About this file

This document is a Bid Question and Answer (Q&A) log for the Installation Entry Control (Main Gate) Facility project. The log contains 37 questions and corresponding answers addressing various technical and administrative aspects of the solicitation, including proposal submission requirements, exhibit documentation, subcontractor information, project management details, and technical specifications. Key clarifications include guidance on proposal volume composition (limited to 10 pages), acceptable past performance documentation, weather barrier installation options, project management software requirements, ballistic protection level (UL 752 Level III), logo specifications, communication and security system infrastructure details, and equipment substitution rules. The Q&A log provides contractors with critical interpretive information to help them prepare accurate and compliant bid responses for this small business set-aside construction project for the NJ Air National Guard.

View the file

Other files for this federal contract opportunity

Other files attached to Installation Entry Control (Main Gate) Facility, newest first.
File Type Posted
Atlantic City ANGB ECF Addendum 03.pdf PDF
Bulletin 20-01 - Active Vehicle Barrier (AVB) Safety Schemes.pdf PDF
Atlantic City ANGB ECF Addendum 02.pdf PDF
Solicitation Amendment W50S8F25RA0100003 SF 30.pdf PDF
FINAL COPY 16May25 BID RFI LOG-ENTRY CONTROL FACILITY-ATLANTIC CITY ANGB.pdf PDF
Solicitation Amendment W50S8F25RA0100002 SF 30.pdf PDF
Atlantic City ANGB ECF Addendum 01.pdf PDF
Solicitation Amendment W50S8F25RA0100001 SF 30.pdf PDF
Wage Determinations NJ20250025 2 May 2025.pdf PDF
Projectmates_Mng_Software_Pricing.pdf PDF
Attendance Record-01 May 2025.pdf PDF
Main Gate Pre-Proposal Conference.pdf PDF
Solicitation - W50S8F25RA010.pdf PDF
Solicitation - W50S8F25RA010.pdf PDF
Attachment 1 - Vol 2 Specifications AQRC169009 Installation ECF B3.pdf PDF
Exhibit A Installation Entry Control (Main Gate) Facility.docx DOCX document
Attachment 1 - Vol 1 Specifications AQRC169009 Installation ECF B3.pdf PDF
Attachment 3 - Installation Entry Contro (Main Gate)l Facility - SOW AQRC169009.pdf PDF
EXHIBIT C Reference Questionnaire Package - Inst Entry Ctrl Fac.docx DOCX document
EXHIBIT B Installation Entry Control (Main Gate) Facility.docx DOCX document
Limited Source Justification FAR Part 8.pdf_Redacted.pdf PDF
Attachment 2 -Drawings NJANG ECF B3 FINAL - FULL SET with Options.pdf PDF
Exhibit D_Letter of Commitment.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Question Answer and Comment

2.5.2. VOLUME 2, PART 1, subfactor 1, Experience & Capability: Kindly confirm that this factor will include below items only:

-Experience: Exhibit A of (3-5 relevant Projects) -Capability: experience of key construction personnel , EXHIBIT B, EXHIBIT D

Exhibits are the minimum requirement. The intent is to provide a narrative discussing the experience of key personnel. Experience and capability proposal is limited to 10 single pages. Review section 00 22 16 2.1.1

Do we need to submit Exhibit ’B’ only if intendent person is not a part of organization? or we need to include EXHIBIT B – SUBCONTRACTOR INFORMATION AND CONSENT FORM in subfactor 1 for all main trades proposed sub-contractor?(Reference below) Vol 2,-2.5.2.2.1 states that “In the event the intended person is not part of the offeror's organization at the time the proposal is submitted then a completed Exhibit B, "Subcontractor /Team/Key Personnel Information and Consent Form" is also required, or the information will not be considered”.

As per section 00 21 16, paragraph 2.5.2.2, completed Exhibit B when intended person is not part of the offeror's organization at the time the proposal is submitted.

Do we need to submit Exhibit D_ letter of commitment for all main trades proposed sub-contractor in subfactor 1?

Question 4: If Sub factor I- will include Exhibit A for (3-5 projects), Key personnel detail, & Exhibit- B ,Exhibit-D, Page limit 10 might not be suffice for all the inclusions.

Submit what you deem necessary to demonstrate technical expereince and capability of key personnel and key subcontractors.

4 2.5.3 Volume 2, Part 2-Offeror need to submit Exhibit ’A’ Vol 2 Part 2 information only? Can Prime contractor include the experience of his proposed sub-contractor under his experience?

Prime contractor may include the experience of his proposed sub-contractor providing it is identified and shown as the sub-contractor's experience. Also review paragraph 2.5.3.9.

2.5.3 Volume 2, Part 2-Offeror need to submit Exhibit ’A’ Vol 2 Part 2 information only? Kindly confirm that if CPARS can be used in place of PPQ- Exhibit C?

Exhibit ‘A’ states: Prepare and send Exhibit C Package to the reference(s) for each of projects discussed in the Exhibit As, whereas

Solicitation letter Sec 00 21 16-2.5.3 Vo 2- 2.5.3.11. mentioned Past Performance References - REQUIRED - A "Final" Performance Evaluation (Construction) (also referred to as CPARS Evaluation) issued for a project may be included in lieu of sending out reference package for the project. OR Offerors shall prepare and submit to prior client(s) of all the projects listed on your Exhibit A submission a Reference Package (Exhibit C) (Detailed instructions are included in Exhibit C Package)

As per Section 2.5.3.11 you may submit CPARS Evaluation in lieu of sending out a

Reference Package (Exhibit C)

WEATHER BARRIER: Per Detail 1 on Drawing #A-601 shows continuous weather barrier and we would like to clarify if that detail applies to Self-adhering air barrier (07 27 19) or Fluid-Applied Membrane air barrier (07 27 26). Please advise.

Contractor has the option to use either or both products to achieve the continuous weather barrier.

PROJECT MANAGEMENT SOFTWARE: Please provide pricing information on the required Project Management Software for bidding purposes.

See Projectmates contractor details attached to solicitation posted in Sam.gov. Please reference section 01 00 00 General requirements paragraph 5.3

BALLISTIC LEVEL - Please provide the Ballistic Resistant Level of Protection Required for bidding purposes. (Examples: UL Level I, UL Level II, UL Level III, etc…) The ballistic resistant level shall be UL 752 Level III.

10 Drawing #A-201 detail #1 shows cast aluminum. “Jersey Devil” logo, but no details and specifications. Please advise.

Multi-color finished cast aluminum logo that includes projected mounting with collars and threaded studs set in adhesive. Size of logo is approximately 16"W x 24"H. Image of

"Jersey Devil" to be Government provided.

Drawing #S-511, Note #3.201 on Drawing #S-511 states see detail #8/S-522 which is missing on Drawing #S-511. Drawing #CS-172 Keyed Note 3.201 on S-511 should reference detail 1/S-502, not 8/S-522.

Solicitation, Offer, and Award Paragraph 10: Solicitation. Can the NJ Air National Guard add NAICS code 237990 Other Heavy and Civil Engineering Construction to the solicitation?

After reviewing the plans and specifications for project #AQRC169009, we found that it contains a substantial amount of Civil Engineering Construction for the NAICS code 237990. Along with the civil work needed in the base bid, Option Line Items (OLI) #1 - Add right turn and acceleration lanes, OLI #2-Reconstruction of existing pavement, OLI #3 - Drive lane gates & barrier, and OLI #4 Base entry signage. We are requesting that this code be added to the solicitation.

After reviewing this request, the Government has determined that NAICS Code 237990 will not be added.

Note # 18 on CS-172 calls out Bid Option 4, but nothing calls out the Base Warning Sign at Entry per detail 10/ CS-201. Is the intent of Bid Option 4 (Primary Installation and Gate Identification Sign) to be constructed in lieu of the Base Warning Sign at Entry per detail 10/ CS-201? Also, per detail 11/CS-201 (Base Warning Sign Along Perimeter Fence), there is no other information as to where they go, how many, how far are they spaced apart. Please provide detail.

