QandA Responses-24MAY2024-W5168W-24-R-0009.xlsx
XLSX spreadsheet 43 KB Posted
- Attached to
- Ft Carson BASOPS (Base Operations Services)
- Solicitation number
- W5168W-24-R-0009
- Issued by
-
Department of the Army
About this file
This document is a set of Questions and Answers related to a federal contract opportunity for Ft. Carson Base Operations Support (BASOPS) services at U.S. Army Fort Carson, CO. The solicitation number is W5168W-24-R-0009.
The key details are:
- The contract will include Common Level of Services (CLS) for Grounds Maintenance, Pavement Clearance, Facility Maintenance (Vertical and Horizontal), Heating and Cooling Services, and Wastewater Services.
- The incumbent contractor is T&H Services, LLC under contract number W911RZ-19-C-0002.
- The solicitation has a proposal due date of 28 June 2024 and includes detailed Performance Work Statement (PWS) requirements across multiple Annexes.
- Offerors must provide pricing and address various clarification questions related to Government Furnished Property, technical exhibits, work order processes, staffing, and other contractual requirements.
View the file
Other files
Show 40 more
Latest 50 of 201 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Date: 24 MAY 2024 | ||||||
| Number | RFP File | Paragraph | Page | Question | Response/Resolution | |
| 1 | PWS and Section L, 6.3.1 | 1. It seems the GFEBS Manager and GFEBS PM Coordinator Lead are used interchangeably in the solicitation. Which term should Offerors use in our proposal responses? | Refer to updated Section L. | |||
| 2 | Attachment T, PPQ | 1. Attachment T, PPQ has an incorrect due date for submission of the PPQ on the cover page. The date currently says, “23 February 2024”. Will The Government please revise Attachment T to the reflect the due date of proposals of 28 May 2024? | Please see revisied Attachment T, PPQ | |||
| 3 | Specific Relevant Contract References Sheet | 1. On the Specific Relevant Contract References Sheet, should questions number “5.” “6.” “7” be “4.a”, “4.b”, “4.c”? If so, Narrative Explanation would be item number 5, and so forth. Would the Government please provide a revised and correct Specific Relevant Contract Reference Sheet? | The template numbering shall remain unchanged. | |||
| 4 | PWS | 2.1.11.1. 2.1.11.1.4 | 1. The PWS states that the Project Manager requires a Tier 3 Secret Clearance. Is the Contractor required to have Secret Facility Clearance? | Please see revised PWS, the Tier 3 requirement has been downgraded to a Tier 1. | ||
| 5 | PWS | 1. Does the Government intend to issue a DD Form 254 to specify security requirements for key personnel, as referenced in the solicitation? | No. A DD Form 254 is not required for this solicitation. Please see revised PWS, the Tier 3 requirement has been downgraded to a Tier 1. | |||
| 6 | PWS | 6. | Would the Government consider sponsoring an offeror, who is in compliance with the NISPOM and has the appropriate cleared personnel in position, for a facility clearance? | Please see revised PWS, the Tier 3 requirement has been downgraded to a Tier 1. | ||
| 7 | Table 3.1.1 – Proposal Organization |
5.0 Volume I – General & Contract Documentation Page 93 of 147
Page 95 of 147 For Volume I, Table 3.1.1 requires:
TAB A - Exceptions Or Assumptions to Terms And Conditions TAB B - Solicitation, Offer and Award TAB C - Section K (Representation, Certifications, and Other Statements of Offerors) TAB D - Other Documents
5.0 requires:
5.1.3 TAB A, Exceptions Or Assumptions To Terms And Conditions
5.1.4 TAB B, Solicitation, Offer and Award
5.1.5 TAB C, RFP Section B
5.1.6 TAB D, RFP Section K
5.1.7 TAB E, Other Documents
| Will the Government please clarify which is correct for Volume I proposal submission? | Please see updated Section 3.1.1 and 5.0. | ||||||
| 8 | General | During the Site Visit on March 13, 2024, there appeared to be a lot of Government Furnished Equipment (GFE) that is not serviceable. Will the Government please provide a separate and complete list of operational GFE? | All the equipment listed in the GFE technical exhibit is servicable albiet in varying states of repair/service. Any equipment that is removed as "unserviceable" prior to award will be updated via the technical exhibit. | ||||
| 9 | General | During the Site Visit on March 13, 2024, there appeared to be a significant number of overhead doors and hanger doors. Will the Government please provide details regarding each overhead and hanger door so the contractor can ensure appropriate maintenance by a qualified vendor? Specifically, for each door, will the Government please provide the door size, make, model, age and the historical data of failure/repairs? | TE-H.2.7 contains the pertinent door information and the workload data has the historical efforts completed. | ||||
| 10 | Attachment A, Annex A | PWS Section 2.2.7, Project Work Orders | 14 of 40 | Performance Work Statement (PWS) Section 2.2.7 relates to Project Work Orders (PWOs). Is this a new requirement or is this work currently being performed by the incumbent? Volume II, TAB B: Subfactor 2 - Workflow Execution, does not include instructions for PWOs. Are offerors only expected to provide past performance as it relates to PWOs? Will the Government please provide historical data for PWOs? Also, will the Government please provide anticipated volumes for PWOs? | 1. It is work that is being performed already. 2. Workflow Execution for PWOs is not part of this evaluation Subfactor. 3. Past Performance needs to address all aspects of the performance work statement. 4. Historical Data on PWOs as specified in this solicitation is not available. All historical workload data has already been provided, it has not been broken down into the level of detail requested due to how workload was tracked on the current contract. 5. Volumes for PWOs: The Government anticipates 150 - 200 PWOs annually. This is just an estimated figure. | ||
| 11 | General | Does the incumbent have a CMMS (Maximo, etc.) and who holds the licenses to the CMMS? | The incumbent contractor holds the license for the CMMS. | ||||
| 12 | General | Will the Government please extend the due date for questions by 3 weeks to allow offerors time to adequately review the TEs and attachments? It is not possible to thoroughly review all TEs, Annex documents and attachments by April 3, 2023. This is less than two weeks from the time the documents were released and not all have been provided yet, which gives the incumbent an unfair advantage. | No | ||||
| 13 | General | Will the Government please provide details about the Waste Treatment Plant? For example, will the Government please clarify how current the technology is, provide service history, etc.? Will the Government please provide specific details about the operation of the WTP? Is it automated? Who is responsible for maintenance? | TE-H.2.11A, TE-H.2.11.3 and TE-H.2.11.3A contains all of the information and checklists for the water treatment plant. Service history information is provided under the workload history TE-A.2A - TE-A.2F-1. Maintenance of the water treatment plant is the responsibility of the Prime Contractor. | ||||
| 14 | Attachment A, Annex A – PWS Section 2.1.11.1.1 | 10 of 44 | PWS Section 2.1.11.1.1 states, “The PM or alternate shall be available 24/7/365 including Federal holidays. The PM shall be available between 0700 - 1600 hours, Monday through Friday except |
Federal holidays or when the Government Facility is closed for administrative reasons.”
