TE-H.2.13.6.5 Chiller Plant Op Log.pdf
PDF 82 KB Posted
- Attached to
- Ft Carson BASOPS (Base Operations Services)
- Solicitation number
- W5168W-24-R-0009
- Issued by
-
Department of the Army
About this file
This document appears to be a Technical Exhibit (TE) that provides a sample format for a Central Chiller Operation Log for Building 1864 at Fort Carson, Colorado. It details the information to be recorded for the operation of the chiller plant, including machine status, temperatures, pressures, flow rates, and other parameters.
The related federal contract opportunity is for Base Operations Support Services at U.S. Army Fort Carson, Colorado. The solicitation number is W5168W-24-R-0009, and the contract will provide a wide range of common level of services (CLS) such as grounds maintenance, facility maintenance, HVAC services, and wastewater services. The contract is being issued by the Mission and Installation Contracting Command-Installation Readiness Center on behalf of the Mission and Installation Contracting Command-Fort Carson.
View the file
Other files
Show 40 more
Latest 50 of 201 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Technical Exhibit
TE-H.2.13.6.5
Jan 2022
Central Chiller Operation Log Sample
TE-5.8.4.3.6
Bldg 1864
Chilled Water Plant, Fort Carson, Colorado
Date: Machine No.
On Off
Purge Pump
Running Hours
#1 #2 #3
Operator 1
In_______ Out_______
Operator 2
Condenser
Water
High Temp
Water
Chilled
Water
Bromide System Pumps Primary
Pumps
Time
T e m p e r a t u r e
I n
T e m p e r a t u r e
O u t
P r e s s u e m p e r a t u r e
I n
T e m p e r a t u r e
O e s s u
G
M
V a l v e
P r e s s u m p e r a t u r e
I n
T e m p e r a t u r e
O
B a r i n g
C o o l a n t
T e m p e r a t u r e
O
L i q u i d
L e v l
S r o n g
S o l u t i o n
T e m p e r a t u
W a k
S o l u t i o n m p e r a t u
R f r i g e r a n m p e r a t u e s s u r e
S o u h e s s u r e
N o r
M
S o u
M
N o r e s s u r e
N o e s s u r e
N o e s s u r e
N o
Technical Exhibit
TE-H.2.13.6.5
Jan 2022
Central Chiller Operation Log Sample
TE-5.8.4.3.6
Bldg 1864
Chilled Water Plant, Fort Carson, Colorado
Date: Machine No.
Purge Pump
Running Hours
#1 #2 #3
Operator 1
Operator 2
File details come from the government source that posted it. Updated .