W519TC24B2001 Conformed to AMD 0007.pdf

PDF 991 KB Posted

Attached to
PBA Water Tank Cleaning, Painting, and Repair
Solicitation number
W519TC24B2001
Issued by

About this file

This solicitation requests proposals for water tank cleaning, painting, and repair services at Pine Bluff Arsenal in Arkansas. The Army Contracting Command - Rock Island will award a single firm fixed price contract for work including interior and exterior sandblasting and painting of six 200,000 gallon elevated water storage tanks. A site visit is required by 31 January 2024 and proposals are due according to a two-step sealed bidding process with Step One due 29 February 2024 and Step Two due 14 March 2024. The solicitation is a 100% small business set-aside and requires lead abatement for Tank A as well as containment for blasting activities.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0011 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
W519TC24B2001 AMD 0002.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0010 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0008 - PBA Tower B Inspection Report.pdf PDF
Attachment 0011 - Drawings - Tanks A-B-C.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Army Contracting Command - Rock Island (ACC-RI) hereby issues solicitation W519TC24R2024 for the procurement of Water Tow er Cleaning, Painting, and Repair Services at Pine Bluff Arsenal (PBA).

This request for proposal is a 100% Small Business Set Aside.

In accordance w ith Federal Acquisiton Regulation (FAR) Subpart 36.204, Discolsure of the magnitude of construction projects, the total estimated magnitude of construction is betw een $1,000,000 and $5,000,000.

Please see the Solicitation for more information.

Attachment 0001: Performance Work Statement Attachment 0002: Wage Determinations

X

MICHELLEANN G. SANCHEZ 309-782-5454

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

17-Jan-2024

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______30 calendar days and complete it w ithin ________60 calendar days after receiving aw ard, X notice to proceed. This performance period is mandatory, X negotiable. (See _________________________

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________29 Feb 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W519TC24B2001 41

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W519TC24B2001

Section SF 30 - Block 14 Continuation Page (SF 30)

AMENDMENT P0007 NARRATIVE

The purpose of Amendment P0007 is for the following:

1) Incorporating the following attachments:

a. Attachment 0012: PBA Steel Tank Maintenance Specifications

b. Attachment 0013:Tank C Altitude Valve Specficiation

c. Attachment 0014: Water Tank Structure Pictures

All other terms and conditions of this solicitaiton remain unchanged and in effect.

AMENDMENT P0006 NARRATIVE

The purpose of this amendment is for the following:

1) Answer questions 26-48 on the Q & A Sheet

2) Include Progress Payment language in the Executive Summary

3) Move Step Two closing date from 4 April 2024 at 9:00am to 4 April 2024 at 12:00pm

4) Extend the Period of Performace to 01 May 2024 to 01 May 2025

All other terms and conditions of this solicitation remain unchanged and in effect.

AMENDMENT P00005 NARRATIVE

The purpose of this amendment is for the following:

1) Extend Step One closing date from 29 February 2024 at 2:00pm CST to 21 March 2024 at 2:00pm CST

2) Extend Step Two closing date from 14 March 2024 at 2:00pm CST to 4 April 2024 at 9:00am CST

3) Extend the Bid Opening Date to 21 March 2024 at 10:00am CST.

All other terms and conditions of this solicitation remain unchanged and in full force and effect.

AMENDMENT P0004 NARRATIVE

The purpose of Amendment P0004 is for the following:

1) Correct the Bid Opening Date from 29 February to 14 March 2024 at 9:00am.

2) Add a deadline to questions of 21 February 2024 at 12:00pm.

All other terms and conditions of this solicitation remain unchanged and in effect.

AMENDMENT P0003 NARRATIVE

The purpose of Amendment P0003 is for the following:

1) Answer questions 13-25 on Q & A Sheet

All other terms and conditions of this solicitation remain unchanged and in effect.

AMENDMENT P0002 NARRATIVE

The purpose of Amenment P0002 is for the following:

1) Answer Questions 1-12 on the Q & A Sheet

2) Incorporate the following attachments:

a. Attachment 0003 – LBP Water Tanks Survey

b. Attachment 0004 – PBA Tower 1 Inspection Report

c. Attachment 0005 – PBA Tower 2 Inspection Report

d. Attachment 0006 – PBA Tower 3 Inspection Report

e. Attachment 0007 – PBA Tower A Inspection Report

f. Attachment 0008 – PBA Tower B Inspection Report

g. Attachment 0009 – PBA Tower C Inspection Report

h. Attachment 0010 – Water Tower Map

i. Attachment 0011 – Drawing – Towers 1, 2, and 3

j. Attachment 0012 – Drawing – Towers A, B, and C

All other terms and conditions of this contract remain unchanged and in effect.

AMENDMENT P0001 NARRATIVE

The purpose of Amendment P0001 is for the following:

1) Extend the solicitation closing date to 29 February 2024 at 2:00pm.

2) Correct the site visit information as found in the Executive Summary.

3) Extend bid due dates. Step One Bids are due 29 February 2024. Step Two Bids are due 14 March 2024.

Please see section 00 21 13 – Instructions to Bidders for more information.

All other terms and conditions of this solicitation remain unchanged and in effect.

Q & A SHEET

Q1. Are there inspection reports or drawings available?

A1. See attached Inspection Reports and Drawing for all 6 towers.

Q2. Looking at the overhead view using Google Maps it appears that not all of the tanks are the same size. The scope states that they are all 200,000 gallon. Do you have dimensions of the tanks so we can verify the capacity?

A2. See attached drawings with dimensions to verify capacity.

Q3. The statement of work states "Contractor shall sandblast and paint 200,000 Gallon elevated water storage tank".

Please confirm if the bid includes interior and exterior sandblasting and painting.

A3. The bid includes both interior and exterior sandblasting and painting.

Q4. Assuming the exterior is included, are we required to contain the tank to prevent blast media from leaving the area? With out containment in place we expect blast media and paint chips to at least blow within the radius 1.5 times the height of the tank. A typical tank is 135' to the top so we expect the media to blow in a radius of at least 200'. Assuming the exterior coating does not contain lead, "open air" blasting is acceptable. "Open air" blasting save both time and money.

A4. Contractors are required to contain the tank to prevent blast media from leaving the area for all six tanks, including the tanks that do not contain lead paint.

Q5. Tank A requires lead abatement. Is the lead on the outside as well as the inside?

A5. Lead abatement is only required on the outside of Tank A. See attached ‘LBP Water Tanks Survey’. Paint sample from the outside Tank A was measured to contain 6.4% lead by weight. After lead abatement is complete, the paint shall contain <0.06% lead by weight. Contactor shall dispose of all paint chips in accordance with environmental regulations.

Q6. Please describe or provide a map to show which tanks are number 1,2 3, A, B & C.

A6. See attached “Water Tower Map” for location of all six tanks.

Q7. Monday - Thursday work restrictions would greatly change the timeline as well as overall cost. Most if not all of the tank contractors bidding would be from out of state and it is more cost effective to work 6 days a week up to 10 hours per day. The statement says we must request additional time at least 48 hours prior to the date of work. For bidding purposes can you tell us if the 6 day / 10 hour work schedule would be accepted? If it is unknown our bid will be quite a bit higher to cover worst case scenario.

A7. The 6 day / 10 hour work schedule will be accepted.

Q8. Are there specs to include the surface prep and coating application? If not, we would suggest calling your local Sherwin Williams store and ask them who your area rep is. They will come to site, inspect the tanks and write you a spec at no charge. This will allow for a 3rd party opinion and keeps all the bidders apples to apples. If requested I can call my local rep and ask for the contact info for the local rep closest to the site.

A8. There are currently no specs for the surface prep and coating application. Please provide us with the contact info for the local rep and we will request specs to provide to the bidders.

Q9. Do you require QP1 or QP2 certification?

A9. QP2 certification is required.

