Attachment 0008 - PBA Tower B Inspection Report.pdf
PDF 20 MB Posted
- Attached to
- PBA Water Tank Cleaning, Painting, and Repair
- Solicitation number
- W519TC24B2001
About this file
This solicitation seeks proposals for water tank cleaning, painting, and repair services at Pine Bluff Arsenal in Arkansas. The Army Contracting Command - Rock Island is requesting these services in accordance with FAR Part 14. The contractor shall perform work in accordance with the attached performance work statement. This is a 100% small business set aside with a NAICS code of 238320. The contract type will be firm fixed price. Interested contractors should contact the listed contracting specialist by January 31, 2024 to schedule a mandatory site visit. Proposals are due by the date specified in the full solicitation document. The work includes cleaning, painting, and making repairs to water tanks at the specified location. Small businesses are encouraged to respond.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MIT DIVING AND COATING
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
SSPC Rating’s Key Description - Good Condition 10 - No Rusting, or <0.01% of surface is rusted 9 - Minor rusting, or <0.03% of surface is rusted 8 - Isolated rust, <.01% of surface is rusted
Description - Fair Condition 7 - Isolated rust, <.03% of surface is rusted 6 - Extensive rusting, <1% of surface is rusted 5 - Approximately 3% of the surface is rusted
Description - Poor Condition 4 - Approximately 10% of the surface is rusted 3 - Approximately 17% of the surface is rusted 2 - Approximately 33% of the surface is rusted 1 - Approximately 50% of the surface is rusted 0 - Approximately 100% of the surface is rusted
Quadrant 2
Exterior Upper Wall Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Exterior Middle Wall Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Exterior Lower Wall Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Interior Upper Wall Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Interior Middle Wall Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Interior Lower Wall Panel Condition
Quadrant 3 Quadrant 4
Delamination Blistering
Chalking Staining
Cracking Pinholes
Cratering Sags/Runs
Additional Comments
Overall Coating Condition
Overall Coating Deficiency’s
Int. Roof Ext. Roof
Overall Weld Condition
Ext. Floor
Int. Roof Ext. Roof
Int. Floor Ext. Floor
Utility Name Date
Dive Control/Supervisor Diver/Inspector Tender
. Floor
Tower B Pine Bluff Arsenal 08/17/2020
Mike Smith Marcus Delgato Ben Pisocki
8 8 8 8
Good Good Good Good
8 8 8 8
Good Good Good Good
8 N/A N/A N/A
Good Good Good Good
7 5 7 7
Fair Fair Fair Fair
7 5 7 7
Fair Fair Fair Fair
7 5 7 7
Fair Fair Fair Fair
Fair Good
Fair Good
Large Concentrated Cell Corrosion nodes at 0530. 1" X 1"
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
Quadrant 1
Utility Name Date
Dive Control/Supervisor Diver/Inspector Tender
SSPC Rating’s Key Description - Good Condition 10 - No Rusting, or <0.01% of surface is rusted 9 - Minor rusting, or <0.03% of surface is rusted 8 - Isolated rust, <.01% of surface is rusted
Description - Fair Condition 7 - Isolated rust, <.03% of surface is rusted 6 - Extensive rusting, <1% of surface is rusted 5 - Approximately 3% of the surface is rusted
Description - Poor Condition 4 - Approximately 10% of the surface is rusted 3 - Approximately 17% of the surface is rusted 2 - Approximately 33% of the surface is rusted 1 - Approximately 50% of the surface is rusted 0 - Approximately 100% of the surface is rusted
Quadrant 2
Interior Roof Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Exterior Roof Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Internal Roof Support
Quadrant 3 Quadrant 4
Quadrant 2
Interior Floor Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Exterior Floor Panel Condition
Quadrant 3 Quadrant 4
Quadrant 2
Support Columns
Quadrant 3 Quadrant 4
Overall Coating Condition
Int. Roof Ext. Roof
Int. Floor Ext. Floor
Overall Weld Condition
Int. Roof Ext. Roof
Int. Floor Ext. Floor
Overall Coating Deficiency’s
Delamination Blistering
Chalking Staining
Cracking Pinholes
Cratering Sags/Runs
Additional Comments
Tower B Pine Bluff Arsenal 08/17/2020
Mike Smith Marcus Delgato Ben Pisocki
5 5 5 5
Fair Fair Fair Fair
7 8 8 8
Fair Good Good Good
5 5 5 5
Fair Fair Fair Fair
7 7 7 7
Fair Fair Fair Fair
6 6 6 6
Fair Fair Fair Fair
5 5 5 5
Fair Fair Fair Fair
Plumbing Locations and Condition
Quadrant One Quadrant Two Quadrant Three Quadrant Four
SSPC Rating Corrosion SSPC Rating Corrosion SSPC Rating Corrosion SSPC Rating Corrosion
Inlet Plumbing
Outlet Plumbing
Manways
Interior Overflow
Floor Drains
Sediment Depths & Plumbing Locations
Sediment Depths
Average Depth of sediment
Sediment Type
Plumbing Locations & Plumbing Identification Key
O = Outlet I = Inlet M = Manway V = Vent D = Drain S = Sump L = Ladder H = Hatch X = Overflow F = Float Level Indicator T = Telemetry C = Column
Additional Comments
6 Fair N/A N/A N/A N/A N/A N/A
6 Fair N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A
N/A N/A N/A N/A N/A N/A N/A N/A
5"
5"5"
5"
5" 5"
5" 5"
5"
5" 5"
5"
5"
Additional Reservoir Components
Primary Manway Condition Size Location
Primary Air Vent Type Condition
Exterior Overflow Location
Cathodic Protection Installed
Water Level Indicator Condition
Primary Access hatch Condition
Exterior Ladder Condition Rail to Rail Rung to Rung
Rail Width Rail Length
Railings
Roof Integrity Cracks Structural Condition
Wall Integrity Cracks Structural Condition
Antennas
Holes
Holes
Present Obstructs Work Site Antennas Offline
Hypalon Floating Cover Present Condition
Inspection Supplemental Report and Additional Information
Condition
Amount of Penetrations
Size
Condition
N/A N/A N/A
Mushroom Yes Good
Quadrant 3 Good
Yes Yes
Fair Float
Good 36"
Fair 14" 12" 9"
2" 1/4"
Yes Good
No No Good
No No Good
No N/A N/A
N/A N/A
Upon initial entry, the tank appeared to be in moderate condition with minor levels of corrosion, staining, and chalking along the floor and walls. The sediment was measured at 5" deep during the cleaning process. After cleaning we noticed more Staining, blistering, and uniform surface corrosion on both the floor and walls. At about the 6 Oclock there was a 2x2" rust nodule. There was no trash rack present on the Inlet/Outlet. The weld seem had some concentrated cell corrosion and could you some epoxy repair. The Cathodic protection entered the tank about the 9 Oclock. The 1" pipe the wires come through was plugged up with concentrated cell corrosion. The ladder appeared to be in fair condition, with staining, blistering, and concentrated cell corrosion. The overflow appeared to be in good condition, with minor staining. The hatch appeared to be in fair condition, with staining and corrosion on the hardware.
The Interior roof has large amounts of uniform surface corrosion.
float guide cable was fine, team replaced step off bracket to secure float level indicator.
We would like to thank you for choosing MIT diving, and we recommend having your tanks cleaned and inspected every three to five years.
Recommend one day epoxy repairs below water level.
spot prime repair rafters and spots on upper walls above water level as budget allows.