W50S87-21-B-5003-0002.pdf
PDF 372 KB Posted
- Attached to
- Munitions Storage Area (MSA) Expansion Federal contract opportunity
- Solicitation number
- W50S87-21-B-5003
About this file
This is an amendment to a solicitation for a Munitions Storage Area expansion project. The amendment revises drawings, includes information sheets for epoxy coating, and adds questions and answers documents as attachments. The project involves expanding an existing Munitions Storage Area for the North Carolina Army National Guard. The pre-bid conference was held on May 27, 2021, and the solicitation includes drawings, specifications, a statement of work, geotechnical report, and safety and security requirements. Product and construction details can be found in the revised drawings and specifications. The solicitation is seeking bids and was issued by the U.S. Property and Fiscal Office for the North Carolina Mission Support Group on behalf of the Department of the Army North Carolina Army National Guard.
View the file
Other files for this federal contract opportunity
Show all 28
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FJRP189050
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to include revised draw ings CD101, C101, C102, C103, S101, S102, S103, S601, ED101, ES101, and E602. Additionally, information sheets for epoxy coating are included. A questions and answ ers document is also included.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 11-Jun-2021
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W50S8721B5003
X 9B. DATED (SEE ITEM 11)
14-May-2021
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
11-Jun-2021
CODE
USPFO NC MISSION SUPPORT GROUP CONTRACTI
4930 MINUTEMAN WAY
CHARLOTTE NC 28208
W50S87 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W50S8721B5003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0002
The purpose of this amendment is to include revised drawings CD101, C101, C102, C103, S101, S102, S103, S601, ED101, ES101, and E602. Additionally, information sheets for epoxy coating are included. A questions and answers document is also included.
SECTION 00010 - SOLICITATION CONTRACT FORM
TABLE OF CONTENTS
The Table of Contents has changed from:
SECTION 00010 Solicitation Contract Form
SOLICITATION, OFFER, AND AWARD SF 1442 and SF 1442 BACK
SECTION 00010 – BID SCHEDULE, NOTES
SECTION 00100 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
SECTION 00700 – CONTRACT CLAUSES
SECTION 00800 – SPECIAL CONTRACT REQUIREMENTS
ATTACHMENT 1 – Drawings Vol 1 of 2, Project #FJRP189050 dated April 5, 2021, 29 pages ATTACHMENT 2 – Drawings Vol 2 of 2, Project #FJRP189050 dated April 5, 2021, 24 pages ATTACHMENT 3 – Specifications, Project #FJRP189050 dated April 5, 2021, 829 pages ATTACHMENT 4 – Statement of work dated 10 February 2021, 7 pages ATTACHMENT 5 – Report of geotechnical subsurface exploration dated December 21, 2018, 33 pages ATTACHMENT 6 – Visitor Request Worksheet, 2 pages ATTACHMENT 7 – Pre-bid conference/site visit and bid drop-off map, 2 pages ATTACHMENT 8 – Brand name justification - Alerton, 4 pages ATTACHMENT 9 – Brand name justification - Best, 4 pages ATTACHMENT 10 – Brand name justification – Various interior/exterior finishes, 7 pages ATTACHMENT 11 – Brand name justification - Monaco, 4 pages ATTACHMENT 12 – 145 AW Contractor safety guide, 4 pages ATTACHMENT 13 – 145 AW Contractor security guide, 10 pages to:
SECTION 00100 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
ATTACHMENT 3 – Specifications, Project #FJRP189050 dated April 5, 2021, 829 pages ATTACHMENT 4 – Statement of work dated 10 February 2021, 7 pages ATTACHMENT 5 – Report of geotechnical subsurface exploration dated December 21, 2018, 33 pages ATTACHMENT 6 – Visitor Request Worksheet, 2 pages ATTACHMENT 7 – Pre-bid conference/site visit and bid drop-off map, 2 pages ATTACHMENT 8 – Brand name justification - Alerton, 4 pages ATTACHMENT 9 – Brand name justification - Best, 4 pages ATTACHMENT 10 – Brand name justification – Various interior/exterior finishes, 7 pages ATTACHMENT 11 – Brand name justification - Monaco, 4 pages ATTACHMENT 12 – 145 AW Contractor safety guide, 4 pages ATTACHMENT 13 – 145 AW Contractor security guide, 10 pages ATTACHMENT 14 – Questions and Answers1 dated 8 June 2021, 4 pages ATTACHMENT 15 – Questions and Answers2 dated 11 June 2021, 2 pages
The following have been modified:
SECTION 00100 – INSTRUCTIONS, CONDITIONS AND NOTICES TO OFFERORS
SECTION 00600 – REPRESENTATIONS & CERTIFICATIONS
ATTACHMENT 3 – Specifications, Project #FJRP189050 dated April 5, 2021, 829 pages ATTACHMENT 4 – Statement of work dated 10 February 2021, 7 pages ATTACHMENT 5 – Report of geotechnical subsurface exploration dated December 21, 2018, 33 pages ATTACHMENT 6 – Visitor Request Worksheet, 2 pages ATTACHMENT 7 – Pre-bid conference/site visit and bid drop-off map, 2 pages ATTACHMENT 8 – Brand name justification - Alerton, 4 pages ATTACHMENT 9 – Brand name justification - Best, 4 pages ATTACHMENT 10 – Brand name justification – Various interior/exterior finishes, 7 pages
ATTACHMENT 11 – Brand name justification - Monaco, 4 pages ATTACHMENT 12 – 145 AW Contractor safety guide, 4 pages ATTACHMENT 13 – 145 AW Contractor security guide, 10 pages ATTACHMENT 14 – Questions and Answers1 dated 8 June 2021, 4 pages ATTACHMENT 15 – Questions and Answers2 dated 11 June 2021, 2 pages
(End of Summary of Changes)