ATTACHMENT 2 - PLANS AND SPECIFICATIONS Vol 2 Project No. XGFG219012.pdf
PDF 5 MB Posted
- Attached to
- CONSTRUCT MUNITIONS MAINTENANCE, INSPECTION, AND ASSEMBLY (M&I) FACILITY Federal contract opportunity
- Solicitation number
- W50S9F-24-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document is the technical specifications and plans for the construction of the F-35 Munitions Maintenance, Inspection, and Assembly (M&I) Facility at the 115th Fighter Wing at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The key details include:
The work involves constructing a new 3,500 sq ft earth-covered, two-bay, conventional Munitions M&I facility to support F-35 mission-specific operations. The project includes constructing a new Secure Work Area within the facility, and providing new mechanical, electrical, and fire protection systems. The facility will be designed as permanent construction in compliance with DOD antiterrorism/force protection requirements. Site work includes constructing a Munitions Assembly Conveyor pad, a new access road, site utilities, and other related site improvements. The construction contract duration is 273 calendar days after notice to proceed. This project is set aside 100% for Small Businesses under NAICS code 236220, with a magnitude of construction between $1,000,000 and $5,000,000.
View the file
Other files for this federal contract opportunity
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Issued for Construction Documents Volume 3 – CD Specifications (2 of 2)
F-35: Munitions M&I Facility
Wisconsin Air National Guard 115th Fighter Wing Dane County Regional Airport Truax Field Air National Guard Base Madison, WI
NGB Contract: W9133L-16-D-0005 Task Order: W50S9F-20-F-0002
WI ANG PN: XGFG219012
October 27, 2023
ANG/WI – F-35: Munitions M&I Facility 20203321F35MNI Issued for Construction 27 October 2023
SEALS PAGE Page 1
SEALS PAGE
DESIGN PROFESSIONALS OF RECORD (DPOR)
A. Architect:
1. Jason Holuby, AIA, LEED AP BD+C
2. Responsible for Division 01 (Portion of Specification 01 57 19), U.N.O Herein; Divisions 06, 07, 08, 09, and 10
3. E-mail: jholuby@fsb-ae.com
4. Ph: 405.840.2931
B. Civil:
1. Lindsay Hausman, P.E.
2. Responsible for Divisions 31, 32 and 33
3. E-mail: lhausman@hanson-inc.com
4. Ph: 217.747.9314
C. Structural:
1. Gene Brown, P.E., LEED AP
2. Responsible for Divisions 03, 04 and 05; and Specification 01 45 35
3. E-mail: gbrown@fsb-ae.com
4. Ph: 405.840.2931
D. Mechanical:
1. Aaron Campbell, P.E., CxA
2. Responsible for Divisions 22 and 23
3. E-mail: acampbell@fsb-ae.com
4. Ph: 405.840.2931
W
IS C O NS IN
A R C H I T E C T
JASON T.
HOLUBY
A-13101
OKLAHOMA CITY
OK
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
GENE O.
BROWN
E-47748
OKLAHOMA CITY
OK
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
AARON P.
CAMPBELL
E-49561-6
OKLAHOMA CITY
OK
ANG/WI – F-35: Munitions M&I Facility 20203321F35MNI Issued for Construction 27 October 2023
SEALS PAGE Page 2
E. Electrical:
1. John T. Little, P.E.
2. Responsible for Division 26
3. E-mail: jlittle@fsb-ae.com
4. Ph: 405.840.2931
F. Fire Protection:
1. Liane Ozmun, P.E.
2. Responsible for Divisions 21 and 28
3. E-mail: lozmun@fsb-ae.com
4. Ph: 405.840.2931
G. Environmental:
1. Lisa Fleming, PE
2. Responsible for Portion of Specification 01 57 19; and
Specification 02 61 13, 02 81 00.
3. E-mail: flemingl@ayresassociates.com
4. Ph: 715.834.3161
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
JOHN T
LITTLE
E-47833
EDMOND
OK
W
IS C O NS IN
P R
O F
E
S S I O N A L
E N G
I N E
E R
LIANE F
OZMUN
E-48073
OKLAHOMA CITY
OK
ANG/ WI - F- 35: Muni t i ons M&I Faci l i t y Tr uax Fi el d, WI I ssued For Const r uct i on 27 Oct ober 2023
PROJECT TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
01 11 00 SUMMARY OF WORK
01 14 00 WORK RESTRI CTI ONS
01 20 00 PRI CE AND PAYMENT PROCEDURES
01 30 00 ADMI NI STRATI VE REQUI REMENTS
01 32 01. 00 10 PROJECT SCHEDULE
01 33 00 SUBMI TTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUI REMENTS
01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS
01 45 00. 00 10 QUALI TY CONTROL
01 45 35 SPECI AL I NSPECTI ONS
01 50 00 TEMPORARY CONSTRUCTI ON FACI LI TI ES AND CONTROLS
01 57 19 TEMPORARY ENVI RONMENTAL CONTROLS
01 74 19 CONSTRUCTI ON WASTE MANAGEMENT AND DI SPOSAL
01 78 00 CLOSEOUT SUBMI TTALS
01 78 23 OPERATI ON AND MAI NTENANCE DATA
01 91 00. 15 10 TOTAL BUI LDI NG COMMI SSI ONI NG
DI VI SI ON 02 - EXI STI NG CONDI TI ONS
02 61 13 EXCAVATI ON AND HANDLI NG OF CONTAMI NATED MATERI AL
02 81 00 TRANSPORTATI ON AND DI SPOSAL OF HAZARDOUS MATERI ALS
DI VI SI ON 03 - CONCRETE
03 30 00 CAST- I N- PLACE CONCRETE
03 45 33 PRECAST AND PRESTRESSED STRUCTURAL CONCRETE
DI VI SI ON 04 - MASONRY
04 20 00 UNI T MASONRY
DI VI SI ON 05 - METALS
05 05 20. 00 27 POST- I NSTALLED CONCRETE AND MASONRY ANCHORS
05 12 00 STRUCTURAL STEEL
05 40 00 COLD- FORMED METAL FRAMI NG
05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS
DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES
06 10 00 ROUGH CARPENTRY
DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 92 00 JOINT SEALANTS
DI VI SI ON 08 - OPENI NGS
08 11 13 STEEL DOORS AND FRAMES
08 34 73 SOUND CONTROL DOOR ASSEMBLI ES
08 39 55 SLI DI NG METAL BLAST RESI STANT DOORS
PROJECT TABLE OF CONTENTS Page 1
08 71 00 DOOR HARDWARE
08 91 00 METAL WALL LOUVERS
DI VI SI ON 09 - FI NI SHES
09 22 00 SUPPORTS FOR GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 51 00 ACOUSTI CAL CEI LI NGS
09 62 38 STATI C- CONTROL FLOORI NG
09 67 23. 16 FUEL RESI STI VE RESI NOUS FLOORI NG, 5- COAT SYSTEM
09 90 00 PAI NTS AND COATI NGS
DI VI SI ON 10 - SPECI ALTI ES
10 14 00. 20 I NTERI OR SI GNAGE
10 26 00 WALL AND DOOR PROTECTI ON
10 44 16 FI RE EXTI NGUI SHERS
DI VI SI ON 21 - FI RE SUPPRESSI ON
21 13 13 WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
DI VI SI ON 22 - PLUMBI NG
22 00 00 PLUMBI NG, GENERAL PURPOSE
DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)
23 05 48. 00 40 VI BRATI ON AND SEI SMI C CONTROLS FOR HVAC PI PI NG AND
EQUI PMENT
23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC
23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS
23 09 00 I NSTRUMENTATI ON AND CONTROL FOR HVAC
23 09 13 I NSTRUMENTATI ON AND CONTROL DEVI CES FOR HVAC
23 09 23. 02 BACNET DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG
CONTROL SYSTEMS
23 23 00 REFRI GERANT PI PI NG
23 30 00 HVAC AI R DI STRI BUTI ON
23 31 13. 00 40 METAL DUCTS
23 81 00 DECENTRALI ZED UNI TARY HVAC EQUI PMENT
23 82 46. 00 40 ELECTRI C UNI T HEATERS
DI VI SI ON 26 - ELECTRI CAL
26 05 19. 10 10 I NSULATED WI RE AND CABLE
26 05 26. 00 40 GROUNDI NG AND BONDI NG FOR ELECTRI CAL SYSTEMS
26 08 00 APPARATUS I NSPECTI ON AND TESTI NG
26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM
26 28 00. 00 10 MOTOR CONTROL CENTERS, SWI TCHBOARDS AND PANELBOARDS
26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON
26 41 00 LI GHTNI NG PROTECTI ON SYSTEM
26 51 00 I NTERI OR LI GHTI NG
DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY
28 31 76 I NTERI OR FI RE ALARM AND MASS NOTI FI CATI ON SYSTEM,
ADDRESSABLE
DI VI SI ON 31 - EARTHWORK
PROJECT TABLE OF CONTENTS Page 2
31 00 00 EARTHWORK
DI VI SI ON 32 - EXTERI OR I MPROVEMENTS
32 01 19. 61 SEALI NG OF JOI NTS I N RI GI D PAVEMENT
32 11 20 BASE COURSE FOR RI GI D PAVI NG AND SI DEWALK AND SUBBASES FOR
FLEXI BLE PAVI NG
32 12 13 BI TUMI NOUS TACK AND PRI ME COATS
32 12 16. 16 ROAD- MI X ASPHALT PAVI NG
32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE
FACI LI TI ES
32 16 19 CONCRETE CURBS, GUTTERS AND SI DEWALKS
32 31 13 CHAI N LI NK FENCES AND GATES
32 92 19 SEEDI NG
DI VI SI ON 33 - UTI LI TI ES
33 40 00 STORM DRAI NAGE UTI LI TI ES
DI VI SI ON 41 - MATERI AL PROCESSI NG AND HANDLI NG EQUI PMENT
41 22 13. 14 BRI DGE CRANES, OVERHEAD ELECTRI C, TOP RUNNI NG
- - End of Pr oj ect Tabl e of Cont ent s - -
PROJECT TABLE OF CONTENTS Page 3
THI S PAGE I NTENTI ONALLY LEFT BLANK
PROJECT TABLE OF CONTENTS Page 4
SECTI ON 21 13 13
WET PI PE SPRI NKLER SYSTEMS, FI RE PROTECTI ON
PART 1 GENERAL
1. 1 REFERENCES
The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.
