Amendment 0002-W5168W-24-R-0009-FtCarsonQandA-17JUNE2024.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

This document is a set of questions and answers related to Amendment 0002 of Solicitation W5168W-24-R-0009 for Base Operations Support Services at Fort Carson, CO. The key details are:

The solicitation requires offerors to provide a plan for mission essential contractor services per DFARS 252.237-7024 and PWS 2.5.7.4. It also requires a warranty plan per PWS 2.2.8. Offerors can provide CPARS information, but it is not required to be included within the 10-page limit for Specific Relevant Contract Reference Sheets. The government clarified that all PWS tasks are considered mission essential, and past performance questionnaires can be submitted by the proposal due date of June 28, 2024. The government also confirmed the required plans to be submitted with the proposal are outlined in Section L, paragraph 5.1.6.

View the file

Other files

File Type Posted
Amendment 0002-W5168W-24-R-0009-FtCarson-18JUN2024.pdf PDF
Section L -W5168W-24-R-0009-FtCarson18JUNE2024.pdf PDF
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON-18JUNE2024.pdf PDF
Amendment 0002-W5168W-24-R-0009-FtCarson-17JUN2024.pdf PDF
Section L -W5168W-24-R-0009-FtCarson17JUNE2024.pdf PDF
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON-17JUNE2024.pdf PDF
W5168W-24-R-0009-GFP List-29MAY2024.pdf PDF
AMENDMENT 0001-FT CARSON W5168W-24-R-0009-24MAY2024.pdf PDF
TE-H.2.23A Playground Checklist.pdf PDF
TE-H.2.4 Eyewash Station Locations.xlsx XLSX spreadsheet
TE-H.2.13.9.2 EMCS Inventory.xlsx XLSX spreadsheet
TE-H.2.11B PCMS and Ft Carson Sewer Manhole Graphic.pdf PDF
TE-H.1.1.1 Real Property Facilities.pdf PDF
TE-H.2.11A STP Description.pdf PDF
TE-H.2.3.1.1 Radon Detection Units.xlsx XLSX spreadsheet
TE-H.2.15.1 Dampness and Mold Visual Assessment Worksheet.pdf PDF
TE-H.2.24A Washers-Dryers.xlsx XLSX spreadsheet
TE-H.2.3.1.1A Exhaust Fan Locations.xlsx XLSX spreadsheet
TE-H.2.3 Furnances-Unit Heaters.xls XLS spreadsheet
TE-H.1.1.1A Non Real Property.xlsx XLSX spreadsheet
TE-H.2.10.8.1 CVWF Description.pdf PDF
TE-H.4.2.2 Self Help Iinventory.xlsx XLSX spreadsheet
TE-A.7.4.A Government Furnished Property (GFP) (Equipment) 1.xlsx XLSX spreadsheet
Section L -W5168W-24-R-0009-FtCarson-24MAY2024.pdf PDF
TE-H.2.10.8 Wash Rack Facilities.xlsx XLSX spreadsheet
TE-H.2.13.1.5 Boiler Operating Hours.xls XLS spreadsheet
TE-H.2.19 Auxilary Generator.xlsx XLSX spreadsheet
TE-H.2.22 Fire Systems.xlsx XLSX spreadsheet
TE-H.2.0A-Excluded Real Property.pdf PDF
TE-H.2.3.1.4 High Occupancy and Crit Facilities.xlsx XLSX spreadsheet
Attachment M-CBA-W5168W-24-R-0009-10APR2024.pdf PDF
Annex H to OPORD 18-011 Facility Maint Vertical-Attachment G.pdf PDF
TE-A.7.3 Consolidated Technical Exhibit Index-17APR2024.pdf PDF
TE-H.17.7.2 Water Contamination Response Plan.pdf PDF
W5168W-24-R-0009 Attachment List-FtCarson-24MAY2024.xlsx XLSX spreadsheet
TE-H.2.28 Food Service Equipment Location.xlsx XLSX spreadsheet
TE-H.25 Sand Pipes and Yard Hydrant Locations.xlsx XLSX spreadsheet
TE-H.2.6 Automatic Doors-Fence Openers.xlsx XLSX spreadsheet
TE-H.2.20.1 LPS and GP test locations.pdf PDF
TE-H.2.13.3 Chiller Wtr Chem.xls XLS spreadsheet
TE-H.2.23 Playground locations.xlsx XLSX spreadsheet
TE-H.2.14 List of Facilities for Winterization and De-Winterization (Mothballed).xlsx XLSX spreadsheet
TE-G.2.1 Historical Snowfall-Updated.xlsx XLSX spreadsheet
TE-H.21.1 AST_UST Locations.xlsx XLSX spreadsheet
TE-H.2.24 Barracks.xls XLS spreadsheet
TE-H.2.7 Overhead Doors.xlsx XLSX spreadsheet
TE-H.2.11 Septic System Locations.xlsx XLSX spreadsheet
TE-H.2.11C Manhole Cardinal Directions.xlsx XLSX spreadsheet
TE-H.2.22B Fire Pump Data.xlsx XLSX spreadsheet
TE-H.5.1 Inventory of Solar PV.pdf PDF
Show 40 more

