07 14 00 Fluid-applied waterproofing.pdf

PDF 50 KB Posted

Attached to
CONSTRUCT MUNITIONS MAINTENANCE, INSPECTION, AND ASSEMBLY (M&I) FACILITY Federal contract opportunity
Solicitation number
W50S9F-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document is a federal contract specification for Section 07 14 00 - Fluid-Applied Waterproofing and Drainage Board for the ANG/WI - F-35: Munitions M&I Facility at Truax Field, Wisconsin. It details the requirements for the fluid-applied membrane waterproofing system, including the membrane, primer, sealants, bond breaker, drainage board, insulation, and installation procedures. Key requirements include a 20-year no dollar limit warranty from the membrane manufacturer, 60 mil thick fluid-applied membrane, high-density polyethylene drainage board, and flood testing of the installed system. The specification also outlines quality control measures such as moisture testing, film thickness verification, and flood testing. Maintenance and repair training for Government personnel is also required.

The related federal contract opportunity is for the construction of the F-35 Munitions Maintenance, Inspection, and Assembly (M&I) Facility at Truax Field, Wisconsin. This is a small business set-aside solicitation with a magnitude of construction between $1-5 million. The contract duration is 273 calendar days after notice to proceed. The solicitation includes requirements for communications, surge protection, floor drains, compressed air, security features, and site work. Brand name products are required for certain systems.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT MUNITIONS MAINTENANCE, INSPECTION, AND ASSEMBLY (M&I) FACILITY, newest first.
File Type Posted
ABSTRACT OF OFFERS - CONSTRUCTION_24B0001.pdf PDF
Question and Answers Log_Questions 1-37 FINAL.pdf PDF
Question and Answers Log_Questions 1-37v1.pdf PDF
W50S9F-24-B-0001_00001.pdf PDF
Question and Answers Log_Questions 1-37.pdf PDF
Question and Answers Log_Questions 1-32.pdf PDF
SECTION 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.pdf PDF
Question and Answers Log_Questions 1-26.pdf PDF
08 39 55 Sliding Metal Blast Resistant Doors.pdf PDF
Pre-Bid Conference Minutes.pdf PDF
03321_AE200 - BUILDING ELEVATIONS AND SECTIONS.pdf PDF
Attendance Sheet MI Pre-Bid Conference 20240502.pdf PDF
03321_AE301 - WALL SECTIONS.pdf PDF
Add 3 Table of Contents.pdf PDF
Pre-Bid Conference Slides - MI.pdf PDF
ATTACHMENT 2 - Add No. 2 - PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG219012.pdf PDF
ATTACHMENT 1 - PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG219012.pdf PDF
ATTACHMENT 2 - PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG219012.pdf PDF
ATTACHMENT 7 - XGFG 219012 MI Facility - Single Source Doc - Monaco Fire Alarm_Redacted.pdf PDF
ATTACHMENT 8 - XGFG219012 MI Facility - Single Source Doc - Schneider_Andover_Redacted.pdf PDF
ATTACHMENT 9 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 4 - GEOTECHNICAL ENGINEERING REPORT.pdf PDF
ATTACHMENT 5 - XGFG219012 MI Facility - Single Source Doc - Advantor_Redacted.pdf PDF
W50S9F-24-B-0001.pdf PDF
ATTACHMENT 3 - DRAWINGS Project No. XGFG219012 Dated 27 Oct 23.pdf PDF
ATTACHMENT 6 -XGFG219012 MI Facility - Single Source Doc - Marshall Best_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ANG/ WI - F- 35: Muni t i ons M&I Faci l i t y Tr uax Fi el d, WI I ssued For Const r uct i on 27 Oct ober 2023

SECTI ON 07 14 00

FLUI D- APPLI ED WATERPROOFI NG AND DRAI NAGE BOARD

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

ASTM I NTERNATI ONAL ( ASTM)

ASTM C33/ C33M ( 2023) St andar d Speci f i cat i on f or Concr et e Aggr egat es

ASTM C578 ( 2023) St andar d Speci f i cat i on f or Ri gi d, Cel l ul ar Pol yst yr ene Ther mal I nsul at i on

ASTM C836/ C836M ( 2018; R 2022) St andar d Speci f i cat i on f or Hi gh Sol i ds Cont ent , Col d Li qui d- Appl i ed El ast omer i c Wat er pr oof i ng Membr ane f or Use Wi t h Separ at e Wear i ng Cour se

