PreBidSlides_W50S87-23-B-0001 Repair Building 51.pptx

PPTX presentation 1001 KB Posted

Attached to
Repair Building 51
Solicitation number
W50S87-23-B-0001
Issued by

View the file

Other files

File Type Posted
Bid Opening Sign-in Sheet.jpg JPG image
OF 1419 Abstract signed.pdf PDF
Questions and Answers 07102023.pdf PDF
Amendment 0001.pdf PDF
Pre-bid signin sheet.jpg JPG image
Pre Bid Sign in sheet.jpg JPG image
ATTACHMENT 13 BRAND NAME JUSTIFICATION Monaco Fire Alarm Trasceiver redacted.pdf PDF
ATTACHMENT 1 SPECS REPAIR BUILDING 51 FJRP112701 dated 20 July 2022 Vol 1 of 4 502 pages.pdf PDF
ATTACHMENT 7 DRAWINGS 145 AW Repair Maint. Hangar Building 51 dated 20 July 2022 Vol 3.pdf PDF
ATTACHMENT 12 BRAND NAME JUSTIFICATION Interior and Exterior Finishes redacted.pdf PDF
ATTACHMENT 18 145 AW CONTRACTOR SECURITY GUIDE.pdf PDF
ATTACHMENT 5 DRAWINGS 145 AW Repair Maint. Hangar Building 51 dated 20 July 2022 Vol 1.pdf PDF
ATTACHMENT 16 PREBID CONFERENCE SITE VISIT and BID DROP OFF MAP.pdf PDF
W50S87-23-B-0001.pdf PDF
ATTACHMENT 19 145 AW CONTRACTOR ENVIRONMENTAL GUIDE.pdf PDF
ATTACHMENT 17 145 AW CONTRACTOR SAFETY GUIDE.pdf PDF
ATTACHMENT 9 SOW Repair Bldg 51 dated 6 November 2022.pdf PDF
ATTACHMENT 8 DRAWINGS 145 AW Repair Maint. Hangar Building 51 dated 20 July 2022 Vol 4.pdf PDF
ATTACHMENT 3 SPECS REPAIR BUILDING 51 FJRP112701 dated 20 July 2022 Vol 3 of 4 490 pages.pdf PDF
ATTACHMENT 15 VISITOR REQUEST WORKSHEET.pdf PDF
ATTACHMENT 4 SPECS REPAIR BUILDING 51 FJRP112701 dated 20 July 2022 Vol 4 of 4 444 pages.pdf PDF
ATTACHMENT 11 BRAND NAME JUSTIFICATION Alerton Direct Digital Controls redacted.pdf PDF
ATTACHMENT 6 DRAWINGS 145 AW Repair Maint. Hangar Building 51 dated 20 July 2022 Vol 2.pdf PDF
ATTACHMENT 10 BRAND NAME JUSTIFICATION - Best Door hardware redacted.pdf PDF
ATTACHMENT 14 BRAND NAME JUSTIFICATION- Sika Sarnafil PVC Roof Membrane redacted.pdf PDF
ATTACHMENT 2 SPECS REPAIR BUILDING 51 FJRP112701 dated 20 July 2022 Vol 2 of 4 542 pages.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15 June 2023 Pre-Bid Conference/Site Visit

Solicitation Number W50S87-23-B-0001

Repair Building 51

Agenda Introduction Administrative Items Process for Questions and Answers Project Overview Solicitation, Plans, Specifications and Amendments Invitation for Bid Basics and Bid Requirements Site Visit to follow conference

Introduction SMSgt Bryant K Alexander – Contracting Officer Capt Zachary D Leddy

LTC James Eaton – Contracting Officer’s Representative (COR) Mr. Hanson Pedersen – COR

Administrative items- Attendance Roster Ensure you sign in on the attendance roster

We will post this roster to www.sam.gov in order to facilitate communication between potential subs and prime contractors

A site visit will follow this presentation

Any questions you have during the site visit should be sent in writing for an official response in accordance with the solicitation.

Submit questions to SMSgt Bryant K Alexander. See Section 00100 for instructions.

Questions and official answers will be posted on a non-attribution basis with solicitation information at www.sam.gov

Submit questions NLT 7 business days prior to bid opening. Do not contact the A/E or any Gov engineering personnel directly.

Amendments will be only issued only if there is a change in the solicitation, specifications, or plans

Process for Questions and Answers

Project Overview A Firm Fixed Price contract will be awarded Invitation for Bid Procedures (FAR Part 14) Small Business Set-Aside

NAICS: 236220

Period of Performance: 540 calendar days after Notice to Proceed (NTP) is issued. Important – Several phases NTP will be issued after approval of Performance and Payment Bonds and all required pre-construction submittals CLINs: 1- 6 (3 thru 6 are Options) Details described in Statement of Work(SOW)

Solicitation, Plans, Specifications and Amendments Located on the Contract Opportunities portion of the www.sam.gov website

The Government is not liable for information furnished by any other source

Amendments (SF30) will be posted to www.sam.gov. It is the offerors responsibility to check the website periodically for any amendments to the solicitation.

Bid Requirements What you must submit (see Section 00010) SF 1442, (Blocks 14-20c) Do not enter less than 90 days in Block 17 Section 00010, Bid Schedule- all items must be priced IAW Clause 252.236-7008, Contract Prices- Bidding Schedules. The prices shown in the Bidding Schedule must reflect ALL costs involved in performing the work, as described in the plans, specifications, and statement of work.

Section 00600, Reps and Certs In addition, the offeror must have entered current and complete data within the past year in Online Representations and Certifications at www.sam.gov. Provisions at 52.204-26 and 252.204-7016. If answer is “does,” need to fill out provisions at 52.204-24 and 252.204-7017. Recommend updating in SAM registration.

Acknowledge all Amendments (SF 30) Bid Bond (Standard Form 24, 20%) and Power of Attorney

The bid opening will occur at the time and date specified in Block 13 of the SF1442 at 4930 Minuteman Way, Charlotte, NC 28208 (map included in solicitation attachments).

Hand Carried Bids - must be deposited in the repository prior to the time established for opening of bids.

Mailed bids - must be received at the location specified in block 7 of the SF1442 prior to the time established for opening of bids.

Repository and Mailing Address: 4930 Minuteman Way, Charlotte, NC 28208. Bid are due 6 July 2023 at 1pm. Attention: Contracting Office, SMSgt Bryant K Alexander Late receipt of bids due to entry delays may not be deemed excusable and the Contracting Officer may declare the bid “late” in accordance with FAR 14.304 and in accordance with clause 52.214-7.

Bid Requirements- Bid Submission

Invitation for Bids Procedures What to expect at the Bid Opening Bid opening officer (BOO) will announce exact time bids are due and that no more bids will be accepted

Bids are opened and read out loud with no discussion or comment on responsiveness (FAR 14.301) of bids, and recorded

BOO opens Government estimate, records

Abstract will be certified and posted to www.sam.gov as soon as practical.

Invitation for Bids Procedures Determination of Responsibility IMPORTANT: Refer to the solicitation and FAR Part 9 for details A bidder is determined to be responsible in accordance with FAR 9.104

After bids are publicly opened, an award will be made with reasonable promptness to that responsible bidder whose bid, conforming to the invitation for bids, will be most advantageous to the Government, considering only price.

To establish its responsibility, the apparent low bidder will be requested by the Government prior to award, to submit a statement/documents regarding his previous experience in performing comparable work, his business and technical organization, financial and bonding resources and plant available to be used in performing the work.

Break for site walk thru image5.png image2.jpeg image1.jpeg image3.png image4.png