| The PWS appears to have a conflict. Will the Government please clarify whether the PM must be available on Federal holidays or not? | The PM or alternate shall be available 24/7/365 including Federal holidays. Please see updated PWS section 2.1.11.1.1. | ||||
| 15 | 2.2.3 Factor 2 – Past Performance, Recency Assessment | 147 of 148 | 2.2.3 Recency Assessment states, “An assessment of the past performance information will be made to determine if it is recent. To be recent, the performance must be within three (3) years or less of the date of the solicitation. The Offeror shall provide three (3) to five (5) completed examples of recent Past performance within the last three (3) years. Performance may be fully completed or in progress for twelve or more months. Past performance information that fails this condition will not be evaluated.” |
| Will the Government please change this requirement from 3 years to 5 years? The 3-year limitation severely limits competition for viable HUBZone prime contractors because there are limited procurements of similar size and relevancy. This issue is complicated by the fact that each contract must be, “fully completed or in progress for twelve or more months”, which limits relevant contracts even more. Combined, these requirements favor the incumbent and minimize the potential for a viable competition. | Please refer to updated Section M. | ||
| 16 | Attachment A, Annex A – PWS Section 2.1.11.1.2 |
Section L, 6.3.1.b Tab A, Subfactor 1: Key Personnel Attachment A, Annex A – PWS Section 2.1.11.1.2
Section L, 6.3.1.b Tab A, Subfactor 1: Key Personnel PWS 2.1.11.1.2 requires a GFEBS PM Coordinator Lead. However, Section L, 6.3.1.b requires a GFEBS Manager.
| Will the Government please clarify whether a GFEBS PM Coordinator Lead or a GFEBS Manager is required as Key Personnel? | Refer to updated Section L. | ||
| 17 | Standard Form 33 |
FAR 15.208(b)(1)(i) 1 of 148 Standard Form 33 states that the proposal is due on May 28, 2024, at 12:00 pm MT. May 28, 2024, is a Tuesday, following the Memorial Day holiday.
FAR 15.208(b)(1)(i) Submission, modification, revision, and withdrawal of proposals states, “Any proposal, modification, or revision, that is received at the designated Government office after the exact time specified for receipt of proposals is "late" and will not be considered unless it is received before award is made, the contracting officer determines that accepting the late proposal would not unduly delay the acquisition; and-
(i) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals…
| Based on FAR 15.208(b)(1)(i), offerors should electronically submit proposals by 5:00 p.m. on Friday, May 24, 2024, to ensure receipt at the initial point of entry to the Government via PIEE. Will the Government please consider revising the due date to later in the week, so proposals only need to be submitted by 5:00 p.m. the day prior? | Refer to Solicitation Amendment for latest due date and time. | |||||
| 18 | 2.1.2.1 | Transition (Phase In/Phase Out) | 43 of 148 | Will the Government please clarify whether the Phase In is 30 days or 60 days? Will the Government please clarify whether the Phase Out is 30 days or 60 days? |
RFP section 2.1.2.1, Transition (Phase In/Phase Out) appears to conflict and includes 30 days as well as 60 days for both periods.
2.1.2.1 Transition (Phase In/Phase Out). The transition plan will have a sixty (60) business day transition period that will be implemented by the Contractor and shall state Contractor key personnel on board, to include IT/Network accounts and access with the appropriate Government organizations.
2.1.2.1.1 Phase In/Phase Out for Incumbent Contractor. If the Contractor is the incumbent Contractor, the phase out/phase in period shall be no more than thirty (30) calendar days and will primarily consist of administrative transition under the new contract number.
2.1.2.2 Transition (Phase-Out). Sixty (60) business days prior to contract expiration will constitute the phase-out period.
| 2.1.2.2 Transition (Phase-Out). During the thirty (30) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract. | Refer to updated PWS. | ||||||
| 19 | Technical Exhibits A.2A – A.2F-1 | ||||||
| 2.2.7. Project Work Orders (PWOs). | PWS Paragraph 2.2.7 states “TE-A.2A 2018 Workload Data, TE-A.2B 2019 Workload Data, TEA.2C 2020 Workload Data and TE-A.2C 2021 Workload data provides historical data on the number of PWOs generated from DMOs.” The TEs only show DMOs by priority. There is not a column or other designation calling out PWOs. Will the government provide an historical list of PWOs? | Historical Data on PWOs as specified in this solicitation is not available. All historical workload data has already been provided, it has not been broken down into the level of detail requested due to how workload was tracked on the current contract. | |||||
| 20 | Attachment J-FtCarson Pricing Matrix | Pricing Matrix | Attachment J states “7. PWO - Markup Rate: The proposed markup rate shall be inclusive of all applicable indirect rates such as G&A and profit and shall be applied to all negotiated PWOs. PWO MARKUP RATE: __________” The administrative costs of managing PWOs is not usually an indirect cost. Will the government clarify if the cost to manage PWOs should be in the $6.5 million plug number or should the cost to manage PWOs be included in the offeror’s program management costs? | The cost of managing PWOs should be included in the Project Management CLIN. | |||
| 21 | Attachment H: Annex J CLS 420 Facilities Maintenance - Horizontal | 24 of 44 | Will the Government please provide Attachment H: Annex J CLS 420 Facilities Maintenance – Horizontal? | Please review updated attachments. Attachment H-Annex J to OPORD 18-011 Facility Maint Horizontal-11APR2024- has been added. | |||
| 22 | Attachment A, Annex A – PWS Sections 2.2 and 2.3 | 11 of 44 | PWS Sections 2.2 Work Management states, “Applicable only for CLS 411, 414, and 420.” PWS 2.3 As-Builts states, “Applicable only for CLS 411, 414 and 420.” | Please refer to updated PWS section 2.2 and 2.3. Updated language: 2.2 Work Management. Applicable only for CLS 411 and 420. | |||
| 23 | TE-A.2.2.4 – | ||||||
| Historical PM Task Listing | TE-A.2.2.4 | Will the Government please provide dates ranges for all line items in TE-A.2.2.4 – Historical PM Task Listing spreadsheet? Per the report dated 1/1/23, line-item frequency ranges from 0 days (C.5.8.4.7.2 Change HVAC Filters) to 7 years (C.5.7.2.3 Power Pole Maintenance). Are the labor hours based on 3 years’ worth of data from 1/1/20 to 1/1/23? | Preventative workload data was provided for 2020 - 2023. Other workload data for 2018 - 2019 is consolidated and not broken out by DMO and PMO. | ||||
| 24 | TE-F.2.2.9.5 – Tree report | TE-F.2.2.9.5 | TE-F.2.2.9.5 Tree report dated 1/1/22 is blank. Will the Government please provide an updated report with data? | The TE is a reference for the formatting requirement. The contractor will fill out the data IAW the contract requirements. | |||
| 25 | TE-G.1.1 Snow Removal Map |
TE-G.1.2 Installation Snow Removal Plan
TE-G.2.1 Historical Snowfall TE-G.1.1
TE-G.1.2
| TE-G.2.1 | Will the Government please provide historical data for all areas requiring snow removal, including equipment usage and labor hours for the past five years? TE-G.2.1 Historical Snowfall includes FTEs for snow events in CY19-20 and CY20-21 only. | The historical data provided is what was available at the time of packaging. The Government will provide the latest historical data that is available. Refer to the updated Technical Exhibit. | ||||
| 26 | TE-A.2.1.10 – Subcontractor Report | TE-A.2.1.10 | TE-A.2.1.10 – Subcontractor Report dated 1/1/22 is blank. Will the Government please provide an updated report with data? | The report is a format for use on the contract. | ||
| 27 | TE-F.2.2.1_ |
TE-F.2.2.1A –
| Fort_Carson Mowing Weeds | TE-F.2.2.1 | ||
| TE-F.2.2.1A | Will the Government please provide the mowing cadence for 290 BAAF acreage? Is it weekly, monthly or something else? | BAAF is non irrigated. Mowing only occurs during the growing season (ie. May - September). | |
| 28 | TE-F.2.2.1B – |
BAAF Mowing
TE-F.2.2.1_TE-F.2.2.1A –
| Fort Carson Mowing Weeds | TE-F.2.2.1B | Will the Government please confirm the total mowing acreage for BAAF? TE-F.2.2.1B – BAAF Mowing shows 496 acres. However, TE-F.2.2.1_TE-F.2.2.1A – Fort Carson Mowing Weeds shows 290 acres. Which TE is accurate | Both are accurate. 496 Acres of runway/pavement, helipad area with 290 acres of actual mowing/ herbicide application area. |
| 29 | TE-F.2.2.1D – | ||
| PCMS Range Mowing | TE-F.2.2.1D | Will the Government please clarify the mowing cadence for all acreage on PCMS? Is it weekly, monthly or something else? | All Ranges are non irrigated. Mowing only occurs during the growing season (ie. May - September). |
| 30 | TE-A.7.4 – | ||
| Government Furnished Property (Facilities) | TE-A.7.4 | Will the Government please provide square footage for all buildings? TE-A.7.4 – Government Furnished Property (Facilities) lists only 27 buildings with a total square footage of 301,142 sq ft. | Square footage can be obtained by cross-referencing TE-A.7.4 against TE-H.1.1.1. |
| 31 | TE-A.7.3 |
Consolidated Technical Exhibit Index Section J - List of Documents, Exhibits and Other Attachments List Of Attachments TE-A.7.3
| Page 112 of 148 | Will the Government please provide all Technical Exhibits (TEs) included in TE-A.7.3 Consolidated Technical Exhibit Index? At a minimum, there appear to be approximately 75 TE-H’s missing from the final RFP documents. These TEs are necessary to ensure a responsive proposal, including valid pricing and relevant past performance. To ensure adequate time to thoroughly review of these TEs and include necessary information in proposals, will the Government please extend the time for questions as well as the proposal due date? | Please review updated attachments. TE-H's have been attached. | |
| 32 | TE-A.7.3 |
Section J - List of Documents, Exhibits and Other Attachments List Of Attachments TE-A.7.3
| 115 of 148 | Will the Government please provide exhibit K.4.1 – AC Inventory? K.4.1 – AC Inventory is referenced in TE-A.7.3 Consolidated Technical Exhibit Index. However, K.4.1 – AC Inventory is not referenced in Section J - List of Documents, Exhibits and Other Attachments List Of Attachments. The K.4.1 – AC Inventory document is not included with the final RFP. | This TE should be TE-H.2.3A AC Units. This TE also applies for Paragraph 4.2 of the "K" Annex. Please review updated TE-A.7.3 and updated Annex K. | |
| 33 | TE-A.7.3 |
Section J - List of Documents, Exhibits and Other Attachments List Of Attachments TE-A.7.3
| 115 of 148 | Will the Government please provide TE J.2.1.2.2 –Traffic Report Example? TE J.2.1.2.2 –Traffic Report Example is listed in TE-A.7.3 – Consolidated Technical Exhibit Index. However, it is not listed in Section J - List of Documents, Exhibits and Other Attachments List Of Attachments. However, the TE J.2.1.2.2 –Traffic Report Example document is not included with the final RFP | Yes. Please review updated attachments. | |
| 34 | TE-A.7.3 |
Section J - List of Documents, Exhibits and Other Attachments List Of Attachments TE-A.7.3
| 115 of 148 | Will the Government please provide TE J.2.2.4.2 – Lift Station PM Checklist? TE J.2.2.4.2 – Lift Station PM Checklist is referenced in TE-A.7.3 – Consolidated Technical Exhibit Index as well as Section J - List of Documents, Exhibits and Other Attachments List Of Attachments. However, the TE J.2.2.4.2 – Lift Station PM Checklist document is not included with the final RFP. | Yes. Please review updated attachments. | ||||