ASTM D5957 ( 1998; R 2021) St andar d Gui de f or Fl ood Test i ng Hor i zont al Wat er pr oof i ng I nst al l at i ons

1. 2 SUBMI TTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" or " S" c l assi f i cat i on. Submi t t al s not havi ng a " G" or " S" c l assi f i cat i on ar e f or Cont r act or Qual i t y Cont r ol appr oval . Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:

SD- 03 Pr oduct Dat a

Fl ui d- Appl i ed Membr ane

Membr ane Pr i mer

Sol vent

Moi st ur e Met er

Dr ai nage Boar d

Bond Br eaker

SD- 06 Test Repor t s

Fl ood Test i ng; G

SECTI ON 07 14 00 Page 1

ADDENDUM #3; 05-09-2024

Gallagher, Brad K.

Cloud

SD- 11 Cl oseout Submi t t al s

War r ant y

I nf or mat i on Car d

Mai nt enance and Repai r Tr ai ni ng

I ncl ude copi es of Saf et y Dat a Sheet s f or mai nt enance/ r epai r mat er i al s.

1. 3 PREWATERPROOFI NG CONFERENCE

Pr i or t o st ar t i ng appl i cat i on of wat er pr oof i ng syst em, ar r ange and at t end a pr ewat er pr oof i ng conf er ence t o ensur e a c l ear under st andi ng of dr awi ngs and speci f i cat i ons. Gi ve t he Cont r act i ng Of f i cer 7 days advance wr i t t en not i ce of t he t i me and pl ace of meet i ng. Ensur e t hat t he mechani cal and el ect r i cal subcont r act or , f l ashi ng and sheet met al subcont r act or , and ot her t r ades t hat may per f or m ot her t ypes of wor k on or over t he membr ane af t er i nst al l at i on, at t end t hi s conf er ence.

1. 4 DELI VERY, STORAGE, AND HANDLI NG

Del i ver wat er pr oof i ng mat er i al s i n manuf act ur er ' s or i gi nal , unopened cont ai ner s, wi t h l abel s i nt act and l egi bl e. Cont ai ner s of mat er i al s cover ed by a r ef er enced speci f i cat i on number must bear t he speci f i cat i on number , t ype, and cl ass of t he cont ent s. Del i ver mat er i al s i n suf f i c i ent quant i t y t o cont i nue wor k wi t hout i nt er r upt i on. St or e and pr ot ect mat er i al s i n accor dance wi t h manuf act ur er ' s i nst r uct i ons, and use wi t hi n t hei r i ndi cat ed shel f l i f e. When hazar dous mat er i al s ar e i nvol ved, adher e t o speci al pr ecaut i ons of t he manuf act ur er , unl ess pr ecaut i ons conf l i c t wi t h l ocal , st at e, and f eder al r egul at i ons. Pr ompt l y r emove f r om t he si t e mat er i al s or i ncompl et e wor k adver sel y af f ect ed by exposur e t o moi st ur e or f r eezi ng. St or e mat er i al s on pal l et s and cover f r om t op t o bot t om wi t h canvas t ar paul i ns.

1. 5 ENVI RONMENTAL CONDI TI ONS

Appl y mat er i al s when ambi ent t emper at ur e i s 40 degr ees F or above f or a per i od of 24 hour s pr i or t o t he appl i cat i on and when t her e i s no i ce, f r ost , sur f ace moi st ur e, or v i s i bl e dampness on t he subst r at e sur f ace.

Appl y mat er i al s when ai r t emper at ur e i s expect ed t o r emai n above 40 degr ees F dur i ng t he cur e per i od r ecommended by t he manuf act ur er .

Moi st ur e t est f or subst r at e i s speci f i ed under par agr aph MOI STURE TEST.

Wor k may be per f or med wi t hi n heat ed encl osur es, pr ovi ded t he sur f ace t emper at ur e of t he subst r at e i s mai nt ai ned at a mi ni mum of 40 degr ees F f or 24 hour s pr i or t o t he appl i cat i on of t he wat er pr oof i ng, and r emai ns above t hat t emper at ur e dur i ng t he cur e per i od r ecommended by t he manuf act ur er .

1. 6 WARRANTY

Pr ovi de syst em mat er i al and wor kmanshi p war r ant i es meet i ng speci f i ed r equi r ement s. Pr ovi de r evi s i ons or amendment t o st andar d membr ane manuf act ur er war r ant y t o compl y wi t h t he speci f i ed r equi r ement s. Pr ovi de a manuf act ur er ' s war r ant y t hat has no dol l ar l i mi t , cover s f ul l syst em

SECTI ON 07 14 00 Page 2 wat er - t i ght ness, and has a mi ni mum dur at i on of 20 year s.