AMERI CAN SOCI ETY OF MECHANI CAL ENGI NEERS ( ASME)
ASME A13. 1 ( 2020) Scheme f or t he I dent i f i cat i on of Pi pi ng Syst ems
ASME B16. 1 ( 2015) Gr ay I r on Pi pe Fl anges and Fl anged Fi t t i ngs Cl asses 25, 125, and 250
ASME B16. 3 ( 2016) Mal l eabl e I r on Thr eaded Fi t t i ngs, Cl asses 150 and 300
ASME B16. 4 ( 2016) St andar d f or Gr ay I r on Thr eaded Fi t t i ngs; Cl asses 125 and 250
ASME B16. 21 ( 2016) Nonmet al l i c Fl at Gasket s f or Pi pe Fl anges
AMERI CAN SOCI ETY OF SANI TARY ENGI NEERI NG ( ASSE)
ASSE 1015 ( 2011) Per f or mance Requi r ement s f or Doubl e Check Backf l ow Pr event i on Assembl i es and Doubl e Check Fi r e Pr ot ect i on Backf l ow Pr event i on Assembl i es - ( ANSI appr oved 2010)
AMERI CAN WATER WORKS ASSOCI ATI ON ( AWWA)
AWWA C104/ A21. 4 ( 2016) Cement - Mor t ar Li ni ng f or Duct i l e- I r on Pi pe and Fi t t i ngs f or Wat er
AWWA C110/ A21. 10 ( 2012) Duct i l e- I r on and Gr ay- I r on Fi t t i ngs f or Wat er
AWWA C111/ A21. 11 ( 2017) Rubber - Gasket Joi nt s f or Duct i l e- I r on Pr essur e Pi pe and Fi t t i ngs
AWWA C203 ( 2008) Coal - Tar Pr ot ect i ve Coat i ngs and Li ni ngs f or St eel Wat er Pi pel i nes - Enamel and Tape - Hot - Appl i ed
AWWA M14 ( 2015) Manual : Recommended Pr act i ce f or Backf l ow Pr event i on and Cr oss- Connect i on Cont r ol
SECTI ON 21 13 13 Page 1
ASTM I NTERNATI ONAL ( ASTM)
ASTM A47/ A47M ( 1999; R 2018; E 2018) St andar d Speci f i cat i on f or Fer r i t i c Mal l eabl e I r on Cast i ngs
ASTM A53/ A53M ( 2018) St andar d Speci f i cat i on f or Pi pe, St eel , Bl ack and Hot - Di pped, Zi nc- Coat ed, Wel ded and Seaml ess
ASTM A135/ A135M ( 2009; R2014) St andar d Speci f i cat i on f or El ect r i c- Resi st ance- Wel ded St eel Pi pe
ASTM A153/ A153M ( 2016a) St andar d Speci f i cat i on f or Zi nc Coat i ng ( Hot - Di p) on I r on and St eel Har dwar e
ASTM A183 ( 2014; R 2020) St andar d Speci f i cat i on f or Car bon St eel Tr ack Bol t s and Nut s
ASTM A536 ( 1984; R 2019; E 2019) St andar d Speci f i cat i on f or Duct i l e I r on Cast i ngs
FM GLOBAL ( FM)
FM 1637 ( 2010) Fl exi bl e Spr i nkl er Hose wi t h Thr eaded End Fi t t i ngs
FM APP GUI DE ( updat ed on- l i ne) Appr oval Gui de ht t p: / / www. appr oval gui de. com/
I NTELLI GENCE COMMUNI TY STANDARD ( I CS)
I CS 705- 1 ( 2010) Physi cal and Techni cal Secur i t y St andar d f or Sensi t i ve Compar t ment ed I nf or mat i on Faci l i t i es
MANUFACTURERS STANDARDI ZATI ON SOCI ETY OF THE VALVE AND FI TTI NGS
I NDUSTRY ( MSS)
MSS SP- 71 ( 2018) Gr ay I r on Swi ng Check Val ves, Fl anged and Thr eaded Ends
NATI ONAL FI RE PROTECTI ON ASSOCI ATI ON ( NFPA)
NFPA 13 ( 2022) St andar d f or t he I nst al l at i on of Spr i nkl er Syst ems
NFPA 24 ( 2022) St andar d f or t he I nst al l at i on of Pr i vat e Fi r e Ser vi ce Mai ns and Thei r Appur t enances
NFPA 291 ( 2022) Recommended Pr act i ce f or Fi r e Fl ow Test i ng and Mar ki ng of Hydr ant s
NFPA 1963 ( 2019) St andar d f or Fi r e Hose Connect i ons
SECTI ON 21 13 13 Page 2
NATI ONAL I NSTI TUTE FOR CERTI FI CATI ON I N ENGI NEERI NG TECHNOLOGI ES
( NI CET)
NI CET 1014- 7 ( 2012) Pr ogr am Det ai l Manual f or Cer t i f i cat i on i n t he Fi el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy ( Fi el d Code 003) Subf i el d of Aut omat i c Spr i nkl er Syst em Layout
UNDERWRI TERS LABORATORI ES ( UL)
UL 193 ( 2016) UL St andar d f or Saf et y Al ar m Val ves f or Fi r e- Pr ot ect i on Ser vi ce
UL 199 ( 2020) UL St andar d f or Saf et y Aut omat i c Spr i nkl er s f or Fi r e- Pr ot ect i on Ser vi ce
UL 262 ( 2004; Repr i nt Oct 2011) Gat e Val ves f or Fi r e- Pr ot ect i on Ser vi ce
UL 312 ( 2010; Repr i nt Mar 2018) UL St andar d f or Saf et y Check Val ves f or Fi r e- Pr ot ect i on Ser vi ce
UL 405 ( 2013; Bul . 2020) UL St andar d f or Saf et y Fi r e Depar t ment Connect i on Devi ces
UL 668 ( 2004; Repr i nt Jul 2016) UL St andar d f or Saf et y Hose Val ves f or Fi r e- Pr ot ect i on Ser vi ce
UL 789 ( 2004; Repr i nt May 2017) UL St andar d f or Saf et y I ndi cat or Post s f or Fi r e- Pr ot ect i on Ser vi ce
UL 2443 ( 2015; Repr i nt May 2020) UL St andar d f or Saf et y Fl exi bl e Spr i nkl er Hose wi t h Fi t i ngs f or Fi r e Pr ot ect i on Ser vi ce
UL Fi r e Pr ot Di r ( 2012) Fi r e Pr ot ect i on Equi pment Di r ect or y
UNI FORM FACI LI TI ES CRI TERI A ( UFC)
UFC 3- 600- 01 ( 2016, Change 6) Fi r e Pr ot ect i on Engi neer i ng f or Faci l i t i es
U. S. DEPARTMENT OF DEFENSE ( DOD)
MI L- STD- 101 ( 2014; Rev C) Col or Code f or Pi pel i nes and f or Compr essed Gas Cyl i nder s
1. 2 SYSTEM DESCRI PTI ON
Pr ovi de wet pi pe spr i nkl er syst em( s) i n t he ent i r e bui l di ng. Except as modi f i ed her ei n, t he syst em must meet t he r equi r ement s of NFPA 13 and UFC 3- 600- 01. Pi pe si zes must be det er mi ned by hydr aul i c cal cul at i ons.
