This solicitation seeks proposals for water tank cleaning, painting, and repair services. The Army Contracting Command - Rock Island is requesting bids to perform work in accordance with the attached performance work statement, which includes drawings of Tanks A, B, and C specifying their heights. The solicitation anticipates awarding a single firm fixed price contract to the responsive, responsible bidder offering the lowest priced, technically acceptable bid. The small business set-aside has a NAICS code of 238320 and is issued using two-step sealed bidding. Interested contractors can schedule a mandatory site visit by contacting the contract specialist by January 31, 2024. The work will be performed at Pine Bluff Arsenal in Arkansas.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0011 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
W519TC24B2001 Conformed to AMD 0007.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
W519TC24B2001 AMD 0002.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0010 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0008 - PBA Tower B Inspection Report.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STee(. £.Al)DER - ----

H

--'-'' 01/ERFi.OW' PIPE

STEEi. PIPE

1-------��--------IJI.--· 18" PLIITG ,r � ,, 2 REtP'D

I£_ 3 ,,; X 4 "'.r 4 ,.

INDUSTRIAL WATER TANKS

TY-PICAL 1-'JLW .

IS" U 33. 9,,,, 8 RE(P'.O

'tfl/L/lt!IA/6 8/1/i'S

C

' ,, i

Tank A: H = 107'-0" Tank B: H = 121'-0" Tank C: H = 130'-0"

Water Tank Drawings A,B,C