1. 6. 1 Membr ane Manuf act ur er War r ant y

Pr ovi de t he membr ane manuf act ur er ' s 20- year no dol l ar l i mi t syst em mat er i al s and i nst al l at i on wor kmanshi p war r ant y, i ncl udi ng f l ashi ng, i nsul at i on, and accessor i es necessar y f or a wat er t i ght syst em const r uct i on. Wr i t e t he war r ant y di r ect l y t o t he Gover nment commenci ng at t i me of Gover nment ' s accept ance of t he wor k. Pr ovi de t he f ol l owi ng st at ement s f or such war r ant y:

a. I f wi t hi n t he war r ant y per i od t he syst em, as i nst al l ed f or i t s i nt ended use i n t he nor mal c l i mat i c and envi r onment al condi t i ons of t he f aci l i t y , becomes non- wat er t i ght , shows evi dence of moi st ur e i nt r usi on wi t hi n t he assembl y, bl i s t er s, spl i t s, t ear s, cr acks, del ami nat es, separ at es at t he seams, or shows evi dence of excessi ve weat her i ng due t o def ect i ve mat er i al s or i nst al l at i on wor kmanshi p, t he r epai r or r epl acement of t he def ect i ve and damaged mat er i al s of t he syst em assembl y and cor r ect i on of def ect i ve wor kmanshi p ar e t he r esponsi bi l i t y of t he membr ane manuf act ur er . Al l cost s associ at ed wi t h t he r epai r or r epl acement wor k ar e t he r esponsi bi l i t y of t he membr ane manuf act ur er .

b. The war r ant y must r emai n i n f ul l f or ce and ef f ect , i ncl udi ng emer gency t empor ar y r epai r s per f or med by ot her s, when t he manuf act ur er or hi s appr oved appl i cat or f ai l t o per f or m t he r epai r s wi t hi n 72 hour s of not i f i cat i on.

1. 6. 2 Cont i nuance of War r ant y

Repai r or r epl acement wor k t hat becomes necessar y wi t hi n t he war r ant y per i od must be appr oved and accompl i shed i n a manner so as t o r est or e t he i nt egr i t y of t he syst em assembl y and val i di t y of t he membr ane manuf act ur er war r ant y f or t he r emai nder of t he manuf act ur er war r ant y per i od.

PART 2 PRODUCTS

2. 1 FLUI D- APPLI ED MEMBRANE

ASTM C836/ C836M.

2. 2 MEMBRANE PRI MER

As r ecommended by t he f l ui d- appl i ed membr ane manuf act ur er unl ess speci f i cal l y pr ohi bi t ed by t he manuf act ur er of t he f l ui d- appl i ed membr ane.

2. 3 SEALANT

As speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS.

2. 4 SEALANT PRI MER

As speci f i ed i n Sect i on 07 92 00 JOI NT SEALANTS.

2. 5 JOI NT FI LLER

As speci f i ed i n Sect i on 03 30 00 CAST- I N- PLACE CONCRETE, .

SECTI ON 07 14 00 Page 3

2. 6 BOND BREAKER

As r ecommended by t he f l ui d- appl i ed membr ane manuf act ur er . Bond br eaker must not i nt er f er e wi t h t he cur i ng pr ocess or ot her per f or mance pr oper t i es of t he f l ui d- appl i ed membr ane. Submi t mat er i al descr i pt i on and physi cal pr oper t i es, appl i cat i on det ai l s, and r ecommendat i ons r egar di ng shel f l i f e, appl i cat i on pr ocedur es, and pr ecaut i ons on f l ammabi l i t y and t oxi c i t y.

2. 7 DRAI NAGE BOARD

Pr emol ded, di mpl ed, HDPE ( Hi gh- densi t y Pol yet hyl ene) composi t i on boar d, 240 mi l mi ni mum t hi ckness Mechani cal l y f ast en t o pour ed- i n- pl ace concr et e at l ocat i ons bel ow gr ade. Pr ovi de a mi ni mum R- r esi st ance of R=0. 63, wi t h a vapor per meabi l i t y of 0. 452 per ms.

2. 8 DRAI NAGE COURSE AGGREGATE

ASTM C33/ C33M, s i ze No. 8.

2. 9 I NSULATI ON

Pol yst yr ene f oam conf or mi ng t o ASTM C578, Cl ass I V, t hi ckness as i ndi cat ed on t he dr awi ngs.