SECTI ON 21 13 13 Page 3
1. 2. 1 Hydr aul i c Desi gn
1. 2. 1. 1 Basi s f or Cal cul at i ons
A wat er f l ow t est was per f or med on Oct ober 21, 2020 ut i l i z i ng f l ow hydr ant s HYDR- 6025- 2 and t est ( gauge) hydr ant HYDR- 6125- 12 and r esul t ed i n a st at i c pr essur e of 90 psi wi t h a r esi dual pr essur e of 82 psi whi l e f l owi ng 1443 gpm. Per f or m a f i r e hydr ant f l ow t est pr i or t o shop dr awi ng submi t t al i n accor dance wi t h NFPA 291, on whi ch hydr aul i c cal cul at i ons ar e based.
Resul t s must i ncl ude hydr ant el evat i ons r el at i ve t o t he bui l di ng and hydr ant number / i dent i f i er s f or t he t est ed hydr ant s, i ncl udi ng whi ch wer e f l owed, whi ch had a gauge, wi t h 15 psi mar gi n of saf et y. Thi s i nf or mat i on must be pr esent ed i n a t abul ar f or m i f mul t i pl e hydr ant s wer e f l owed. The r esul t s must be i ncl uded wi t h t he hydr aul i c cal cul at i ons. Hydr aul i c cal cul at i ons must be based upon t he Hazen- Wi l l i ams f or mul a wi t h a " C" val ue not ed i n NFPA 13 f or pi pi ng. Hydr aul i c cal cul at i ons must be based on oper at i on of t he f i r e pump( s) pr ovi ded i n Sect i on 21 30 00 FI RE PUMPS.
The mi ni mum r esi dual pr essur e i n a ser vi ce l at er al ( l ead- i n) at t he 150% of t he f i r e pump r at ed f l ow must be 20 psi at t he i nl et t o t he backf l ow pr event er or gr eat er , af t er der at i ng t he wat er suppl y by t he 15 psi mar gi n of saf et y.
1. 2. 1. 2 Hydr aul i c Cal cul at i ons
a. Wat er suppl y cur ves and syst em r equi r ement s must be pl ot t ed on semi - l ogar i t hmi c gr aph ( N̂ 1. 85) paper so as t o pr esent a summar y of t he compl et e hydr aul i c cal cul at i on.
b. Pr ovi de a summar y sheet l i s t i ng spr i nkl er s i n t he desi gn ar ea and t hei r r espect i ve hydr aul i c r ef er ence poi nt s, el evat i ons, mi ni mum di schar ge pr essur es and mi ni mum f l ows. El evat i ons of hydr aul i c r ef er ence poi nt s ( nodes) must be i ndi cat ed.
c. Document at i on must i dent i f y each pi pe i ndi v i dual l y and t he nodes connect ed t her et o. I ndi cat e t he di amet er , l engt h, f l ow, vel oci t y, f r i c t i on l oss, number and t ype f i t t i ngs, t ot al f r i c t i on l oss i n t he pi pe, equi val ent pi pe l engt h and Hazen- Wi l l i ams coef f i c i ent f or each pi pe.
d. Wher e t he spr i nkl er syst em i s suppl i ed by i nt er connect ed r i ser s, t he spr i nkl er syst em must be hydr aul i cal l y cal cul at ed usi ng t he hydr aul i cal l y most demandi ng si ngl e r i ser . The cal cul at i ons must not assume t he si mul t aneous use of mor e t han one r i ser .
e. Al l cal cul at i ons must i ncl ude t he backf l ow pr event er manuf act ur er ' s st at ed f r i ct i on l oss at t he desi gn f l ow or 12 psi f or a r educed pr essur e backf l ow pr event er , whi chever i s gr eat er .
f . Al l cal cul at i ons must be per f or med back t o t he act ual l ocat i on of t he f l ow t est , t aki ng i nt o account t he di r ect i on of f l ow i n t he ser vi ce mai n at t he t est l ocat i on.
g. For gr i dded syst ems, cal cul at i ons must show peaki ng of demand ar ea f r i ct i on l oss t o ver i f y t hat t he hydr aul i cal l y most demandi ng ar ea i s bei ng used. A f l ow di agr am i ndi cat i ng t he quant i t y and di r ect i on of f l ows must be i ncl uded.
SECTI ON 21 13 13 Page 4
1. 2. 1. 3 Desi gn Cr i t er i a
Hydr aul i cal l y desi gn t he syst em t o di schar ge a mi ni mum densi t y i n accor dance wi t h UFC 3- 600- 01, Tabl e 9- 3, f or t he Hazar d Cl assi f i cat i on i ndi cat ed on t he dr awi ngs. Hydr aul i c cal cul at i ons must be i n accor dance wi t h t he Ar ea/ Densi t y Met hod of NFPA 13. Add an al l owance f or ext er i or hose st r eams of 250 gpm t o t he spr i nkl er syst em demand at t he f i r e hydr ant shown on t he dr awi ngs cl osest t o t he poi nt wher e t he wat er ser vi ce ent er s t he bui l di ng, and t he r equi r ed 15 psi mar gi n of saf et y.
1. 2. 2 Spr i nkl er Cover age
Spr i nkl er s must be uni f or ml y spaced on br anch l i nes. Pr ovi de cover age t hr oughout 100 per cent of t he bui l di ng. Thi s i ncl udes, but i s not l i mi t ed t o, t el ephone r ooms, el ect r i cal equi pment r ooms ( r egar dl ess of t he f i r e r esi st ance r at i ng of t he encl osur e) , boi l er r ooms, swi t chgear r ooms, t r ansf or mer r ooms, at t ached el ect r i cal vaul t s and ot her el ect r i cal and mechani cal spaces. Cover age per spr i nkl er must be i n accor dance wi t h NFPA 13. Pr ovi de spr i nkl er s bel ow al l obst r uct i ons i n accor dance wi t h
NFPA 13.
