Main Gate Pre-Proposal Conference.pdf
PDF 744 KB Posted
- Attached to
- Installation Entry Control (Main Gate) Facility Federal contract opportunity
- Solicitation number
- W50S8F25RA010
- Issued by
- Department of the Army National Guard
About this file
This document is a pre-proposal conference presentation for a federal contract opportunity for the Installation Entry Control (Main Gate) Facility at the 177th Fighter Wing in Egg Harbor Township, NJ. The solicitation (W50S8F-25-R-A010) is a firm fixed-price construction contract set aside 100% for small businesses, with a project value between $5,000,000 and $10,000,000. The base contract includes constructing the main gate facility, with four optional line items for adding a right turn lane, reconstructing existing pavement, installing drive lane gates and barriers, and adding base entry signage.
Key submission requirements include electronic proposal submission via email by 16 May 2025 at 1:00 pm local time, with two required volumes: a price proposal and a technical/performance proposal. The contract will be awarded using source selection tradeoff procedures, evaluating technical capability, past/present performance, and price. The project has a 600-calendar day performance period, requires payment and performance bonds, and will be administered using Projectmates Construction Program Management Software. Contractors must be registered in the System for Award Management (SAM) and are cautioned to strictly comply with all solicitation instructions, with no expectation of discussions or proposal revisions.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-Proposal Conference
Project Title: Installation Entry Control (Main Gate) Facility
Solicitation: W50S8F-25-R-A010
May 1, 2025 177 Fighter Wing, NJANG Egg Harbor Township, NJ
Introductions Contracting o Ms. Johanna Paz Base Contracting Officer o Jose Maldonado Contracting Officer o MSgt Tammy Hickerson, Contract Specialist o Major Chris Hower Chief of Contracting, USPFO
Civil Engineering o Major Rick Basora
Base Civil Engineer o Major Natalia Rojas Deputy Base Civil Engineer o Ms. Savina McGarrity Contracting Officer Representative (COR)
Other Base Representation o Security o Safety o Environmental
This meeting is strictly informational.
It is the responsibility of the contractor to review and respond to all the information in the solicitation prior to submitting a proposal
Project Description Firm fixed-price contract for the construction of the Installation Entry Control (Main Gate) Facility at the 177th Fighter Wing in Egg Harbor Township, N.J.
o Base Contract Line Item
• Construction of Installation Entry Control (Main Gate)
Facility o 4 Option Line Items (OLI):
• OLI 1 – Add right turn and acceleration lane
• OLI 2 - Reconstruction of existing pavement
• OLI 3 – Drive lane gates and barriers
• OLI 4 – Base entry signage
Ref: Section 00 10 00 of Solicitation
Solicitation Information Solicitation was posted to www.SAM.gov on 16 April 2025
This project is set aside 100% for small businesses
The North American Industry Classification System (NAICS) code is 236220, with a small business size standard of $45,000,000
The magnitude of construction is between $5,000,000 and $10,000,000
Offer guarantee is required http://www.sam.gov/
Payment, & Performance Bonds will be required
Performance Period: 600 CALENDAR DAYS after Notice to Proceed (NTP) o (Includes Punch Lists, Cleanup, and Closeout Documents)
There are Liquidated Damages associated with this project
Wage Determination Currently, General Decision Number: NJ20250025 03/14/2025, Modification number 2 is in effect o State: New Jersey o Construction Type: Building o County: Atlantic County in New Jersey
Updates to the DOL Wage Determination will be posted to www.SAM.gov as a formal Solicitation Amendment on a SF30 and must be acknowledged by the Offeror on their SF1442
No Solicitation Amendment has been issued to date
• All solicitation document are posted in www.SAM.gov
• Offerors shall interpret the solicitation (SF1442) and all attachments; including the drawings, specifications, SOW, and Solicitation Q&A Log; to give meaning to ALL its parts o In the event of a discrepancy, generally the more stringent shall apply o All deficiencies shall be brought to the attention of the Contracting Officer prior to submitting the proposal.