Q10. Are there Liquidated Damages associated with this project? If so how much?

A10. There are not liquidated damages associated with this project.

Q11. Is there a warranty associated with this project? If so how long?

A11. There is a warranty associated with this project covering material and workmanship for a period of one year (365 days) from acceptance date.

Q12. What style are the tanks? Is it a mix of single pedestal and legged?

A12. All six tanks are legged style.

Q13: Could the government please provide drawings and specifications for this project?

A13: Specifications for Exterior Blast Clean and paint: All exterior surfaces shall be blast cleaned to SSPC-SP #6 “Commercial” finish. A prime coat with a minimum of 2.0 mil dry film thickness shall be applied. The prime coat shall be rust inhibitive red iron oxide, zinc oxide, oil, and alkyd primer in accordance with SSPC Paint #25. The prime coat shall be followed by two (2) coats, each a minimum of 1.5 mil dry film thickness, of white alkyd enamel in accordance with SSPC Paint #104 Type 1.

Specifications for Interior Blast Clean and paint: All interior surfaces shall be blast cleaned to SSPC-SP #10 “Near White” finish. A prime coat of at least 3.0 mil dry film thickness and a white coat of at least 5.0 mil dry film thickness shall be applied. Each coat shall be a two-component catalyzed epoxy in accordance with MS DOD-C- 24654. The prime coat shall contrast with the color of the white finish coat.

Disinfection shall follow Arkansas Board of Health regulations as wall as those of A.W.W.A.

Additional specifications can be submitted for government approval by bidders. All bidders will be notified of additional approved specifications.

Q14: Could the government please provide as-built drawings for the tanks?

A14: See attached as-built drawings for each tank.

Q15: Are there minimum levels of bonding required to be responsive to this solicitation?

A15: The requirements for bonding can be found in clause FAR 52.228-1, Bid Guarantee, found in the solicitation.

Q16: What are the required minimum levels of experience for the key personal as outlined in Factor 1?

A16: The key personnel must have experience in projects of similar scope or difficulty.

Q17: Since specifications were not issued with the release of the solicitation, please indicate the required positions of key personnel as outlined in Factor 1.

A17: The key personnel included in the solicitation shall include the on-site Project Managers/Supervisors and the off-site Program Managers that will be involved in this project.

Q18: In Factor 2, it states that at least one (1) but not more than (2), 2-page experience statements shall be included. One of the experience statements must be from the prime. Should we assume that one experience statement be from the prime and one from a key subcontractor if we elect to submit two statements?

A18: Yes, if a subcontractor is used, an experience statement is expected from at least one key prime contractor and one key subcontractor.

Q19: Is there a specific number or limit of projects we are to include on each experience statement(s)?

A19: There is not a specific number or limit of projects to include on the experience statements.

Q20: If we elect to submit the experience of a subcontractor, must we include a teaming agreement to demonstrate the relationship in the Step One proposal?

A20: Yes, a teaming agreement between the sub and prime contractor must be included.

Q21: Define what SP level the surface prep and blast must be made too?

A21: The surface prep and blast must be made to SP-10: Near-White Metal Blast Cleaning.

Q22: Is a NAIC inspector required onsite during all blasting and coating operations. If so, will the inspector be required to be onsite for punch list and minor touch up.

A22: A NAIC inspector is not required on-site during all blasting and coating operations.

Q23: Define working hours?

A23: Working hours are defined in the attached Performance Work Statement. Additional working hours can and will be approved to accommodate contractor scheduling.

Q24: Will weekend work be allowed to accommodate coatings windows and weather perimeters?

A24: Yes, weekend work will be allowed to accommodate contractor scheduling.

Q25: Are API 653 inspection reports available for the tank group?

A25: See attached inspection reports for each tank.

Q26: What are the employee eligibility requirements to work on base? US citizen only? Will permanent residents be allowed?

A26: US Citizens and permanent residents will be allowed to work on base.

Q27: There is one tank with lead on it and the project requires QP2 certification. Will the contract only be awarded to a QP2 certified contractor?