1. 2. 3 Qual i f i ed Fi r e Pr ot ect i on Engi neer ( QFPE)
An i ndi v i dual who i s a l i censed pr of essi onal engi neer ( P. E. ) who has passed t he f i r e pr ot ect i on engi neer i ng wr i t t en exami nat i on admi ni st er ed by t he Nat i onal Counci l of Exami ner s f or Engi neer i ng and Sur veyi ng ( NCEES) and has r el evant f i r e pr ot ect i on engi neer i ng exper i ence. Ser vi ces of t he QFPE must i ncl ude:
a. Revi ewi ng SD- 02, SD- 03, and SD- 05 submi t t al packages f or compl et eness and compl i ance wi t h t he pr ovi s i ons of t hi s speci f i cat i on. Wor ki ng ( shop) dr awi ngs and cal cul at i ons must be pr epar ed by, or pr epar ed under t he i mmedi at e super vi s i on of , t he QFPE. The QFPE must af f i x t hei r pr of essi onal engi neer i ng st amp wi t h s i gnat ur e t o t he shop dr awi ngs, cal cul at i ons, and mat er i al dat a sheet s, i ndi cat i ng appr oval pr i or t o submi t t i ng t he shop dr awi ngs t o t he DFPE.
b. Pr ovi de a l et t er document i ng t hat t he SD- 02, SD- 03, and SD- 05 submi t t al package has been r evi ewed and not i ng al l out st andi ng comment s.
c. Per f or mi ng i n- pr ogr ess const r uct i on sur vei l l ance pr i or t o i nst al l at i on of cei l i ngs ( r ough- i n i nspect i on) .
d. Revi ewi ng SD- 06 t est pl ans and pr ocedur es and t est r epor t s f or compl et eness and compl i ance wi t h t he pr ovi s i ons of t hi s speci f i cat i on. The QFPE must af f i x t hei r r evi ew st amp wi t h s i gnat ur e t o t he t est pl ans and r epor t s i ndi cat i ng appr oval bef or e submi t t i ng t o t he DFPE.
e. Wi t nessi ng pr e- Gover nment and f i nal Gover nment f unct i onal per f or mance t est i ng and per f or mi ng a f i nal i nst al l at i on r evi ew.
f . Si gni ng appl i cabl e cer t i f i cat es under SD- 07.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;
submi t t al s not havi ng a " G" desi gnat i on ar e f or i nf or mat i on onl y. Par t i al
SECTI ON 21 13 13 Page 5 submi t t al s and submi t t al s not f ul l y compl yi ng wi t h NFPA 13 and t hi s speci f i cat i on sect i on wi l l be r et ur ned di sappr oved wi t hout r evi ew. SD- 02, SD- 03 and SD- 05 must be submi t t ed s i mul t aneousl y.
Shop dr awi ngs ( SD- 02) , pr oduct dat a ( SD- 03) and cal cul at i ons ( SD- 05) must be pr epar ed by t he desi gner and combi ned and submi t t ed as one compl et e package. The QFPE must r evi ew t he SD- 02/ SD- 03/ SD- 05 submi t t al package f or compl et eness and compl i ance wi t h t he Cont r act pr ovi s i ons pr i or t o submi ssi on t o t he Gover nment . The QFPE must pr ovi de a Let t er of Conf i r mat i on t hat t hey have r evi ewed t he submi t t al package f or compl i ance wi t h t he cont r act pr ovi s i ons. Thi s l et t er must i ncl ude t hei r pr of essi onal engi neer st amp and si gnat ur e. Par t i al submi t t al s and submi t t al s not r evi ewed by t he QFPE must be r et ur ned di sappr oved wi t hout r evi ew.
Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL
PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Qual i f i ed Fi r e Pr ot ect i on Engi neer ( QFPE) ; G
Spr i nkl er Syst em Desi gner ; G
Spr i nkl er Syst em I nst al l er ; G
SD- 02 Shop Dr awi ngs
Shop Dr awi ng; G
SD- 03 Pr oduct Dat a
Pi pe; G
Fi t t i ngs; G
Val ves, i ncl udi ng gat e, check, but t er f l y, and gl obe; G
Ri ser Check Val ves; G
Rel i ef Val ves; G
Spr i nkl er s; G
Pi pe Hanger s and Suppor t s; G
Spr i nkl er Al ar m Swi t ch; G
Val ve Super vi sor y ( Tamper ) Swi t ch; G
Fi r e Depar t ment Connect i on; G
Backf l ow Pr event i on Assembl y; G
Ai r Vent ; G
Hose Val ve; G
Namepl at es; G
SECTI ON 21 13 13 Page 6
SD- 05 Desi gn Dat a
Hydr aul i c Cal cul at i ons; G
SD- 06 Test Repor t s
Pr el i mi nar y Test Pr ocedur es; G
Fi nal Test Pr ocedur es; G
Pr el i mi nar y Test Repor t ; G
Fi nal Test Repor t ; G
SD- 07 Cer t i f i cat es
Ver i f i cat i on of Compl i ant I nst al l at i on; G
Request f or Gover nment Fi nal Test ; G
Cer t i f i cat i on By The QFPE; G
SD- 10 Oper at i on and Mai nt enance Dat a
Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons; G
Post ed Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons; G
Spar e Par t s Dat a; G
SD- 11 Cl oseout Submi t t al s
As- bui l t dr awi ngs; G
1. 4 QUALI TY ASSURANCE
1. 4. 1 Pr econst r uct i on Submi t t al s
Wi t hi n 36 days of cont r act awar d but no l ess t han 14 days pr i or t o commenci ng wor k on si t e, t he pr i me Cont r act or must submi t t he SD- 01 Submi t t al s f or r evi ew and appr oval . SD- 02, SD- 03 and SD- 05 submi t t al s r ecei ved pr i or t o t he r evi ew and appr oval of t he qual i f i cat i ons wi l l be r et ur ned Di sappr oved Wi t hout Revi ew.
1. 4. 1. 1 Shop Dr awi ng
Thr ee copi es of t he shop dr awi ngs pl us one di gi t al copy, no l at er t han 28 days pr i or t o t he st ar t of syst em i nst al l at i on. Wor ki ng dr awi ngs conf or mi ng t o t he r equi r ement s pr escr i bed i n NFPA 13 and must be no smal l er t han t he Cont r act Dr awi ngs. Each set of dr awi ngs must i ncl ude t he f ol l owi ng:
1. A descr i pt i ve i ndex wi t h dr awi ngs l i s t ed i n sequence by number . A l egend sheet i dent i f y i ng devi ce symbol s, nomencl at ur e, and convent i ons used i n t he package.
2. Fl oor pl ans dr awn t o a scal e not l ess t han 1/ 8- i nch equal s 1- f oot c l ear l y showi ng l ocat i ons of devi ces, equi pment , r i ser s, and ot her det ai l s r equi r ed t o c l ear l y descr i be t he pr oposed ar r angement .
SECTI ON 21 13 13 Page 7
3. Act ual cent er - t o- cent er di mensi ons bet ween spr i nkl er s on br anch l i nes and bet ween br anch l i nes; f r om end spr i nkl er s t o adj acent wal l s; f r om wal l s t o br anch l i nes; f r om spr i nkl er f eed mai ns, cr oss mai ns and br anch l i nes t o f i ni shed f l oor and r oof or cei l i ng. A det ai l must show t he di mensi on f r om t he spr i nkl er and spr i nkl er def l ect or t o t he cei l i ng i n f i ni shed ar eas.
4. Longi t udi nal and t r ansver se bui l di ng sect i ons showi ng t ypi cal br anch l i ne and cr oss mai n pi pe r out i ng, el evat i on of each t ypi cal spr i nkl er above f i ni shed f l oor and el evat i on of " c l oud" or f al se cei l i ngs i n r el at i on t o t he bui l di ng cei l i ngs.
5. Pl an and el evat i on v i ews whi ch est abl i sh t hat t he equi pment wi l l f i t t he al l ot t ed spaces wi t h c l ear ance f or i nst al l at i on and mai nt enance.
6. Ri ser l ayout dr awi ngs dr awn t o a scal e of not l ess t han 1/ 2- i nch equal s 1- f oot t o show det ai l s of each syst em component , c l ear ances bet ween each ot her and f r om ot her equi pment and const r uct i on i n t he r oom.
7. Det ai l s of each t ype of r i ser assembl y, pi pe hanger , and el ect r i cal devi ces and i nt er connect i ng wi r i ng. The di mensi on f r om t he edge of ver t i cal pi pi ng t o t he near est adj acent wal l ( s) must be i ndi cat ed on t he dr awi ngs when ver t i cal pi pi ng i s l ocat ed i n st ai r s or ot her por t i ons of t he means of egr ess.
8. Det ai l s of each t ype of pi pe hanger and r el at ed component s.
9. I ncl ude f i r e pump cur ve wi t h shop dr awi ngs and hydr aul i c cal cul at i ons.
1. 4. 1. 2 Pr oduct Dat a
Thr ee copi es of annot at ed cat al og dat a t o show t he speci f i c model , t ype, and si ze of each i t em. Cat al og cut s must al so i ndi cat e t he NRTL l i s t i ng.