• Offerors are solely responsible for reviewing and adhering to ALL solicitation requirements & amendments posted to www.SAM.gov
• Offerors shall monitor www.SAM.gov for Solicitation Amendments and Government responses to Offer Questions/Clarifications
• The contract will be awarded using Source Selection tradeoff procedures to arrive at a Best Value decision
• The evaluation factors are o Technical o Past/Present Performance o Price
• Submission requirements and instructions are detailed in RFP section 00 21 16 o Two volumes are required
Volume 1 – Price proposal Volume 2
Part 1 - Technical Capability Proposal Part 2 - Past/Present Performance Information
• Proposal evaluations and basis for award are detailed in RFP section 00 22 16
• EXHIBIT A - Performance Relevancy Questionnaire o Prepare not more than three (3)
• EXHIBIT B -Subcontractor Information and Consent Form
• EXHIBIT C - Reference Questionnaire package o For projects listed in exhibit A
• EXHIBIT D - Letter of Commitment o For key subcontractor and/or key personnel
• The Government Intends To Award Without Discussion
• There May Not Be A Chance For Discussions, Corrections, Or Revised Proposals
• Offerors are cautioned to strictly comply with all instructions and procedures for a successful submission
• Failure to furnish a complete proposal may result in the proposal being unacceptable
• Offerors MUST be registered in System for Award Management (SAM) at the time of Offer Closing Date o This is offerors responsibility (ref: FAR 52.204-7(b)(1))
Contactor Site Facilities
• Contractor Site Facilities o Site Office Trailer / Storage
• Government facilities are NOT available for administrative use, break areas or secure storage
• Contractor shall provide such facilities as deemed required for completion of the project o Contractor shall provide & maintain their own sanitary facilities (port-a-john toilets, wash stations) for the duration of the project o Utilities
• Water, natural gas, electric, communication, etc. are NOT available
• Contractor shall provide for his own utilities, i.e. generator & water tanks
• Propane tanks are NOT allowed
• Filling of non-potable water tanks on base hydrant near the project site may be available
Foreign Object Debris (FOD)
• Contractor will be required to conduct a daily FOD sweep of worksite at the end of every workday
• FOD: Any article or substance, alien to an aircraft or system, which could potentially cause damage o Rocks o Broken pavement o Garbage o Tools, bolts, metal shavings, wire, etc
Key Project Personnel
• Project Management & Site Superintendent o The contractor shall be required to provide a dedicated Site Superintendent through completion of the project o The Site Superintendent MUST be on site at all times during active construction activities.
• Key Positions SHALL NOT be subcontracted below the Prime Contractor
• The following are considered key positions o Project Manager o Quality Control o Safety Officer o Superintendent
RFP Questions
• Submit all questions via email to the contracting office at the following address
• Email: 177fw.contracting.org@us.af.mil
• Subject Line: RFP Question for W50S8F-25-R-A010
• Do NOT contact the A-E or Engineering personnel
• All questions and requests for information (RFI) must be received NOT LATER THAN 5 days prior to closing o Submit questions early in this process
• Answers will be posted to www.SAM.gov.
o Final Q&A posted will require receipt acknowledgement.
• Contractors will not receive personalized responses to questions
Offer Submission
• Due – 16 May 2025 @ 1:00pm local time o Changes to the Offer Due Date & Time will ONLY be made by a formal Solicitation Amendment on an SF30 and posted to www.SAM.gov o Official Offer Due Date & Time is located on the SF1442, Block 13
• Offerors shall submit their proposals electronically via email o Offer Submission Procedures are outlined in solicitation, section 00 21 00 paragraph 5 o Submit proposals via email to 177fw.contracting.org@us.af.mil, Subject Line: Proposal for RFP W50S8F- 25-R-A010 o NO OTHER TRANSMISSION METHODS (FACSIMILE, REGULARMAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED
• Offerors are responsible for ensuring that their Offers are received by the Due Date & Time
Late Offers will NOT be Accepted
Project Administration
• The Contractor shall be required to attend bi-weekly
Progress Meetings
• This project will be administered using Projectmates Construction Program Management Software
Projectmates will be mandatory for submission of ALL documents & communication
The Contractor will be responsible for the project set-up and fees with Projectmates
Reference solicitation section 01 00 00 paragraph 5.3
Site Visit to Follow
Meeting Minutes will be posted to www.SAM.gov
Questions http://www.sam.gov/
| �����������PRE-Proposal Conference��Project Title: Installation Entry Control (Main Gate) Facility��Solicitation: W50S8F-25-R-A010�� |
| Introductions |
| Slide Number 3 |
| Project Description |
| Solicitation Information |
| Solicitation Information |
| Solicitation Information |
| Solicitation Information |
| Solicitation Information |
| Solicitation Information |
| Contactor Site Facilities |
| Foreign Object Debris (FOD) |
| Key Project Personnel |
| RFP Questions |
| Offer Submission |
| Project Administration |
| Site Visit to Follow��Meeting Minutes will be posted to www.SAM.gov |