This document is an Addendum (Addendum No. 3) for the Entry Control Facility project at Atlantic City Air National Guard Base (ANGB). The addendum modifies Section 281005 of the technical specifications, specifically making four key changes: 1) replacing "Access Control Devices" with "Control Devices" in the Submittals section, 2) deleting "or access control card" from a paragraph, and 3-4) updating section headings related to control devices and access control systems. The addendum is dated May 20, 2025, with the project number AQRC169009, and is issued to all bidders with a warning that failure to acknowledge the addendum in the proposal will result in bid rejection.

View the file

Other files for this federal contract opportunity

Other files attached to Installation Entry Control (Main Gate) Facility, newest first.
File Type Posted
Atlantic City ANGB ECF Addendum 02.pdf PDF
Solicitation Amendment W50S8F25RA0100003 SF 30.pdf PDF
Bulletin 20-01 - Active Vehicle Barrier (AVB) Safety Schemes.pdf PDF
FINAL COPY 16May25 BID RFI LOG-ENTRY CONTROL FACILITY-ATLANTIC CITY ANGB.pdf PDF
Solicitation Amendment W50S8F25RA0100002 SF 30.pdf PDF
Atlantic City ANGB ECF Addendum 01.pdf PDF
Solicitation Amendment W50S8F25RA0100001 SF 30.pdf PDF
Wage Determinations NJ20250025 2 May 2025.pdf PDF
Main Gate RFI log published 9 May 2025.pdf PDF
Projectmates_Mng_Software_Pricing.pdf PDF
Attendance Record-01 May 2025.pdf PDF
Main Gate Pre-Proposal Conference.pdf PDF
Solicitation - W50S8F25RA010.pdf PDF
Solicitation - W50S8F25RA010.pdf PDF
Attachment 1 - Vol 2 Specifications AQRC169009 Installation ECF B3.pdf PDF
Attachment 1 - Vol 1 Specifications AQRC169009 Installation ECF B3.pdf PDF
Attachment 3 - Installation Entry Contro (Main Gate)l Facility - SOW AQRC169009.pdf PDF
EXHIBIT C Reference Questionnaire Package - Inst Entry Ctrl Fac.docx DOCX document
EXHIBIT B Installation Entry Control (Main Gate) Facility.docx DOCX document
Limited Source Justification FAR Part 8.pdf_Redacted.pdf PDF
Attachment 2 -Drawings NJANG ECF B3 FINAL - FULL SET with Options.pdf PDF
Exhibit D_Letter of Commitment.docx DOCX document
Exhibit A Installation Entry Control (Main Gate) Facility.docx DOCX document
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Atlantic City ANGB ECF Addendum 03 cover Page 1 of 1

Project name: Entry Control Facility Client: Atlantic City ANGB, NJ ANG

Project location: Atlantic City ANGB, NJ Client representative: Maj Natalia Rojas

Project number: AQRC169009 Date: May 20, 2025

TO ALL BIDDERS: You are requested to make all changes and/or additions contained in this Addendum to the Bidding Documents. Failure to acknowledge this Addendum in Proposal shall result in rejection of bid.

I. SPECIFICATIONS

A. Make the following changes to section 281005:

1. Section 1.2 SUBMITTALS: Under SD-03 Product Data, replace “Access Control Devices” with “Control Devices”

2. Section 2.3.6.1, paragraph b: Delete “or access control card” from the third line of that paragraph.

3. Section 2.4: Replace “ACCESS CONTROL SYSTEM (ACS)” with “CONTROL DEVICES” as the section heading.

4. Section 2.4.1: Replace “Access Control Devices” with “Control Devices” as the heading.

END OF ADDENDUM