| 35 | 2.2 Factor 2 – Past Performance | 146 of 148 | As an offeror on other procurements, we have experienced issues with the Government accessing the Contractor Performance Assessment Reporting System (CPARS) to retrieve relevant Contractor Performance Assessment Reports (CPAR). Will the Government allow offerors to provide relevant CPAR information with our proposals and if so, will it be excluded from page count? If Government cannot locate the relevant CPAR information related to all contracts referenced in an offeror’s proposal, will the Government contact the offeror or the client POC to get a copy of the applicable CPAR? | 1. The Offeror can provide CPARS information. It will be included in the page count. 2. IAW Section M, In conducting the Past Performance evaluation, the Government reserves the right to use information provided in the Offeror’s Past Performance Volume, past performance questionnaires, in addition to information obtained from other sources available to the Government to include, but not limited to, the Contractor Performance Assessment Reporting System (CPARS) or other databases, interviews with Program Managers, Contracting Officers, Fee Determining Officials, Defense Contract Management Agency (DCMA), and commercial sources. | ||
| 36 | 7.4 Government Furnished Property | 77 of 148 | 7.4 Government Furnished Property states, “The Contractor shall be responsible for maintaining this equipment in a safe, operational state to include calibrations. Upon reaching the end of the equipment’s useful life cycle, the Contractor shall determine the need for replacement. In the event replacement is warranted, the Contractor shall replace at no cost to the Government. All Government provided tools/equipment that are determined to be beyond economical repair shall be disposed of IAW Army Supply Policy, removed from the Contractors fiduciary hand receipt and documentation of turn in provided to the COR and MICC Property Administrator. The Contractor shall own and be responsible for all replaced tools and equipment; the Contractor shall not invoice the Government for any tool or equipment purchases. |
| Will the Government please provide a list of all Government Furnished Property that is at, or near its life expectancy, so the offeror can appropriately plan for, and price, replacement of necessary property? Will the Government please provide a condition code for all GFP? | No. GFP no longer being provided "AS-IS" equipment and will be maintained by the Government through the the EAGLE maintenance task order. | ||||||
| 37 | Attachment A-Annex A-PWS | Attachment A-Annex A-PWS, page 24, refers to CLS 420 Facility Maintenance-Horizontal, Annex J; however, that attachment does not appear in the solicitation. | Will the Government please provide the attachment for CLS 420 Facility Maintenance-Horizontal, Annex J? | Please review updated attachments. | |||
| 38 | Attachment A-Annex A-PWS | Attachment A-Annex A-PWS - 2.2.2 GFEBS refers to web-based access to GFEBS. Normally, this is accomplished with government networked computers, In TE-A.7.4.A there are only 2 HVAC technical laptops listed as GFE computer equipment. | How many GFE computers will be issued to contractor for GFEBS access | The Government anticipates no more than 10. | |||
| 39 | Attachment A-Annex A-PWS | Attachment A-Annex A-PWS- 2.2.8.6 technical document library operation. The contractor shall store, maintain, and make technical documents available | Is this technical document library hosted on government furnished network systems, or on contractor furnished network systems? | Contractor furnished network. Also includes hard copy versions of many documents | |||
| 40 | Attachment A-Annex A-PWS | Attachment A-Annex A-PWS - 2.3.1 Maintain As-Builts | Will the As-Builts drawings be updated on GFE computer systems or on Contractor computer systems? | The drawings shall be marked up and provided to the DPW GIS office for updating when necessary. | |||
| 41 | Section L, 2.1.8.2 | The Government states that "All text, including table and figure identifiers, shall be indexed and 100% searchable text using Microsoft Word." | Can the Government please clarify if this requirement extends to text within graphics? | Please refer to Section L 2.1.8.2. Texts within graphics do not need to be searchable. | |||
| 42 | Section L, 2.1.8.1 | The Government states that proposals should be submitted in Microsoft Office. However, in Table 3.1.1, Digital formats are noted as Word or PDF. | Can the Government clarify which file type must be submitted through PIEE? | Refer to updated Section L | |||
| 43 | Attachment A-Annex A-PWS & Section L, 6.3.1 | In Section L, the Government identifies a GFEBS Manager as Key Personnel in Section 6.3.1. In the PWS, a GFEBS PM Coordinator Lead is identified as key personnel. | Can the Government please clarify which is the correct position title? | Refer to updated Section L | |||
| 44 | W5168W-24-R-0009 Clause 252.225-7001 Buy American and Balance of Payments Program - BASIC | The Publication Notice references the January 2023 version, but there is a newer version dated February 2024. | Can the Government please clarify if the clause date should be the February 2024 Publication Notice 20240215 dated February 15, 2024, or if the intent is to use the January 2023 version? | Refer to updated solicitation. | |||
| 45 | Attachment M-CBA | Attachment M contains no labor information for the existing CBA. | Can the Government please provide the full CBA? | See updated Attachment M (CBA) | |||
| 46 | Attachment A - PWS: DPW Work Reception | The PWS mentions a DPW Work Control desk and DPW Work Reception. | Can the Government please clarify if the desk is to be operated by the Contractor, or does the Government staff and operate the desk? | DPW will operate the work reception aspect. The offeror shall be responsible to operate their own internal work control mechanism able to receive efforts from the DPW work reception desk. | |||
| 47 | L | 8.0-8.1 | 139 of 148 | Page 139 of 148 of RFP states under 8.0 Volume IV – Factor 3 Price that the volume consists of the pricing worksheet matrix (Attachment J). Attachment J includes the proposed markup rate for CLIN X014. Is the statement “and the proposed markup rate for CLIN X014” in paragraph 8.1 added for emphasis or is the offeror to include the markup rate in another location in addition to Attachment J? If the former, could the Government amend the instruction from “and the proposed markup rate” to “including the proposed markup rate” so offerors have clear instructions? If the latter, could the Government provide instructions where additionally the markup rate should be provided? | Refer to updated Section L, 8.0 - 8.1 | ||
| 48 | L | 8.2 | 139 of 148 | Page 139 of 148 of RFP states under 8.1.1 regarding proposed price, “Under no circumstances shall this information and documentation be included elsewhere in the proposal.” Yet, on page 135 of 148 of the RFP, paragraph 5.5.5 TAB C (of Volume I – General & Contract Documentation), states, “Offerors shall propose a fixed price for each FP CLIN in Section B and on the Pricing Matrix. For CLINs on the Pricing Matrix with banding identified, the Offeror shall price each band contained on the Pricing Matrix.” It appears that everything required in Volume IV (the completed Pricing Matrix) is a subset in Tab C of Volume I. Unless price analysis techniques cannot be performed, there is no additional information provided in Volume IV that is not included in Tab C Volume I. Volume IV is the pricing matrix and Tab C Volume I is the Section B and the pricing matrix. This contradiction and redundancy between paragraph 8.1.1 and 5.5.5 generates multiple questions list below: |
a. Which paragraph of the RFP takes precedence, 5.5.5 or 8.1.1?