A27: The contractor or subcontractor performing the hazardous paint removal must be a QP2 certified contractor.

Q28: How many tanks can be taken out of service at a time?

A28: Two tanks can be taken out of service at a time.

Q29: Will there be any time or work day restrictions? Can we work all 7 days if needed up to 12 hour days?

A29: There will not be any time or work day restrictions. Government will approve work outside of normal duty hours.

Q30: Will a coating specification be provided so all bidders can bid apples to apples or are we to propose a system in our technical proposal? For most water tank rehabilitation projects, a typical exterior system would be zinc, epoxy, polyurethane and a typical interior system would be a three coat epoxy system or zinc, epoxy, epoxy.

A30: See attached ‘PBA Steel Tank Maintenance Specifications’ for required coating specifications.

Q31: Is it known if there is a ladder in the risers of tank 1,2,3?

A31: There is not a ladder in the risers of tanks 1,2,3.

Q32: The scope of work states to install splash pads at all sites but Tanks 2 and 3 already have them in place. Are we to remove and replace them or leave them in place and only install new ones at the other four tanks? Are we to match the size of the ones currently in place or can a drawing be provided of what is required?

A32: The splash pads on Tanks 2 and 3 can be left in place but the drainage shall be improved to divert water away from the tank legs. The new splash pads can match the ones currently in place and must divert water away from tank legs.

Q33: Regarding QC inspections:

o Will the owner provide third party inspection for the blasting and coating work?

o If the contractor is responsible for inspection, is third party required or can the QC inspector be an employee of the company? Are there any credentials required for the inspectors like NACE 1 or 2?

A34: The government will provide 3rd party inspections for the blasting and coating work.

Q35: Confirm that the power lines next to tank A will be rerouted at the time of construction?

A35: Yes, the powerlines next to tank A will be rerouted at time of construction.

Q36: Can a specification be provided for the altitude valve replacement? Can a picture be provided with the vault cover removed?

A36: See attached ‘Tank C Altitude Valve Specification’ for picture and specification of altitude valve.

Q37: Can a a specification be provided for the drainage valves required on the three north end tanks? Can a photo be provided of the current ones?

A37: Surrounding fire hydrants are currently used to drain the north end tanks. New drainage valves shall be installed between the tank risers and isolation valves. Drainage shall be directed away from the water tower legs.

Q38: Will it be acceptable to trim or remove branches and trees if they are going to be in the way of the containment system?

A38: Yes, it will be acceptable to trim or remove branches and trees in the way of containment systems.

Q39: Can a picture be provided looking at one of the Tanks 1, 2, or 3 capturing all of the structure in the photo?

A39: See attached ‘Water Tank Structure Pictures’ capturing the structure of tanks 1, 2, 3, A, B, and C.

Q40: If there are steel repairs required after sandblasting the tank, will that be handled as a change order?

A40: Yes, any steel repairs required will be handled as a change order.

Q41: 5 months is not achievable to complete all 6 tanks, especially if a maximum of two are allowed to be out of service at any given time. Tanks 1,2, and 3 will take longer than A,B, and C because of the significant amount of structure in place. Will a contract time of 1 year be acceptable?

A41: Yes, a contract time of 1 year will be acceptable. See attached ‘Performance Work Statement Amended 3-5- 2024’

Q42: The Wage Determination listed in the solicitation is for Service Contracts. We believe the Davis-Bacon Wage determination referenced in the solicitation for Jefferson County, Arkansas should be Wage Determination AR20240036 issued 1/5/24. Can you please confirm?

A43: Wage Determination AR20240036 is hereby in effect.

Q44: There are different periods of performance listed on page 1 of the SF 1442 in box 11 versus the PWS versus the CLINS. We would like to suggest a uniform period of performance in the requirement of 180 days. Can you please confirm?

A44: See ‘Performance Work Statement Amended 3-5-2024’. Uniform period of performance to complete all work described in PWS is 1 year from date of award.

