Attachment 0011 - Drawings - Tanks 1-2-3.pdf

PDF 1 MB Posted

Attached to
PBA Water Tank Cleaning, Painting, and Repair
Solicitation number
W519TC24B2001
Issued by

About this file

This document is Attachment 0011 - Drawings - Tanks 1-2-3.pdf, which contains drawings related to the federal contract opportunity for PBA Water Tank Cleaning, Painting, and Repair Services. The solicitation number is W519TC-24-B-2001, issued by the Army Contracting Command - Rock Island (ACC-RI) for the procurement of water tank cleaning, painting, and repair services at Pine Bluff Arsenal in Arkansas. The contract will be a Firm Fixed Price (FFP) type, with the award subject to the availability of funds. The procurement is 100% set aside for Small Businesses, under the NAICS Code 238320 - Painting and Wall Covering Contractors. Interested contractors are required to schedule a Site Visit no later than January 31, 2024. This attachment provides drawings for Tanks 1-2-3, which are likely part of the required work under the Performance Work Statement (PWS) referenced in the solicitation.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
W519TC24B2001 Conformed to AMD 0007.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
W519TC24B2001 AMD 0002.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0010 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0008 - PBA Tower B Inspection Report.pdf PDF
Attachment 0011 - Drawings - Tanks A-B-C.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .