Atlantic City ANGB ECF Addendum 02.pdf
PDF 3 MB Posted
- Attached to
- Installation Entry Control (Main Gate) Facility Federal contract opportunity
- Solicitation number
- W50S8F25RA010
- Issued by
- Department of the Army National Guard
About this file
This document is an Addendum (Addendum No. 2) for the Atlantic City Air National Guard Base Entry Control Facility project, dated May 16, 2025. The addendum includes several key modifications to the original project documents: drawing updates for CG081, CG101, A-201, and TY601, which involve changes such as adding coordination notes, removing installation notes, and updating building numbers. Specification changes are detailed in sections 083402 and 129300, including requirements for bullet-resistant components to meet UL 752 Level III standards and precise specifications for tempered one-way glass with specific transmission and coating characteristics.
A significant addition to the document is a comprehensive section on bench specifications (section 2.5), which provides detailed requirements for bench design, including height (18-20 inches), seat depth (12-18 inches), back rest specifications, and material standards. The benches must be made of extruded or formed aluminum with a clear anodized finish, designed to support a minimum of 300 lbs per person, and include specific details about fasteners, anchoring brackets, and accessories. These modifications appear to be part of the ongoing design refinement for the Entry Control Facility project at the Atlantic City Air National Guard Base.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Atlantic City ANGB ECF Addendum 02 cover Page 1 of 2
Project name: Entry Control Facility Client: Atlantic City ANGB, NJ ANG
Project location: Atlantic City ANGB, NJ Client representative: Maj Natalia Rojas
Project number: AQRC169009 Date: May 16, 2025
TO ALL BIDDERS: You are requested to make all changes and/or additions contained in this Addendum to the Bidding Documents. Failure to acknowledge this Addendum in Proposal shall result in rejection of bid.
I. DRAWINGS (All drawing updates are attached as full sheets.)
A. Drawing CG081:
1. Add Coordination and Communication note 4.
B. Drawing CG101:
1. Removed Installation Note 5.
C. Drawing A-201:
1. Add informational note about cast aluminum jersey devil logo to drawing.
D. Drawing TY601:
1. Updated ITN Building number from 27 to 272.
II. SPECIFICATIONS
A. Make the following changes to section 083402:
1. At the end of section 1.4 paragraph, add the following sentence: “Bullet resistant components shall be in accordance with the requirements of UL 752 Level III.”
B. Make the following changes to section 129300:
1. Replace section 2.1.6 Tempered Glass with the following:
“2.1.6 Tempered One-Way Glass
Type I, Class 1, Quality Q1, ¼-inch thick, grey mirrored tempered glass coated on one face with a hard, adherent film of pyrolytic coating or other approved coating of equal durability.
Visible transmittance is 11 percent. Visual transmission for the coated side is 68 percent and the reflected side is 16 percent.”
2. Add the following between section 2.4 Site Standards and 2.5 Shelters:
Addendum No. 2
Atlantic City ANGB ECF Addendum 02 cover Page 2 of 2
“2.5 Benches
Furnish benches with no sharp edges or protruding hardware.
A. Height: The height above finished grade or specified surface must be between 18-20 inches and level.
B. Seat: The seat surface must be pitched or slotted to shed water; the seat depth must be between 12-18 inches and pitched down at the back at 0–5-degree angle. Seat must have a minimum width of 24 inches per person and must overhang the support base by a minimum of 4 inches for heel space and to facilitate rising from a seated position.
C. Back Rest: When back rests are required, the height must be between 15-18 inches from the top of the seat and the connection must be at a 90–110-degree angle to the seat.
D. Arm Rest: no arm rest required.
E. Length: Length of bench shall be 4 feet.
F. Weight Limit: Seat must support a minimum of 300 lbs for each person they are designed to accommodate.
2.5.1 Aluminum Units
Provide extruded or formed aluminum slat bench in accordance with manufacturer's standard, with clear anodized finish.
A. Design benches to sustain a live load of not less than 200 pounds per square foot.
B. Provide manufacturer's standard cast aluminum freestanding pedestal.
2.5.2 Accessories
Provide manufacturer’s standard materials and accessories as required for assembly of units and as indicated on the assembly drawings. Provide unexposed aluminum, stainless steel, or steel plates, angles, and supports as required for complete assembly. Separate dissimilar materials to prevent electrolytic action.
2.5.3 Fasteners
Provide concealed fasteners except where specifically approved; types as required for specific usage.
2.5.4 Anchoring Brackets
Provide zinc-plated steel angle anchoring brackets that are designed for proper anchoring and are pre-drilled for bolting benches to substrate.”
3. Renumber existing section 2.5 to be section 2.6 and renumber subsections to be consistent.
END OF ADDENDUM
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
© Copyright 2024 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
ANG NO: AQRC169009
AQ
R
C
AT
LA
N
TI
C C
IT
Y, N J
11/01/2024 TYPE B3 FINAL
GC081
GENERAL NOTES
SAH
DAY
JAK
X:
\4
\1
6.
\T
EC
H \C
AD
\B
1\
AT
EC
_G C
1.
D W
G
5/
/2
:5 5:
A
M
AT
LA
N
TI
C C
IT
Y
AN
G
B
IN
ST
AL
LA
TI
O N
E N
TR
Y
C O
N
TR
O L
FA
C
IL
IT
Y
4498700-170096.01
NOVEMBER 1, 2024
GENERAL NOTES:
1. DIG PERMITS, IF REQUIRED, SHALL BE OBTAINED FROM THE CONTRACTING OFFICERS
REPRESENTATIVE FOR APPROVAL SIGNATURES. THIS MAY TAKE APPROXIMATELY 3 WEEKS OR MORE TO COMPLETE. UPON COMPLETION CONTRACTOR SHALL CALL NEW JERSEY ONE-CALL FOR UTILITY LOCATE SERVICES AT 1-800-272-1000 OR 811. FIELD VERIFY THE LOCATION OF UTILITY AND OTHER FEATURES AND COMPARE TO THE CONTRACT DOCUMENTS. INFORM THE CONTRACTING OFFICER OF
ANY DISCREPANCIES.
2. FILE FAA FORM 7460-1 IN REFERENCE TO THE CONTRACTOR'S SITE CONSTRUCTION EQUIPMENT.
MAXIMUM EQUIPMENT HEIGHT IS ANTICIPATED TO BE 30 FEET. COORDINATE WITH ATLANTIC COUNTY AIR NATIONAL GUARD BASE CE OFFICE AND CONTRACTING OFFICER FOR ANY TEMPORARY AIRFIELD WAIVERS. LOCAL AIRFIELD CONSTRUCTION WAIVERS WILL BE APPROVED AFTER THE CONTRACTOR
HAS RECEIVED FAA APPROVAL/DETERMINATION.
3. COMPLETE THE STORM WATER POLLUTION PREVENTION PLAN (SWPPP), REFER TO SPECIFICATION
01 57 19 FOR ADDITIONAL INFORMATION.
4. PROVIDE STABILIZED CONSTRUCTION ACCESS ROAD ENTRANCE AND COORDINATE LOCATION WITH
THE CONTRACTING OFFICER.
5. STOP WORK IMMEDIATELY AND CONTACT THE CONTRACTING OFFICER IF A UTILITY LINE IS
DISTURBED.
6. KEEP ALL ROADS AND STREETS CLEAN OF CONSTRUCTION DEBRIS, MUD, ETC. AT ALL TIMES.
PROVIDE EQUIPMENT AND PERSONNEL TO CLEAN ANY STREETS AS REQUESTED BY THE
CONTRACTING OFFICER. CONTRACTOR IS RESPONSIBLE FOR ALL REPAIRS TO STREETS, PARKING
AREAS, AND BASE OR GOVERNMENT PROPERTY, DUE TO DAMAGE BY THEIR CONSTRUCTION
ACTIVITIES. PROVIDE PHOTOGRAPHS AND/OR VIDEO RECORDING OF THE EXISTING STATE FOR THE
PROJECT LIMITS. ACCESS POINTS, HAUL ROUTES, LAYDOWN AREA AND ANY OTHER AREAS
DISTURBED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR ORIGINAL CONDITION OR BETTER
TO THE SATISFACTION OF THE CONTRACTING OFFICER. COORDINATE WITH THE CONTRACTING
OFFICER FOR A PRECONSTRUCTION VIDEO DETAILING THE EXISTING CONDITION OF ACCESS POINTS, HAUL ROUTES, AND LAYDOWN AREAS TO BE PERFORMED.
7. ALL WORK SHALL BE SUBJECT TO INSPECTION BY AUTHORIZED PERSONNEL OF STATE, LOCAL, AND
GOVERNMENT REGULATORY AGENCIES AND THE CONTRACTING OFFICER.
8. ALL WORK SHALL BE CONDUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS, STATE.
LOCAL, AND GOVERNMENT CODES, ORDINANCES, AND REGULATIONS. IN CASE OF CONTRADICTION
OR DISCREPANCY BETWEEN REQUIREMENTS, INCORPORATE WHICHEVER IS MOST STRINGENT.
WHERE A QUESTION REMAINS ON WHICH REQUIREMENT IS MOST STRINGENT, SUBMIT ISSUE TO THE
CONTRACTING OFFICER IN WRITING. THE DECISION OF THE CONTRACTING OFFICER SHALL BE
CONSIDERED FINAL.
9.INSTALL A TEMPORARY SILT FENCE AROUND THE CONSTRUCTION SITE STAGING AND LAYDOWN AREAS AS NEEDED FOR SECURITY OF EQUIPMENT AND MATERIALS AS DIRECTED BY CONTRACTING
OFFICER.
10. COORDINATE THE DISCONNECTION OF UTILITIES THROUGH THE CONTRACTING OFFICER.
DEMOLITION SHALL NOT BEGIN UNTIL WRITTEN BASE APPROVAL IS RECEIVED. ALL EXISTING UTILITIES ARE TO BE TERMINATED AT THEIR POINT OF CONNECTION TO THE MAINS. WHERE CONNECTIONS OF NEW UTILITIES TO EXISTING UTILITIES ARE SHOWN ON THE PLANS, EXPOSE THE EXISTING LINES AT THE PROPOSED CONNECTIONS TO VERIFY THE LOCATIONS AND DEPTHS PRIOR TO EXCAVATION FOR
THE NEW LINES.
11. EXPOSE, VERIFY AND BACKFILL ALL EXISTING UNDERGROUND UTILITIES AND STRUCTURES AT UTILITY CROSSINGS PRIOR TO EXCAVATION OF PIPELINE TRENCH. UTILITY CROSSINGS AT A DEPTH
GREATER THAN 12 INCHES BELOW TRENCH BOTTOM DO NOT NEED TO BE EXPOSED. UTILITY
ALIGNMENT AND GRADE MAY BE CHANGED IF THERE ARE CONFLICTS WITH ANY EXISTING
UNDERGROUND UTILITIES AND STRUCTURES, WHETHER SHOWN ON THE PLANS OR NOT.
COORDINATE WITH THE CONTRACTING OFFICER.
12. FACILITIES IN THE UTILITY CORRIDOR SHALL BE RESTORED UPON COMPLETION OF
CONSTRUCTION. SCREEN WALLS, FENCES, RETENTION WALLS, VEGETATION, ANDOTHER
LANDSCAPING SHALL BE REPLACED IN LIKE KIND TO THE ORIGINAL FEATURES AND TO THE
APPROVAL OF THE CONTRACTING OFFICER. COORDINATE WITH CONTRACTING OFFICER.
13. MOW AND MAINTAIN ALL AREAS WITHIN THE PROJECT LIMITS AS COORDINATED WITH THE
CONTRACTING OFFICER FROM NOTICE-TO-PROCEED DATE THROUGH THE DURATION OF THE
PROJECT. MOW TO A MAXIMUM AVERAGE HEIGHT OF 3-INCHES FOR SPRING/SUMMER MAINTENANCE
AND 6-INCHES FOR FALL/WINTER MAINTENANCE.
14. UTILIZE EROSION CONTROL DEVICES FOR THE STAGING AREA AND ANY MATERIAL STOCK PILES
WHEN NECESSARY TO CONTROL EROSION AND STORM WATER RUNOFF, IN ACCORDANCE WITH ALL
FEDERAL, STATE, AND LOCAL REGULATIONS.
15. OBSERVE THE LOCATION OF EXISTING BUILDING AND UTILITY STRUCTURES AT ALL TIMES.
PROTECT STRUCTURES TO REMAIN WHEN WORK OCCURS PROXIMATE TO THOSE LOCATIONS.
EFFORT AND COST TO BE BORNE BY THE CONTRACTOR.
COORDINATION AND COMMUNICATION:
1. APPOINT A CONSTRUCTION SUPERINTENDENT, SUBJECT TO THE APPROVAL OF THE
CONTRACTING OFFICER, PRESENT ON THE CONSTRUCTION SITE DURING WORKING
HOURS WHILE JOB IS IN PROGRESS. THE SUPERINTENDENT SHALL BE DESIGNATED AS
THE RESPONSIBLE CONTRACTOR'S REPRESENTATIVE WHO SHALL BE AVAILABLE ON A
24-HOUR BASIS. WHEN THE CONTRACTOR'S REPRESENTATIVE IS NOT AVAILABLE ON
THE CONSTRUCTION SITE, AN ALTERNATE REPRESENTATIVE SHALL BE PROVIDED.
PROVIDE NAMES AND CONTACT INFORMATION OF REPRESENTATIVES TO THE
CONTRACTING OFFICER PRIOR TO THE START OF CONSTRUCTION ACTIVITIES.
2. MAINTAIN CONSTANT COORDINATION BETWEEN ANY SUBCONTRACTORS AND THE
CONTRACTING OFFICER. ALL CONSTRUCTION ACTIVITIES PLANNED BY THE
CONTRACTOR SHALL BE REVIEWED AND APPROVED BY THE CONTRACTING OFFICER.
3. COORDINATE WITH VERIZON NEW JERSEY FOR THE RELOCATION OF FACILITIES
ADJACENT TO TILTON ROAD. SEE SHEET CD101. RELOCATION COORDINATION SHOULD
BEGIN EARLY IN PROJECT CONSTRUCTION TO ALLOW TIME FOR VERIZON NEW JERSEY
TO RELOCATE FACILITIES.
4. CONTRACTOR MUST NOTIFY THE CONTRACTING OFFICER TWO WEEKS PRIOR TO
WHEN ALL BURIED UTILITIES ARE BEING INSTALLED PRIOR TO BACKFILLING AND FOR
EXISTING UTILITIES THAT ARE UNCOVERED. THE CONTRACTING OFFICER WILL
COORDINATE WITH FAATC SO THAT THE FAATC CAN GPS AND MONITOR ALL UTILITIES.
ACCESS AND SAFETY NOTES:
1. ACCESS TO THE PROJECT FOR ALL CONTRACTOR PERSONNEL VEHICLES, AND EQUIPMENT IS ILLUSTRATED ON DRAWINGS. ACCESS ROUTES MAY BE SUBJECT TO CHANGE BASED ON OPERATIONAL REQUIREMENTS ON ATLANTIC CITY ANGB. COORDINATE POTENTIAL SCHEDULE IMPACTS WITH THE CONTRACTING OFFICER.
2. LOCATE CONTRACTOR'S STAGING AREA AND POV EMPLOYEE PARKING AS INDICATED ON SHEET GC141 OR AS
DIRECTED BY THE CONTRACTING OFFICER.
3. MAINTAIN EXISTING BASE ROADS USED AS HAUL ROADS SUCH THAT UNOBSTRUCTED ACCESS WILL BE PROVIDED AT ALL TIMES FROM THE ROAD TO THE STAGING AREA AND FROM THE STAGING AREA TO THE WORK SITE AND FACILITATE GOVERNMENT ACCESS TO THE BASE AT ALL TIMES. PROVIDE HAUL ROAD LOCATIONS
SHALL BE AS INDICATED IN SHEET GC141 AND APPROVED BY THE CONTRACTING OFFICER.
4. COORDINATE ACTIVITIES THROUGHOUT THE PROJECT IN A MANNER THAT ALLOWS EMERGENCY ACCESS TO ALL EXISTING ROADWAYS AT ALL TIMES WITHOUT DELAYS TO EMERGENCY VEHICLE'S RESPONSE TIME.
5. MAINTAIN THE ACCESS ROUTE TO BE FREE FROM DEBRIS CAUSED FROM CONSTRUCTION ACTIVITIES ON A
DAILY BASIS.
6. STAGING AREA AND ANY OTHER AREA DISTURBED BY CONTRACTOR DURING CONSTRUCTION SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION OF EXISTING SITE. CONTRACTOR SHALL PROVIDE PHOTOGRAPHS AND VIDEO RECORDING OF THE EXISTING SITE CONDITIONS OF THE PROJECT LIMITS PRIOR TO
START OF ANY WORK.
7. RESTORE ALL AREAS DISTURBED BY ANY CONSTRUCTION ACTIVITIES INCLUDING BORROW AREAS, STOCKPILE AREAS, MATERIAL LAYDOWN, EQUIPMENT PARKING, CONTRACTOR PARKING, EARTHWORK ACTIVITIES, UTILITY TRENCHING, OVERHEAD UTILITY WORK, ETC. TO BETTER THAN EXISTING CONDITIONS. COVER ALL AREAS NOT DESIGNATED FOR PAVEMENT OR GRAVEL SURFACING WITH A MINIMUM 4-INCHES OF TOPSOIL, SEEDED, AND
IRRIGATED/MAINTAINED UNTIL 95% COVERAGE OF GROUND COVER PER THE SPECIFICATIONS.
8. ALL CONTRACTOR VEHICLES AND PERSONNEL MAY BE SEARCHED BY SECURITY POLICE WHEN ENTERING THE BASE AND MAY EXPERIENCE DELAYS. ALL PERSONNEL ENTERING ATLANTIC CITY ANGB MUST HAVE A VALID PHOTO ID PER BASE SECURITY REQUIREMENTS. ALL VEHICLES ENTERING THE BASE MUST HAVE CURRENT/VALID REGISTRATION, CURRENT/VALID INSURANCE, AND CURRENT/VALID DRIVER'S LICENSE FOR THE OPERATOR. ALL CONTRACTOR VEHICLES AND PERSONNEL SHALL BE RESPONSIBLE FOR COORDINATING WITH THE BASE SECURITY OFFICER IN OBTAINING PROPER SECURITY CLEARANCE AND BADGING PRIOR TO ENTERING SECURE
AREAS.
9. MISCELLANEOUS CONTRACTOR ACCESS PROCEDURES: PERIODIC BASE EXERCISES MAY OR MAY NOT IMPACT DAILY ENTRY PROCEDURES TO WORK AREAS ON ATLANTIC CITY ANGB. IN ADDITION, ALL CONTRACTOR PERSONNEL MAY BE REQUIRED TO LEAVE AN AREA AND RE-ACCOMPLISH ENTRY PROCEDURES. IN THE EVENT OF AN EMERGENCY THAT REQUIRES EVACUATION FROM THE AREA, COMPLY WITH THE INSTRUCTIONS FROM
SECURITY FORCES.
10. PROVIDE ALL NECESSARY WATER AND TOILET FACILITIES FOR WORKERS WITHIN THE CONSTRUCTION SITE.
DO NOT USE GOVERNMENT FACILITIES UNLESS SPECIFICALLY INDICATED OTHERWISE. COORDINATE LOCATIONS
OF FACILITIES WITH CONTRACTING OFFICER.
11. WHEN NOT ENGAGED IN CONSTRUCTION ACTIVITIES, PARK CONSTRUCTION EQUIPMENT AND VEHICLES
WITHIN THE WORK AREA/STAGING AREA.
12.COORDINATE ANY GOVERNMENT OWNED EQUIPMENT REQUIRING RELOCATION TO COMPLETE THE PROJECT
WITH THE CONTRACTING OFFICER.
13. IF ANY EMERGENCY ROUTES REQUIRE CLOSURE DUE TO CONSTRUCTION ACTIVITIES, NOTIFY THE CONTRACTING OFFICER, POLICE, LOCAL FIRE AUTHORITY, AND ALL OTHER EMERGENCY SERVICES OF THE
CLOSURE A MINIMUM OF 14 DAYS IN ADVANCE.
RECORD DRAWING NOTES:
1. MAINTAIN UPDATED RECORD DRAWINGS AT ALL TIMES THROUGH THE DURATION OF THE PROJECT.
CONSTRUCTION RECORD DRAWINGS, IN CADD AND GIS FORMAT, SHALL BE SUBMITTED TO THE CONTRACTING OFFICER. CONTRACTING OFFICER WILL SHARE WITH FAA. AS-BUILTS (X, Y, Z) FOR ALL UTILITY SYSTEMS AND BUILDING STRUCTURES SHALL BE FIELD SURVEYED BY A LICENSED SURVEYOR IN THE STATE OF NEW JERSEY.
2. DURING CONSTRUCTION OF THE PROJECT, KEEP TRACK OF ANY CONTRACTING OFFICER APPROVED FIELD CONSTRUCTION REVISIONS TO THE DESIGN DEPICTED ON APPROVED CONSTRUCTION DRAWINGS. THESE
REVISIONS SHALL BE USED TO PREPARE RECORD DRAWINGS OF COMPLETED CONSTRUCTION.
3. ALL VARIATIONS IN PROJECT CONDITIONS, LOCATIONS, CONFIGURATIONS, AND ANY OTHER CHANGES OR DEVIATIONS FROM THE INFORMATION PRESENTED ON THE ORIGINAL, APPROVED CONSTRUCTION DRAWINGS SHALL BE NOTED. THIS INCLUDES BURIED OR CONCEALED CONSTRUCTION AND UTILITY FEATURES THAT WERE
REVEALED DURING CONSTRUCTION.
TRAFFIC CONTROL:
1. PRIOR TO CONSTRUCTION, CORDON OFF THE LIMITS OF CONSTRUCTION BY USING CHAIN LINK TEMPORARY CONSTRUCTION
FENCE APPROVED BY THE CONTRACTING OFFICER.
2. MARK ALL CONSTRUCTION EQUIPMENT AND VEHICLES WITH COMPANY DESIGNS, INSIGNIAS, OR OTHER MARKINGS, WHICH ARE CLEARLY VISIBLE. PROVIDE EACH VEHICLE WORKING INSIDE THE SECURITY FENCE WITH AMBER COLORED LED STROBE
LIGHTS.
3. PROVIDE CONSTRUCTION EQUIPMENT WITH AUTOMATIC SIGNALING DEVICES TO SOUND AN ALARM WHEN MOVING IN REVERSE.
4. ONLY RUBBER-TIRE VEHICLES WILL BE ALLOWED ON EXISTING PAVEMENT TO REMAIN.
5. IMMEDIATELY CLEAN ANY DEBRIS DEPOSITED ONTO THE SITE, ROADS, ETC. FROM CONTRACTOR'S EQUIPMENT OR OPERATIONS. MATERIAL DROPPED WITHIN THESE AREAS SHALL BE CONTINUOUSLY REMOVED BY SURFACE SWEEPERS OR OTHER APPROVED METHODS DURING WORKING HOURS. MAINTAIN ONE FULLY OPERATIONAL STREET SWEEPER/VAC TRUCK ON
SITE AT ALL TIMES.
6. CONSTRAIN STOCKPILED MATERIAL IN A MANNER TO PREVENT MOVEMENT RESULTING FROM AIRCRAFT PROP WASH OR JET
BLAST.
TEMPORARY CONSTRUCTION EQUIPMENT AND STOCKPILE HEIGHT:
1. TEMPORARY OBSTRUCTIONS, SUCH AS CRANES, MUST BE MARKED AND LIGHTED IN ACCORDANCE WITH FAA AC 70/7460-1.
DELINEATE ALL HAZARDOUS AREAS WITH LIGHTED BARRICADES ON ALL EXPOSED (VISIBLE OR ACCESSIBLE) SIDES. PROVIDE ALL NECESSARY INFORMATION TO THE CONTRACTING OFFICER FOR CONSTRUCTION CRANES, EQUIPMENT, AND RELATED EQUIPMENT, AND RELATED ACTIVITIES. ALL FORMS SHALL BE APPROVED PRIOR TO USING OR BRINGING EQUIPMENT ON SITE.
BASE CE TO SUBMIT 7460.1 FORMS TO FAA FOR PERMANENT BUILDING. CONTRACTOR TO SUBMIT 7460-1 FORMS TO FAA FOR
ALL TEMPORARY CONSTRUCTION.
2. THE MAXIMUM ALLOWABLE HEIGHT OF CONSTRUCTION EQUIPMENT OPERATING IN AN AIRCRAFT OPERATIONS AREA IS GOVERNED BY FAA AC 150/5370.2F AND AC 150/5300-13A (CURRENT EDITIONS). TEMPORARY OBSTRUCTIONS, SUCH AS CRANES AND EQUIPMENT LESS THAN 200'-0" IN HEIGHT REQUIRE ADDITIONAL LOCAL APPROVAL AS WELL AS FAA 7460-1 APPROVAL.
COORDINATE WITH CONTRACTING OFFICER FOR LOCAL OBSTRUCTION APPROVAL WHEN EQUIPMENT IS EXPECTED TO PENETRATE THE AIRFIELD APPROACH SURFACES OR WHEN CRANES WILL BE USED ON-SITE, PROVIDE A MINIMUM NOTICE OF 45 DAYS TO THE CONTRACTING OFFICER AND BASE AIRFIELD OPERATIONS PRIOR TO THE START OF CONSTRUCTION TO COORDINATE THE SUBMITTAL OF FAA FORM 7460.1 TO THE FAA REGIONAL OFFICE. PERMISSION TO USE CRANES SHALL BE ISSUED BY BASEAIRFIELD OPERATIONS AND THE CONTRACTING OFFICER AFTER APPROVAL BY THE FAA.
3. WHEN NOT IN OPERATION, ALL EQUIPMENT AND CRANES SHALL HAVE BOOMS OR ARMS LOWERED TO THEIR LOWEST
ELEVATION.
4. DO NOT STOCKPILE CONSTRUCTION MATERIALS, SPOILS, OR DEBRIS IN ANY AREA WHERE SUCH STOCKPILES WOULD PENETRATE AVIATION SURFACES. STOCKPILING OF MATERIAL WITHIN THE AIRFIELD SAFETY AREAS IS PROHIBITED.
GRADING REQUIREMENTS:
1. TO THE MAXIMUM EXTENT POSSIBLE, EXCAVATED SOILS SHALL BE REPURPOSED TO REMAIN WITHIN THE PROJECT LIMITS AS FILL MATERIAL. FAA RESERVES THE RIGHT OF FIRST REFUSAL TO RETAIN ALL EXCESS MATERIAL GENERATED FROM CONSTRUCTION PROJECTS PERFORMED ON TECHNICAL CENTER PROPERTY (INCLUDING LEASED AREAS).
2. ANY SOIL THAT IS PROPOSED TO BE RELOCATED OUTSIDE OF A PROJECT AREA MUST BE SAMPLED AND ANALYZED FOLLOWING NJDEP FILL MATERIAL GUIDANCE (I.E., ONE TCLP SAMPLE PER EVERY 1,000 YDS) AND RECEIVE APPROVAL FROM FAA PRIOR TO TRANSPORT. IN THE EVENT FAA ELECTS TO REFUSE ACCEPTANCE OR IF THE EXCAVATED SOIL IS FOUND TO BE CONTAMINATED AND NOT BEING USED AS ON-SITE BACKFILL MATERIAL, THE CONTRACTOR WILL BE REQUIRED TO PREPARE AN OFF-SITE DISPOSAL PLAN AND COORDINATE WITH FAA ON THE MATERIAL’S TRANSPORT AND DISPOSAL TO AN
APPROVED, OFF-SITE FACILITY.
3. ANY CLEAN SOIL REMAINING ON TECHNICAL CENTER PROPERTY SHALL BE TRANSPORTED TO A GOVERNMENT STOCKPILE AREA WITHIN 3 MILES OF THE PROJECT SITE AND THE CONTRACTOR MUST PROVIDE A DOZER TO BREAK DOWN THE
STOCKPILES AFTER DELIVERY.
05/16/2025 ADDENDUM 22
11/01/2024
PRO
FESSI O NAL E N G I NE
No.
24GE05890500
S T
A T
E
O F N EW J ER
S
E Y
L I C E N S E D
E R
S C
O T
T A H A S B U
R G
H
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM COMM
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E E
E
E
E
E
E
E
E
E
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
D
D C
I
D
D C
I
W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
W W
T
OHW OHW OHW OHW OHW OHW OHW OHW OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW
OHW OHW OHW OHW
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx x x x x x x x x x x x x xxxxxxxxxxxxxxxxxx
TILTON RD
0+
1+
2+
103+00
SD SD
SD SD
BASE BOUNDARY
xxx xxx xxx xxx xxx xxx xxx
POLE AND GUY WIRES TO
BE RELOCATED BY VERIZON
POLE AND GUY WIRES TO
BE RELOCATED BY VERIZON
SILT FENCE
SILT FENCE
SILT FENCE
SILT FENCE
2 -125 FT 18" REINFORCED
CONCRETE PIPE, CLASS V
N INV: 52.00
S INV:52.00
STORMWATER BASIN55
525354
54 54
EXISTING CVIF TO BE
REMOVED BY OTHERS
BID OPTION 4
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
SHEET NO.