PART 3 EXECUTI ON

3. 1 PREPARATI ON

Coor di nat e wor k wi t h t hat of ot her t r ades t o ensur e t hat component s t o be i ncor por at ed i nt o t he wat er pr oof i ng syst em ar e avai l abl e when needed.

I nspect and appr ove sur f aces i mmedi at el y bef or e appl i cat i on of wat er pr oof i ng mat er i al s. Remove l ai t ance, l oose aggr egat e, shar p pr oj ect i ons, gr ease, oi l , di r t , cur i ng compounds, and ot her cont ami nant s whi ch coul d adver sel y af f ect t he compl et e bondi ng of t he f l ui d- appl i ed membr ane t o t he concr et e sur f ace.

3. 1. 1 Cr acks and Joi nt s

Pr epar e v i s i bl e cr acks and j oi nt s i n subst r at e t o r ecei ve f l ui d- appl i ed wat er pr oof i ng membr ane by pl aci ng a bond br eaker and an el ast omer i c s l i p sheet bet ween membr ane and subst r at e. Appl y a 2 i nch bond br eaker t o cr acks t hat show movement f ol l owed by an el ast omer i c sheet adher ed t o t he deck. Nonmovi ng cr acks must be doubl e coat ed wi t h f l ui d- appl i ed wat er pr oof i ng.

3. 1. 2 Pr i mi ng

Pr i me sur f aces t o r ecei ve f l ui d- appl i ed wat er pr oof i ng membr ane. Appl y pr i mer as r equi r ed by membr ane manuf act ur er ' s pr i nt ed i nst r uct i ons.

3. 2 SPECI AL PRECAUTI ONS

Pr ot ect wat er pr oof i ng mat er i al s dur i ng t r anspor t and appl i cat i on. Do not di l ut e pr i mer s and ot her mat er i al s, unl ess speci f i cal l y r ecommended by mat er i al s manuf act ur er . Keep cont ai ner s c l osed except when r emovi ng cont ent s. Do not mi x r emai ns of unl i ke mat er i al s. Thor oughl y r emove r esi dual mat er i al s bef or e usi ng appl i cat i on equi pment f or mi xi ng and t r anspor t i ng mat er i al s. Do not per mi t equi pment on t he pr oj ect s i t e t hat has r esi due of mat er i al s used on pr evi ous pr oj ect s. Use cl eaner s onl y f or

SECTI ON 07 14 00 Page 4 cl eani ng, not f or t hi nni ng pr i mer s or membr ane mat er i al s. Ensur e t hat wor ker s and ot her s who wal k on cur ed membr ane wear c l ean, sof t - sol ed shoes t o avoi d damagi ng t he wat er pr oof i ng mat er i al s.

3. 3 APPLI CATI ON

Over pr i med sur f aces, pr ovi de a uni f or m, wet , monol i t hi c coat i ng of f l ui d- appl i ed membr ane, 60 mi l s t hi ck, pl us or mi nus 5 mi l s by f ol l owi ng manuf act ur er ' s pr i nt ed i nst r uct i ons. Appl y mat er i al by t r owel , squeegee, r ol l er , br ush, spr ay appar at us, or ot her met hod r ecommended by membr ane manuf act ur er . Check wet f i l m t hi ckness as speci f i ed i n par agr aph FI LM THI CKNESS and adj ust appl i cat i on r at e as necessar y t o pr ovi de a uni f or m coat i ng of t he t hi ckness speci f i ed. Wher e possi bl e, mar k of f sur f ace t o be coat ed i n equal uni t s t o f aci l i t at e pr oper cover age. At expansi on j oi nt s, cont r ol j oi nt s, pr epar ed cr acks, f l ashi ng, and t er mi nat i ons, car r y membr ane over pr ef or med el ast omer i c sheet i n a uni f or m 60 mi l t hi ck, pl us or mi nus 5 mi l s, wet t hi ckness t o pr ovi de a monol i t hi c coat i ng. I f membr ane cur es bef or e next appl i cat i on, wi pe pr evi ousl y appl i ed membr ane wi t h a sol vent t o r emove di r t and dust t hat coul d i nhi bi t adhesi on of over l appi ng membr ane coat . Use sol vent r ecommended by t he membr ane manuf act ur er , as appr oved.