The dat a must be hi ghl i ght ed t o show model , s i ze, opt i ons, and ot her per t i nent i nf or mat i on, t hat ar e i nt ended f or consi der at i on. Dat a must be adequat e t o demonst r at e compl i ance wi t h al l cont r act r equi r ement s.
Pr oduct dat a f or al l equi pment must be combi ned i nt o a s i ngl e submi t t al .
1. 4. 1. 3 Hydr aul i c Cal cul at i ons
Cal cul at i ons must be as out l i ned i n NFPA 13 except t hat cal cul at i ons must be per f or med by comput er usi ng sof t war e i nt ended speci f i cal l y f or f i r e pr ot ect i on syst em desi gn usi ng t he desi gn dat a shown on t he dr awi ngs.
Cal cul at i ons must i ncl ude i somet r i c di agr am i ndi cat i ng hydr aul i c nodes and pi pe segment s.
1. 4. 1. 4 Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons
Submi t i n accor dance wi t h Sect i on 01 78 23 OPERATI ON AND MAI NTENANCE DATA as suppl ement ed and modi f i ed by t hi s speci f i cat i on sect i on.
Pr ovi de si x paper manual s and one pdf ver si on on el ect r oni c medi a. The manual s must i ncl ude t he manuf act ur er ' s name, model number , par t s l i s t , l i s t of par t s and t ool s t hat shoul d be kept i n st ock by t he owner f or r out i ne mai nt enance, t r oubl eshoot i ng gui de, and r ecommended ser vi ce or gani zat i on ( i ncl udi ng addr ess and t el ephone number ) f or each i t em of equi pment .
SECTI ON 21 13 13 Page 8
Submi t spar e par t s dat a f or each di f f er ent i t em of mat er i al and equi pment speci f i ed. The dat a must i ncl ude a compl et e l i s t of par t s and suppl i es, and a l i s t of par t s r ecommended by t he manuf act ur er t o be r epl aced af t er 1- year and 3 year s of ser vi ce. I ncl ude a l i s t of speci al t ool s and t est equi pment r equi r ed f or mai nt enance and t est i ng of t he pr oduct s suppl i ed.
1. 4. 1. 4. 1 Post ed Oper at i ng and Mai nt enance ( O&M) I nst r uct i ons
Pr ovi de Post ed O&M I nst r uct i ons, i n col or wi t h pr of essi onal l y pr epar ed gr aphi cs, 15" x 21" or l ar ger , f r amed i n heavy gauge ext r uded met al f r ames, mount ed under gl ass, wat er / weat her pr oof . Per manent l y mount i n a r eser ved cl ear wal l ar ea as shown on t he shop dr awi ngs, near FACU and/ or spr i nkl er r i ser . I ncl ude compr ehensi ve schemat i cs f or spr i nkl er and f i r e al ar m syst ems, f aci l i t y f l oor pl ans showi ng l ocat i on of al l f i r e equi pment and devi ces wi t h coor di nat ed i dent i f i cat i on. I ncl ude f i r e r at ed wal l s, f i r e damper s, f i r e al ar m r i ser di agr am, I / O mat r i x, poi nt l i s t , and al l component s. I ncl ude val ve char t s, equi pment schedul e and wi r i ng di agr ams and schemat i cs.
1. 4. 2 Qual i f i cat i ons
1. 4. 2. 1 Spr i nkl er Syst em Desi gner
The spr i nkl er syst em desi gner must be cer t i f i ed as a Level I I I Techni c i an by Nat i onal I nst i t ut e f or Cer t i f i cat i on i n Engi neer i ng Technol ogi es ( NI CET) i n t he Wat er - Based Syst ems Layout subf i el d of Fi r e Pr ot ect i on Engi neer i ng Technol ogy i n accor dance wi t h NI CET 1014- 7.
1. 4. 2. 2 Spr i nkl er Syst em I nst al l er
The spr i nkl er syst em i nst al l er must be r egul ar l y engaged i n t he i nst al l at i on of t he t ype and compl exi t y of syst em speci f i ed i n t he cont r act document s, and must have ser ved i n a s i mi l ar capaci t y f or at l east t hr ee syst ems t hat have per f or med i n t he manner i nt ended f or a per i od of not l ess t han 6 mont hs.
1. 4. 3 Regul at or y Requi r ement s
Equi pment and mat er i al must be l i s t ed or appr oved. Li st ed or appr oved, as used i n t hi s Sect i on, means l i s t ed, l abel ed or appr oved by a Nat i onal l y Recogni zed Test i ng Labor at or y ( NRTL) such as UL Fi r e Pr ot Di r or FM APP GUI DE. The omi ssi on of t hese t er ms under t he descr i pt i on of an i t em or equi pment descr i bed must not be const r ued as wai v i ng t hi s r equi r ement . Al l l i s t i ngs or appr oval s by t est i ng l abor at or i es must be f r om an exi st i ng ANSI or UL publ i shed st andar d. The r ecommended pr act i ces st at ed i n t he manuf act ur er ' s l i t er at ur e or document at i on ar e mandat or y r equi r ement s.
1. 5 DELI VERY, STORAGE, AND HANDLI NG
Pr ot ect al l equi pment del i ver ed and pl aced i n st or age f r om t he weat her , excessi ve humi di t y and t emper at ur e var i at i ons, di r t and dust , or ot her cont ami nant s. Al l pi pes must be ei t her capped or pl ugged unt i l i nst al l ed.
1. 6 EXTRA MATERI ALS
Spar e spr i nkl er s and wr ench( es) must be pr ovi ded as spar e par t s i n accor dance wi t h NFPA 13.
SECTI ON 21 13 13 Page 9
PART 2 PRODUCTS
2. 1 MATERI ALS AND EQUI PMENT
2. 1. 1 St andar d Pr oduct s
Pr ovi de mat er i al s, equi pment , and devi ces l i s t ed f or f i r e pr ot ect i on ser vi ce when so r equi r ed by NFPA 13 or t hi s speci f i cat i on. Sel ect mat er i al f r om one manuf act ur er , wher e possi bl e, and not a combi nat i on of manuf act ur er s, f or a c l assi f i cat i on of mat er i al . Mat er i al and equi pment must be st andar d pr oduct s of a manuf act ur er r egul ar l y engaged i n t he manuf act ur e of t he pr oduct s f or at l east 2 year s pr i or t o bi d.
2. 1. 2 Namepl at es
Maj or component s of equi pment must have t he manuf act ur er ' s name, addr ess, t ype or st y l e, model or ser i al number , cat al og number , dat e of i nst al l at i on, i nst al l i ng Cont r act or ' s name and addr ess, and t he cont r act number pr ovi ded on a new name pl at e per manent l y af f i xed t o t he i t em or equi pment . Namepl at es must be et ched met al or pl ast i c, per manent l y at t ached by scr ews t o cont r ol uni t s, panel s or adj acent wal l s.
2. 1. 3 I dent i f i cat i on and Mar ki ng
Pi pe and f i t t i ng mar ki ngs must i ncl ude name or i dent i f y i ng symbol of manuf act ur er and nomi nal s i ze. Pi pe must be mar ked wi t h ASTM desi gnat i on. Val ves and equi pment mar ki ngs must have name or i dent i f y i ng symbol of manuf act ur er , speci f i c model number , nomi nal s i ze, name of devi ce, ar r ow i ndi cat i ng di r ect i on of f l ow, and posi t i on of i nst al l at i on ( hor i zont al or ver t i cal ) , except i f val ve can be i nst al l ed i n ei t her posi t i on. Mar ki ngs must be i ncl uded on t he body cast i ng or on an et ched or st amped met al namepl at e per manent l y on t he val ve or cover pl at e.
2. 1. 4 Pr essur e Rat i ngs
Val ves, f i t t i ngs, coupl i ngs, al ar m swi t ches, and si mi l ar devi ces must be r at ed f or t he maxi mum wor ki ng pr essur es t hat can be exper i enced i n t he syst em, but i n no case l ess t han 175 psi .
2. 2 UNDERGROUND PI PI NG COMPONENTS
2. 2. 1 Pi pe
Pi pe must compl y wi t h NFPA 24. Mi ni mum pi pe si ze i s 6 i nches. Pi pi ng mor e t han 5 f eet out si de t he bui l di ng wal l s must compl y wi t h Sect i on 33 11 00 WATER UTI LI TY DI STRI BUTI ON PI PI NG. A cont i nuous sect i on of wel ded st ai nl ess st eel f i r e wat er ser vi ce pi pi ng f r om a poi nt out s i de t he bui l di ng per i met er t o a f l anged f i t t i ng at 1- f oot above t he f i ni shed f l oor wi t hi n t he bui l di ng i s r equi r ed.
2. 2. 2 Fi t t i ngs and Gasket s
Fi t t i ngs must be duct i l e- i r on conf or mi ng t o AWWA C110/ A21. 10 wi t h cement mor t ar l i ni ng conf or mi ng t o AWWA C104/ A21. 4. Gasket s must be sui t abl e i n desi gn and si ze f or t he pi pe wi t h whi ch such gasket s ar e t o be used.
Gasket s f or duct i l e- i r on pi pe j oi nt s must conf or m t o AWWA C111/ A21. 11.
SECTI ON 21 13 13 Page 10
2. 2. 3 Gat e Val ve and I ndi cat or Post s
I nst al l at i on must compl y wi t h NFPA 24. Gat e val ves f or use wi t h i ndi cat or post must conf or m t o UL 262 and must be pr ovi ded wi t h t amper swi t ches moni t or ed by t he f i r e al ar m syst em. I ndi cat or post s must conf or m t o UL 789.
Pr ovi de each i ndi cat or post wi t h one coat of pr i mer and t wo coat s of r ed enamel pai nt .
2. 2. 4 Bur i ed Ut i l i t y War ni ng and I dent i f i cat i on Tape
Pr ovi de det ect abl e al umi num f oi l pl ast i c backed t ape or det ect abl e magnet i c pl ast i c t ape manuf act ur ed speci f i cal l y f or war ni ng and i dent i f i cat i on of bur i ed pi pi ng. Tape must be det ect abl e by an el ect r oni c det ect i on i nst r ument . Pr ovi de t ape, 3 i nches mi ni mum wi dt h, col or coded f or t he ut i l i t y i nvol ved wi t h war ni ng and i dent i f i cat i on i mpr i nt ed i n bol d bl ock l et t er s cont i nuousl y and r epeat edl y over t he ent i r e t ape l engt h.
War ni ng and i dent i f i cat i on must r ead " CAUTI ON BURI ED WATER PI PI NG BELOW" or s i mi l ar wor di ng. Use per manent code and l et t er col or i ng unaf f ect ed by moi st ur e and ot her subst ances cont ai ned i n t r ench backf i l l mat er i al .
2. 3 ABOVEGROUND PI PI NG COMPONENTS
2. 3. 1 St eel Pi pi ng Component s
2. 3. 1. 1 St eel Pi pe
Except as modi f i ed her ei n, pi pe must be bl ack st eel as per mi t t ed by NFPA 13 and conf or m t o t he appl i cabl e pr ovi s i ons of ASTM A53/ A53M, ASTM A135/ A135M or ASTM A153/ A153M.
St eel pi pe must be mi ni mum Schedul e 40.
2. 3. 1. 2 Fi t t i ngs
Fi t t i ngs must be wel ded, t hr eaded, or gr ooved- end t ype. Thr eaded f i t t i ngs must be cast - i r on conf or mi ng t o ASME B16. 4, mal l eabl e- i r on conf or mi ng t o ASME B16. 3 or duct i l e- i r on conf or mi ng t o ASTM A536. Pl ai n- end f i t t i ngs wi t h mechani cal coupl i ngs, f i t t i ngs t hat use st eel gr i ppi ng devi ces t o bi t e i nt o t he pi pe, st eel pr ess f i t t i ngs and f i el d wel ded f i t t i ngs ar e not per mi t t ed. Fi t t i ngs, mechani cal coupl i ngs, and r ubber gasket s must be suppl i ed by t he same manuf act ur er . Thr eaded f i t t i ngs must use Tef l on t ape or manuf act ur er ' s appr oved j oi nt compound. Reduci ng coupl i ngs ar e not per mi t t ed.
2. 3. 1. 3 Gr ooved Mechani cal Joi nt s and Fi t t i ngs
Joi nt s and f i t t i ngs must be desi gned f or not l ess t han 175 psi ser vi ce and t he pr oduct of t he same manuf act ur er . Fi el d wel ded f i t t i ngs must not be used. Fi t t i ng and coupl i ng housi ng must be mal l eabl e- i r on conf or mi ng t o ASTM A47/ A47M, Gr ade 32510; duct i l e- i r on conf or mi ng t o ASTM A536, Gr ade 65- 45- 12. Rubber gasket ed gr ooved- end pi pe and f i t t i ngs wi t h mechani cal coupl i ngs ar e per mi t t ed i n pi pe si zes 2 i nches and l ar ger . Gasket must be t he f l ush t ype t hat f i l l s t he ent i r e cavi t y bet ween t he f i t t i ng and t he pi pe. Nut s and bol t s must be heat - t r eat ed st eel conf or mi ng t o ASTM A183 and must be cadmi um- pl at ed or z i nc- el ect r opl at ed.
2. 3. 1. 4 Fl anges
Fl anges must conf or m t o NFPA 13 and ASME B16. 1. Gasket s must be
SECTI ON 21 13 13 Page 11 non- asbest os compr essed mat er i al i n accor dance wi t h ASME B16. 21, 1/ 16- i nch t hi ck, and f ul l f ace or sel f - cent er i ng f l at r i ng t ype. Cl eat ed f l anges or f l ange adapt er s on any pi pi ng i s pr ohi bi t ed.
2. 3. 2 Fl exi bl e Spr i nkl er Hose
The use of f l exi bl e hose i s per mi t t ed. Fl exi bl e spr i nkl er hose must compl y wi t h UL 2443 and FM 1637, and i nst al l ed per FM r ecommended bend r equi r ement s.
2. 3. 3 Pi pe Hanger s and Suppor t s
Pr ovi de gal vani zed pi pe hanger s, suppor t s i n accor dance wi t h NFPA 13.
2. 3. 4 Val ves
Pr ovi de val ves of t ypes appr oved f or f i r e ser vi ce. Val ves must open by count er cl ockwi se r ot at i on.
2. 3. 4. 1 Cont r ol Val ve
Manual l y oper at ed spr i nkl er cont r ol / gat e val ve must be out si de st em and yoke ( OS&Y) t ype and must be l i s t ed.
2. 3. 4. 2 Check Val ves
Check val ves must compl y wi t h UL 312. Check val ves 4 i nches and l ar ger must be of t he swi ng t ype, have a c l ear wat er way and meet t he r equi r ement s of MSS SP- 71, f or Type 3 or 4. I nspect i on pl at e must be pr ovi ded on val ves l ar ger t han 6 i nches.
2. 3. 4. 3 Hose Val ve
Val ve must compl y wi t h UL 668.
2. 3. 5 Ri ser Check Val ves
Pr ovi de r i ser check val ve, pr essur e gauges and mai n dr ai n. Pr ovi de r el i ef val ve and ot her component s as r equi r ed f or a f ul l y oper at i onal syst em.
Val ves must compl y wi t h UL 193.
2. 4 ALARM I NI TI ATI NG AND SUPERVI SORY DEVI CES
2. 4. 1 Spr i nkl er Al ar m Swi t ch
Pr ovi de vane t ype f l ow swi t ch. Connect i on of swi t ch must be by t he f i r e al ar m i nst al l er . Vane t ype al ar m act uat i ng devi ces must have mechani cal di aphr agm cont r ol l ed r et ar d devi ce adj ust abl e f r om 10 t o 60 seconds and must i nst ant l y r ecycl e.