Q45: Both projects noted above are missing the complete Insurance requirements. Pine Bluff is a military contract, and it appears that they expect us to know what the Insurance requirements are for military contracts which we do not. I am hoping you could help with this. If we are unsuccessful, we can note to use your current limits and coverages, but I would like to perform a due diligence first.

A45: We have no standard or specific requirements for the type of insurance that contractors need.

Q46: Would the Government be willing to entertain a plan to demo existing tanks and build a new tank or tanks to accommodate storage needs for the facility? As after the site visit I saw multiple repairs, upgrades, and site work needed to bring the tanks and site conditions to current standards and compliance. If not, speaking now of just the site work, will the Government incorporate site work needed to be done in this contract as a separate line item, or should the contractor put this work in his cost to complete the work required in the solicitation?

A46: The government is not willing to entertain a plan to demo existing tanks. The contractor should not include additional site work in the cost to complete the work required in the solicitation. Only include the cost to complete the work stated in the attached ‘Performance Work Statement Amended 3-5-2024’. If completing the work required in this PWS is contingent upon completing additional site work that is not currently stated, please make note of that in your technical proposal and the government will look into including it as a separate line item.

Q47: Amendment U0002 Q9. does State that QP2 Certification is Required. Would the government accept an extensive history of water storage tank rehabilitation for the field and clerical staff and have a QC program, Health and Safety Program, and Environmental Protection Plan in place, directly related to the structural steel painting industry and a current certified lead competent person and NACE certified inspector on staff to perform equal to what the QP1 / QP2 program requires?

A47: The contractor or subcontractor performing the hazardous paint removal must be a QP2 certified contractor.

Q48: It states that the performance period is negotiable in the solicitation. From experience, the average time to complete all 6 tanks will be rather extensive for the base items proposed to be done considering site conditions. Will the government be willing to have the contractor provide the performance and payment bond for 1 or 2 tanks at a time and release that performance and payment bond, start the warranty period for the first tank(s) completed, then have a performance and payment bond issued for the subsequent tanks to be worked on?

A48: Yes, progress payments will be allowed in this contract and the government is willing to have the contractor provide a performance and payment bond for 1 or 2 tanks at a time. The performance and payment bonds can be released and the warranty period can begin after the acceptance of each tank by the government.

Section 00 10 00 - Solicitation

EXECUTIVE SUMMARY

1. The Army Contracting Command - Rock Island (ACC-RI) hereby issues this Invitation for Bid (IFB) W519TC-24-B-2001 in accordance with Federal Acquisition Regulation (FAR) Part 14, Sealed Bidding, for the procurement of Water Tank Cleaning, Painting, and Repair Services located at Pine Bluff Arsenal in Arkansas. The Contractor shall perform work in accordance with Attachment 0001 - Performance Work Statement (PWS). This IFB is 100% set aside for Small Business. The NAICS Code for this procurement is 238320 - Painting and Wall Covering Contractors.

The award of a subsequent contract is subject to the availability of funds. It is anticipated that a single Firm Fixed Price (FFP) type contract will be awarded to the responsive, responsible bidder whose bid reperesents the lowest priced, technically acceptable bid. This IFB is issued using the Two-Step Sealed Bidding Method. Please see section 00 21 13 – Instructions to Bidders within this IFB for the Technical Requirements and Evaluation Criteria for Step-One.

SITE VISIT: For contractors interested in a Site Visit, please contact the Contract Specialist, MichelleAnn Hulett, michelleann.g.hulett.civ@army.mil to schedule a Site Visit. Site Visits shall be conducted no earlier than 7 February no later than 14 February 2024. Please see FAR 52.236-27 below.

Requesting all questions to the customer be submitted no later than 21 February 2024 at 12:00pm.

