03321_AE301 - WALL SECTIONS.pdf

PDF 483 KB Posted

Attached to
CONSTRUCT MUNITIONS MAINTENANCE, INSPECTION, AND ASSEMBLY (M&I) FACILITY Federal contract opportunity
Solicitation number
W50S9F-24-B-0001
Issued by
Department of the Army National Guard

About this file

This document is a wall section detail drawing for a planned Munitions Maintenance, Inspection, and Assembly (M&I) Facility construction project at Truax Field in Madison, Wisconsin. The drawing provides technical specifications for the construction of the facility, including details on the ground floor, roof, concrete walls, drainage systems, insulation, and other architectural and structural components.

The related federal contract opportunity is an Invitation for Bids (IFB) issued by the Wisconsin National Guard to award a single firm fixed-price construction contract for the new 3,500 square foot M&I Facility. The project requires constructing the facility to support F-35 mission-specific operations, including a Secure Work Area, mechanical, electrical, and fire protection systems, and site work such as a Munitions Assembly Conveyor pad and access road. The contract duration is 273 calendar days after notice to proceed. The project is set aside 100% for Small Businesses under NAICS code 236220, with a construction magnitude between $1,000,000 and $5,000,000. The solicitation includes brand name product requirements and a limitation on subcontracting to similarly situated entities.

View the file

Other files for this federal contract opportunity

Other files attached to CONSTRUCT MUNITIONS MAINTENANCE, INSPECTION, AND ASSEMBLY (M&I) FACILITY, newest first.
File Type Posted
ABSTRACT OF OFFERS - CONSTRUCTION_24B0001.pdf PDF
Question and Answers Log_Questions 1-37 FINAL.pdf PDF
Question and Answers Log_Questions 1-37v1.pdf PDF
W50S9F-24-B-0001_00001.pdf PDF
Question and Answers Log_Questions 1-37.pdf PDF
Question and Answers Log_Questions 1-32.pdf PDF
SECTION 27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM.pdf PDF
Question and Answers Log_Questions 1-26.pdf PDF
08 39 55 Sliding Metal Blast Resistant Doors.pdf PDF
Pre-Bid Conference Minutes.pdf PDF
03321_AE200 - BUILDING ELEVATIONS AND SECTIONS.pdf PDF
Attendance Sheet MI Pre-Bid Conference 20240502.pdf PDF
07 14 00 Fluid-applied waterproofing.pdf PDF
Add 3 Table of Contents.pdf PDF
Pre-Bid Conference Slides - MI.pdf PDF
ATTACHMENT 2 - Add No. 2 - PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG219012.pdf PDF
ATTACHMENT 1 - PLANS AND SPECIFICATIONS Vol 1 Project No. XGFG219012.pdf PDF
ATTACHMENT 2 - PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG219012.pdf PDF
ATTACHMENT 7 - XGFG 219012 MI Facility - Single Source Doc - Monaco Fire Alarm_Redacted.pdf PDF
ATTACHMENT 8 - XGFG219012 MI Facility - Single Source Doc - Schneider_Andover_Redacted.pdf PDF
ATTACHMENT 9 - SFS Form 12 - Template.xls XLS spreadsheet
ATTACHMENT 4 - GEOTECHNICAL ENGINEERING REPORT.pdf PDF
ATTACHMENT 5 - XGFG219012 MI Facility - Single Source Doc - Advantor_Redacted.pdf PDF
W50S9F-24-B-0001.pdf PDF
ATTACHMENT 3 - DRAWINGS Project No. XGFG219012 Dated 27 Oct 23.pdf PDF
ATTACHMENT 6 -XGFG219012 MI Facility - Single Source Doc - Marshall Best_Redacted.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GROUND FLOOR

100'-0"

T.O. ROOF

118'-0"

DOUBLE TEE

WITH 2" TOPPING

DRAINAGE BOARD

ON WATERPROOFING

2" RIGID

INSULATION BOARD

DRAINAGE BOARD

ON

WATERPROOFING

CAST-IN-PLACE

CONCRETE

WALL

SELECT FILL,

MIN. 12" THICK

SLOPE TO DRAIN

RE: CIVIL

FOOTING

SLAB ON GRADE

FILTER LAYER

RIGID INSULATION

GRANULAR FILL

6" GRAVEL FILL

BACK FILL

CAST-IN-PLACE

CONCRETE WALL

PERFORATED

DRAIN PIPE - WRAP

COMPLETELY IN

SILT FABRIC

FLUID-APPLIED

WATERPROOFING

AS SPECIFIED

B.O. CONC DOUBLE T BEAM

RE: STRUCTURAL

DRAINAGE BOARD

WATERPROOFING

FLUID-APPLIED

WATERPROOFING

AS SPECIFIED

2' -8

CONC. TIE BEAM

RE: STRUCTURAL

BRASS CAP

CLEANOUT ON

12" X 12" CONC

UTILITY PAD

16" MIN. CLAY

TOPPING

VAPOR BARRIER

PERIMETER

PERFORATED

DRAIN PIPE - WRAP

COMPLETELY IN

SILT FABRIC

GROUND FLOOR

100'-0"

