TE-H.2.22B Fire Pump Data.xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

This document appears to be an Excel spreadsheet containing data on fire pumps for a government facility. The spreadsheet lists 30 fire pumps, providing details on the building, pump size, type, manufacturer, model, and serial number for each one. It also includes maintenance and inspection schedules for the various fire pump systems located throughout the facility.

The related federal contract opportunity is for providing Base Operations Support Services at Fort Carson, Colorado. The solicitation is seeking a contractor to perform a range of facilities maintenance and utility services, including grounds maintenance, pavement clearance, vertical and horizontal facility maintenance, heating and cooling, and wastewater services. The Department of the Army is the procuring agency for this requirement.

View the file

Other files

File Type Posted
QandA Responses-24MAY2024-W5168W-24-R-0009.xlsx XLSX spreadsheet
TE-H.2.0B PM Tasks.xlsx XLSX spreadsheet
Annex K to OPORD 18-011 Heating and Cooling-18APR2024.pdf PDF
TE-H.2.23A Playground Checklist.pdf PDF
TE-H.1.1 Historical Locations.pdf PDF
TE-J.2.2.4.2 Lift Station PM Checklist.pdf PDF
TE-H.2.13.6.5 Chiller Plant Op Log.pdf PDF
TE-H.2.3.1.1A Exhaust Fan Locations.xlsx XLSX spreadsheet
Section M-W5168W-24-R-0009-FtCarson 23APR2024.pdf PDF
TE-H.2.13.1 List of Equip in Heat Plants.pdf PDF
TE-H.2.13.6 Major Oper Equip Cool Plant.pdf PDF
TE-H.2.13.4.2 Air Dryers.xlsx XLSX spreadsheet
TE-H.2.3 Furnances-Unit Heaters.xls XLS spreadsheet
TE-H.2.13.9.1 EMCS Facilities.xlsx XLSX spreadsheet
TE-H.9.5 Airfield Lighting.pdf PDF
TE-H.2.24A Washers-Dryers.xlsx XLSX spreadsheet
TE-H.2.13.7 Kitchen Hoods.xlsx XLSX spreadsheet
TE-H.2.29.1.7 Kitchen_Grill Hoods.xlsx XLSX spreadsheet
TE-H.9.1 Traffic Lights.xlsx XLSX spreadsheet
TE-H.2.27 Master Best Lock and Key count.xlsx XLSX spreadsheet
Add-In Text for-Executive Order 14055 Clause-Add in PD2.pdf PDF
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-24MAY2024.xlsx XLSX spreadsheet
Attachment Q-W5168W-24-R-0009-DAVISBACON-RESIDENTIAL-08DEC2023-FTCARSON.pdf PDF
Attachment D- Annex L to OPORD 18-011 Wastewater Services.pdf PDF
Attachment V- Annex K to OPORD 18-011 Heating and Cooling.pdf PDF
Attachment T3 - Specific Relevant Contracts Reference Sheet-W5168W-24-R-0009-FTCARSON.pdf PDF
TE-J.2.1.2.1 Cross walk locations.pdf PDF
TE-J.2.1.2.1 School Crosswalk Locations.pdf PDF
TE-J.2.2.4.1 Range 145 Sewer.pdf PDF
TE-J.2.2.4.1c Range 111 Sewer Maps.pdf PDF
TE-J.2.2.3b Olympic Shooting Complex Water Distribution.pdf PDF
TE-J.2.2.3a PCMS Water Distribution System.pdf PDF
TE-J.2.1.4.1 Running Trails.pdf PDF
TE-J.2.1.3.1 FCCO Firebreaks.pdf PDF
TE-J.2.1.8A PCMS Rail.pdf PDF
TE-J.1.2.2 IGSA Responsibilities.pdf PDF
TE-G.1.1 Snow Removal Map.pdf PDF
TE-G.2.1.2.3 Known Dumpster Locations.xls XLS spreadsheet
TE-G.2.1 Historical Snowfall.xlsx XLSX spreadsheet
TE-F.2.2.1C Down Range Mowing Maps.pdf PDF
TE-F.2.2.11 Fort Carson Irrigation.pdf PDF
TE-L.1.2 Sanitary Sewer Manhole Locations.pdf PDF
TE-A.2.1.3B PCMS Installation Map.PDF PDF
TE-A.2C 2020 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2E-1 2022 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2E 2022 Workload Data (DMO)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2.1.3A Fort Carson Installation Map.pdf PDF
TE-A.2.1.3D ADACG and Bldg 20000.pdf PDF
TE-A.7.4 Government Furnished Property (Facilities).pdf PDF
TE-G.1.2 Installation Snow Removal Plan.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fire Pumps

