4. BKTZ222001 Construct NCC Submittals Matrix.pdf

PDF 136 KB Posted

Attached to
Construct Network Control Center Federal contract opportunity
Solicitation number
W50S97-25-B-A002
Issued by
Department of the Army National Guard

About this file

This document is a comprehensive Submittals Matrix for a construction project to build a Network Control Center at Berry Field Air National Guard Base. The matrix details specific documentation requirements for each specification section, ranging from earthwork and concrete to mechanical and electrical systems. Key submittal requirements include product data, shop drawings, warranties, certifications (notably Buy American Certification), test reports, installation instructions, and samples across multiple construction disciplines.

The matrix is part of the solicitation W50S97-25-B-A002, which is a 100% small business set-aside contract for constructing an approximately 1,500 square foot building. The project has a 365-calendar day completion timeline with an estimated value between $1-5 million. Unique aspects include sole-source/brand-specific systems like Automated Logic Energy Management System, Vertiv Liebert Computer Room Air Conditioning units, and Monaco fire system. The pre-bid conference is tentatively scheduled for 16 July 2025, with a bid opening planned around 1 August 2025, and all interested contractors must be registered in the System for Award Management (SAM).

View the file

Other files for this federal contract opportunity

Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BKTZ222001

SECTION 01 33 23

SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES

04.12.24 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 23-1

Specification Section

Title

Submittals Required

01 11 00 Summary of Work • None

01 26 20 Weather Delays • Daily work logs

• Weather data to support claims

01 31 13 Coordination • Written authorization from Contracting Officer if superintendence changes

01 31 19 Project Meetings • Prepare/Distribute Project Meeting Agenda

• Prepare/Distribute Project Meeting Minutes

01 33 00 Submittals

• Progress Reports on AF Form 3065

• CPM Construction Schedule

• Applications for Payment (Monthly)

• Chronological Material Submittal Schedule within 10 days of NTP

• Samples

• Mock-Ups

• Standards except as noted

• Record Documents

• Operating and Maintenance Data

• Materials and Tools

01 41 00 Regulatory Requirements • None

01 45 00 Quality Control Services • Submit 3 materials testing firms

• Written Reports per “Report Data”

01 50 00 Temporary Facilities and Controls

• None

01 60 00 Product Requirements • As required per 01 33 00

01 74 19 Construct Waste Management & Disposal

• Waste Management Plan

• Waste Disposal Reports

• Landfill Alternatives Proposal

01 77 00

Closeout Procedures

• Final Payment Request

• AIA Document G706 (Contractor’s Affidavit of

Payment of Debts and Claims)

• AIA Document G706A (Contractor’s Affidavit of

Release of Liens)

• AIA Document G707 (Consent of Surety Company to Final Payment)

• Final Progress Report (AF Form 3065)

• 3 Copies O & M Manuals

• Project Record Documents

• Equipment Listing and Warranties

• Roofing Description and Warranties

01 78 23 Operation and Maintenance Data

• 2 Copies of Preliminary Draft of Proposed O & M Manuals

• 3 Copies of O & M Manuals 01 78 39 Project Record Documents • Submit Record Documents

02 41 00 Site Demolition • Contractor qualifications

• Applicable Permits

03 11 19 Insulating Concrete Forming

• ICF Product Name

• Credentials of Installer

• Test & Evaluation Reports

• Manufacturers’ Instructions

04.12.24 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 23-2

• Form Alignment System Engineering

• Shop Drawings

• Delegated-Design Submittal

• Warranty Documentation

• Maintenance Instructions

• Mock-up

03 20 00 Concrete Reinforcement

• Warranty

• Shop Drawings

• AWS Qualifications

03 30 00

Cast In Place Concrete

• Mix Designs

• Test Reports

• Pre-Concrete Conference Minutes

05 12 00 Structural Steel

• List of Previous Projects

• Product Data

• Shop Drawings

• AWS Qualifications

• Mill Certification that steel meets specifications

• Electrode manufacturer’s certification

• Test Reports

• Buy American Certificate

05 17 00 Misc. Steel

• Shop Drawings

• AWS Qualifications

• Erection sequence

• Mill Certification that steel meets specifications

• Electrode manufacturer’s certification

• Product Data

05 19 00 Handrails

• Shop Drawings

• Product Data

• Buy American Certification

05 30 00 Steel Decking

• Shop Drawings

• Load Tables for Supplied Product

• Size and Location of deck units

• Welding and screw patterns

• Sizes and location of holes

• AWS Qualifications

• Product Data

05 40 00 Cold-Formed Metal Framing • Manufacturer’s data

05 40 10 Light Gauge Steel Trusses

• Product Data

• Shop Drawings

• Installation Instructions

06 10 00 Rough Carpentry • Product Data

• Buy American Certification

07 13 00 Sheet Waterproofing

• Product Data

• Installation Instructions

• Warranty

• Buy American Certification

07 21 00 Thermal Insulation

• Product Data

• Installation Instructions

• Samples

• Buy American Certificate

07 22 20 Roof Boards

• Product Data

• Installation Instructions

• Sample Warranty

04.12.24 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 23-3

• Buy American Certificate

07 24 00 Exterior Insulation & Finish System

• Product Data

• Evaluation Reports and Certificates

• Samples

• Warranty

• Mock-Ups

07 25 00 Weather Barriers

• Product Data

• Shop Drawings

• Installation Instruction

• ABAA Manufacturer Qualification

• Buy American Certification

07 61 00 Sheet Metal Roofing

• Shop Drawings

• Samples

• Performance Test Results

• Engineer’s Sealed Calculations

• Manufacturer’s Certifications

• Warranty

• Buy America Certification

07 62 00 Sheet Metal Flashing and Trim

• Shop Drawings

• Samples

• Buy American Certification

07 90 00 Joint Sealants

• Product Data

• Technical Data Sheets

• Color Cards

• Buy American Certification

08 11 13 Hollow Metal Doors and Frames

• Product Data

• Shop Drawings

• Installation Instructions

• Buy American Certification

08 43 14 Aluminum-Framed Storefronts

• Product Data

• Shop Drawings

• Samples

• Buy American Certification

08 71 00 Door Hardware

• Product Data

• Hardware Schedules

• Keying Schedule

• Manufacturer’s Installation Instructions

• Maintenance Data

• Keys

• Warranty

• Project Record Documents

• Maintenance Materials and Tools

• Furnish Templates

• Buy American Certification

08 80 00 Glazing

• Product Data

• Samples

• Certification

• Warranty

• Buy American Certification

09 21 00 Gypsum Board Assemblies • Product Data

• Buy American Certification

09 22 16 Non-Structural Metal Framing

• Manufacturer’s Specifications

• Installation Instructions

04.12.24 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 23-4

• Buy American Certification

09 51 00 Acoustical Ceilings

• Product Data

• Samples

• Manufacturer’s Certifications

• Buy American Certification

09 65 00 Resilient Flooring

• Product Data

• Samples

• Manufacturer’s Installation Instructions

• Buy American Certification

09 69 00 Access Flooring

• Product Data

• Shop Drawings

• Manufacturer’s Certificate

• Maintenance Materials

• Buy American Certification

09 83 00 Acoustic Finishes

• Manufacturer’s Specifications

• Installation Instructions

• Buy American Certification

09 90 00 Paints and Coatings

• Product Data

• Samples

• Environmental Requirements

• Buy American Certification

10 28 00 Toilet, Bath, and Laundry Accessories

• Product Data

• Schedule of Accessories

• Installation Instructions

• Buy American Certification

10 44 00 Fire Protection Specialties

• Product Data

• Installation Instructions

• Buy American Certification

10 73 16 Canopies

• Product Data

• Shop Drawings

• Design Data

• Warranty

• Buy American Certification

Division 22 Plumbing

• Product Data

• Shop Drawings

• Warranty Description ALL submittal for this division in a single package and submitted with Mechanical, Fire Suppression and Electrical.

Division 23 HVAC

• Product Data

• Shop Drawings

• Warranty Description

• Voltages Clearly Identified ALL submittal for this division in a single package and submitted with Plumbing, Fire Suppression, and Electrical.

Division 26 Electrical

• Product Data

• Shop Drawings

• Warranty Description ALL submittal for this division in a single package and submitted with Mechanical, Fire Suppression, and Plumbing.

Division 27 Communications • Product Data

04.12.24 SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES 01 33 23-5

• Shop Drawings

• Warranty Description

• Testing and Acceptance Reports

31 00 00 Earthwork • Geotextile Fabric

• Compaction Tests

32 16 19 Concrete Curbs, Gutters, & Sidewalks

• Compressive Strength Test Reports

32 17 23 Pavement Markings • Product Data

• Manufacturer’s Installation Instruction

33 11 00 Water Distribution System • Product Data

• Buy American Certificate

33 30 00 Sanitary Sewer System • Product Data

• Buy American Certificate

33 40 00 Storm Drainage Facilities • Product Data

• Buy American Certificate

File details come from the government source that posted it. Updated .