3. 3. 1 Wor k Sequence

Per f or m wor k so t hat dr ai nage boar d i s i nst al l ed pr i or t o usi ng t he wat er pr oof ed sur f ace. Do not per manent l y i nst al l dr ai nage boar d unt i l t he membr ane has passed t he f l ood t est speci f i ed under par agr aph FLOOD TESTI NG. Move mat er i al st or age ar eas as wor k pr ogr esses t o pr event abuse of membr ane and over l oadi ng of st r uct ur al deck.

3. 3. 2 Dr ai nage Boar d

Pr ot ect f l ui d- appl i ed membr ane by pl aci ng a mi ni mum 240 mi l hi gh densi t y pol yet hyl ene dr ai nage boar d over f l ui d appl i ed membr ane at a t i me r ecommended by t he membr ane manuf act ur er . Dr ai nage boar d must be di mpl ed t o pr ovi de a dr ai nage r egi on at t he concr et e sur f ace. Dr ai nage boar d i s t o be mechani cal l y f ast ened t o t he concr et e. Pr ot ect membr ane appl i cat i on when pr ot ect i on boar d i s not pl aced i mmedi at el y. Fol l ow manuf act ur er ' s i nst al l at i on met hods f or at t achi ng, over l appi ng, and secur i ng dr ai nage boar d i nt o pl ace.

3. 3. 3 Si l t Fabr i c

Pl ace 100 gr am si l t f abr i c wher e shown, over i nsul at i on boar d, af t er f l ood t est s ar e compl et ed and concr et e pr ot ect i on s l ab or wear i ng cour se i s r eady t o be i nst al l ed.

3. 3. 4 I nsul at i on

Pl ace i nsul at i on of t hi ckness i ndi cat ed, on t op of dr ai nage cour se j ust pr i or t o pl acement of concr et e pr ot ect i on s l ab.

3. 4 FI ELD QUALI TY CONTROL

3. 4. 1 Moi st ur e Test

Pr i or t o appl i cat i on of f l ui d- appl i ed wat er pr oof i ng, measur e moi st ur e cont ent of subst r at e wi t h a moi st ur e met er i n t he pr esence of t he Cont r act i ng Of f i cer . Do not begi n appl i cat i on unt i l met er r eadi ng

SECTI ON 07 14 00 Page 5 i ndi cat es " dr y" r ange as per manuf act ur er ' s i nst al l at i on i nst r uct i ons.

3. 4. 2 Fi l m Thi ckness

Measur e wet f i l m t hi ckness ever y 100 squar e f eet dur i ng appl i cat i on by pl aci ng f l at met al pl at es on t he subst r at e or usi ng a mi l - t hi ckness gage especi al l y manuf act ur ed f or t he pur pose.

3. 4. 3 Fl ood Test i ng

Af t er appl i cat i on and cur i ng i s compl et e, f l ood t est t he wat er pr oof ed ar ea i n accor dance wi t h ASTM D5957. Fl ood t est ar ea wi t h wat er t o achi eve a mi ni mum cover of one i nch but not exceed a maxi mum dept h of 4 i nches at t he l owest poi nt . Mai nt ai n wat er hei ght so as not t o exceed a mi ni mum l evel of 2 i nches bel ow t he edge of f l ashi ngs. Pl ug dr ai ns and f i l l wat er pr oof ed ar ea wi t h wat er t o a dept h of 2 i nches. A mi ni mum 48- hour cur e t i me, or l onger cur e t i me i f r ecommended by t he membr ane manuf act ur er , i s r equi r ed pr i or t o f l ood t est i ng. Al l ow wat er t o st and 24 hour s. Test wat er t i ght ness by measur i ng wat er l evel at begi nni ng and end of t he 24- hour per i od. I f wat er l evel f al l s , dr ai n wat er , al l ow i nst al l at i on t o dr y, and i nspect . Make r epai r s or r epl ace as r equi r ed and r epeat t he t est . Do not pr oceed wi t h wor k bef or e appr oval of r epai r s or r epl acement .

3. 5 MAI NTENANCE AND REPAI R TRAI NI NG

Pr ovi de wr i t t en and ver bal i nst r uct i ons on pr oper mai nt enance pr ocedur es t o desi gnat ed Gover nment per sonnel . Ver bal i nst r uct i ons must be pr ovi ded by a compet ent r epr esent at i ve of t he membr ane manuf act ur er and i ncl ude a mi ni mum of 4 hour s on mai nt enance and emer gency r epai r of t he membr ane.

I ncl ude a demonst r at i on of membr ane r epai r , and gi ve sour ces of r equi r ed speci al t ool s. Pr ovi de i nf or mat i on on saf et y r equi r ement s dur i ng mai nt enance and emer gency r epai r oper at i ons.

