This document provides details for a federal contract solicitation seeking construction services to modify an existing aircraft maintenance hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The solicitation requests proposals to alter approximately 39,261 square feet of an F-16 hangar to accommodate F-35 operations, including bringing 270VDC power to parking spots and adding ducting/cooling, upgrading the lightning protection system, and adding rooftop and aircraft maintenance fall protection. Additional work includes minor demolition, utility improvements, interior fall protection, upgraded fire detection/suppression, specialized aircraft mechanical and electrical systems, and modified security and technology systems. Proposals are due by May 5, 2022. The contract will be a fixed-price construction contract awarded using a best value determination considering technical evaluation, past performance, and price factors. The North American Industry Classification System code is 236220 and the project magnitude is estimated between $5-10 million.

View the file

Other files

File Type Posted
W50S9F-22-R-0003_00002 Conform.pdf PDF
W50S9F-22-R-0003_00002.pdf PDF
B412 XGFG052008 Install IR Heaters_2005.pdf PDF
Questions and Answers 05.pdf PDF
IMG-2699.jpg JPG image
IMG-2698.jpg JPG image
XGFG112032 Repair B412 Alert Shelters - EPDM Roof Submittal.pdf PDF
Questions and Answers 04.pdf PDF
IMG-2700.jpg JPG image
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE v1.docx DOCX document
Drawing for Q and A 03 Question 24.jpg JPG image
Questions and Answers 03.pdf PDF
B412 XGFG022024B and C Wolverine Fire Protection_2014.pdf PDF
B412 XGFG 022024B and C Upgrade B412 Fire Supression System_2014.pdf PDF
EXHIBIT G PROPOSAL PRICE SCHEDULE v1.docx DOCX document
Questions and Answers 02.pdf PDF
W50S9F-22-R-0003_00001.pdf PDF
412 Pre Proposal Minutes 08Apr22.pdf PDF
Questions and Answers 01.pdf PDF
Site Visit Attendance Sheet.pdf PDF
ATTACHMENT 04 XGFG182004 F35 Alter B412 LBP and Asbestos Results.pdf PDF
ATTACHMENT 08 PRE PROPOSAL SITE VISIT DROP OFF INSTRUCTIONS.pdf PDF
EXHIBIT F SUBCONTRACTING PLAN FORMAT.docx DOCX document
ATTACHMENT 05 XGFG182004 Single Source Determination Monaco_Redacted.pdf PDF
EXHIBIT G PROPOSAL PRICE SCHEDULE.docx DOCX document
EXHIBIT D PAST PERFORMANCE REFERENCE QUESTIONNAIRE.docx DOCX document
EXHIBIT B SUBCONTRACTOR TEAM KEY PERSONNEL INFORMATION AND CONSENT FORM.doc DOC document
ATTACHMENT 02 XGFG182004 F 35 Alter B412 Drawings.pdf PDF
ATTACHMENT 03 XGFG182004 F35 Alter B412 Geotechnical Results.pdf PDF
ATTACHMENT 06 XGFG182004 Single Source Determination Marshall Best_Redacted.pdf PDF
ATTACHMENT 07 SFS FORM 12.xlsx XLSX spreadsheet
EXHIBIT C LETTER OF COMMITMENT.docx DOCX document
EXHIBIT A PERFORMANCE RELEVANCY QUESTIONNAIRE AND SPECIALIZED COMPANY EXPERIENCE.docx DOCX document
ATTACHMENT 01 XGFG182004 F35 Alter B412 Plans and Specifications.pdf PDF
W50S9F-22-R-0003.pdf PDF
EXHIBIT E SMALL BUSINESS PARTICIPATION PLAN FORMAT.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wisconsin Air National Guard Solicitation W50S9F-22-R-0003

W5S09F-22-R-0003 Alter F-35 B412 Flow-Through Aircraft Shelter08 April 2022 Project No. XGFG182004

