This document contains Questions and Answers (Q&A) 43-45 for the W50S97-25-B-A002 Construct Network Control Center solicitation. The Q&A addresses three specific contractor inquiries: (1) a request for drawings related to wireless access points (WAPs) and cameras, (2) detailed questions about Antiterrorism/Force Protection doors and frames, including pressure ratings, performance specifications, and seating requirements, and (3) a request to modify a specific manufacturer certification requirement for telecommunications contractors.
The document also elaborates on contractor certification requirements, specifically detailing the need for telecommunications contractors to have Certified Installer Plus (CIP) certification, BICSI certifications, and optical fiber training. At least 30% of the installation and termination crew must be certified by BICSI and have optical fiber training. The certifications are described as standard industry certifications that require passing an exam, including CompTIA A+ (a general IT knowledge exam) and BICSI Installer Levels 1 and 2, which validate knowledge in information and communications technology (ICT) systems and structured cabling installation.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W50S97-25-B-A002 Construct Network Control Center Questions and Answers 43-45
43. Due to no drawings for the data drops; Will there be any WAPs or Cameras? If so please provide those drawings. (Section/Sheet IT5.1)
a. See BNCC Q-43 PDF
44. We’re having trouble getting the Antiterrorism/Force Protection Doors and Frames quoted from our manufacturer because of lack of specifics. Is there a specification available for the blast doors? If not, are we able to get answers for the following questions?
a. Pressure rating (PSI / PSF) and duration (psi-ms) OR standoff distance / weight charge (I or II). In addition to door specification, all new exterior doors and frames to meet Antiterrorism/force protection requirements from Section 3-11.1 of UFC 4-010-01.
b. How are the doors to perform after an occurrence? (Level of Protection) In addition to door specification, all new exterior doors and frames to meet Antiterrorism/force protection requirements from Section 3-11.1 of UFC 4-
10-01.
c. Are the doors seated or unseated? In addition to door specification, all new exterior doors and frames to meet Antiterrorism/force protection requirements from Section 3-11.1 of UFC 4-010-01.
45.Request this requirement be deleted. I believe this is a specific manufacturers certification (Legrand), but we didn’t recall seeing Legrand being a sole source requirement. If not deleted, request other manufacturers certification be used as a suitable substitute. For example, a “Certified Alliance Partner in Belden’s Installer Program.” And I expect each manufacturer has similar programs with slightly different standards.
04.12.24 TELEPHONE AND COMPUTER WIRING 27 01 00-3
1.5 APPROVED CONTRACTOR
A. The Telecommunications contractor must be an approved Certified Installer Plus (CIP). A copy of certification documents must be submitted with the quote in order for such quote to be valid. The Telecommunications contractor is responsible for workmanship and installation practices in accordance with the product manufacturer they use. At least 30 percent of the installation and termination crew
W50S97-25-B-A002 Construct Network Control Center Questions and Answers 43-45 must be certified by BICSI and at least 30 percent of the installation and termination crew must be certified by approved organizations in Optical Fiber Training.
These are both Standard Industry Certifications, listed so as not to cause reliance on a single vendor type Certification. Both only require passing an exam to complete.
CIP A+ is a general IT knowledge exam.
BICSI has Several levels depending on the required work, However both Installer Levels are exam-based Certifications
"CIP A+" refers to the CompTIA A+ certification.
CompTIA A+ is a widely recognized IT certification focused on foundational IT skills like hardware, operating systems, and networking.
"BICSI" Installer 1 is a non-renewable certificate. It demonstrates entry-level knowledge and skills to install information and communications technology (ICT) systems. The certificate validates basic knowledge in the proper and most current methods of installing ICT-related cabling within the confines of a commercial building structure.
"BICSI" Installer 2, Optical Fiber Installers are skilled at working with structured cabling systems (SCS) and network components. Optical fiber installers perform duties in compliance with industry best practices, BICSI methodologies, standards, and codes.