Latest 50 of 201 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Date: 17 JUNE 2024
NumberRFP FileParagraphPageQuestionResponse/Resolution
1Amendment 0001Attachment J: Pricing MatrixCLIN X002Comment: The document lists Bands for what appears to be three capabilities for Operational Work Orders (OWO’s). But unlike the other CLINS, X002 does not have quantities listed for each capability. Question: How would the government like offerors to propose these three Bands?The Offeror needs to propose for all OWO's performed during the year for each capability.
2Amendment 0001Attachment TPast Performance QuestionnaireComment: We noticed that the required date to return the questionnaires to the Government is May 28, 2024. Since that date has passed and the proposal is now due June 28, 2024, please advise how we should proceed to remain compliant.
Question: Should we send out the questionnaires as is and note to our citations that the due date should be June 28, 2024, or, change the letter to the correct due date, or, will the Government send out a revised letter to include with the June 28, 2024 due date?Refer to updated Attachment T.
3Amendment 0001Attachment TPast Performance Questionnaire, Page 149 of 157Question: Will the Government please modify Attachment T so it is consistent with the RFP and states to have PPQs submitted by the proposal due date and time?Please refer to question #2.
4Amendment 0001Questions & AnswersQuestion 101Comment: In response to Question 101, regarding Mission Essential Contractor Services, the government states “The PWS in its entirety is considered mission essential contractor services.”

PWS 2.5.6.2 requires development of a Labor Dispute Contingency Plan that includes identification and addresses critical Preventive Maintenance and inspection tasks that are to be continued with no interruption in the event of a labor dispute.

Question: If all PWS tasks are mission essential, are all PMO tasks considered critical?Yes.
5Amendment 0001RFP, 3.1.1, Table 3.1.1 – Proposal Organization

Questions & Answers Page 143 of 157

Question 35 Comment: The answer to Question 35 states, “The Offeror can provide CPARS information. It will be included in the page count.” However, per Table 3.1.1 – Proposal Organization in the RFP, there is no page limit set aside for CPARS. In addition, the 10-page limit for each Specific Relevant Contract Reference Sheets (Attachment P2) is not adequate to include the most recent CPAR information.

Question: Will the Government please clarify where CPAR information should be included in Volume III, Past Performance? In addition, will the Government please clarify what the page limitation is for the CPAR?The Offeror is not required to provide CPARS information in Vol III. CPARS information will be reviewed by the Government for evaluation purposes.
6Amendment 0001Questions & AnswersQuestion 35
Question 66Comment: The response to Question 66 refers to question 35. However, the response to Question 35 does not state whether a Contractor Performance Assessment Report (CPAR) can be provided in lieu of having a customer submit past performance questionnaire (PPQ). Question: Will the Government please clarify whether a CPAR can be provided in the proposal response instead of having a customer complete a PPQ?Please refer to question 5.
7RFP, 5.1.6 TAB D, Other DocumentsPage 145 of 157Comment: The RFP states, “ Offerors shall submit the documents listed below with its proposal…
•Mission Essential Contractor Services Plan, Offerors shall submit the plan IAW DFARS Provision 252.237-7024, Notice of Continuation of Essential Contractor Services.
•Mission Essential Contractor Services Plan Offerors shall submit the plan IAW PWS 2.5.7.4.”
Question: Will the Government please verify which plans are required to be submitted with the proposal?Required plans to be submitted with the proposal are outlined in section 5.1.6 of Section L, page 145.
8Amendment 0001Questions & AnswersQuestion 35
Question 66Comment: Based on previous experience, it can be difficult to find a contract POC who is available, willing and able to provide a completed PPQ.
Question: In the case where a customer contact no longer exists for a past performance reference, even though the contract was completed within the past five years, will the Government please accept a CPAR in lieu of a completed PPQ?Please refer to question 5.
9RFP, 5.1.6 TAB D, Other Documents PWS 2.2.85.1.6 TAB D Other DocumentsPage 145 to 157

Page 14 of 41 Comment: The RFP states, “ Offerors shall submit the documents listed below with its proposal… Warranty Plan, provide Offerors shall submit the plan IAW PWS 2.2.4.5. However, PWS 2.2.4.5 doesn’t appear to exist. PWS 2.2.8 is “Warranty Program”.

Question: Will the Government please clarify which PWS element the Warranty Plan should be in accordance with? Refer to updated Section L

File details come from the government source that posted it. Updated .