2. Technical Proposals (Step One) shall not include prices or pricing information. Technical proposals are due by 21 March 2024 at 2:00pm Central Time and should be emailed to the following POCs:

MichelleAnn Hulett, michelleann.g.hulett.civ@army.mil Bethany Carbajal, bethany.n.carbajal.civ@army.mil

3. Only bids based upon technical proposals (Step-One) determined to be acceptable, either initially or as a result of discussions, will be considered further for award into Step-Two. Each bid in the second step must be based on the bidder’s own technical proposal. Bidders shall submit bids that are acceptable without additional explanation or information. The Government may make a final determination regarding a technical proposal’s acceptability solely on the basis of the bid as submitted. The Government may proceed with Step-Two without requesting further information from any bidder; however, the Government may request additional information from bidders that it considers reasonably susceptible of being made acceptable, and may discuss bids with the prospective bidders.

4. A notice of unacceptability will be forwarded to the Bidder upon completion of the technical proposal evaluation (Step-One) and final determination of unacceptability.

5. An additional IFB will not be issued for Step Two Evaluations. Bidders are cautioned to ensure their Step- Two bids are fully complete, including all fill-ins. Any bidder submitting a bid agrees by submission that their bid and the prices contained therein will be valid for 60 days after receipt of bids.

6. Bids from eligible bidders (Step Two) are due by 4 April 2024 at 9:00am Central Time and should be emailed to the following POCs:

MichelleAnn Hulett, michelleann.g.hulett.civ@army.mil

The Bid Opening will take place on 4 April 2024 at 12:00pm Central Time.

7. Progress Payments will be allowed monthly as the work proceeds. Please see FAR 52.232-5 for more information.

8. The prevailing Davis-Bacon Act for wage determination will be incorporated into the resultant contract and will be in effect for the entire performance period of the resultant contract. The most recent wage determination can be found online at https://www.wdol.gov/dba.aspx or see Attachment 0002 – Davis Bacon Wage Determination. If the wage determination is revised during the period of performance, it shall be provided to the contractor through modification to the resultant contract.

9. This executive summary is provided as an administrative convenience and is not intended to alter the terms and conditions of the IFB in any way. Any inconsistencies between this executive summary and other IFB provisions shall be resolved in favor of the other IFB provisions.

10. Contractors must be registered in the System for Award Management (SAM) to be eligible for an award with the U.S. Government. The link follows: www.sam.gov. Failure to comply with SAM registration may deem a quote ineligible for an award.

11. For the contract resulting from this IFB, the payment will be paid by DFAS, via invoicing in Procurement Integrated Enterprise Environment (PIEE) - formerly Wide Area Workflow (WAWF).

12. Although the Government intends to award the resultant contract without discussions, the Government reserves the right to open discussions.

13. Attachments are as follows:

Attachment 0001 – Performance Work Statement dated 4 March Attachment 0002 – Wage Determinations AR20240036 Attachment 0003 – LBP Water Tanks Survey Attachment 0004 – PBA Tower 1 Inspection Report Attachment 0005 – PBA Tower 2 Inspection Report Attachment 0006 – PBA Tower 3 Inspection Report Attachment 0007 – PBA Tower A Inspection Report Attachment 0008 – PBA Tower B Inspection Report Attachment 0009 – PBA Tower C Inspection Report Attachment 0010 – Drawing – Tanks 1, 2, 3 Attachment 0011 – Drawings – Tanks A, B, C

14. For parts that may be shipped to Pine Bluff Arsenal in support of this service, the shipping address follows:

US Army, Pine Bluff Arsenal Central Shipping Receiving Point (CSRP) Bldg. 53-990, 504th Street Pine Bluff, AR 71602

ALL CARRIER SHIPMENTS MUST BE SCHEDULED IN ADVANCE. SEE “NOTICE TO

TRANSPORTATION CARRIERS” BELOW.

