This amendment modifies a solicitation for water tank cleaning, painting, and repair services. The U.S. Army Contracting Command - Rock Island is seeking bids to clean, sandblast, paint, and perform any necessary repairs on six elevated water storage tanks totaling 200,000 gallons each located at Pine Bluff Arsenal in Arkansas. The amendment provides inspection reports, drawings, and lead testing results for the tanks. It also answers questions from potential bidders regarding the scope of work, containment requirements, and which tanks require lead abatement. The solicitation is set aside for small businesses and will result in a firm fixed-price contract award to the responsive, responsible bidder offering the lowest price meeting the technical requirements. Bids are due by the amended date specified in the solicitation.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0011 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
W519TC24B2001 Conformed to AMD 0007.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0010 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0008 - PBA Tower B Inspection Report.pdf PDF
Attachment 0011 - Drawings - Tanks A-B-C.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Please see Narrative.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W519TC24B2001

X 9B. DATED (SEE ITEM 11)

17-Jan-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

U0002

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Feb-2024

CODE

ARMY CONTRACTING COMMAND - ROCK ISLAND

3055 RODMAN AVE

ROCK ISLAND IL 61299

W519TC 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W519TC24B2001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT P0002 NARRATIVE

The purpose of Amenment P0002 is for the following:

1) Answer Questions 1-12 on the Q & A Sheet

2) Incorporate the following attachments:

a. Attachment 0003 – LBP Water Tanks Survey

b. Attachment 0004 – PBA Tower 1 Inspection Report

c. Attachment 0005 – PBA Tower 2 Inspection Report

d. Attachment 0006 – PBA Tower 3 Inspection Report

e. Attachment 0007 – PBA Tower A Inspection Report

f. Attachment 0008 – PBA Tower B Inspection Report

g. Attachment 0009 – PBA Tower C Inspection Report

h. Attachment 0010 – Water Tower Map

i. Attachment 0011 – Drawing – Towers 1, 2, and 3

j. Attachment 0012 – Drawing – Towers A, B, and C

All other terms and conditions of this contract remain unchanged and in effect.

Q & A SHEET

Q1. Are there inspection reports or drawings available?

A1. See attached Inspection Reports and Drawing for all 6 towers.

Q2. Looking at the overhead view using Google Maps it appears that not all of the tanks are the same size. The scope states that they are all 200,000 gallon. Do you have dimensions of the tanks so we can verify the capacity?

A2. See attached drawings with dimensions to verify capacity.

Q3. The statement of work states "Contractor shall sandblast and paint 200,000 Gallon elevated water storage tank".

Please confirm if the bid includes interior and exterior sandblasting and painting.

A3. The bid includes both interior and exterior sandblasting and painting.

Q4. Assuming the exterior is included, are we required to contain the tank to prevent blast media from leaving the area? With out containment in place we expect blast media and paint chips to at least blow within the radius 1.5 times the height of the tank. A typical tank is 135' to the top so we expect the media to blow in a radius of at least 200'. Assuming the exterior coating does not contain lead, "open air" blasting is acceptable. "Open air" blasting save both time and money.

A4. Contractors are required to contain the tank to prevent blast media from leaving the area for all six tanks, including the tanks that do not contain lead paint.

Q5. Tank A requires lead abatement. Is the lead on the outside as well as the inside?

A5. Lead abatement is only required on the outside of Tank A. See attached ‘LBP Water Tanks Survey’. Paint sample from the outside Tank A was measured to contain 6.4% lead by weight. After lead abatement is complete, the paint shall contain <0.06% lead by weight. Contactor shall dispose of all paint chips in accordance with environmental regulations.

Q6. Please describe or provide a map to show which tanks are number 1,2 3, A, B & C.

A6. See attached “Water Tower Map” for location of all six tanks.

W519TC24B2001

Q7. Monday - Thursday work restrictions would greatly change the timeline as well as overall cost. Most if not all of the tank contractors bidding would be from out of state and it is more cost effective to work 6 days a week up to 10 hours per day. The statement says we must request additional time at least 48 hours prior to the date of work. For bidding purposes can you tell us if the 6 day / 10 hour work schedule would be accepted? If it is unknown our bid will be quite a bit higher to cover worst case scenario.

A7. The 6 day / 10 hour work schedule will be accepted.

Q8. Are there specs to include the surface prep and coating application? If not, we would suggest calling your local Sherwin Williams store and ask them who your area rep is. They will come to site, inspect the tanks and write you a spec at no charge. This will allow for a 3rd party opinion and keeps all the bidders apples to apples. If requested I can call my local rep and ask for the contact info for the local rep closest to the site.

A8. There are currently no specs for the surface prep and coating application. Please provide us with the contact info for the local rep and we will request specs to provide to the bidders.

Q9. Do you require QP1 or QP2 certification?

A9. QP2 certification is required.

Q10. Are there Liquidated Damages associated with this project? If so how much?

A10. There are not liquidated damages associated with this project.

Q11. Is there a warranty associated with this project? If so how long?

A11. There is a warranty associated with this project covering material and workmanship for a period of one year (365 days) from acceptance date.

Q12. What style are the tanks? Is it a mix of single pedestal and legged?

A12. All six tanks are legged style.