2. 4. 2 Val ve Super vi sor y ( Tamper ) Swi t ch
Swi t ch must be i nt egr al t o t he cont r ol val ve or sui t abl e f or mount i ng t o t he t ype of cont r ol val ve t o be super vi sed open. The swi t ch must be t amper r esi st ant and cont ai n SPDT ( For m C) cont act s ar r anged t o t r ansf er upon r emoval of t he housi ng cover or c l osur e of t he val ve of mor e t han t wo r ot at i ons of t he val ve st em.
SECTI ON 21 13 13 Page 12
2. 5 BACKFLOW PREVENTI ON ASSEMBLY
Doubl e det ect or check val ve assembl y backf l ow pr event er compl yi ng wi t h ASSE 1015 and AWWA M14. Backf l ow pr event i on assembl i es must have cur r ent " Cer t i f i cat e of Appr oval f r om t he Foundat i on f or Cr oss- Connect i on Cont r ol and Hydr aul i c Resear ch, FCCCHR Li st " and be l i s t ed f or f i r e pr ot ect i on use. Li st i ng of t he speci f i c make, model , desi gn, and si ze i n t he FCCCHR Li st i s accept abl e as t he r equi r ed document at i on.
2. 5. 1 Backf l ow Pr event er Test Connect i on
Test connect i on must consi st of a ser i es of l i s t ed hose val ves wi t h 2 1/ 2- i nch Nat i onal St andar d mal e hose t hr eads wi t h cap and chai n.
2. 6 FI RE DEPARTMENT CONNECTI ON
Fi r e depar t ment connect i on must be pr oj ect i ng or f l ush t ype wi t h cast - br ass body, mat chi ng wal l escut cheon l et t er ed " Aut o Spkr " wi t h a pol i shed- br ass f i ni sh. The connect i on must have i ndi v i dual sel f - c l osi ng cl apper s, caps wi t h dr i p dr ai ns and chai ns. Femal e i nl et s must have 2 1/ 2- i nch di amet er Amer i can Nat i onal Fi r e Hose Connect i on Scr ew Thr eads ( NH) per NFPA 1963. Compl y wi t h UL 405 and r equi r ement s of AHJ.
2. 7 SPRI NKLERS
Spr i nkl er s must compl y wi t h UL 199 and NFPA 13 and UFC 3- 600- 01.
Spr i nkl er s wi t h i nt er nal O- r i ngs ar e not accept abl e. Spr i nkl er s i n hi gh heat ar eas i ncl udi ng at t i c spaces or i n c l ose pr oxi mi t y t o uni t heat er s must have t emper at ur e c l assi f i cat i on i n accor dance wi t h NFPA 13. Ext ended cover age spr i nkl er s ar e per mi t t ed f or l oadi ng docks, r esi dent i al occupanci es and hi gh- pi l ed st or age appl i cat i ons onl y.
2. 7. 1 Pendent Spr i nkl er
Pendent spr i nkl er must be r ecessed qui ck- r esponse t ype wi t h nomi nal K- f act or of 5. 6 or 8. 0. Pendent spr i nkl er s must have a pol i shed chr ome f i ni sh. Assembl y must i ncl ude an i nt egr al escut cheon.
2. 7. 2 Upr i ght Spr i nkl er
Upr i ght spr i nkl er must be br ass qui ck- r esponse t ype and have a nomi nal K- f act or of 5. 6 or 8. 0.
2. 7. 3 Si dewal l Spr i nkl er
Si dewal l spr i nkl er must be t he qui ck- r esponse t ype. Si dewal l spr i nkl er must have a nomi nal K- f act or of 5. 6 or 8. 0. Si dewal l spr i nkl er must have a br ass f i ni sh.
2. 7. 4 Conceal ed Spr i nkl er
Conceal ed spr i nkl er must be qui ck- r esponse t ype and have a nomi nal K- f act or of 5. 6 or 8. 0. Cover pl at e must be whi t e unl ess i ndi cat ed ot her wi se.
2. 7. 5 Cor r osi on- Resi st ant Spr i nkl er
Cor r osi on- r esi st ant spr i nkl er must be t he upr i ght or pendent t ype i nst al l ed i n l ocat i ons as i ndi cat ed. Cor r osi on- r esi st ant coat i ngs must be
SECTI ON 21 13 13 Page 13 f act or y- appl i ed by t he spr i nkl er manuf act ur er .
2. 7. 6 Dr y Spr i nkl er Assembl y
Dr y spr i nkl er assembl y must be of t he pendent or s i dewal l t ype as i ndi cat ed. Assembl y must i ncl ude an i nt egr al escut cheon. Maxi mum l engt h must not exceed maxi mum i ndi cat ed i n i t s l i s t i ng. Spr i nkl er must have a pol i shed chr ome f i ni sh.
2. 8 ACCESSORI ES
2. 8. 1 Spr i nkl er Cabi net
Pr ovi de spar e spr i nkl er s i n accor dance wi t h NFPA 13 and must be pl aced i n a sui t abl e met al or pl ast i c cabi net of suf f i c i ent s i ze t o accommodat e al l t he spar e spr i nkl er s and wr enches i n desi gnat ed l ocat i ons. Spar e spr i nkl er s must be r epr esent at i ve of , and i n pr opor t i on t o, t he number of each t ype and t emper at ur e r at i ng of t he spr i nkl er s i nst al l ed as r equi r ed by NFPA 13. At l east one wr ench of each t ype r equi r ed must be pr ovi ded.
2. 8. 2 Pendent Spr i nkl er Escut cheon
Escut cheon must be one- pi ece met al l i c t ype wi t h a dept h of l ess t han 3/ 4- i nch and sui t abl e f or i nst al l at i on on pendent spr i nkl er s. The escut cheon must have a f act or y f i ni sh t hat mat ches t he pendent spr i nkl er .
2. 8. 3 Pi pe Escut cheon
Pr ovi de spl i t hi nge met al pl at es f or pi pi ng ent er i ng wal l s, f l oor s, and cei l i ngs i n exposed spaces. Pr ovi de pol i shed st ai nl ess st eel pl at es or chr omi um- pl at ed f i ni sh on copper al l oy pl at es i n f i ni shed spaces. Pr ovi de pai nt f i ni sh on met al pl at es i n unf i ni shed spaces.
2. 8. 4 Spr i nkl er Guar d
Li st ed guar d must be a st eel wi r e cage desi gned t o encase t he spr i nkl er and pr ot ect i t f r om mechani cal damage. Guar ds must be pr ovi ded on spr i nkl er s l ocat ed wi t hi n 7 f eet of t he f l oor .
2. 8. 5 Rel i ef Val ve
Rel i ef val ves must be l i s t ed and i nst al l ed at t he r i ser i n accor dance wi t h
NFPA 13.
2. 8. 6 Ai r Vent
Ai r vent s must be of t he aut omat i c t ype and pi ped t o dr ai n t o t he bui l di ng ext er i or .
2. 8. 7 I dent i f i cat i on Si gn
Val ve i dent i f i cat i on s i gn must be mi ni mum 6 i nches wi de by 2 i nches hi gh wi t h enamel baked f i ni sh on mi ni mum 18 gage st eel or 0. 024- i nch al umi num wi t h r ed l et t er s on a whi t e backgr ound or whi t e l et t er s on r ed backgr ound. Wor di ng of s i gn must i ncl ude, but not be l i mi t ed t o " mai n dr ai n" , " auxi l i ar y dr ai n" , " i nspect or ' s t est " , " al ar m t est " , " al ar m l i ne" , and si mi l ar wor di ng as r equi r ed t o i dent i f y oper at i onal component s. Wher e t her e i s mor e t han one spr i nkl er syst em, s i gnage must i ncl ude speci f i c det ai l s as t o t he r espect i ve syst em. Al l cont r ol val ves shal l be
SECTI ON 21 13 13 Page 14 i dent i f i ed wi t h per manent s i gns st at i ng " NORMALLY OPEN" or " NORMALLY CLOSED" . Pr ovi de per manent , engr aved, hydr aul i c i nf or mat i on s i gn.