b. Will the Government amend the instructions to remove the contradiction?
c. Did the Government intend for the offeror to include Volume IV as a separate volume AND the entirety of Volume IV as a subset of TAB C of Volume I?
| Please refer to updated Section L 8.1.1: Price Information | ||||||
| 49 | L | 7.0-7.2.1.7.2 | 137 of 148 | Re Section L, 7.0 VOLUME III – FACTOR 2: PAST PERFORMANCE, Subsections 7.2.1.7.1 and 7.2.1.7.2, will the Government confirm that mentor-protégé joint venture offerors need not submit Meaningful Relationship Commitment Letters to explain the meaningful relationship and commitments of the joint venture members, as submission of their Joint Venture Agreement sufficiently demonstrates their relationship and commitment? | Meaningful Relationship Commitment Letters shall be submitted IAW (in accordance with) the guidance in Section L paragraph 7.2.1.6.2 | |
| 50 | PWS | 2.2.3.1 – 2.2.7.1.1 | What the threshold for converting a DMO to a PWO? For example, is it 32 work hours or $5,000 in cost? |
PWS paragraph 2.2.3.1 on p. 48 states, “DPW Work Reception Desk. The Contractor shall receive notification of work from the DPW work reception desk. The Contractor is authorized to execute DMOs that do not exceed thirty-two (32) work hours in labor. DMOs exceeding the Contractor’s authorized limit shall be executed IAW Annex B, Facilities Maintenance Instruction.” However, PWS paragraph 2.2.7.1.1 on p. 50 states, “Conversion Prior to Execution. The Contractor shall stop work immediately upon determining that a DMO will exceed the thirty-two (32) hour threshold. The Contractor shall then complete the following tasks:
| • The Contractor shall notify the KO/COR in writing of the reason for expecting the DMO to exceed the $5000.00 cost threshold and a preliminary cost estimate…” | A DMO converts to a PWO when the DMO labor exceeds 32 man hours or $5,000 in material costs. The PWS has been updated to clarify the $5,000 is attributed to material costs only. | ||||||
| 51 | Annex L | 2.1 | Annex L Wastewater Services, page 2, 2.1 STP Operation, Operations shall be in compliance with NPDES permit numbers CO0021181 and COG-652000. The NPDES permit is dated 8 Nov 2011. Will the permit be updated during the PoP of this contract? | At this time, the Government does not anticipate the permit being updated during the life of the follow-on contract. If the permit is updated, it will be the Government's responsibility. | |||
| 52 | Attachment M | Attachment M-CBA-W5168W-24-R-0009.pdf appears to be for another contract. Will the government provide the correct CBA? | See updated Attachment M (CBA) | ||||
| 53 | Annex H | 1.1.2 | Annex H Facility Maintenance - Vertical ,1.1.2 Installed Building Equipment (IBE). Will the government provide a listing of all IBE on the contract? Are there any exclusions or exceptions to the equipment covered under the contract? | The Government does not have this information in the level of detail requested. IBE is marked with an asset tag within facilities. There may be equipment that does not have an asset tag, such equipment will need to have an asset tag applied. | |||
| 54 | TE-J | 2.1.6 | TE-J.2.1.6 Retention Ponds and Dams, Will the government provide details on the construction and age of the dams? | That information would not be relevent to the efforts on this soicitation. Should retention pond and/or dam work need to occur, the Contracting Officer will determine which contract vehicle (ie. PWO, IGSA, USACE, etc) will be used. | |||
| 55 | TE-J | 2.1.5 | TE-J.2.1.5 Bridge Locations, will the government provide information on the age and current condition of the bridges? | The BASOPS contractor is responsible for maintenance of the bridges (ie. maintaining hand rails, tightenting bolts, small deck replacements, etc.) Should structural work need to occur, the Contracting Officer will determine which contract vehicle (ie. PWO, IGSA, USACE, etc) will be used. | |||
| 56 | TE-J | 2.1.7.4 | TE-J.2.1.7.4 BAAF Paint Diagram, will the government provide the expected dates for repainting as shown in the diagram? | Repainting occurs annually but the scheduling of the repainting is coordinated with the Air Field Manager. | |||
| 57 | TE-J | 2.2.1.1 | TE-J.2.2.1.1 UPS Locations, will the government provide information on the age and condition of the UPS? | Refer to updated TE. | |||
| 58 | TE-H | 2.24 | TE-H.2.24 Washers and Dryers, is the contractor required to replace washers and dryers? Will the government provide information on the age and condition of washers and dryers? | The contractor is not responsible for replacing washers and dryers. They are only responsible for the repair of the washer and dyrer. If a washer or dyer needs to be replaced, the Government will be responsible for handling the replacement. | |||
| 59 | TE-F | 2.2.11 | TE-F.2.2.11 Irrigation Systems, will the government provide information on the age and condition of the irrigation systems? | The Government does not have information on the age of the irrigation systems but the irrigation system is maintained in working order. | |||
| 60 | Annex K | 2.14.1 | Annex K Heating and Cooling Services, 2.14.1 Asbestos and Lead Containing Material. Wiil the government provide additional details on the presence of asbestos and lead containing materials in the facilities or systems covered by the contract? | Additional details will be available to the awardee from the DPW Environmental Division for buildings that have already been sureveyed. | |||
| 61 | Annex K | 3.1 | Annex K Heating and Cooling Services, 3.1 Fuel Oil. Will the government provide clarification on the process for purchasing fuels, such as heating oil and natural gas, for the Government-owned equipment? Will the government purchase and provide fuels or is it the responsibility to purchase the fuels and obtain reimbursement? | Refer to TE-K.3.1 for the purchasing process. Any contractor owned equipment is not permitted to use this fuel. | |||
| 62 | Annex K | 3.1 | Will the Government provide the historical cost of fuel such as fuel oil and natural gas for the government owned equipment? | This information will not be provided by the Government as it is not a Contractor incurred cost. | |||