PRE-PROPOSAL CONFERENCE

Construction Location 115th Fighter Wing Truax Field ANGB Madison, Wisconsin

INTRODUCTION

MSgt Kate Fox: Procurement Contracting Officer

TSgt Josh King: Contract Specialist

2d Lt Cory Corson: Civil Engineer, Contracting Officer Representative

Lt Col Mike Dunlap: Base Civil Engineer/Commander

Scope (work) of Contract Project is being solicited as an Unrestricted action

The Contract will be awarded using Tradeoff Source Selection Procedures resulting in the Best Value to the Government

Evaluation Factors – Technical, Past/Present Performance, Small Business Participation and Price

Period of Performance Base

180 Days after Notice to Proceed (NTP)

Contract Line Item Number (CLIN) Structure:

Base = CLIN 0001

SOLICITATION, PLANS & SPECIFICATIONS

Website – https://beta.sam.gov

Solicitation & Amendments

Exhibits

Questions & Answers (Q&A) Document

Check Regularly

Specifications & Plans/Drawings

Attachments

IMPORTANT REMINDER

The following is a brief overview of the proposal requirements

The Government intends to award without discussions and there may not be a chance for discussions, corrections, or revised proposals.

DISCLAIMER

Offerors are strongly cautioned to carefully read ALL the requirements of the solicitation and comply accordingly.

Proposal Evaluation Evaluation Factors for Award is detailed in RFP section 00120

Carefully review section 00120 when preparing proposal

Comply with section 00100 and 00110 requirements

Failure to furnish a complete proposal may result in elimination from consideration

BEST VALUE

Best value is defined as an award based on the greatest overall benefit in response to the requirement. Award is based on price and other non-cot related factors.

Award in this process does not necessarily mean the lowest price wins

Evaluation Factors and Relative Importance

I KNOW YOU ARE ALL ANXIOUS TO GET TO THE SITE, HOWEVER, KNOWING HOW YOUR PROPOSALS ARE GOING TO BE EVALUATED AND KNOWING WHAT TO SUBMIT IS JUST AS IMPORTANT. YOUR PROPOSAL CAN BE ELIMINATED IF YOU DO NOT FOLLOW THE PROPOSAL INSTRUCTIONS. SO PLEASE STICK WITH ME IN THE COMING SLIDES.

Factor 1, Technical Merit

Factor 2, Past/Present Performance

Factor 2 is approximately equal to Factor 3

Factor 3, Small Business Participation

Factor 3 is approximately equal to Factor 2

Price

Factor 1 is approximately equal to Factor 2 and Factor 3 combined (The subfactors 1-4 will be rated in descending order of importance with Subfactor 1, Experience and Capability, being the most important.)

Not rated

Price evaluation will determine if the proposed prices are fair and reasonable

Sub-factor 1, Experience and Capability

Sub-factor 3, Commissioning Approach/Timeline

Sub-factor 4, Quality Control

Sub-factor 2, Construction Schedule

SUBMISSION REQUIREMENTS

Section 00110 of the RFP Details the Required Information and Format of the Proposal Proposal 5 Volumes (2 CD/DVD) or submit through Solicitation Portal on Procurement Integrated Enterprise Environnent (PIEE) (https://piee.eb.mil/) Volume 1 – Technical Proposal Volume 2 – Past/Present Performance Volume 3 – Small Business Participation Plan Volume 4 - Price Proposal (to include bid schedule) & Pro forma Volume 5 – Solicitation, Offer and Award Documents, and Certifications/Representations

READ THROUGH THOROUGHLY FOR SUBMISSION REQUIREMENTS. ONLY GIVING SUMMARY OF REQUIREMENTS IN THIS SLIDE PRESENTATION, YOU MUST FOLLOW THE PROPOSAL. THIS SLIDE SHOW IS NOT BINDING. THE SUBMISSIONS DO NOT HAVE TO BE FANCY. WE ARE NOT EVALUATING ON HOW MANY GRAPHICS YOU INCLUDE OR HOW FANCY YOUR BINDERS ARE.