2. 8. 7. 1 Post ed O&M I nst r uct i ons
Pr ovi de post ed O&M i nst r uct i ons, weat her pr oof , f r amed i n heavy gauge ext r uded met al f r ames, mount ed under gl ass. I nst r uct i ons shal l be per manent l y mount ed, compl et e wi t h pr of essi onal l y pr epar ed gr aphi cs, pr i nt ed i n col or on f ul l s i zed sheet s. Pr epar e i nst r uct i ons f or al l syst ems and i ncl ude al l component s. Post ed i nst r uct i ons shal l show, at a mi ni mum:
( a) Compr ehensi ve schemat i c pi pi ng di agr ams i ncl udi ng wat er suppl y, f i r e pump and spr i nkl er syst ems.
( b) Faci l i t y f l oor pl ans showi ng l ocat i on of al l f i r e equi pment and devi ces wi t h coor di nat ed i dent i f i cat i on. Show i t ems such as f i r e bar r i er s, f i r e damper s, et c.
( c) Syst em di agr ams, i ncl udi ng i somet r i cs of speci al equi pment such as f i r e r i ser s and al l appur t enances.
( d) Val ve char t s.
( e) Equi pment schedul e.
( f ) Wi r i ng di agr ams and schemat i cs.
PART 3 EXECUTI ON
3. 1 VERI FYI NG ACTUAL FI ELD CONDI TI ONS
Bef or e commenci ng wor k, exami ne al l adj oi ni ng wor k on whi ch t he cont r act or ' s wor k t hat i s dependent f or per f ect wor kmanshi p accor di ng t o t he i nt ent of t hi s speci f i cat i on sect i on, and r epor t t o t he Cont r act i ng Of f i cer ' s Repr esent at i ve a condi t i on t hat pr event s per f or mance of f i r st c l ass wor k. No " wai ver of r esponsi bi l i t y" f or i ncompl et e, i nadequat e or def ect i ve adj oi ni ng wor k wi l l be consi der ed unl ess not i ce has been f i l ed bef or e submi t t al of a pr oposal .
3. 2 I NSTALLATI ON
The i nst al l at i on must be i n accor dance wi t h t he appl i cabl e pr ovi s i ons of UFC 3- 600- 01, NFPA 13, NFPA 24 and publ i cat i ons r ef er enced t her ei n.
Locat e spr i nkl er s i n a consi st ent pat t er n wi t h cei l i ng gr i d, l i ght s, and ai r suppl y di f f user s. I nst al l spr i nkl er syst em over and under duct s, pi pi ng and pl at f or ms when such equi pment can negat i vel y af f ect or di sr upt t he spr i nkl er di schar ge pat t er n and cover age. Coor di nat e wi t h br i dge cr anes and ot her equi pment .
a. Pi pi ng of f set s, f i t t i ngs, and ot her accessor i es r equi r ed must be f ur ni shed t o pr ovi de a compl et e i nst al l at i on and t o el i mi nat e i nt er f er ence wi t h ot her const r uct i on.
b. Wher ever t he cont r act or ' s wor k i nt er connect s wi t h wor k of ot her t r ades t he Cont r act or must coor di nat e wi t h ot her Cont r act or s t o i nsur e al l Cont r act or s have t he i nf or mat i on necessar y so t hat t hey may pr oper l y i nst al l al l necessar y connect i ons and equi pment . I dent i f y al l wor k i t ems needi ng access ( damper s and si mi l ar equi pment ) t hat ar e conceal ed above hung cei l i ngs by per manent col or coded pi ns/ t abs i n t he cei l i ng di r ect l y bel ow t he i t em.
c. Pr ovi de r equi r ed suppor t s and hanger s f or pi pi ng, condui t , and equi pment so t hat l oadi ng wi l l not exceed al l owabl e l oadi ngs of st r uct ur e. Submi t t al of a bi d must be a deemed r epr esent at i on t hat
SECTI ON 21 13 13 Page 15 t he cont r act or submi t t i ng such bi d has ascer t ai ned al l owabl e l oadi ngs and has i ncl uded i n hi s est i mat es t he cost s associ at ed i n f ur ni shi ng r equi r ed suppor t s.
3. 2. 1 Wast e Removal
At t he concl usi on of each day' s wor k, c l ean up and st ockpi l e on si t e al l wast e, debr i s, and t r ash whi ch may have accumul at ed dur i ng t he day as a r esul t of wor k by t he cont r act or and of hi s pr esence on t he j ob.
Si dewal ks and st r eet s adj oi ni ng t he pr oper t y must be kept br oom cl ean and f r ee of wast e, debr i s, t r ash and obst r uct i ons caused by wor k of t he cont r act or , whi ch wi l l af f ect t he condi t i on and saf et y of st r eet s, wal ks, ut i l i t i es, and pr oper t y.
3. 3 CERTI FI CATI ON BY QUALI FI ED FI RE PROTECTI ON ENGI NEER
Pr i or t o cei l i ng i nst al l at i on and concur r ent wi t h t he Fi nal Accept ance Test Repor t , cer t i f i cat i on by t he QFPE t hat t he spr i nkl er syst em i s i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s, i ncl udi ng si gned appr oval of t he Pr el i mi nar y and Fi nal Accept ance Test Repor t s. The QFPE shal l :
1) I nspect t he spr i nkl er syst em per i odi cal l y dur i ng t he i nst al l at i on t o assur e t hat t he spr i nkl er syst em i s bei ng pr ovi ded and i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s.
2) Wi t ness t he pr el i mi nar y and f i nal t est s and si gn t he t est r esul t s.
3) Af t er compl et i on of t he syst em i nspect i ons and a successf ul f i nal t est , cer t i f y i n wr i t i ng t hat t he syst em has been i nst al l ed i n accor dance wi t h t he cont r act r equi r ement s. Any di scr epancy shal l be br ought t o t he at t ent i on of t he Cont r act i ng Of f i cer i n wr i t i ng, no l at er t han t hr ee wor ki ng days af t er t he di scr epancy i s di scover ed.
3. 4 UNDERGROUND PI PI NG I NSTALLATI ON
The f i r e pr ot ect i on wat er mai n must be l ai d, and j oi nt s anchor ed, i n accor dance wi t h NFPA 24. Mi ni mum dept h of cover must be 7 f eet or 12" bel owt he f r ost l i ne, whi chever i s deeper . Lead- i n shal l be a wel ded st ai nl ess st eel i n- bui l di ng r i ser . The suppl y l i ne must t er mi nat e i nsi de t he bui l di ng wi t h a f l anged pi ece, t he bot t om of whi ch must be set at 12" t o 13" above t he f i ni shed f l oor . A bl i nd f l ange must be i nst al l ed t empor ar i l y on t op of t he f l anged pi ece t o pr event t he ent r ance of f or ei gn mat t er i nt o t he suppl y l i ne. A concr et e t hr ust bl ock must be pr ovi ded at t he el bow wher e t he pi pe t ur ns up t owar d t he f l oor . I n addi t i on, j oi nt s must be anchor ed i n accor dance wi t h NFPA 24. Bur i ed st eel component s must be pr ovi ded wi t h a cor r osi on pr ot ect i ve coat i ng i n accor dance wi t h AWWA C203. Pi pi ng mor e t han 5 f eet out si de t he bui l di ng wal l s must meet t he r equi r ement s of NFPA 24 and t he Ci vi l dr awi ngs and speci f i cat i ons.
3. 5 ABOVEGROUND PI PI NG I NSTALLATI ON
The met hods of f abr i cat i on and i nst al l at i on of t he abovegr ound pi pi ng must f ul l y compl y wi t h t he r equi r ement s and r ecommended pr act i ces of NFPA 13 and t hi s speci f i cat i on sect i on.
3. 5. 1 Pr ot ect i on of Pi pi ng Agai nst Damage
Sei smi c r est r ai nt i s not r equi r ed f or spr i nkl er pi pi ng. Br ace equi pment
SECTI ON 21 13 13 Page 16 over 30 pounds f or f or ce pr ot ect i on.
3. 5. 2 Pi pi ng i n Exposed Ar eas
I nst al l exposed pi pi ng wi t hout di mi ni shi ng exi t access wi dt hs, cor r i dor s or equi pment access. Exposed hor i zont al pi pi ng, i ncl udi ng dr ai n pi pi ng, must be i nst al l ed t o pr ovi de maxi mum headr oom.
3. 5. 3 Pi pi ng i n Fi ni shed Ar eas
I n ar eas wi t…