Civil Base Warning Sign added to DWG CS172 on south side of driveway. ABI 4 does not replace Detail 10/ CS201, both are required. Locations of Detail 11/ CS201 added to

CS172

Clarify what the communication contract will or will not provide for the Advantor system/cabling. Provide network fiber per design, patch, test and terminate to Security switch in gatehouse.

15 Will the Cat6 cables to the camera locations be installed by Advantor or should this be done by the telecomm contractor?

The design intent was for the telecom contractor to provide all the category 6 cables and coordinate with the security contractor. Defer to COR for additional comments.

Will the camera Cat6 drops terminate on the 48 port patch panel shown on TT502 Detail 4 telecomm wall cabinet or will the camera drops terminate on a separate patch panel in the security cabinet?

Guidance for outdoor cameras and license plate readers is provided on TS012 general note

B. Keyed note 3 on sgeet TT100 addresses other securty CAT 6 locations.

Where will the 25pr underground OSP cable terminate in the new shelter?

Unclear on 'Shelter' terminology. If the question is refering to the new guardhouse direction is provided on sheet TT601 for end points of optical fiber and copper cabling.

Detail 6 on sheet TT501 provides further gudiance for the location of the primary entrance terminal for the 25-pair cable.

Willl a fire rated plywood backboard be needed for the 25pr OSP terminal in the shelter?

This is a means and methods. Since the protector is located in the rear pan of the lower telecommunications cabinet a backboard is not required per electrical code.

TT601 shows a 24SM, 25pr and 9-cell fiber mesh duct. Is the 9-cell fiber mesh duct only to be installed from existing MH-26-2 to the new guardhouse? Or, does it need to be installed from the new guardhouse all the way back to B272?

Drawing TT601 detail 2 depicts the two end points for the cabling and fabric mesh duct which are ITN 272 and the new guardhouse.

Is there spare open and available existing MaxCell or innerduct from B272 to existing MH-26-2 that the 24SM and 25pr cables can be pulled through? At the time of the design the base indicated that there was sufficent spare capacity.

Is there available rack space in B272 for a 1U fiber shelf to be installed for the fiber termination?

At the time of the design the base indicated that there was sufficent rack capacity. See keyed note 1 on sheet TT601.

Is there backboard space available in B272 to mount the lightning protector for the 25pr SOP cable?

At the time of the design the base indicated that there was sufficent wall space. See keyed note 1 on sheet TT601.

Please confirm that alternate electric or hydraulic crash rated barriers can be proposed as long as they meet the specified impact conditions and penetration ratings?

Other barriers are acceptable if they comply with the specifications and are on the current

DOD Anti-Ram Vehicle Barrier List.

Does each proposal have to include the basis of design equipment along with any alternative options, or can bidders only bid “or equal” equipment?

Bidders may bid 'or equal' equipment and materials, but if the equipment or material submittals are reviewed and deemed to not be equal, bidder will be required to provide the equipment or materials that meet the requirements, at no additional cost to the

Government. It is suggested that 'or equal' requests be submitted during bidding, so a determination can be made and distributed prior to the bid date.

The Vol 2 Specifications 2.16 UNINTERRUPTIBLE POWER SUPPLIES (UPS) states When the facility UPS provides power to equipment/systems listed, then separate stand alone UPS are not required. Does the facility have a UPS that provides power to equipment? The building does not have a facility-wide UPS system.

May a staging area be located outside the base if a secure temporary fence is installed around it?

The intent is for the full project site to be considered outside of the Base once the temporary perimeter fence has been installed. The staging area can be part of that.

I can’t find any information on the specific door hardware that is to be provided. Can you please provide that information? Hardwares sets will be provided as part of Addendum 1.

Section 00 21 00 Instructions #11. BID BONDS states a bid bond must be provided with our proposal but does not qualify the amount. Please advise the amount required for the Bid Bond.

See solicitation clause 52.228-1 Bid Guarantee