© Copyright 2024 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
2440 Deming Way Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
ANG NO: AQRC169009
AQ
R
C
AT
LA
N
TI
C C
IT
Y, N J
11/01/2024 TYPE B3 FINAL
CG101
EROSION CONTROL
PLAN
SAH
DAY
JAK
X:
\4
\1
6.
\T
EC
H \C
AD
\B
1\
AT
EC
_C G
1.
D W
G
5/
/2
:5 3:
A
M
4498700-170096.01
NOVEMBER 1, 2024
00 20 40
3+
C
G
GENERAL NOTES:
1. SEED USED FOR TEMPORARY OR PERMANENT SEEDING SHALL BE ELITE
DWARF TURF TYPE TALL FESCUES PER THE CONTRACT SPECIFICATIONS
REQUIRED TO CONFORM WITH THE PORT'S WILDLIFE HAZARD
MANAGEMENT PLAN.
2. SLOPE TO RECEIVE TEMPORARY OR PERMANENT SEEDING SHALL HAVE
THE SURFACE ROUGHENED BY MEANS OF TRACK-WALKING OR THE USE
OF OTHER APPROVED IMPLEMENTS. SURFACE ROUGHENING IMPROVES
SEED BEDDING AND REDUCES RUN-OFF VELOCITY.
3. LONG TERM SLOPE STABILIZATION MEASURES SHALL INCLUDE THE
ESTABLISHMENT OF PERMANENT VEGETATIVE COVER VIA SEEDING WITH
APPROVED MIX AND APPLICATION RATE.
4. TEMPORARY SLOPE STABILIZATION MEASURES SHALL INCLUDE:
COVERING EXPOSED SOIL WITH PLASTIC SHEETING, STRAW MULCHING,
WOOD CHIPS, OR OTHER APPROVED MEASURES.
5. STOCKPILED SOIL OR STRIPPINGS SHALL BE PLACED IN A STABLE
LOCATION AND CONFIGURATION. DURING "WET WEATHER" PERIODS,
STOCKPILES SHALL BE COVERED WITH PLASTIC SHEETING OR STRAW
MULCH. SEDIMENT FENCE IS REQUIRED AROUND THE PERIMETER OF THE
STOCKPILE.
6. EXPOSED CUT OR FILL AREAS SHALL BE STABILIZED THROUGH THE USE
OF TEMPORARY SEEDING AND MULCHING, EROSION CONTROL BLANKETS
OR MATS, MID-SLOPE SEDIMENT FENCES OR WATTLES, OR OTHER
APPROPRIATE MEASURES. SLOPES EXCEEDING 25% MAY REQUIRE
ADDITIONAL EROSION CONTROL MEASURES.
7. AREAS SUBJECT TO WIND EROSION SHALL USE APPROPRIATE DUST
CONTROL MEASURES INCLUDING THE APPLICATION OF A FINE SPRAY OF
WATER, PLASTIC SHEETING, STRAW MULCHING, OR OTHER APPROVED
MEASURES.
8. CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF
CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES INCLUDING, BUT NOT LIMITED TO, TIRE WASHES,
STREET SWEEPING, AND VACUUMING MAY BE BE REQUIRED TO INSURE
THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE
PROJECT.
9. ACTIVE INLETS TO STORM WATER SYSTEMS SHALL BE PROTECTED
THROUGH THE USE OF APPROVED INLET PROTECTION MEASURES. ALL
INLET PROTECTION MEASURES ARE TO BE REGULARLY INSPECTED AND
MAINTAINED AS NEEDED.
10. SATURATED MATERIALS THAT ARE HAULED OFF-SITE MUST BE
TRANSPORTED IN WATER-TIGHT TRUCKS TO ELIMINATE SPILLAGE OF
SEDIMENT AND SEDIMENT-LADEN WATER.
11. AN AREA SHALL BE PROVIDED FOR THE WASHING OUT OF CONCRETE
TRUCKS IN A LOCATION THAT DOES NOT PROVIDE RUN-OFF THAT CAN
ENTER THE STORM WATER SYSTEM. IF THE CONCRETE WASH-OUT AREA
CAN NOT BE CONSTRUCTED GREATER THAN 50' FROM ANY DISCHARGE
POINT, SECONDARY MEASURES SUCH AS BERMS OR TEMPORARY
SETTLING PITS MAY BE REQUIRED. THE WASH-OUT SHALL BE LOCATED
WITHIN SIX FEET OF TRUCK ACCESS AND BE CLEANED WHEN IT REACHES
50% OF THE CAPACITY.
12. SWEEPINGS FROM EXPOSED AGGREGATE CONCRETE SHALL NOT BE
TRANSFERRED TO THE STORM WATER SYSTEM. SWEEPINGS SHALL BE
PICKED UP AND DISPOSED IN THE TRASH.
13. AVOID PAVING IN WET WEATHER WHEN PAVING CHEMICALS CAN RUN-OFF
INTO THE STORM WATER SYSTEM.
14. USE BMPs SUCH AS CHECK-DAMS, BERMS, AND INLET PROTECTION TO
PREVENT RUN-OFF FROM REACHING DISCHARGE POINTS.
15. COVER CATCH BASINS, MANHOLES, AND OTHER DISCHARGE POINTS WHEN
APPLYING SEAL COAT, TACK COAT, ETC. TO PREVENT INTRODUCING
THESE MATERIALS TO THE STORM WATER SYSTEM.