| 63 | Annex H | 2.3.4.1.2 | Annex H Facility Maintenance – Vertical, Controls Technicians 2.3.4.1.2, Can the government provide more details about the use of LonWorks database software and vendor configuration tools? | Information in regards to LonWorks is already provided in the PWS Annex A. | |||
| 64 | Annex H | 2.3.5 | Annex H Facility Maintenance – Vertical, Related Components and Accessories 2.3.5: Can the government provide more details about the maintenance and repair of equipment inside ductwork? | The Government is unable to answer this question as asked. | |||
| 65 | TE-A | 6.1 | TE-A.6.1 Consolidated Contractor Plans. Will the government provide a format for the required plans? | The Government will not provide a format/template to be used. It is the contractor's responsibility to provide a plan that meets the requirements of the solicitation and related regulatory/statutory/policies requirements. | |||
| 66 | Section L | 7.2.1.8 | Section L.7.2.1.8 Past Performance Questionnaire - (Past Performance Questionnaire Attachment T) states the Offeror should use Past Performance Questionnaire (Attachment T). Would the government allow CPARs in-place of PPQs. | Refer to the response under question 35. | |||
| 67 | TE-A | 7.4.A | Per tech exhibit of Government furnished property/equipment, are all vehicles DPW vehicles or does it include GSA vehicles? Can the Government please identify which are GSA vehicles? Will all of these vehicles be provided to the contractor for the life of the contract? | Vehicles that are provided are not GSA vehicles. The vehicles provided will remain on the contract until their turn-in date. | |||
| 68 | TE-A | 7.4.A | Please verify there will be 335 Government furnished vehicles and 3,884 total equipment items provided for the life of the contract. Will the Government maintain and/or replace all items in the exhibit? Will the Government provide fuel cards for equipment? | The GFP is annotated in the appropriate TE's and will be updated as changes occur. Fuel for GFP is provided by the government. | |||
| 69 | Solicitation | Table 3.1.1 | 133 of 148 | Will the Government please verify the Tabs for Volume II – Mission Capability (Factor 1)? There are currently two (2) tabs labeled “TAB C.” One is “Subfactor 3 – Organization and Staffing” and the other is “Staffing Matrix (Attachment K)” | Please see updated Section 3.1.1 and 5.0. | ||
| 70 | Solicitation | 3.1.1 & 5.1.4 | Page 132, 133 &135 of 148 | On Page 132, The solicitation states that ““Original” designates paper/printed submission.” On Page 133, the solicitation calls only for “Digital Copies” of the proposal volumes. However, on page 135, the solicitation states that “The Offeror is cautioned that the SF33 must contain an original signature in block 17 of the form.” Will the Government please confirm that they do not intend to require paper copies of the SF33? And if paper copies are not required, will the Government please confirm that electronic signatures or copies of signatures assigned electronically will meet the requirement for an “original signature?” | Refer to solicitation amendment for removal of the hard copy submission. Digital copies are required. Signatures can be either electronic signatures or copy (i.e. scanned in document) of the original signature. | ||
| 71 | SF33/RFP | Box 9 | pg 1: Sealed offers in original and1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in_____ until 12:00PM local time 28 May 2024 | Can the Government confirm that all referenced due dates and times are in Mountain Standard Time (MST)? | All due dates and times are in Central Standard Time Zone, as that is where the MICC-IRC is located. | ||
| 72 | SF33/RFP, Section B | X004 | 3 of 148; |
11 of 148;
18 of 148;
25 of 148;
| 32 of 148: CLINs X004 Data Descriptions refer to Annex B for CLS-411. However, there is no Annex B included in the solicitation. | Will the Government please confirm Annex H is the correct reference? | Please see updated CLIN 0004, 1004, 2004, 3004, 4004. Updated language: The Contractor shall conduct Preventative Maintenance in accordance with PWS 2.2.4 and instructions provided in Annex H for CLS 411. | |||
| 73 | SF33/RFP, Section B | X005 | 4 of 148; |
11 of 148;
18 of 148;
25 of 148;
| 32 of 148: CLINs X005 Data Descriptions refer to Annex B for CLS-411. However, there is no Annex B included in the solicitation. | Will the Government please confirm Annex H is the correct reference? | Please see updated CLIN 0005, 1005, 2005, 3005, 4005. Updated language: The Contractor shall perform Demand Maintenance Orders in accordance with PWS 2.2.3 and instructions provided in Annex H for CLS 411. | |||
| 74 | SF33/RFP, Section B | X008; X009 | 5 of 148; |
13 of 148;
20 of 148;
27 of 148;
| 34 of 148: CLINs X008 & X009 Data Descriptions refer to Annex B for CLS-420. However, there is no Annex B included in the solicitation. | Will the Government please confirm Annex J is the correct reference? | Please see updated CLIN 0008, 0009, 1008, 1009, 2008, 2009, 3008, 3009, 4008, 4009. Updated language: The Contractor shall conduct Preventative Maintenance in accordance with PWS 2.2.4 and instructions provided in Annex J for CLS 420.[0008], The Contractor shall perform Demand Maintenance Orders in accordance with PWS 2.2.3 and instructions provided in Annex J for CLS 420. [0009] | ||||||
| 75 | SF33/RFP, Section C, Annex A (PWS); Performance Requirements Summary (Section 4.0); Annexes F, G, H, J, K, and L (Section 5.0) | The requirements detailed in Section C, Annex A (PWS), PWS Section 4.0, Performance Requirements Summary (PRS), and PWS Section 5.0 Annexes F (Grounds Maintenance), G (Pavement Clearance), H (Facility Maintenance – Vertical), J (Facility Maintenance – Horizontal), K (Heating and Cooling Services), and L (Wastewater Services) are very detailed and extensive. As such, this set of requirements warrants a technical staffing solution to ensure the Government can be confident that Offerors can provide the required level of experience and expertise to meet the customer’s expectations and mission requirements. | Not having the current baseline staffing tilts the competitive balance in favor of the incumbent contractor. Therefore, to level the playing field, will the Government please consider providing the current baseline staffing? | No, the Government will not provide this information. | ||||
| 76 | SF33/RFP, Section C, Annex A (PWS) | 2.1.3.2 | 43 of 148: A DPW Work Control Desk will be operated twenty (24) hours a day, seven (7) days a week and will transmit work orders to the Base Operations Contractor and/or customer requests outside of standard working hours. | Is the DPW Work Control Desk staffed by the Contractor? | This DPW work reception effort is not within this solicitation. The effort within this solicitation is to receive work from the DPW work reception and disseminate as appropriate within the contractors purview for execution against this solicited effort which will involve after normal hours, emergency, weekend, holiday efforts. | |||
| 77 | SF33/RFP, Section C, Annex A (PWS) and Section L, 6.3.1 | 2.1.11.1.2; 2.1.11.1.3 | 46 of 148: Paragraphs 2.1.11.1.2 and 2.1.11.1.3 refer to the GFEBS PM Coordinator Lead as a key personnel. However, Section L, 6.3.1 refers to the GFEBS Manager as a key personnel. | Will the Government please confirm if the key personnel title is GFEBS PM Coordinator Lead or GFEBS Manager? | Refer to updated Section L. | |||
| 78 | SF33/RFP, Section C, Annex A (PWS) | 2.2.3.1 | 48 of 148: The Contractor shall receive notification of work from the DPW work reception desk. The work control team shall have at least one (1) year of experience entering maintenance orders into GFEBS, charging time and materials on the orders, and running/analyzing maintenance order reports. | Is the DPW work reception desk staffed by the Contractor? | This DPW work reception effort is not within this solicitation. The effort within this solicitation is to receive work from the DPW work reception and disseminate as appropriate within the contractors purview for execution against this solicited effort which will involve after normal hours, emergency, weekend, holiday efforts. | |||
| 79 | SF33/RFP, Section C, Annex A (PWS) | 2.2.3.1 | 48 of 148: DMOs exceeding the Contractor’s authorized limit shall be executed IAW Annex B, Facilities Maintenance Instruction. | Annex B, Facilities Maintenance Instruction was not included in the solicitation. Will the Government please provide Annex B? | This was removed as an Annex and made as a Technical Exhibit. Ref TE-H.1.3.3 | |||
| 80 | SF33/RFP, Section C, Annex A (PWS) | 2.2.3.4 | 49 of 148: The Contractor shall be responsible for all materials required for DMO repair work. | The workload data provided in TE-A.2C 2020 (DMO); TE-A.2D 2021 (DMO); TE-A.2E 2022 (DMO); and TE-A.2F 2023 (DMO) show little to no material costs. Will the Government please confirm that the material costs shown in these TE’s is accurate data? | Material costs on historical DMOs may have some fluctuation due to bulk purchases (ie. keys, door hardware, drywall, nails, etc.). | |||
| 81 | SF33/RFP, Section C, Annex A (PWS) | 2.2.4 | 49 of 148: Until the PMO program as described in paragraph 2.2.4.1 below is complete, the Contractor shall executed PMOs in accordance with historical PM data provided in TE-A.2.2.4 Historical PM Data. | TE-A.2.2.4 does not provide any material costs. Will the Government please provide any material-related costs associated with the historical PM data? | Material costs on historical PM may have some fluctuation due to bulk purchases (ie. keys, door hardware, drywall, nails, etc.). TE-A.2.2.4 is a task listing with frequencies. Historical Data can be found on TE-A.2A - TE-A.2F-1. | |||
| 82 | SF33/RFP, Section C, Annex A (PWS) | 2.2.4.1 | 49 of 148: The Contractor shall first verify and update the equipment in the buildings listed in TE-H.1.11 Real Property Facilities. | TE-H.1.11 was not included in the solicitation. Will the Government please provide TE-H.1.11 | Please review updated PWS section 2.2.4.1, the correct TE is H.1.1.1 | |||
| 83 | SF33/RFP, Section C, Annex A (PWS) | 2.2.4.3 | 49 of 148: Upon completion of the PM inspection, the Contractor shall attach a sticker to the equipment item (or in the immediate vicinity thereof) indicating the equipment Maintenance Control Designation (MCD) number, the date of maintenance, and the initials and identification number of the Contractor employee who performed the work. | Is the Contractor responsible for providing the PMO Stickers/Log? | Yes | |||
| 84 | SF33/RFP, Section C, Annex A (PWS) | 2.2.8.1 | 52 of 148: The Contractor shall appoint a Warranty Manager to monitor and track all Government-owned equipment and Real Property as identified by the Government as having a warranty. | Can the Warranty Manager be dual-hatted? | The PWS does not prohibit the Warranty Manager from being dual-hatted. | |||
| 85 | SF33/RFP, Section C, Annex A (PWS) | 2.3 | 52 of 148: As-Builts. Applicable only for CLS 411, 414 and 420. | Section C, Annex A (PWS), paragraph 5.0 does not show a CLS 414. Will the Government please clarify what CLS 414 is? | Please review updated PWS section 2.3. Updated language: As-Builts. Applicable only for CLS 411 and 420. | |||
| 86 | SF33/RFP, Section C, Annex A (PWS) | 2.5.6.4 | 56 of 148: Labor Dispute Contingency Plan. The plan shall establish procedures and time frames to secure replacement personnel in the event of a strike; and shall also record the Contractor’s experience with and establish Contractor procedures for collective bargaining. The Contractor shall submit a Labor Contingency Plan NLT contract start date. | PWS paragraph 2.5.6.4 states the Contractor shall submit a Labor Contingency Plan NLT contract start date. However, Section L, paragraph 5.1.7 TAB E, Other Documents, states Offerors shall submit a Labor Dispute Contingency plan IAW PWS paragraph 2.5.6.4. Will the Government please confirm if a Labor Dispute Contingency plan must be submitted as part of Volume I? | Yes. It shall be submitted in Vol I: Tab D- Other Documents. | |||
| 87 | SF33/RFP, Section C, Annex A (PWS) | 5 | 59 of 148: The Contractor shall ensure that all work meets or exceeds the specifications for the listed CLS. | Annex J (Facility Maintenance – Horizontal) was not included in the solicitation. Will the Government please provide Annex J? | Please review updated attachments. Attachment H-Annex J to OPORD 18-011 Facility Maint Horizontal-11APR2024- has been added. | |||
| 88 | SF33/RFP, Section C, Annex A (PWS) | 7.3 | 76 of 148: With the exception of TE-H.2.24 (Washers/Dryers), all other TE-H documents referenced in Annex H (Facility Maintenance – Vertical) were not included in the solicitation. | Will the Government please provide the missing TEs? | Please review updated attachments. TE-H's have been attached. | |||
| 89 | SF33/RFP, Section C, Annex A (PWS) | 7.3 | 76 of 148: With the exception of TE-K.3.1 (Fuel Ordering Process) and TE-K.4.2.1 (Monthly Chiller Log), TE-K.4.1 (AC Inventory List) referenced in Annex K was not included in the solicitation. | Will the Government please provide TE.K.4.1 (AC Inventory List)? | This TE should be TE-H.2.3A AC Units. This TE also applies for Paragraph 4.2 of the "K" Annex. | |||
| 90 | SF33/RFP, Section C, Annex A (PWS) | 7.4 | 77 of 148: The Government will initially provide all tools/equipment annotated in TE-A.7.4.A Government Furnished Equipment (GFE). The Contractor shall be responsible for maintaining this equipment in a safe, operational state to include calibrations. Upon reaching the end of the equipment’s useful life cycle, the Contractor shall determine the need for replacement. In the event replacement is warranted, the Contractor shall replace at no cost to the Government. | TE-A.7.4.A does not provide the age of the assets shown or the current condition of the assets (Good, Fair, Marginal, etc.). Will the Government please provide the age and current condition of the GFE shown in TE-A.7.4A? | No. GFP no longer being provided "AS-IS" equipment and will be maintained by the Government through the the EAGLE maintenance task order. | |||
| 91 | SF33/RFP, Section C, Annex A (PWS) | 7.4 | 77 of 148: The Government will initially provide all tools/equipment annotated in TE-A.7.4.A Government Furnished Equipment (GFE). The Contractor shall be responsible for maintaining this equipment in a safe, operational state to include calibrations. | Is the Contractor responsible for performing all maintenance-related activities associated with GFE, or are maintenance-related activities performed by the Fort Carson EAGLE contractor or via another contract vehicle? | Maintenance-related activities for GFP will be performed by the Fort Carson EAGLE contractor. | |||
| 92 | SF33/RFP, Section C, Annex A (PWS) | 7.4.1 | 77 of 148: Materials: In the event materials are either provided by the government or reutilization of system components is utilized, the contractor shall not invoice the government for those material costs. | Will the Government please confirm if it will provide any Government Furnished Materials (GFM)? | Any materials of a Found On Installation nature are not guaranteed and provided only as opportunity arises. Offerors should not rely on this for bidding purposes | |||
| 93 | SF33/RFP, Section C, Annex A (PWS) | 7.5.2 | 77 of 148: Contractor-Furnished Items. The Contractor shall provide all vehicles, equipment, parts, tools, fuel, oil, materials, and any other items required to perform all Contract requirements except where explicitly absolved from that responsibility. | Will the Government please confirm if the incumbent contractor supplements the GFP/GFE shown in TE-A.7.4A with Contractor-Furnished Property (CFP)/Material (CFM)/Equipment(CFE)? | Any contractor acquired property and/or equipment under the current contract becomes Government owned property and/or equipment. | |||
| 94 | SF33/RFP, Section C, Annex A (PWS) | 7.5.2 | 77 of 148: Contractor-Furnished Items. The Contractor shall provide all vehicles, equipment, parts, tools, fuel, oil, materials, and any other items required to perform all Contract requirements except where explicitly absolved from that responsibility. | Will the Government please provide a list of the incumbent contractor’s CFE? | The Government is not at liberty to provide this information. | |||
| 95 | SF33/RFP | Section I | 90 of 148: The U.S. Department of Labor Nondisplacement of Qualified Workers Under Service Contracts. It is our understanding that the final rule that was published on December 14, 2023 implementing Executive Order (EO) 14055 (Nondisplacement of Qualified Workers Under Service Contracts) is now in effect and will apply to all new SCA-covered solicitations and contracts issued after February 12, 2024 even though the relevant FAR clause has yet to be published. | Will the Government please confirm if EO 14055 is applicable to this solicitation/contract? | Language has been added for the Executive Ordder 14055 Clause per the instructions published in the Final Rule. | |||
| 96 | SF33/RFP, Section L | 2.1.7 | 131 of 148: Each digital volume shall be separately labeled and clearly identified by file name. | Does the Government have a proffered naming convention that Offerors should use for each file other than those requirements imposed by PIEE? | Refer to updated Section L 4.1 | |||
| 97 | SF33/RFP, Section L | 2.1.8.1 | 131 of 148: To enable the Government to successfully view the proposals electronically, the Offerors shall submit their proposals in Microsoft Office (i.e., Microsoft Word or Microsoft Excel). The Government will use electronic copies in the evaluation process. The electronic submitted proposal shall be deemed and treated as the official version for all purposes. | Table 3.1.1 – Proposal Organization states that Volume I is to be submitted as “MS Word, PDF.” Will the Government confirm that Volume I may be submitted as a PDF, which allows Offerors to submit the signed SF33 and completed Representations and Certifications in their original format? | It can be submitted in Microsoft Word or PDF as long as the document is searchable as specified in Section L. | |||
| 98 | SF33/RFP, Section L | 4.1 | 134 of 148: Offeror shall submit proposal via email or the Regular Procurement Integrated Enterprise Environment (PIEE) Solicitation Module to Samuel J. Colton (Contracting Officer) and Melanie D. Palmas (Contract Specialist). | Please confirm that Offerors may submit proposal files via email instead of using the PIEE Solicitation Module. | Refer to updated Section L. |