Questions and Answers 03.pdf
PDF 434 KB Posted
- Attached to
- F-35 Alter B412 Flow -Through Aircraft Shelter
- Solicitation number
- W50S9F22R0003
- Issued by
-
Department of the Army National Guard
About this file
This document contains questions and answers related to a federal contract solicitation for alterations to an F-35 aircraft shelter. Key details include:
-
The solicitation is for alterations to an existing F-16 maintenance hangar at Dane County Regional Airport in Madison, WI to accommodate F-35 operations. Work includes modifications for 270VDC power to parking spots, ducting and power for aircraft avionics cooling, upgrades to the lightning protection system, rooftop and aircraft maintenance fall protection, and upgrades to the fire detection/suppression and security systems.
-
The solicitation will result in a single firm fixed-price construction contract. An option is included for security equipment. The period of performance is 180 days from notice to proceed. The estimated value is between $5-10 million. The NAICS code is 236220 with a size standard of $39.5 million.
-
A pre-proposal conference and site visit will be held on April 8, 2022. The solicitation closing date is April 1, 2022 and the source selection process will follow FAR Part 15 procedures evaluating technical, past performance and price factors. The government intends to award without discussions.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S9F22R0003; Alter B412 Q&A #03
19. UPDATED RESPONSE: Note 1/T102 - Please provide approximate length to server room in base ops in B404. Please confirm existing conduit that we are run fiber in runs.
A. Chord Lengths:
B412-MH0035: 45.01ft MH0035-MH0032: 160.10ft MH0032-MH0033: 320.54ft MH0033-B404: 171.56ft Total Length: 697.21ft
* Does not include length in manholes, length from building entrance to termination, or any maintenance loops. Contractor shall field verify the actual length of cable.
20. Please provide the existing roofing information – type, thickness, manufacturer, warranty?
A. See document Supplemental Information Document: XGFG112032 Repair B412, Alert Shelters -
EPDM Roof Submittal
21. Preaction System As-Builts - Are as-built drawings (showing the existing pipe sizing, pipe layout, sprinkler head locations) of the existing preaction fire suppression system available? These are necessary to determine what upgrades are required to the existing piping system to meet the proposed increased design density. They will also assist in determining the extent of work required to reroute piping for the new structural steel.
A. See document Suplemental Information Documents:
"B412 XGFG022024B&C Upgrade B412 Fire Supression System (2014)" "B412 XGFG022024B&C Wolverine Fire Protection (2014)"
22. High Expansion Foam System As-Builts - Are as-built drawings (showing the existing pipe sizing, pipe layout, foam generator locations) of the existing high expansion foam system available? These would assist with determining the extent of demolition work required. They will also assist in determining the amount of foam that must be disposed of.
A. See question 18.
23. High Expansion Foam System Signage - Drawing FX401 Sheet Keynote number one references installing signage at the foam concentrate tank. The other drawings indicate the high expansion foam system is being removed. Please confirm that the signage is not required.
A. Contract Drawing FX401 was deleted from the 02/18/2022 Issued For Bid set. High expansion foam systems and associated signage are not required.
24. The one line diagram on page on E701, on the new one line. On the electrical power plans they do not show any generator or ATS as shown on E701.
A. Existing generator to remain. New ATS to be located beside existing panel D.
25. Is it assumed the existing ground loop & Lighting protection system meets the standards laid out on the plans?
A. Yes, the current system meets standards.
26. Is Monaco the FA supplier? For parts and smarts?
A. Provide a Monaco MAAP-X FACU/ACU/FAC and a Det-Tronics Eagle Quantum Premier RSFACU in accordance with Contract Drawing FA001 General Note 1. Provide Det-Tronics
X3301 optical flame detectors in accordance with Contract Specification 28 31 76 section 2.10.
The contract documents do not require other fire alarm equipment to be by a specific manufacturer.
Provide equipment and devices in accordance with the fire alarm Contract Drawings and Contract Specification 28 31 76. All equipment and devices shall be compatible and operable with existing supervising station fire alarm system and shall not impair reliability of operational functions of existing supervising station fire alarm system per 28 31 76 section 1.7.
27. Are MG&E charges by WANG? Please confirm A. All costs associated with MG&E are contract costs. The Government does not have the ability to pay for MG&E costs outside of the construction contract.
28. General notes on T101 say that Advantor the security vendor, we shall get a price from them for the installation of this part, but on page T102 it says we are only supposed to sleeve the items for the government’s security vendor to do the installation, please advise what page is correct? Also if we are to provide a price for the system a contact to reach directly A. General Notes on T-101 shall read as follows:
1. REFER TO SHEETS T-001 AND T-002 FOR ELECTRICAL LEGEND.
2. INSTALL RACEWAYS, BOXES AND ASSOCIATE COMPONENTS FOR
GOVERNMENT FURNISHED SECURITY SYSTEM.
3. THE SECURITY AND CCTV EQUIPEMENT SHALL BE PROVIDED BY ADVANTOR.
ADVANTOR SHALL DO INTALLATION AND TESTING OF ALL SECUIRTY AND CCTV
SYSTEMS.
4. NOT ALL EXISTING OUTLET AND COMM DEVICES ARE SHOWN. IF DEVICE ARE
SHOWN LOCATIONS ARE BASED OFF AS BUILT DRAWINGS. THE CONTRACTOR
SHALL FIELD LOCATION.
The Government will provide the contractor with Advantor's submittal post-award.
29. A4 270V DC Input 480V/150A 3P Receptacle please provide more information on specific model required. Shown on one line E701 A. Refer to detail A1 on sheet E-501 for receptacle A4, B4, C4 and D4 detail.
30. I would to clarify if it includes any epoxy flooring.
A. Epoxy flooring is not considered in the scope of work.
File details come from the government source that posted it. Updated .