T.O. ROOF

118'-0"

CONCRETE ROOF

DECK BEYOND

CONCRETE

WALL

CONCRETE

WALL BEYOND

CONCRETE

SIDEWALK.

REFER TO CIVIL

B

SLOPE

FLUID-APPLIED

WATERPROOFING

AS SPECIFIED

DRAINAGE BOARD ON

WATERPROOFING

PERFORATED

DRAIN PIPE -

COMPLETELY WRAP

IN SILT FABRIC

GRANULAR

FILL

T.O. BACK WALL

121'-2"

2' -8

RETAINING WALL

SHOWN BEYOND

8"

6"

BRASS CAP

CLEANOUT ON

12" X 12" CONC

UTILITY PAD

16" MIN. CLAY

TOPPING

C4

AE200

2" RIGID

INSULATION BOARD

GROUND FLOOR

100'-0"

T.O. ROOF

118'-0"

A1

AE600

Sim

SLAB ON

GRADE

STEEL PLATE

BLAST-RESISTANT

DOOR

CAST-IN-PLACE

CONCRETE

WALL

SELECT FILL, 12"

MIN. THICKNESS

FOOTING

REFER TO

CIVIL FOR

APRON DET'S

A

SLOPE

CONC. DOUBLE TEE

BEAM W/ 2" TOPING

RIGID

INSULATION

FLUID-APPLIED

WATERPROOFING

AS SPECIFIED

WALL PACK

BEYOND

B.O. DBL T BEAM

115'-4"

T.O. FRONT WALL

121'-8"

1' -0

2'

-8

1/8" / 12"

6" GRAVEL

FILL

DRIP EDGE

DRAINAGE BOARD

2" RIGID

INSULATION BOARD

CONT STEEL

TUBE HEAD

AND JAMBS

16" MIN. CLAY

TOPPING

VAPOR

BARRIER

1 1/2" STL TUBE

WELD TO

BOLLARD - RE:

STRUCT.

1"

2 2

GROUND FLOOR

100'-0"

T.O. ROOF

118'-0"

FOOTING

CAST-IN-PLACE

CONCRETE WALL

DRAINAGE

BOARD ON

WATERPROOFING

SELECT FILL

A

SLOPE

PERIMETER

PERFORATED

DRAIN PIPE - WRAP

COMPLETELY IN

SILT FABRIC

T.O. FRONT WALL

121'-8"

1' -0

2'

-8

16" MIN. CLAY

TOPPING

VAPOR

BARRIER

FLUID-APPLIED

WATERPROOFING

AS SPECIFIED

2" RIGID INSULATION

BOARD

5801 Broadway Extension, Suite 500 Oklahoma City, OK 73118-7436

405.840.2931 | fsb-ae.com

D

SHEET NUMBER:

ISSUE DATE:

SHEET TITLE:

PROJECT NUMBER:

PROJECT INFORMATION:

REVISION HISTORY:

DATEDESCRIPTION

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

PROJECT MANAGER:

C

B

A

D

C

B

A

54321

FSB2020-332-01

MJT

M un iti on s M &I

F ac ilit y

Tr ua x F ie ld , M ad iso n, W is co ns in

F-

B ed do wn

OCTOBER 27, 2023

C :\U sers\bkg\D o cum ents\M y R evit\03321_Arch_B G allagher5S

B23.rvt

5/9/2024 10:03: 25 AM

WALL SECTIONS

AE301

CKG

GAZ

MJT

SCALE: 1/2" = 1'-0"

WALL SECTIONA1 SCALE: 1/2" = 1'-0"

WALL SECTIONA2 SCALE: 1/2" = 1'-0"

WALL SECTIONA3 SCALE: 1/2" = 1'-0"

WALL SECTIONA4 0 1' 2' 4'

1/2" = 1'-0"

1 ADDENDUM #2 02/12/2024

2 ADDENDUM #3 05/09/2024

File details come from the government source that posted it. Updated .