TE-H.2.22B
Fire Pumps
Jan-22
Fire Sprinkler System Fire Pump Data
Revision Date: January 2022Total Pumps: 30
Building / AssetSizeGPMTypeManufacturerModel No.Serial No.
FP50181250HorizontalPatterson Pump Co.8x8FP-C00019269-01-01
FP5106500Vertical In-LineS.A. Armstrong1A-F 6x4605737
FP5156500HorizontalPatterson Pump Co.5.3 MACFP-C079086
FP5176750Vertical In-LinePatterson Pump Co.6x6 VIPFP-C096507
FP7046750HorizontalAurora Pump Co.4-481-11D09-1833514
FP74981000Vertical In-LinePatterson Pump Co.8x8x13A VIPFP-C181179-01
FP11176500Vertical In-LinePatterson Pump Co.5x3 VIPFP-C188681-01
FP12108750HorizontalAurora Pump Co.4-481-11D09-1833508
FP14356750HorizontalAurora Pump Co.4-481-11D08-1636206
FP14476750HorizontalAurora Pump Co.4-481-1508-1670193
FP15006500Vertical In-LineFairbanks Morse Pump1591BF 4"K4H1-027097
FP23306750Vertical In-LineAurora Pump Co.4-383-10B09-1851048
FP20396750Vertical In-LineAurora Pump Co.4-383-1313-2311174
FP34906750HorizontalAurora Pump Co.4-481-11D09-1833576
FP8002-181,000HorizontalPeerless5AEF850008179
FP8002-281,000HorizontalColt IndustriesUnknownK2R 1061285-1
FP80096750HorizontalAurora Pump Co.4-481-11C08-1634531
FP80106500HorizontalAurora Pump Co.3-481-1002-841995
FP81106750Vertical In-LineAllis Chalmers158007-050506-01-01/QKE805
FP814382,000HorizontalAllis ChalmersUnknownUnknown
FP89308750Vertical In-LinePentair Aurora Pump Co.4-483-15 483 BF H17-2516923
FP90676750Vertical In-LinePatterson Pump Co.6x6 VIPFP-C0100470
FP90796750Vertical In-LinePatterson Pump Co.6x6 VIPFP-C0112044
FP9624-181,500HorizontalPatterson Pump Co.8x6 MAAFP-C0135952-06
FP9624-281,500HorizontalPatterson Pump Co.8x6 MAAFP-C0135952-05
FP9624-381,500HorizontalPatterson Pump Co.8x6 MAAUnkown
FP9624-481,500HorizontalPatterson Pump Co.8x6 MAAFP-C0163764-01
FP9624-581,500HorizontalPatterson Pump Co.8x6 MAAFP-C000176067-1
FP9624-681,500HorizontalPatterson Pump Co.8x6 MAAFP-C0135952-03
FP2000081,000HorizontalAllis Chalmers8000 8x6x125851-89132-01-01
Page 1 of 2

Data

AnnualJanKennyAdmin AreaAnnual Inspection ONLY
MonthlyFebMaryEllenA1 Rm. 124Has Backflow
MarA-C Hanger BaysHas Backflow x 2
AprAttic SystemNo Backflow
MayB2 Rm. 124No Backflow Needed
JunBack of RestaurantNo Tampers or Alarms
JulBasement Mech. Rm.One Backflow Protects all Systems
AugBasement Riser Rm.Open Head Deluge System
SepBasement Riser CageSee above comments
OctBay 1System Feed from Bldg. 704
NovBay 2
DecBehind Paint Booth
Bldg. 2 2nd Floor
Bldg. B & C 1st Floor
Bldg. A 3rd Floor
C/D Rm. 164
Canvas Shop
Center
Center East Warehouse
Center Loading Dock
Center Mech. Rm.
Center Storage
Center Warehouse
Clipper Rm.
Coolers Overhead System
Coolers Rack System
Comm. Bldg.
Corner of Bldg.
CQ Area
D-E Hanger Bays
Dorm Room
E1 Rm. 164
E2 Rm. 164
East Admin
East Attic
East Canopy
East Freezers
East Mech. Rm.
East Storage
East Warehouse
Elevators
Fabrication Shop
Fire Hose Valve System
Fire Pump House
Fire Riser Rm.
Food Court
Front Entrance Cage
Garage
Garden Center
Gas Bay
Generator Rm.
Hallway
Hard Stand
High Bays
Hydraulic Shop
Janitors Closet
Kitchen Area
Machine Shop
Main Entry
Main Retail
Mainflow & Mezz
Maintenance Shop
Mech. Rm.
Mech. Rm. 109
Metal Shop
Mod 1
Mod 2
Mod 2 Hard Stand
Mod 3
Mod 3 Hard Stand
Mod 4
Mod 5
Mod 6
Mod 6 Hard Stand
NE Warehouse
North Canopy
North Center
North CIF Area
North End
North Mech. Rm.
North Side Hallway
North Storage
North System
NW Corner Rm.
NW Corner Warehouse
Outside Storage
Overhead
Parachute Tower
Penthouse
Pharmacy Closet
Rack Storage
Readiness Area
Riser Rm. In Supply Cage
SE Corner of Bldg.
SE Mech. Rm.
Skiff Overhead System
Skiff Rack System & N. Classroom
Skiff South Rm's
South Area
South Canopy
South Center
South End
South Mech. Rm.
South Mod
South Retail
South Secure Rm.
South Storage
South System
South Warehouse
Spray Booth
Stage Area Only
Standpipe
Supply Cage
SW Corner of Bldg.
Under Mezz. System
Upper Mezz. Mech. Rm.
Warehouse
Warehouse Rack System
Weld Shop
West Admin
West Attic
West Canopy
West Freezers
West Mech. Rm.
West Storage
West Warehouse
1st Floor Center
2nd Floor Center
4th Floor Stairwell
1st Floor
2nd Floor
3rd Floor
4th Floor
5th Floor
6th Floor
7th Floor
8th Floor
9th Floor
10th Floor
1st Floor Tower
2nd Floor Tower
3rd Floor Tower
4th Floor Tower
5th Floor Tower
6th Floor Tower
7th Floor Tower
8th Floor Tower
9th Floor Tower
10th Floor Tower
1st Floor & Elevator
2nd Floor & Elevator
1st Floor North & Elevator
3rd Floor & Elevator
1st Floor North
2nd Floor North
3rd Floor North
1st Floor South
2nd Floor South
3rd Floor South
1st Floor East
2nd Floor East
3rd Floor East
1st Floor West
2nd Floor West
3rd Floor West
1st & 2nd Center
2nd Floor Center

File details come from the government source that posted it. Updated .