Energy consumption deviates above the degree-day adjusted energy consumption without a significant change in operating hours or function

File details come from the government source that posted it. Updated .