LEGEND
GRADING LIMITS
FLOW DIRECTION
EROSION MAT
STRUCTURE PROTECTION
SILT FENCE
DITCH CHECK
CONSTRUCTION
ENTRANCE STONE
AT
LA
N
TI
C C
IT
Y
AN
G
B
IN
ST
AL
LA
TI
O N
E N
TR
Y
C O
N
TR
O L
FA
C
IL
IT
Y
INSTALLATION NOTES:
1. THE CONTRACTOR SHALL PERFORM ALL WORK, FURNISH ALL
MATERIALS AND INSTALL ALL MEASURES REQUIRED TO REASONABLY
CONTROL SOIL EROSION RESULTING FROM CONSTRUCTION
OPERATIONS AND MINIMIZE LOSS OF SEDIMENT FROM THE
CONSTRUCTION SITE. THE CONTRACTOR SHALL ADHERE TO THE
CERTIFIED SOIL EROSION AND SEDIMENT CONTROL PLAN SHOWING THE
METHODS TO BE USED FOR CONTROLLING EROSION DURING
CONSTRUCTION WHICH INCLUDES SEQUENCE OF CONSTRUCTION
OPERATIONS. WHEN NO WORK WILL BE PERFORMED ON CRITICAL
AREAS FOR MORE THAN 14 DAYS, THEY SHALL BE PROTECTED BY
TEMPORARY SEEDING, MULCHING, OR SODDING, OR THE SLOPE
LENGTHS SHALL BE REDUCED BY THE INSTALLATION OF DIVERSIONS OR
OTHER MEANS.
2. THE CONTRACTOR SHALL INSTALL EROSION CONTROLS ON ALL
DISTURBED CRITICAL AREAS OR DISTURBANCES ADJACENT TO CRITICAL
AREAS.
3. CRITICAL AREAS ARE ANY AREA SUBJECT TO EXCESSIVE EROSION DUE
TO HIGHLY ERODIBLE SOILS, SLOPE LENGTH, STEEPNESS, WATER
CONCENTRATION OR OTHER FACTORS. AREAS MAY BECOME CRITICAL
WHEN THE VEGETATION OR OTHER SOIL SURFACE PROTECTION IS
REMOVED.
4. THE PERMANENT VEGETATIVE COVER SUCH AS SEEDING OR SODDING
ON ALL AREAS SHALL BE ACCOMPLISHED WITHIN 10 DAYS AFTER FINAL
GRADING OPERATIONS HAVE BEEN COMPLETED. TIME EXTENSIONS
BEYOND THE 10 DAY REQUIREMENT MAY BE REQUESTED IN WRITING
AND ARE SUBJECT TO WRITTEN APPROVAL.
6. EXCAVATED SOIL MATERIAL SHALL NOT BE PLACED ADJACENT TO
RIVERS, STREAMS OR BODIES OF WATER IN A MANNER THAT WILL
CAUSE IT TO BE WASHED AWAY BY HIGH WATER OR RUNOFF. EXCESS
BORROW MATERIAL REMOVED FROM THE CONSTRUCTION SITE SHALL
BE STABILIZED AT THE SITE OF PLACEMENT.
7. THE CONTRACTOR SHALL COMPLY WITH APPLICABLE STATE AND LOCAL
REGULATIONS FOR PREVENTION AND ABATEMENT OF POLLUTION.
MAINTENANCE NOTES:
1. ALL STRUCTURAL MEASURES FOR CONTROL
OF SOIL EROSION AND SEDIMENTATION MUST
HAVE TIMELY MAINTENANCE IF THE
MEASURES ARE TO ENDURE AND EFFICIENTLY
PERFORM THEIR DESIGN FUNCTION.
PARTICULAR ATTENTION SHOULD BE GIVEN
TO TEMPORARY STRUCTURES.
2. SEDIMENT BARRIERS SUCH AS SILT FENCE
CAN ACCUMULATE LARGE QUANTITIES OF
SEDIMENT, PARTICULARLY AFTER A HEAVY
STORM. THE SAME IS TRUE FOR STORM
SEWER INLET PROTECTION, WHICH SHOULD
BE FREQUENTLY INSPECTED FOR BLOCKAGE.
3. CONSTRUCTION ENTRANCES COMPOSED OF
LOOSE AGGREGATE MAY BECOME IMPACTED
WITH SEDIMENTS SCOURED FROM THE TIRES
OF CONSTRUCTION VEHICLES. WHEN SOIL
BEGINS TO TRACK ONTO PAVED SURFACES,
THE AGGREGATE MUST BE REPLACED OR
NEW AGGREGATE ADDED ON TOP OF THE OLD.
4. VEGETATIVE MAINTENANCE DURING
CONSTRUCTION SHALL CONSIST OF SEEDING,
MULCHING OR EROSION MAT INSTALLATION,
WATERING, AND RE-SEEDING AS NEEDED
UNTIL 70% VEGETIVE COVER IS ESTABLISHED.
CONSTRUCTION SEQUENCE:
1. INSTALL PERIMETER EROSION CONTROL AND STABILIZED
CONSTRUCTION ENTRANCE (2 DAYS)
2. DEMOLITION OF PAVEMENTS AND STRIPPING OF TOPSOIL ( 4 WEEKS)
3. ROUGH GRADE SITE AND INSTALL UNDERGROUND STORMWATER
ARCHES (6 WEEKS)
4. INSTALL UTILITIES ( 6 WEEKS)
5. INSTALL INLET PROTECTION (2 DAYS)
6. CONSTRUCT SITE (6 MONTHS)
7. INSTALL SEED AND EROSION MAT OF DISTURBED AREAS (2 DAYS)
8. REMOVE PERIMETER EROSION CONTROL (2 DAYS)
05/16/2025 ADDENDUM 22
11/01/2024
PRO
FESSI O NAL E N G I NE
No.
24GE05890500
S T
A T
E
O F N EW J ER
S
E Y
L I C E N S E D
E R
S C
O T
T A H A S B U
R G
H
LEVEL 1
100'-0"
LEVEL 1
100'-0"
CACBCCGAGB
T.O.S. CANOPY
120'-0"
T.O.S. CANOPY
120'-0"
A-302
10'-1 3/4" 5'-8" 76'-0"
41'-6" 34'-6"
A-302
A-302
A-302
T.O.S. GUARDHOUSE
110'-8"
T.O.S. GUARDHOUSE
110'-8"
CANOPY SOFFIT
117'-0"
CANOPY SOFFIT
117'-0"
A-202
A-203
CAST ALUMINUM
JERSEY DEVIL LOGO.
CENTERED ON
CONCRETE BARRIER.
