TE-H.2.13.1.5A Boiler Operating Log.xls

XLS spreadsheet 44 KB Posted

Attached to
Ft Carson BASOPS (Base Operations Services)
Solicitation number
W5168W-24-R-0009
Issued by

About this file

This document is a Facilities Operating Log for the High Temperature Hot Water (HTHW) plant at Fort Carson, Colorado. The log records daily operational data such as tank pressures, temperatures, flow rates, generator efficiency, and fuel consumption. The log is used to track and monitor the performance of the HTHW plant.

The related federal contract opportunity is for Base Operations Support Services at Fort Carson. The solicitation seeks a contractor to provide a range of facilities management services including grounds maintenance, pavement clearance, vertical and horizontal facility maintenance, heating and cooling services, and wastewater services. The contract will be awarded by the Department of the Army's Mission and Installation Contracting Command.

View the file

Other files

File Type Posted
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON-18JUNE2024.pdf PDF
W5168W-24-R-0009-GFP List-29MAY2024.pdf PDF
TE-G.2.1 Historical Snowfall-Updated.xlsx XLSX spreadsheet
TE-J.2.2.1.1 UPS-Locations-Updated.xlsx XLSX spreadsheet
TE-H.2.13.9.2 EMCS Inventory.xlsx XLSX spreadsheet
Annex A-Performance Work Statement (PWS)-W5168W-24-R-0009-24MAY2024.pdf PDF
TE-H.2.15.2 Post Remediation Verification Letter.pdf PDF
TE-H.2.10.3 Sump_Lift Station Locations.pdf PDF
TE-H.2.11A STP Description.pdf PDF
TE-H.2.14 List of Facilities for Winterization and De-Winterization (Mothballed).xlsx XLSX spreadsheet
TE-H.1.1.1A Non Real Property.xlsx XLSX spreadsheet
TE-H.2.28 Food Service Equipment Location.xlsx XLSX spreadsheet
TE-H.25 Sand Pipes and Yard Hydrant Locations.xlsx XLSX spreadsheet
TE-H.2.9 Compressors.xls XLS spreadsheet
TE-H.21.1 AST_UST Locations.xlsx XLSX spreadsheet
TE-H.9.0 Privatized Street Lights.xlsx XLSX spreadsheet
TE-H.2.3.1.1 Radon Detection Units.xlsx XLSX spreadsheet
TE-H.2.4 Eyewash Station Locations.xlsx XLSX spreadsheet
W5168W-24-R-0009 Attachment List-FtCarson-24MAY2024.xlsx XLSX spreadsheet
Attachment J-FtCarson Pricing Matrix-W5168W-24-R-0009-20MAR2024-Final.xlsx XLSX spreadsheet
Attachment P-W5168W-24-R-0009-DAVISBACON-HIGHWAY-08DEC2023-FTCARSON.pdf PDF
Attachment T - W5168W-24-R-0009-Past Performance Questionnaire-FTCARSON.pdf PDF
Attachment K - W5168W-24-R-Staffing Matrix-FTCARSON.xlsx XLSX spreadsheet
Attachment M-CBA-W5168W-24-R-0009.pdf PDF
TE-J.2.1.8.8 Fort Carson Rail Graphic.pdf PDF
TE-J.2.1.3 Downrange Routes.pdf PDF
TE-J.2.2.3 Fort Carson Water Distribution System.pdf PDF
TE-J.2.1.6 Retention Ponds and Dams.pdf PDF
TE-J.2.2.4.1d Range 143 Sewer.pdf PDF
TE-J.2.2.4.1b Range 109 Sewer.pdf PDF
TE-J.2.2.4.1e PCMS Sewer.pdf PDF
TE-J.2.2 Rail Insp Checklist.pdf PDF
TE-J.2.2.1.3a Traffic Controller PM inspection and checklist.pdf PDF
TE-J.2.2.1.1 UPS-Locations.xlsx XLSX spreadsheet
TE-J.2.2.1.3 Traffic Control Cabinets.pdf PDF
TE-H.2.24 Washers-Dryers.xlsx XLSX spreadsheet
Attachment F-Annex G to OPORD 18-011 Pavement Clearance.pdf PDF
Attachment E-Annex F to OPORD 18-011 Grounds Maint.pdf PDF
TE-F.2.2.9.5 Tree Report.pdf PDF
TE-A.2.4.1 Integrated Cultural Resources Management Plan (ICRMP).pdf PDF
TE-A.2.1.3C Carson Cantonment Map.pdf PDF
TE-A.2F 2023 Workload Data (DMO-30JAN2024.xlsx XLSX spreadsheet
TE-A.2D-1 2021 Workload Data (PM)-30JAN2024.xlsx XLSX spreadsheet
TE-A.2A 2018 Workload Data.xlsx XLSX spreadsheet
TE-A.2.2.4 Historical PM Task Listing.xlsx XLSX spreadsheet
TE-A.7.3 Consolidated Technical Exhibit Index-15MAR2024.pdf PDF
TE-A.6.1 Consolidated Contractor Plans.xlsx XLSX spreadsheet
W5168W-24-R-0009-Ft Carson Solicitation - 21MAR2024.pdf PDF
TE-J.2.1.4 Tank Trails.pdf PDF
TE-J.2.2.3c Red Devil Water Distribution.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Report

TE-H.2.13.1.5A
Facilities Operating Log
1-Jan-22
Installation: Fort CarsonPlant: HTHWBldg No:Date:
Jan 2022
DateExpansion tank pressureGenerator supply pressureGenerator outlet tempGenerator return tempTotal flow m / lbs / hr.Generator Flue Gas % O2Flue Gas Temp
123123
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
HGH
LOW
AVG
Remarks:
Prepared By:Date:Approved By:Date:
Post Engineer:Date
DateOutside Temp HighOutside Temp LowBTU's Produced (millions)Gas Used M Cu. Ft.Make-up water (gallons)Oil used (gallons)Generator Efficiency %Meter ##1#2F.O. #1F.O. #2
Stop469860664280
Start453900648850
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
TOT
HGH
LOW
AVG
Prepared By:Date:Approved By:Date:
Post Engineer:Date

File details come from the government source that posted it. Updated .