Attachment 0008 - PBA Tower B Inspection Report.pdf

PDF 20 MB Posted

Attached to
PBA Water Tank Cleaning, Painting, and Repair
Solicitation number
W519TC24B2001
Issued by

About this file

This solicitation seeks proposals for water tank cleaning, painting, and repair services at Pine Bluff Arsenal in Arkansas. The Army Contracting Command - Rock Island is requesting these services in accordance with FAR Part 14. The contractor shall perform work in accordance with the attached performance work statement. This is a 100% small business set aside with a NAICS code of 238320. The contract type will be firm fixed price. Interested contractors should contact the listed contracting specialist by January 31, 2024 to schedule a mandatory site visit. Proposals are due by the date specified in the full solicitation document. The work includes cleaning, painting, and making repairs to water tanks at the specified location. Small businesses are encouraged to respond.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0011 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
W519TC24B2001 Conformed to AMD 0007.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
W519TC24B2001 AMD 0002.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0010 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0011 - Drawings - Tanks A-B-C.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MIT DIVING AND COATING

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

SSPC Rating’s Key Description - Good Condition 10 - No Rusting, or <0.01% of surface is rusted 9 - Minor rusting, or <0.03% of surface is rusted 8 - Isolated rust, <.01% of surface is rusted

Description - Fair Condition 7 - Isolated rust, <.03% of surface is rusted 6 - Extensive rusting, <1% of surface is rusted 5 - Approximately 3% of the surface is rusted

Description - Poor Condition 4 - Approximately 10% of the surface is rusted 3 - Approximately 17% of the surface is rusted 2 - Approximately 33% of the surface is rusted 1 - Approximately 50% of the surface is rusted 0 - Approximately 100% of the surface is rusted

Quadrant 2

Exterior Upper Wall Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Exterior Middle Wall Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Exterior Lower Wall Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Interior Upper Wall Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Interior Middle Wall Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Interior Lower Wall Panel Condition

Quadrant 3 Quadrant 4

Delamination Blistering

Chalking Staining

Cracking Pinholes

Cratering Sags/Runs

Additional Comments

Overall Coating Condition

Overall Coating Deficiency’s

Int. Roof Ext. Roof

Overall Weld Condition

Ext. Floor

Int. Roof Ext. Roof

Int. Floor Ext. Floor

Utility Name Date

Dive Control/Supervisor Diver/Inspector Tender

. Floor

Tower B Pine Bluff Arsenal 08/17/2020

Mike Smith Marcus Delgato Ben Pisocki

8 8 8 8

Good Good Good Good

8 8 8 8

Good Good Good Good

8 N/A N/A N/A

Good Good Good Good

7 5 7 7

Fair Fair Fair Fair

7 5 7 7

Fair Fair Fair Fair

7 5 7 7

Fair Fair Fair Fair

Fair Good

Fair Good

Large Concentrated Cell Corrosion nodes at 0530. 1" X 1"

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

Quadrant 1

Utility Name Date

Dive Control/Supervisor Diver/Inspector Tender

SSPC Rating’s Key Description - Good Condition 10 - No Rusting, or <0.01% of surface is rusted 9 - Minor rusting, or <0.03% of surface is rusted 8 - Isolated rust, <.01% of surface is rusted

Description - Fair Condition 7 - Isolated rust, <.03% of surface is rusted 6 - Extensive rusting, <1% of surface is rusted 5 - Approximately 3% of the surface is rusted

Description - Poor Condition 4 - Approximately 10% of the surface is rusted 3 - Approximately 17% of the surface is rusted 2 - Approximately 33% of the surface is rusted 1 - Approximately 50% of the surface is rusted 0 - Approximately 100% of the surface is rusted

Quadrant 2

Interior Roof Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Exterior Roof Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Internal Roof Support

Quadrant 3 Quadrant 4

Quadrant 2

Interior Floor Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Exterior Floor Panel Condition

Quadrant 3 Quadrant 4

Quadrant 2

Support Columns

Quadrant 3 Quadrant 4

Overall Coating Condition

Int. Roof Ext. Roof

Int. Floor Ext. Floor

Overall Weld Condition

Int. Roof Ext. Roof

Int. Floor Ext. Floor

Overall Coating Deficiency’s

Delamination Blistering

Chalking Staining

Cracking Pinholes

Cratering Sags/Runs

Additional Comments

Tower B Pine Bluff Arsenal 08/17/2020

Mike Smith Marcus Delgato Ben Pisocki

5 5 5 5

Fair Fair Fair Fair

7 8 8 8

Fair Good Good Good

5 5 5 5

Fair Fair Fair Fair

7 7 7 7

Fair Fair Fair Fair

6 6 6 6

Fair Fair Fair Fair

5 5 5 5

Fair Fair Fair Fair

Plumbing Locations and Condition

Quadrant One Quadrant Two Quadrant Three Quadrant Four

SSPC Rating Corrosion SSPC Rating Corrosion SSPC Rating Corrosion SSPC Rating Corrosion

Inlet Plumbing

Outlet Plumbing

Manways

Interior Overflow

Floor Drains

Sediment Depths & Plumbing Locations

Sediment Depths

Average Depth of sediment

Sediment Type

Plumbing Locations & Plumbing Identification Key

O = Outlet I = Inlet M = Manway V = Vent D = Drain S = Sump L = Ladder H = Hatch X = Overflow F = Float Level Indicator T = Telemetry C = Column

Additional Comments

6 Fair N/A N/A N/A N/A N/A N/A

6 Fair N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A

N/A N/A N/A N/A N/A N/A N/A N/A

5"

5"5"

5"

5" 5"

5" 5"

5"

5" 5"

5"

5"

Additional Reservoir Components

Primary Manway Condition Size Location

Primary Air Vent Type Condition

Exterior Overflow Location

Cathodic Protection Installed

Water Level Indicator Condition

Primary Access hatch Condition

Exterior Ladder Condition Rail to Rail Rung to Rung

Rail Width Rail Length

Railings

Roof Integrity Cracks Structural Condition

Wall Integrity Cracks Structural Condition

Antennas

Holes

Holes

Present Obstructs Work Site Antennas Offline

Hypalon Floating Cover Present Condition

Inspection Supplemental Report and Additional Information

Condition

Amount of Penetrations

Size

Condition

N/A N/A N/A

Mushroom Yes Good

Quadrant 3 Good

Yes Yes

Fair Float

Good 36"

Fair 14" 12" 9"

2" 1/4"

Yes Good

No No Good

No No Good

No N/A N/A

N/A N/A

Upon initial entry, the tank appeared to be in moderate condition with minor levels of corrosion, staining, and chalking along the floor and walls. The sediment was measured at 5" deep during the cleaning process. After cleaning we noticed more Staining, blistering, and uniform surface corrosion on both the floor and walls. At about the 6 Oclock there was a 2x2" rust nodule. There was no trash rack present on the Inlet/Outlet. The weld seem had some concentrated cell corrosion and could you some epoxy repair. The Cathodic protection entered the tank about the 9 Oclock. The 1" pipe the wires come through was plugged up with concentrated cell corrosion. The ladder appeared to be in fair condition, with staining, blistering, and concentrated cell corrosion. The overflow appeared to be in good condition, with minor staining. The hatch appeared to be in fair condition, with staining and corrosion on the hardware.

The Interior roof has large amounts of uniform surface corrosion.

float guide cable was fine, team replaced step off bracket to secure float level indicator.

We would like to thank you for choosing MIT diving, and we recommend having your tanks cleaned and inspected every three to five years.

Recommend one day epoxy repairs below water level.

spot prime repair rafters and spots on upper walls above water level as budget allows.