Volume 1– TECHNICAL

NO PRICES/COST IN THIS VOLUME

Sub-Factor 1Max No. of Pages
Experience & Capability10 single pages. If more than 10 submitted, only first 10 pages will be evaluated.
Key personnel2 single pages for each key personnel resume. Same as above is submit more than 2.
Sub-Factor 2Max No. of Pages
Construction ScheduleSchedule is not subject to page limits, Gantt Chart with Notice to Proceed of June 22, 2022. Any narrative limited to 5 pages, excluding tabs and indexes
Sub-Factor 3Max No. of Pages
Commissioning ApproachSubmission limited to 5 pages
Sub-Factor 4Max No. of Pages
Quality ControlNarrative limited to 5 pages

Volume 1– TECHNICAL

NO PRICES/COST IN THIS VOLUME

Submission Requirements

Demonstrated Experience

Min of 2 max of 5 completed or currently well underway projects.

Turn over no more than 6 years preceding this solicitation

Letters of Commitments from subcontractors, Exhibit D

Exhibit A-Performance Relevancy Questionnaire

Key Personnel

Project Manager, Site Superintendent, Quality Control Manager and Safety Manager

Section 01000 for min qualifications

Exhibit B-Subcontractor/Team/ Key Personnel Info and Consent Form

Letter of commitments from subcontractors, Exhibit D

Technical Approach Plan

Will be incorporated into the contract

Complete all topics listed (a – h)

Construction Schedule

Gantt chart

Estimated NTP date

Within period of performance in 52.211-10

Volume 1 – TECHNICAL

Technical Ratings (Section 00120):

Utilizes combined technical/risk rating method descriptions

VOLUME 2

PAST/PRESENT PERFROMANCE INFORMATION

Past/Present Performance

25 Page Maximum. Pages exceeding will not be reviewed.

Within 6 years preceding this solicitation

Performance Relevancy Questionnaire, Exhibit A. No more than 5

Reference Package, Exhibit D

JVs and Formal Teaming Agreements: each company shall complete Exhibit A and obtain Exhibit D

Consider the currency and the relevancy

Final CPARS in lieu of references packages for a project

Key Personnel may be evaluated

Gov may use: PPIRS, FAPIIS, eSRS, interviews or personal business experience

Current/on-going performance complete to 75% or greater

Volume 2– PAST/PRESENT PERFORMANCE INFORMATION

Exhibit A – Part 1 – Performance Relevancy Questionnaire Use Exhibit Format Complete no more than five (5) forms for Relevant Contracts Quality > Quantity Completed or Substantially Completed (75%) in the last six (6) years Send Questionnaires for the Exhibit A Projects to your references Do this Early! – Must be received by the Contracting office by the solicitation close date

Exhibit A - Part 2 –Provide the following one (1) time:

Describe compliance with FAR 52.219-8, Utilization of Small Businesses (2A) 2B problems/corrective actions 2C assessed Liq Dam in last 6yrs 2D terminated projects in last 6yrs 2E compliance with safety standards Exhibit D – Reference Questionnaire Package “Prepare & submit to the owners of the projects listed in Exhibit A”

Volume 2 Past/Present Performance (cont.)

If you do not have relevant past/present performance and are using the experience of key personnel, predecessor companies or subcontractors, ensure you clearly state this in the proposal.

In order to consider the work of subs and teaming partners not currently employed by proposing contractor, the subcontractor must complete Exhibit B – Information and Consent form.

Volume 2 – Part II Past/Present Performance Information

Past/Present Performance Ratings (Section 00120):

Volume 3 - Small Business Participation/Subcontracting Plan

Small Business Participation Plan

Offerors shall use Exhibit E

Offerors shall identify to extent to which all listed SB categories in the solicitation will be utilized

Goals are an estimated percentage of total contract dollars (total proposed amount including options)

This is not a subcontracting plan and it is required from both, small businesses and large businesses.

Min goals for each category are identified in Section 00120 of the solicitation

Volume 3 - Small Business Participation/Subcontracting Plan

Small Business Subcontracting Plan

Offerors may use Exhibit F

In accordance with AFARS Appendix DD and FAR Clause 52.219-9, Will be incorporated into the contract upon award of the contract

ONLY required for large businesses.

