Attachment 0010 - Drawings - Tanks 1-2-3.pdf

PDF 1 MB Posted

Attached to
PBA Water Tank Cleaning, Painting, and Repair
Solicitation number
W519TC24B2001
Issued by

About this file

This document describes a federal contract opportunity for water tank cleaning, painting, and repair services. The U.S. Army Contracting Command - Rock Island is soliciting bids under solicitation number W519TC24B2001 to provide water tank cleaning, painting, and repair services at Pine Bluff Arsenal in Arkansas. The contractor shall perform work in accordance with the requirements in Attachment 0001, the Performance Work Statement. This is a 100% set-aside for small businesses with a NAICS code of 238320 for painting and wall covering contractors. The contract type will be firm fixed price. Interested contractors can schedule a mandatory site visit by January 31, 2024 by contacting the listed contract specialist. Bids are due in response to this two-step sealed bid solicitation.

View the file

Other files

File Type Posted
Attachment 0010 - Water Tower Map.pdf PDF
Attachment 0011 - Drawings - Tanks 1-2-3.pdf PDF
Attachment 0014 - Tank C Altitude Valve Specification.pdf PDF
Attachment 0015 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0012 - Drawings - Tanks A-B-C.pdf PDF
Attachment 0014 - Water Tank Structure Pictures.pdf PDF
Attachment 0013 - Tank C Altitude Valve Specification.pdf PDF
W519TC24B2001 Conformed to AMD 0007.pdf PDF
Attachment 0012 - PBA Steel Tank Maintenance Specifications.pdf PDF
Attachment 0002 - Wage Determination AR20240036.pdf PDF
Attachment 0001 - Performance Work Statement 5 March 2024.docx DOCX document
W519TC24B2001 Conformed to AMD 0006.pdf PDF
W519TC24B2001 AMD 0005.pdf PDF
W519TC24B2001 AMD 0004.pdf PDF
W519TC24B2001 AMD 0003.pdf PDF
Attachment 0003 - LBP Water Tanks Survey.pdf PDF
Attachment 0005 - PBA Tower 2 Inspection Report.pdf PDF
W519TC24B2001 AMD 0002.pdf PDF
Attachment 0009 - PBA Tower C Inspection Report.pdf PDF
Attachment 0007 - PBA Tower A Inspection Report.pdf PDF
Attachment 0004 - PBA Tower 1 Inspection Report.pdf PDF
Attachment 0006 - PBA Tower 3 Inspection Report.pdf PDF
Attachment 0008 - PBA Tower B Inspection Report.pdf PDF
Attachment 0011 - Drawings - Tanks A-B-C.pdf PDF
W519TC24B2001 AMD 0001.pdf PDF
Attachment 0001 - Performance Work Statement.docx DOCX document
W519TC24B2001.pdf PDF
Attachment 0002 - Wage Determination 15-5121.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .