This is a Questions and Answers Log for a federal construction contract solicitation for Building 512 at a military installation in Milwaukee, Wisconsin. The document addresses 29 numbered questions submitted by prospective contractors regarding project scope, specifications, and technical requirements.
Key project requirements include replacement of roofing with a 20-year No Defects Limit (NDL) warranty designed to accommodate wind speeds for a Category II facility per ASCE standards, replacement of exterior doors with medium stile storefront doors and hollow metal doors, new insulated glazing, and tuckpointing and repainting of exterior CMU walls. The project comprises a base bid and Option 2 (new storefront doors and associated work). Cypher locks must be Best Lock compatible with programmable keypads and panic bars. All doors and frames must meet architectural brown color standards per manufacturer specifications or through priming and painting. The facility must comply with UFC 4-010-01 antiterrorism and force protection standards for doors and glazing with no additional blast rating requirements. Rough door opening dimensions are provided ranging from 44"x86.5" to 96.25"x93", with exterior storefront door jambs at 4.5" and interior door jambs at 6.5". The project period is 180 days from Notice to Proceed, with anticipated award at the end of September 2026 and NTP within two weeks thereof. No asbestos is present (Building 512 was abated in 1997 with roof replacement in 2002). Existing caulking requires complete removal and replacement to ensure exterior watertight seals, with all painting limited to exterior surfaces only.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A Log 512 Page 1 8/6/2026 3:22 PM
Question Answer and Comment
Please provide a model number for the cypher lock that needs to be priced.
Cypher Lock shall be Best Lock compatible with programmable keypad and lever handle on exterior side. Inside hardware shall be consist of panic bar with a hex key for holding panic bar in the unlocked position. A photo is provided of similar door for security forces with a cypher lock installed for reference.
The Statement of Work, Option 2 calls out the new storefront doors to exterior rated with insulated glazing. Do these exterior storefront doors also need to meet AT/FP blast ratings or any level of blast rating requirements?
Facility must meet UFC 4-010-01, Antiterrorism, Force Protection, and Security Engineering. Reference paragraphs 5-11, and 5-12 for doors and glazing requirements.
No additional blast ratings/levels required above minimum requirements listed.
3 Please advise if the SSHO, CQC and Site Superintendent can be administered by (1) person?
No. With KO approval site superintendent and CQC can be the same individual to accomplish both roles if they meet the qualifications for both positions. The SSHO is a separate individual required to ensure all safety regulations are followed on site.
Contract specifications, Part 4, 4.2 Optional Quote Item 1, indicates to tuck-point 15% of the existng CMU exterior wall and repaint approx. 6,600 sf of exterior wall face on B512. Please advise if the mentioned 6,600 sf of exterior wall face equates to 15% of the existing CMU exterior wall? If not, please provide exterior elevation drawings of Building 512 to calculate the 15% area of tuckpointing.
6600 SF is the estimated Sq Footage that will require painting (exterior block wall).
Estimated required tuckpointing is 15% of that surface area.
The Statement of Work, Option 2, paragraph k, calls out all doors and frames to be primed and 2 coats of paint to match base standard. Does this apply to both the aluminum storefront and hollow metal doors or should the aluminum doors be anodized to best match and just the metal doors painted?
All doors and frames shall meet the base standard of color of architectural brown or COR approved closely matched color. If doors are provided from manufacturer in that color then no additional painting is required.
Q&A Log 512 Page 2 8/6/2026 3:22 PM
Have any of the existing roofing materials, storefront openings or caulk tested positive for asbestos ? Asbestos Management Plan was conducted in 1997 for all facilities on base. B512 has had all potential areas abated or tested as Non-Detect (ND). Roof was last replaced in 2002.
Based on Question already asked, if the doors need to be blast resistant, please provide detailed blast requirements.
Please note, typically once the blast material requirements are provided, it takes about 3-4 weeks to get back pricing from suppliers/manufacturers.
Reference Question 2
8 If this is not a blast resistant system, please confirm what glass make-up should be provided Reference Question 2 9 Please confirm if the new doors are to be narrow, medium or wide stile. Medium Stile 10 Can the site superintendent, safety and control be the same person? Reference Question 3
Is this project/building FM insured? There have been federal buildings that follow or were or are FM )factory mutual) insured. They have a different set of specifications that have to be followed. It is not very often but once in a while that is in the specifications. No nothing with bonding, it’s a set of separate specifications that a outside company would approve all the submittals and shop drawings
No.
12 Is there an area to stage material and equipment? Space will be provided in adajacent lot
What are the disqualifications for access to site ie: not a us citizen, felony? Security Forces/Air Force maintains list of law enforcement sensitive reasoning for not allowing access to military installation. Reason for disqualifcation will not be provided to contractor as items are law enforcement sensitive and are releated to that individual's past.
14 Is this project on track for a fall 2026 start time or winter/spring of 2027? If this becomes funded, it will be awarded in at the end of September with a NTP date within two weeks of that date. The PoP is 180 days for NTP.
15 Is there a recycle percentage mandate for construction debris on this project? There is no percentage mandate associated with the project
What is the wind warranty needed with the 20-year NDL, 55 MPS or higher? Contractor shall provide a 20-year warranty and coordinate with manufacturer to ensure materials provided and installation methods are designed to accommodate the wind speeds for a Category II facility with location of Milwaukee, WI. Utilize the ASCE Hazards Report Tool (https://ascehazardtool.org/) to determine wind speeds.
17 Does all the trim on gables/fascia need to ne changed to match? The area in concern would be below the gravel stop on the gables and below the gutters (Fascia area) Yes, all flashing shall be changed IAW Statement of Work, Base Bid, Section III(e)
18 Will the gutters need to be like in kind (6-inch aluminum K style) or commercial 6-inch box gutters 24 gauge painted steel 12-foot sections? Replace in kind
19 Will the downspouts be like in kind (closed aluminum) or open faced steel? Replace in kind
Q&A Log 512 Page 3 8/6/2026 3:22 PM
20 Will the with splash blocks (where needed) need to be replaced? Not in Scope of Project. Splash blocks will remain 21 Will the entrance roofs be added to the project? Reference Statement of Work for roof areas requiring replacement
22 is a coverboard required on the insulation or can the EPDM be glued to the insulation if it is not required by the manufacture for the 20 NDL warranty? Reference Statement of Work, Base Bid, Section III (a)
Please provide the actual thickness {gauge) of the existing metal roof deck. We are not requesting the distance or cavity space between the roof rafters/joists and the ceiling assembly. We specifically require the thickness of the metal decking itself to accurately prepare our bid.
Drilled sample from bottom side of roof deck is approximately 1/16" thick (16 ga) metal deck
Is asbestos present within the existing roofing system or any related building materials included in the project area? If asbestos-containing materials are present, please clarify how they are to be handled, including whether abatement will be performed by the Government under a separate contract or if it is to be included within this contract's scope of work. Please provide any available asbestos survey or testing reports.
Reference Question 6
Option 1 indicates for the contractor to re-caulk all doors and windows to ensure the building retains a watertight seal.
The re-caulking $$$ of the existing doors and windows included in Option 1 will be needed ONLY if Option 2 is not exercised. Please advise?
Include only the re-caulking of exterior windows. Doors and storefront window assemblies will be in Option 2.
Rough opening width and height from Brick to Brick and Floor to Lintel
Rough sizes for doors are to assist during soliciation however are not to be used after award for ordering. After award contractor shall verify all sizes prior to ordering to ensure proper fit during installation. Door 1 - 44"x86.5", Door 2- 73"x 93.5", Door 3&5 - 71.75"x93", Door4&7 - 96.25"x93", Door 6 - 72"x93.25", Door 8 - 71.75x107"
Q&A Log 512 Page 4 8/6/2026 3:22 PM
Jamb depth
Rough sizes for doors are to assist during soliciation however are not to be used after award for ordering. After award contractor shall verify all sizes prior to ordering to ensure proper fit during installation. All exterior storefront doors jambs are 4.5". Interior door jambs are 6.5"
28 Specific glass requirements for the sidelites other than insulated glass? Reference Question 2
Specifications Part 4., 4.2 Optional Quote Item 1 indicates “The contractor shall also re-caulk all doors and windows to ensure…..”
Please advise as to the acceptable method to “re-caulk”.
1. Does the existing caulk need to be removed and replaced or can we re-caulk over the existing?
2. Do we need to re-caulk both interior and exterior at all doors and windows?
3. When repainting the door and window trims as needed, do we paint the exterior trim only?
As the prime, the contractor shall provide the necessary expertise to deliver a quality, finished product and is solely responsible for determining the means, methods, and site preparation required to complete the project.
Regarding Option 1 (Exterior Building Project):
1. Existing caulk shall be removed and replaced to guarantee an exterior watertight seal, as mandated by the Statement of Work.
2. Watertight Seal is on the exterior of the building
3. All painting is on the exterior
NO MORE QUESTIONS WILL BE ACCEPTED. ALL QUESTIONS SUBMITTED ARE LISTED ABOVE AND ANSWERED.
IF YOU DO NOT SEE A QUESTION ABOVE THAT YOU SUBMITTED, CONTACT SMSGT KATE FOX.