LEVEL 1
100'-0"
C2
G3
C1
G4
C3
G2
T.O.S. CANOPY
120'-0"
G1
29'-0"
6'-0" 23'-0"
2'-10" 22'-9 3/4" 3'-4 1/4"
8'-4 1/2" 8'-4 1/2" 6'-0 3/4"
A-301
A-301
T.O.S. GUARDHOUSE
110'-8"
CANOPY SOFFIT
117'-0"
A-202
A-204
LEVEL 1
100'-0"
C2 C1C3
T.O.S. CANOPY
120'-0"
29'-0"
23'-0" 6'-0"
A-301
A-301
T.O.S. GUARDHOUSE
110'-8"
CANOPY SOFFIT
117'-0"
A-202
A-204
LEVEL 1
100'-0"
LEVEL 1
100'-0"
CA CB CC GA GB
T.O.S. CANOPY
120'-0"
T.O.S. CANOPY
120'-0"
A-302
10'-1 3/4"5'-8"76'-0"
41'-6"34'-6"
A-302
A-302
A-302
T.O.S. GUARDHOUSE
110'-8"
CANOPY SOFFIT
117'-0"
CANOPY SOFFIT
117'-0"
A-203
A-203
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
© Copyright 2024 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
14000 Quail Springs Parkway Suite 500
Oklahoma City, OK 73114 phone: 405-478-5353 benham.com
ISSUED
ANG NO.: AQRC169009
A Q
R C
/1
/2
:3
:4
P
M A u to d e s k D o c s /1
N
J A
N G
A P
E
C F
D e s ig n J
V R
/1
A
R C
H .r v t
A T
L A
N T
IC
C
IT
Y
A N
G B
IN
S
T A
L L A
T
IO
N E
N T
R Y
C O
N T
R O
L F
A C
IL
IT
Y
A-201
COMPOSITE BUILDING
ELEVATIONS
4498700-170096.01
S HUBERT
D RIDENOUR
NOVEMBER 01, 2024
M NOBERT
A T
L A
N T
IC
C
IT
Y
N
J
1/8" = 1'-0"1
COMPOSITE BUILDING ELEVATION - NORTH
1/8" = 1'-0"2
COMPOSITE BUILDING ELEVATION - EAST
1/8" = 1'-0"3
COMPOSITE BUILDING ELEVATION - WEST
1/8" = 1'-0"4
COMPOSITE SOUTH BUILDING ELEVATION - SOUTH 08' 4' 8' 16'
SCALE: 1/8" = 1'-0"
0 11/01/2024 TYPE B3 FINAL
CAST ALUMINUM JERSEY DEVIL LOGO:
MULTI-COLOR FINISHED CAST ALUMINUM LOGO
THAT INCLUDES PROJECTED MOUNTING IWTH
COLLARS AND THREADED STUDS SET IN
ADHESIVE. SIZE OF LOGO IS APPROXIMATELY
16"W x 24"H. IMAGE OF "JERSEY DEVIL" TO BE
GOVERNMENT PROVIDED.
05/16/2025 ADDENDUM 22
SPD
SPD
SPD
SPD
SPD
SPD
SPD
SPD
SPD
SPD
CAM-1
CAM-2
LPR-1
LPR-2
LPR-3
CAM-3
CAM-4
CAM-5
CAM-6
CAM-7
GUARDHOUSE
IDS PANEL
KAS
GUARDHOUSE
SECURITY CABINET
GUARDHOUSE
COMMUNICATIONS
CABINET
ITN BUILDING 27
BASE SECURITY
MONITORING CENTER
DOOR 101B
HSSDUR
DOOR 101A
HSS
DOOR 101C
HSS DUR
GUARDHOUSE
DURVOL
LANE 2 BARRIER
LANE 1 COLUMN
DUR
DUR
TRUCK INSPECTION LANE
DUR
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
© Copyright 2024 Mead & Hunt, Inc.
This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
14000 Quail Springs Parkway Suite 500
Oklahoma City, OK 73114 phone: 405-478-5353 benham.com
ISSUED
ANG NO.: AQRC169009
A Q
R C
/2 /2
:3
:0
A
M A u to d e s k D o c s /1
N
J A
N G
A P
E
C F
D e s ig n J
V R
/1
E
L E
C .r v t
A T
L A
N T
IC
C
IT
Y
A N
G B
IN
S
T A
L L A
T
IO
N E
N T
R Y
C O
N T
R O
L F
A C
IL
IT
Y
TY601
SECURITY ONE-LINES
4498700-170096.01
M. MOCAS
M. HENDERSON
NOVEMBER 1, 2024
M. HENDERSON
A T
L A
N T
IC
C
IT
Y
N
J
NONE
SECURITY SYSTEM ONE-LINE
SHEET KEYED NOTES:
NOT ALL KEYED NOTES ARE USED ON THIS SHEET
1. PATHWAY AND FIBER PROVIDED BY THE COMMUNICATIONS CONTRACTOR.
2. EXISTING PATHWAYS AND EXISTING FIBER.
3. PROVIDE CAT6 PATHWAY FROM EACH CAMERA TO GUARDHOUSE SECURITY CABINET.
4. PROVIDE PATHWAY FOR CAT6.
XX
CAMERA NUMBER DESCRIPTION OF VIEW
IMPACTED ROADWAY INTERSECTION
APPROACH ZONE OVERWATCH
RESPONSE ZONE
CAM-1
CAM-2
CAM-3
APPROACH ZONE OVERWATCHCAM-4
LANE 1 OPERATIONS AT ID CHECKCAM-5
LANE 2 OPERATIONS AT ID CHECKCAM-6
RESPONSE ZONECAM-7
LEGEND
SPD SURGE PROTECTION DEVICE
3 4
LICENSE PLATE READERLPR-1
LICENSE PLATE READERLPR-2
LICENSE PLATE READERLPR-3
11/01/2024 TYPE B3 FINAL
05/16/2025 ADDENDUM 22
| NJ ECF Addendum 2 |
| CG101 |
| Sheet 1 |
| A-201_20250510 |
| A-201 - COMPOSITE BUILDING ELEVATIONS |
File details come from the government source that posted it. Updated .