15. The Point of Contact for this action is MichelleAnn Hulett at michelleann.g.hulett.civ@army.mil and

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job OPTION Sandblast and Paint Tank 1

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

FOB: Destination

PSC CD: J046

NET AMT

0002 1 Job OPTION Sandblast and Paint Tank 2

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0003 1 Job OPTION Sandblast and Paint Tank 3

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0004 1 Job OPTION Sandblast and Paint Tank A

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0005 1 Job OPTION Sandblast and Paint Tank B

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0006 1 Job OPTION Sandblast and Paint Tank C

FFP

Sandblast and paint 200,000-gallon elevated water storage tanks at the Pine Bluff Arsenal (PBA) as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0007 1 Job Repair Concrete Pads

FFP

Work performed as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0008 3 Each OPTION Install Drain Valves on North End Tanks

FFP

Work performed as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0009 1 Each OPTION Install New Altitude Valve

FFP

Work performed as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0010 6 Each OPTION Install New #24 Mesh Screen

FFP

Work performed as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

0011 1 Job OPTION Install Concrete Splash Pads

FFP

Work performed as stated in Attachment 0001 - Performance Work Statement.

Period of Performance is to start no later than 30 days after contract award and complete within 5 months of contract award.

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 01-MAY-2024 TO

01-MAY-2025

N/A PINE BLUFF ARSENAL

504TH STREET, BLDG 53 990 CENTRAL

RECEIVING P

PINE BLUFF AR 71602

W41G26

0002 POP 01-MAY-2024 TO

01-MAY-2025

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0006 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0007 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0008 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0009 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0010 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

0011 POP 01-MAY-2024 TO

N/A (SAME AS PREVIOUS LOCATION)

CLAUSES INCORPORATED BY REFERENCE

52.202-1 Definitions JUN 2020 52.203-3 Gratuities APR 1984 52.203-11 Certification And Disclosure Regarding Payments To

Influence Certain Federal Transactions

SEP 2007

52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.209-7 Information Regarding Responsibility Matters OCT 2018 52.211-10 Commencement, Prosecution, and Completion of Work APR 1984 52.214-3 Amendments To Invitations For Bids DEC 2016 52.214-4 False Statements In Bids APR 1984 52.214-5 Submission Of Bids DEC 2016 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-18 Preparation of Bids-Construction APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-23 Late Submission, Modifications, And Withdrawals Of

Technical Proposals Under Two-Step Sealed Bidding

NOV 1999

52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.219-2 Equal Low Bids OCT 1995 52.219-6 Notice Of Total Small Business Set-Aside NOV 2020 52.219-14 Limitations On Subcontracting OCT 2022 52.219-28 Post-Award Small Business Program Rerepresentation SEP 2023 52.222-5 Construction Wage Rate Requirements--Secondary Site of the

Work

MAY 2014

52.222-6 Construction Wage Rate Requirements AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination-Debarment MAY 2014 52.222-13 Compliance With Construction Wage Rate Requirements and

Related Regulations

MAY 2014

52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-20 Contracts for Materials, Supplies, Articles, and Equipment JUN 2020 52.222-26 Equal Opportunity SEP 2016 52.222-35 Equal Opportunity for Veterans JUN 2020 52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020

52.222-40 Notification of Employee Rights Under the National Labor Relations Act

DEC 2010

52.222-50 Combating Trafficking in Persons NOV 2021 52.222-54 Employment Eligibility Verification MAY 2022 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-15 Energy Efficiency in Energy-Consuming Products MAY 2020 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts

AUG 2018

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

JUN 2020

52.225-10 Notice of Buy American Requirement--Construction Materials

MAY 2014

52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-1 Authorization and Consent JUN 2020 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 (Dev) Individual Surety--Pledge of Assets (DEVIATION 2020-

O0016)

FEB 2021

52.228-12 Prospective Subcontractor Requests for Bonds DEC 2022 52.228-14 Irrevocable Letter of Credit NOV 2014 52.228-15 (Dev) Performance and Payment Bonds-Construction. (Deviation

2020-O0016)

JUN 2020

52.229-3 Federal, State And Local Taxes FEB 2013 52.232-17 Interest MAY 2014 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award