3. 6 I NFORMATI ON CARD

For each syst em appl i cat i on, pr ovi de a mi ni mum 8- 1/ 2 i nch by 11 i nch i nf or mat i on car d f or f aci l i t y r ecor ds and a car d l ami nat ed i n pl ast i c and f r amed f or i nt er i or di spl ay at access poi nt , or a phot oengr aved 0. 032 i nch t hi ck al umi num car d f or ext er i or di spl ay. I dent i f y f aci l i t y name and number ; l ocat i on; Cont r act number ; appr oxi mat e ar ea; det ai l ed syst em descr i pt i on, i ncl udi ng deck t ype, membr ane, number of pl i es, met hod of appl i cat i on, manuf act ur er , i nsul at i on and cover boar d syst em and t hi ckness; pr esence of t aper ed i nsul at i on f or pr i mar y dr ai nage, pr esence of vapor r et ar der ; dat e of compl et i on; i nst al l i ng Cont r act or i dent i f i cat i on and Cont r act i nf or mat i on; membr ane manuf act ur er war r ant y expi r at i on, war r ant y r ef er ence number , and cont act i nf or mat i on. I nst al l car d at syst em access l ocat i on as di r ect ed by t he Cont r act i ng Of f i cer and pr ovi de a paper copy t o t he Cont r act i ng Of f i cer .

SECTI ON 07 14 00 Page 6

FORM 1

FLUI D- APPLI ED WATERPROOFI NG SYSTEM COMPONENTS

1. Cont r act Number

2. Dat e Wor k Compl et ed

3. Pr oj ect Speci f i cat i on Desi gnat i on

4. Subst r at e Mat er i al

5. Sl ope of Subst r at e

6. Dr ai ns Type/ Manuf act ur er

7. Wat er pr oof i ng

a. Membr ane

b. Seal ant

c. El ast omer i c Sheet

d. Mat er i al s Manuf act ur er ( s)

8. Pr ot ect i on Boar d

a. Type

b. Thi ckness

c. Manuf act ur er ' s Name

9. Dr ai nage Cour se Mat er i al Gr aduat i on

10. I nsul at i on

a. Type

b. Thi ckness

c. Manuf act ur er ' s Name

11. Pr ot ect i on Sl ab

a. Mat er i al

b. Thi ckness

c. Suppor t

d. Joi nt Syst em

SECTI ON 07 14 00 Page 7

FORM 1

FLUI D- APPLI ED WATERPROOFI NG SYSTEM COMPONENTS

12. Wear i ng Cour se

a. Type

b. Sl ope

c. Joi nt Syst em

d. Seal ant / Gasket Type

13. Wear i ng Sur f ace Type

Manuf act ur er ' s Name

14. War r ant y

a. Manuf act ur er war r ant y expi r at i on

b. War r ant y r ef er ence number

15. St at ement of Compl i ance or Except i on

Cont r act or ' s Si gnat ur e Dat e Si gned

I nspect or ' s Si gnat ur e Dat e Si gned

- - End of Sect i on - -

SECTI ON 07 14 00 Page 8

DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 14 00 - FLUID-APPLIED WATERPROOFING AND DRAINAGE BOARD
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 PREWATERPROOFING CONFERENCE
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 ENVIRONMENTAL CONDITIONS
1.6 WARRANTY
1.6.1 Membrane Manufacturer Warranty
1.6.2 Continuance of Warranty
PART 2 PRODUCTS
2.1 FLUID-APPLIED MEMBRANE
2.2 MEMBRANE PRIMER
2.3 SEALANT
2.4 SEALANT PRIMER
2.5 JOINT FILLER
2.6 BOND BREAKER
2.7 DRAINAGE BOARD
2.8 DRAINAGE COURSE AGGREGATE
2.9 INSULATION
PART 3 EXECUTION
3.1 PREPARATION
3.1.1 Cracks and Joints
3.1.2 Priming
3.2 SPECIAL PRECAUTIONS
3.3 APPLICATION
3.3.1 Work Sequence
3.3.2 Drainage Board
3.3.3 Silt Fabric
3.3.4 Insulation
3.4 FIELD QUALITY CONTROL
3.4.1 Moisture Test
3.4.2 Film Thickness
3.4.3 Flood Testing
3.5 MAINTENANCE AND REPAIR TRAINING
3.6 INFORMATION CARD

File details come from the government source that posted it. Updated .