Min goals for each category are identified in Section 00120 of the solicitation

Volume 3 Small Business Participation Plan Small Business Participation Plan Ratings (Section 00120):

Volume 4 Cost/Price Info Basis of Estimate

Exhibit G – Proposal Price Schedule

Original Bid Bond & Power of Attorney

Volume 5 Solicitation, Offer and Award Docs and Reps and Certs Section 00110- Introductory Page. Refer to paragraph 3.1.5.1 for details.

Offer-SF 1442, Offeror portion, Blocks 14 to 20c

Put pricing in CLINs in Section 00010

Section 00600 – Representations & Certifications Complete Reps & certs on sam.gov Complete & return Reps & Certs in Section 00600

Executed Joint Venture Agreement (if applicable)

Important Reminders Award is contemplated to be made without discussions. Do not anticipate a chance to make corrections or changes.

Your first proposal will probably be your ONLY proposal.

Read the solicitation requirements carefully and then read them again. Read through all the exhibits.

Consider using Sections 001100 and 00120 to “rate” yourself before submitting the proposal. Is it complete?

When using a subcontractor to obtain/enhance relevancy provide Subcontractor Information and Consent Form (Exhibit B) and provide a Letter of Commitment (Exhibit C) or it will NOT be considered.

The subcontractors you submit with your proposal have to be used for the project after award.

Submit a complete proposal in accordance with instructions-use formats provided.

Prime Contractors are responsible for coordination among the divisions with subcontractors.

All amendments will be posted on PIEE and sam.gov-only OFFICIAL sites where information will be disseminated.

After closing, no information will be available until award.

Award will be posted to Sam.gov.

PLEASE DO NOT CONTACT THE CONTRACTING OFFICE REGARDING AWARD. WE CANNOT GIVE RESULTS OVER THE PHONE NOR GIVE A TIME FRAME FOR AWARD. YOU WILL HAVE TO CHACK BETA.SAM.

Page 2 of SF 1442, acknowledge all amendments.

IF DO NOT ACKNOWLEDGE AMENDMENTS, CAN BE ELIMINATED.

How Questions Will be Handled See Section 00100 paragraph 3 for details.

Questions and RFIs are due NLT fifth day prior to closing (COB Thursday, April 28th).

Answers to questions should be posted not later than two working days prior to closing (COB May 3)

DO NOT call technical personnel or AE directly.

Amendments will only be issued if there is a change in the solicitation, specifications, or plans.

How Questions Will be Handled

TODAY

We will not be answering any questions today. You must submit them in writing following the process in the solicitation. This gives everyone, even those who are not attending this conference, an opportunity to see the Q&A’s.

PLEASE, read through everything first before submitting questions. Do not read through a section, send a question, read through another section, and send a question….

Answers to Questions All questions and answers will be posted on sam.gov.

Will not be answering directly to emailed questions. Check sam.gov regularly for Q&A’s.

If there are necessary addendums, they will be issued by an amendment and posted.

Helpful Websites https://beta.sam.gov Solicitation posting, amendments, Q&A’s Wage determination https://www.acquisition.gov FAR/DFAR/AFAR-Clauses https://sam.gov Must be registered when submit proposal or will be disqualified https://piee.eb.mil Procurement Integrated Enterprise Environment (PIEE)

Procurement Integrated Enterprise Environment (PIEE) https://piee.eb.mil

WAWF

Solicitation Module Web Based Training (WBT) Please leave enough time to make sure it is submitted

Proposal Due Dates Proposal Due 3:00PM CT on Thursday May 5, 2022 Don’t forget to have references sent in by this time

Proposal MUST be signed by Officer of your Company

No Facsimile

Address in proposal if sending. If sending, please email me the tracking number

Instructions for drop off are in Attachment 12. Must contact me by 1:00PM on May 4th if dropping off.

Wisconsin Air National Guard image3.png image4.png image1.png image5.png image6.png image7.png image8.png image9.png image10.jpeg image2.png

File details come from the government source that posted it. Updated .