Management

OCT 2018

52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business

Subcontractors

MAR 2023

52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements

APR 1984

52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-16 Quantity Surveys APR 1984 52.236-17 Layout of Work APR 1984 52.236-26 Preconstruction Conference FEB 1995

52.242-13 Bankruptcy JUL 1995 52.242-14 Suspension of Work APR 1984 52.243-4 Changes JUN 2007 52.244-5 Competition In Subcontracting DEC 1996 52.244-6 Subcontracts for Commercial Products and Commercial

Services

DEC 2023

52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2020 52.249-2 Alt I Termination for Convenience of the Government (Fixed-

Price) (Apr 2012) - Alternate I

SEP 1996

52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD

Officials

SEP 2011

252.203-7001 Prohibition On Persons Convicted of Fraud or Other Defense- Contract-Related Felonies

JAN 2023

252.203-7002 Requirement to Inform Employees of Whistleblower Rights DEC 2022 252.203-7004 Display of Hotline Posters JAN 2023 252.203-7005 Representation Relating to Compensation of Former DoD

Officials

SEP 2022

252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7008 Compliance With Safeguarding Covered Defense Information

Controls

OCT 2016

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

JAN 2023

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

JAN 2023

252.204-7016 Covered Defense Telecommunications Equipment or Services -- Representation

DEC 2019

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation

MAY 2021

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services

JAN 2023

252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.204-7020 NIST SP 800-171 DoD Assessment Requirements NOV 2023 252.205-7000 Provision Of Information To Cooperative Agreement Holders JUN 2023 252.206-7000 Domestic Source Restriction AUG 2023 252.209-7004 Subcontracting With Firms That Are Owned or Controlled By

The Government of a Country that is a State Sponsor of Terrorism

MAY 2019

252.211-7003 Item Unique Identification and Valuation JAN 2023 252.215-7008 Only One Offer DEC 2022 252.219-7011 Notification to Delay Performance JUN 1998 252.223-7004 Drug Free Work Force SEP 1988 252.223-7006 Prohibition On Storage, Treatment, and Disposal of Toxic or

Hazardous Materials

SEP 2014

252.223-7008 Prohibition of Hexavalent Chromium JAN 2023 252.225-7012 Preference For Certain Domestic Commodities APR 2022 252.225-7048 Export-Controlled Items JUN 2013 252.227-7022 Government Rights (Unlimited) MAR 1979 252.227-7033 Rights in Shop Drawings APR 1966 252.231-7000 Supplemental Cost Principles DEC 1991

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

DEC 2018

252.242-7005 Contractor Business Systems FEB 2012 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2022 252.246-7004 Safety of Facilities, Infrastructure, and Equipment for

Military Operations

OCT 2010

252.247-7023 Transportation of Supplies by Sea JAN 2023

CLAUSES INCORPORATED BY FULL TEXT

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238320.

(2) The small business size standard is $19,000,000.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519, if the acquisition--

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

( ) Paragraph (d) applies.

( ) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services--Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.

(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract is for supplies to be delivered or services to be performed in the United States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial products or commercial services.

(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.

(xix) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals--Representation. This provision applies to solicitations that include the clause at 52.204-7.)

(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xxi) 52.225-4, Buy American-Free Trade Agreements-Israeli Trade Act Certificate. (Basic, Alternates II and III.)

This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $50,000, the basic provision applies.

(B) If the acquisition value is $50,000 or more but is less than $92,319, the provision with its Alternate II applies.

(C) If the acquisition value is $92,319 or more but is less than $100,000, the provision with its Alternate III applies.

(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certification. This provision applies to all solicitations.

(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.

(2) The following representations or certifications are applicable as indicated by the Contracting Officer:

[Contracting Officer check as appropriate.]

X (i) 52.204-17, Ownership or Control of Offeror.

X (ii) 52.204-20, Predecessor of Offeror.

(iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

(iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Certification.

(v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.

(vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA- Designated Products (Alternate I only).

(vii) 52.227-6, Royalty Information.

(A) Basic.

(B) Alternate I.

(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The Offeror has completed the annual…